Info Proyek
nama | alamat | nama_kecamatan | nama_badan_usaha | jenis_kegiatan | tahun | nilai |
---|---|---|---|---|---|---|
2019-CAPEX PROJECT-CONNECT POWER SUPPLY FROM JETTY TRANSFORMER TO DOCK 8 INCLUDING TRANSFORMER & EQUIPMENTS | JL. BRIGJEN KATAMSO (BUNDARAN), TANJUNG UNCANG | BATU AJI | - | - | - | 2.939.300.000 |
ADDITIONAL CANOPY WITH OVERHEAD CRANE STRUCTURE | JL. HANG KESTURI I NO. 2 | NONGSA | - | - | - | 458.398.165 |
ANNUAL SERVICING HT SWITCHGEAR AT BATAMINDO INDUSTRIAL PARK | BATAMINDO INDUSTRIAL PARK | SEI BEDUK | - | - | - | 950.000.000 |
ANNUAL SERVICING YEAR 2020 | BATAMINDO INDUSTRIAL PARK | SEI BEDUK | - | - | - | 170.000.000 |
ARCHITECTURAL WORKS IN PARTICULAR METAL ROOF SYSTEM, WALL CLADDING SYSTEM AND BELLYPAN INSTALLATION | JALAN BRIGJEN KATAMSO KM 5 TANJUNG UNCANG | BATU AJI | - | - | - | 2.800.000.000 |
BACKFILLING FOR 30 MW BALOI GAS POWER PLANT PROJECT | JL SUDIRMAN , SUKAJADI KEC BATAM KOTA | BATAM KOTA | - | - | - | 400.000.000 |
BEKISTING BALOK DAN PLAT LANTAI | JL RE MARTADINATA NO 01 SEKUPANG | SEKUPANG | - | - | - | 2.617.000.000 |
BONGKAR PASANG ATAP SPANDEK , CNP GORDING , TALI ANGIN , RAFTER & PENINGGIAN ATAP BAGHOUSE | JL BIRGJEND KATAMSO KM 6 NO 9 RT 005/RW 001 TANJUNG UNCANG | BATU AJI | - | - | - | 350.000.000 |
CITRA PLAZA NAGOYA BATAM, PAKET PEKERJAAN PEMASANGAN PINTU BESI | KOMP. NAGOYA CITYWALK BLOK NORTHWALK A NO. 1 KEPULAUAN RIAU KOTA BATAM | LUBUK BAJA | - | - | - | 1.619.320.000 |
CLUSTER PHOENIX NO. 1, 3, 5 & 7 | PERUMAHAN TAMAN KURNIA DJAJA ALAM, BATAM CENTRE | BATAM KOTA | - | - | - | 100.402.000 |
CONSTRUCT OF TWO STOREY NEW OFFICE BUILDING | MC DERMOTT | BATU AMPAR | - | - | - | 12.822.449.020 |
CONSTRUCT OF TWO STOREY NEW OFFICE BUILDING | MC DERMOTT INDONESIA | BATU AMPAR | - | - | - | 12.822.449.020 |
COR LANTAI TEMPAT PENYIMPANAN TRAFO BEKAS | PLTD BATU AMPAR PT PLN BATAM | BATU AMPAR | - | - | - | 122.858.000 |
DAK FISIK BIDANG PENDIDIKAN TAHUN ANGGARAN 2020 | PERUM SEKAWAN PEMKO KELURAHAN BELIAN | - | - | - | - | 945.000.000 |
DRAINASE KELURAHAN TANJUNG BUNTUNG RT.1/RW.7 | KECAMATAN BENGKONG | - | - | - | - | 149.636.364 |
DRAINASE KOMPLEK BUKIT MAS RT 02 RW 04 KEL. LUBUK BAJA (POKMAS BUKIT MAS II) | KOMPLEK BUKIT MAS RT 02 RW 04 KEL. LUBUK BAJA | - | - | - | - | 34.971.000 |
DRAINASE RT 03 RW 03 KAMP.TANJUNG (POKMAS DAU TG SARI II) | RT 03 RW 03 KAMP.TANJUNG | - | - | - | - | 22.996.655 |
DRAINASE U 30 FASUM PERUM PURI RHABAYU RT 008 RW 015 POKMAS LESTARI 5 | RT 008 RW 015 KELURAHAN PATAM LESTARI | - | - | - | - | 37.334.000 |
DRAINASE U 30 FASUM PERUM PURI RHABAYU RT 008 RW 015 POKMAS LESTARI 6 | RT 008 RW 015 KELURAHAN PATAM LESTARI | - | - | - | - | 19.178.500 |
DRAINASE U 40 PATAM ASRI RT 006 RW 001 POKMAS LESTARI 7 | RT 006 RW 001 KELURAHAN PATAM LESTARI | - | - | - | - | 47.296.700 |
DRAINASE U30 RT 01 RW 01 (POKMAS PEPAYA) | RT 01 RW 01 KEL. TIBAN LAMA | - | - | - | - | 11.777.000 |
DRAINASE U30 RT 01 RW 12 (POKMAS KEDONDONG) | RT 01 RW 12 KEL. TIBAN LAMA | - | - | - | - | 44.606.000 |
DRAINASE U30 RT 02 RW 13 (POKMAS NANAS III) | RT 02 RW 13 | - | - | - | - | 12.060.000 |
DRAINASE U30 RT 06 RW 12 (POKMAS KEDONDONG VII) | RT 06 RW 12 KEL. TIBAN LAMA | - | - | - | - | 9.098.000 |
DRAINASE U30 SAMPING PANIN BANK JL. TEUKU UMAR RT.003 RW.001 (POKMAS UTAMA ATAS II) | SAMPING PANIN BANK JL. TEUKU UMAR RT.003 RW.001 | - | - | - | - | 12.927.000 |
DRAINASE U40 JL.MUARA TAKUS RT 01 RW 05 (POKMAS KAMPUNG SERAYA I) | JL.MUARA TAKUS RT 01 RW 05 KEL KAMPUNG SERAYA | - | - | - | - | 24.495.000 |
DRAINASE U40 JL.MUARA TAKUS RT 02 RW 02 | JL.MUARA TAKUS RT 02 RW 02 (POKMAS KAMPUNG SERAYA II) | - | - | - | - | 20.977.916 |
DRAINASE U40 PERUM ASPOL BALOI RT 01 RW 02, 29 M (POKMAS SUKAJADI MAJU 1) | PERUM ASPOL BALOI RT 01 RW 02, 29 M | - | - | - | - | 11.582.000 |
DRAINASE U40 PERUM MARINA RAYA RT 07 RW 13 (POKMAS MARINA RAYA) | RT 07 RW 13 KEL. TANJUNG RIAU | - | - | - | - | 41.144.000 |
DRAINASE U40 RT 01 RW 07 (POKMAS STRAWBERY II) | RT 01 RW 07 KEL. TIBAN LAMA | - | - | - | - | 10.468.000 |
DRAINASE U40 RT 02 RW 03 (POKMAS BELIMBING III) | RT 02 RW 03 KEL. TIBAN LAMA | - | - | - | - | 20.655.000 |
DRAINASE U40 RT 02 RW 11 POKMAS SALAK 1 | RT 02 RW 11 KELURAHAN TIBAN LAMA | - | - | - | - | 26.681.600 |
DRAINASE U40 RT 03 RW 01 (POKMAS PEPAYA VI) | RT 03 RW 01 KEL. TIBAN LAMA | - | - | - | - | 11.726.000 |
DRAINASE U40 RT 03 RW 12 (POKMAS KEDONDONG VI) | RT 03 RW 12 KEL. TIBAN LAMA | - | - | - | - | 18.514.000 |
DRAINASE U40 RT 04 RW 011 POKMAS SALAK 2 | RT 04 RW 11 KELURAHAN TIBAN LAMA | - | - | - | - | 25.117.400 |
DRAINASE U40 RT 04 RW 12 (POKMAS KEDONDONG VIII) | RT 04 RW 12 KEL. TIBAN LAMA | - | - | - | - | 24.345.000 |
ELECTRICITY POWER ENGINEERING OF LOT 11 | JL. BERINGIN LOT 11 BATAMINDO, MUKA KUNING | - | - | - | - | 1.669.800.000 |
EXPANSION AREA MANUAL ELECTRO PLATING (CONCRETE & TRYPAN) | JL HANG KESTURI I NO 2 | - | - | - | - | 28.761.000 |
FINISHING DAPUR DAN TOILET PADA FACTORY IKAYU, KAWASAN PANBIL INDUSTRIAL | MUKA KUNING | - | - | - | - | 26.150.000 |
FINISHING DINDING DI VILLA PANBIL BLOK AA NO. 02 KAWASAN VILLA PANBIL | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 201.681.376 |
FIRE ALARM ENGINEERING OF LOT 2 | JL. BERINGIN LOT 2, BATAMINDO, MUKA KUNING | - | - | - | - | 446.200.000 |
FIRE ALARM PTB_LOT 21 PHASE 1 | LOT 21 PHASE 1 KAWASAN BIC MUKA KUNING | - | - | - | - | 195.000.000 |
GALERY DAN FOODCOURT | RT. 001/RW.003 KEL. DURIANGKANG, KEC. SUNGAI BEDUK | - | - | - | - | 1.000.000.000 |
GEDUNG SERBA GUNA HAPPY GARDEN RT 03 RW 09 (HAPPY GARDEN 2) | RT 1 / RW 5 BATU SELICIN | - | - | - | - | 99.997.000 |
GEDUNG SERBA GUNA PERUM WINDSOR PHASE 3 RT 04 RW 09 (WINDSOR PHASE 1) | RT 1 / RW 5 BATU SELICIN | - | - | - | - | 99.997.000 |
GEDUNG SERBA GUNA RT 02 RW 11 BENGKONG POLISI (DAHLIA DAU 1) | RT 2 / RW 11 TANJUNG BUNTUNG | - | - | - | - | 99.869.000 |
GEDUNG SERBAGUNA RT 01 RW 04 (POKMAS PELITA 1) | RT 1 / RW 4 KAMPUNG PELITA | - | - | - | - | 99.997.000 |
GEDUNG SERBAGUNA RT 03 RW 02 (POKMAS PELITA 3) | RT 3 / RW 2 KAMPUNG PELITA | - | - | - | - | 99.997.000 |
HEADER PIPING SET FOR COMPRESSOR & DRYER 1-6 | KAWASAN INDUSTRIAL TUNAS BLOK 4-C JL ENGKU PUTRI BATAM CENTRE 29461 | - | - | - | - | 951.874.000 |
HT SUBSTATION MSB ROOM AND TENANTS SWITCHROOM LOT 209 POWER UPGRADING WORKS ON LOT 209 | BATAMINDO INDUSTRIAL PARK | - | - | - | - | 1.020.000.000 |
HULL 063 (PEKERJAAN : FABRICATION, WELDING, FIT UP, ERECTION, OUTFITTING) | PT. LAUTAN LESTARI SHIPYARD, KAVLING 20 KEL. SUNGAI LEKOP, KEC. SAGULUNG | - | - | - | - | 330.000.000 |
HULL 064 (PEKERJAAN : FABRICATION, WELDING, FIT UP, ERECTION, OUTFITTING) | PT. LAUTAN LESTARI SHIPYARD, KAVLING 20 KEL. SUNGAI LEKOP, KEC. SAGULUNG | - | - | - | - | 330.000.000 |
INSPECTOR TRANSMISSION LINE 150KV | PLN BATAM | - | - | - | - | 476.415.512 |
INSPECTOR TRANSMISSION LINE 150KV | AREA BATAM | - | - | - | - | 492.237.000 |
INSTALASI PENGOLAHAN LIMBAH PUSKESMAS BERAKIT, KIJANG, KUALA SEMPANG DAN TOAPAYA | DINAS KESEHATAN KABUPATEN BINTAN JL. RAYA TANJUNG PINANG - TANJUNG UBAN KM 42, BANDAR SERI BENTAN | - | - | - | - | 1.469.714.473 |
INSTALATION FIRE PROTECTION SYSTEM BAY 6 | JL BRIGJEN KATAMSO KM 6 TANJUNG UNCANG | - | - | - | - | 2.497.000.000 |
JAKON BATAM (0410598 / 40976699102) | KOTA BATAM | - | - | - | - | 43.750.000 |
JALAN PERUM VILLA SEMPURNA I BLK H1 POKMAS MUJAIR | RT 003 RW 011 KELURAHAN TIBAN INDAH | - | - | - | - | 42.212.500 |
JARINGAN PIPA TRANSMISI WADUK TEMBERSI - WADUK MUKA KUNING | TEMBESI | - | - | - | - | 44.929.430.731 |
JERAMBAH (DEPAN RUMAH SDRI. LIZA - DEPAN JALAN SURAU ABDULLAH RT. 003/RW. 003 KAMPUNG TANJUNG) (POKMAS DAU TG SARI I) | JERAMBAH (DEPAN RUMAH SDRI. LIZA - DEPAN JALAN SURAU ABDULLAH RT. 003/RW. 003 KAMPUNG TANJUNG) | - | - | - | - | 134.719.236 |
JERAMBAH BETON (PAK HUZRIN) PULAU SARANG RT 02 RW 06 (POKMAS DAU 3 SEKANAK RAYA) | PULAU SARANG RT 02 RW 06 KEL. SEKANAK RAYA | - | - | - | - | 91.501.174 |
JERAMBAH BETON LANJUTAN KAMPUNG BUGIS BATU GAJAH RT 01 RW 01 (POKMAS DAU 2 SEKANAK RAYA) | KAMPUNG BUGIS BATU GAJAH RT 01 RW 01 KEL. SEKANAK RAYA | - | - | - | - | 181.360.511 |
JERAMBAH BETON RT 02 RW 03 (ANGGREK 12) | RT 2 / RW 3 TANJUNG UMA | - | - | - | - | 169.980.000 |
MALL & TOWER PHASE 1 MEISTERTADT BATAM | SEI PANAS | - | - | - | - | 999.500.000.000 |
NEW CONSTRUCTION LAND EX DORMITORY I,J,K & L - BIC - NEW CONSTRUCTION OF 4 LOTS TYPE E FACTORY FOR P | KOMPLEK KAWASAN BATAMINDO MUKA KUNING | - | - | - | - | 53.680.000.000 |
NEW TYPE E FACTORY FOR PT SIMATELEX PROJECT BATAMINDO INDUSTRIAL PARK - ELECTRICAL RETICULATION WORK | BATAMINDO INDUSTRIAL PARK | - | - | - | - | 20.400.000.000 |
NEW WAREHOUSE HYDRILL BUILDING AT TENARIS HYDRILL | JL. HANG KESTURI KAV. 23-24, KABIL | - | - | - | - | 1.475.082.822 |
OZON HOTEL INTERNATIONAL - BATAM | OZON HOTEL BATAM | - | - | - | - | 73.260.000 |
PEKERJAAN ARSITEKTUR PROYEK HOTEL GRAND MERCURE BATAM CENTER | BATAM CENTER | - | - | - | - | 39.863.636.364 |
PEKERJAAN ARSITEKTUR UNTUK PROYEK FORMOSA RESIDENCE | JL. PEMBANGUNAN KOMP. CITY PLAZA FORMOSA HOTEL BLOK G NO 1-2 | - | - | - | - | 4.500.000.000 |
PEKERJAAN BESI FABRICATION & ERECTION DALAM PEMBANGUNAN GEDUNG INDUSTRI TYPE C 798 | KAWASAN BINTANG INDUSTRI II TYPE C 798 - TANJUNG UNCANG | - | - | - | - | 265.195.068 |
PEKERJAAN BESI FABRICATION & ERECTION DALAM PEMBANGUNAN GEDUNG INDUSTRI TYPE C 799 | KAWASAN BINTANG INDUSTRI II TYPE C 799 - TANJUNG UNCANG | - | - | - | - | 238.070.227 |
PEKERJAAN BESI FABRICATION & ERECTION DALAM PEMBANGUNAN GEDUNG INDUSTRI TYPE C 800 | KAWASAN BINTANG INDUSTRI II TYPE C 800 - TANJUNG UNCANG | - | - | - | - | 266.535.750 |
PEKERJAAN BORED PILE | BALOI APARTMENT - BATAM | - | - | - | - | 5.020.977.559 |
PEKERJAAN BORED PILE HOTEL HUANG HI - BATAM | NAGOYA | - | - | - | - | 11.000.000.000 |
PEKERJAAN BORED PILE PROYEK PLTMG 30 MW BALOI BATAM | BALOI | - | - | - | - | 1.180.818.000 |
PEKERJAAN ELEKTRIKAL RUSUN TAHAP II BLOK J KAWASAN INDUSTRI PANBIL | KAWASAN INDUSTRI PANBIL | - | - | - | - | 197.000.000 |
PEKERJAAN ERECTION HANGGAR REIDSTEEL | HANGGAR PT. BATAM AERO TEKNIK KAWASAN BANDAR UDARA HANG NADIM, BATU BESAR NONGSA | - | - | - | - | 20.380.000.000 |
PEKERJAAN FINISHING (AS 15/A-F, AS F/8-15, A/8-15) FACTORY A LOT 03 | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 127.072.090 |
PEKERJAAN FINISHING AS 1/A-F, AS F/1-8, AS A/1-8) FACTORY A LOT 03 | KAWASAN VILLA PANBIL MUKA KUNING | - | - | - | - | 241.179.560 |
PEKERJAAN FINISHING LANTAI 1 DI RUSUN TAHAP II BLOK J | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 157.730.164 |
PEKERJAAN FINISHING RUSUN TAHAP-II BLOK H | KAWASAN PANBIL INDUSTRIAL MUKA KUNING | - | - | - | - | 502.102.638 |
PEKERJAAN INSTALASI ELEKTRIKAL DI FACTORY IKAYU PHASE II. KAWASAN PANBIL INDUSTRIAL | MUKA KUNING | - | - | - | - | 90.000.000 |
PEKERJAAN KONSTRUKSI BAJA 22 UNIT TANGKI PADA PROYEK OLEIC ACID PLANT, BERLOKASI DI PT MUSIM MAS | PT. MUSIM MAS BATAM, PELABUHAN KABIL | - | - | - | - | 3.350.000.000 |
PEKERJAAN KONSTRUKSI BAJA BANGUNAN FATTY ACID PADA PROYEK MS94 (BTMB-MS94) | RAYA PELABUHAN CPO KABIL, KABIL, NONGSA | - | - | - | - | 4.652.900.000 |
PEKERJAAN KONSTRUKSI BAJA BOILER 35 TPH & COAL WAREHOUSE PADA PROYEK MS94 | PELABUHAN KABIL BATAM | - | - | - | - | 3.258.500.000 |
PEKERJAAN KONSTRUKSI BAJA TANK FARM REPAIR MS TANK CAP 2500M WITH STEAM COIL | PT. MUSIM MAS, BELAWAN | - | - | - | - | 2.656.800.000 |
PEKERJAAN PANCANG PHASE 1 | BATAM CENTER | - | - | - | - | 1.914.000.000 |
PEKERJAAN PEMANCANGAN SHEET PILE DAN RC PILE (ONSHORE) PROYEK PEMBANGUNAN JETTY | TANJUNG UNCANG | - | - | - | - | 2.164.755.000 |
PEKERJAAN PEMANCANGAN TIANG PANCANG SPUN PILE, STEEL PILE DAN RC PILE PADA PEMBANGUNAN DERMAGA PELABUHAN DI KAWASAN COASTAL AREA | TANJUNG BALAI KARIMUN | - | - | - | - | 2.331.820.000 |
PEKERJAAN PEMASANGAN BATU KALI DI SALURAN ALAM AA.21.KAWASAN VILLA PANBIL | MUKA KUNING | - | - | - | - | 59.000.000 |
PEKERJAAN PEMASANGAN KERAMIK AREA BUNDARAN PATUNG BUNDA MARIA KAWASAN WISATA ROHANI KAMPUNG VIETNAM, PULAU GALANG - BATAM | AREA BUNDARAN PATUNG BUNDA MARIA KAWASAN WISATA ROHANI KAMPUNG VIETNAM, PULAU GALANG - BATAM | - | - | - | - | 155.562.840 |
PEKERJAAN PEMASANGAN PINTU KAYU PROYEK: CITRA PLAZA NAGOYA BATAM | KOMP. NAGOYA CITYWALK BLOK NORTHWALK A NO. 01, LUBUK BAJA | - | - | - | - | 2.311.325.030 |
PEKERJAAN PEMBANGUNAN GUDANG TYPE H LOT 20 | HORIZON INDUSTRIAL PARK | - | - | - | - | 5.200.000.000 |
PEKERJAAN PEMBERSIHAN, PERBAIKAN, PEMASANGAN KERAMIK, CARPORT DI RENOVASI VILLA PANBIL BLOK S NO. 17 | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 11.296.000 |
PEKERJAAN PEMBONGKARAN ATAP DAN DINDING SERTA PEKERJAAN SIPIL PEMBANGUNAN AUDITORIUM, SHAFT LIFT DAN KANTOR AREA DI PROJECT RENOVASI SHOWROOM RIWAY INDONESIA-BATAM | BATAM CENTRE JL. AHMAD, TLK KERING KEC BATAM | - | - | - | - | 3.960.000.000 |
PEKERJAAN PEMBONGKARAN DAN PEMASANGAN GORONG-GORONG, PEMBONGKARAN U-DITCH DAN MAINHOLE DI KAWASAN KARIMUN GOLDCOAST TANJUNG BALAI KARIMUN | KAWASAN KARIMUN GOLDCOAST TANJUNG BALAI KARIMUN | - | - | - | - | 143.075.000 |
PEKERJAAN PEMBONGKARAN DAN PEMASANGAN SALURAN, GORONG-GORONG DAN PROTEKSI SLOPING TANAH DI KARIMUN GOLDCOAST, TANJUNG BALAI KARIMUN | KARIMUN GOLDCOAST TANJUNG BALAI KARIMUN | - | - | - | - | 72.768.000 |
PEKERJAAN PEMIPAAN ISBL ISOLASI PIPA ISBL PROYEK MS94 | AREAL PELABUHAN KABIL | - | - | - | - | 7.700.000.000 |
PEKERJAAN PENAMBAHAN CROSSING DRAINAGE PADA SALURAN DI KARIMUN GOLDCOAST DI KARIMUN GOLDCOAST, TANJUNG BALAI KARIMUN | KARIMUN GOLDCOAST TANJUNG BALAI KARIMUN | - | - | - | - | 171.723.000 |
PEKERJAAN PENGECATAN DINDING DALAM DAN LUAR POS JAGA DAN PAGAR DI TAMAN WISATA ROHANI KAMPUNG VIETNAM | PULAU GALANG - BATAM | - | - | - | - | 13.856.970 |
PEKERJAAN PENGECATAN DINDING DAN PLAFOND VILLA BLOK DD NO 15 & 25 KAWASAN VILLA PANBIL, MUKA KUNING | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 20.719.000 |
PEKERJAAN PENGECATAN ULANG DINDING LUAR, DALAM DAN PLAFOND DI BLOK DD NO. 18, 19 & 20 | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 37.246.000 |
PEKERJAAN PENGECETAN DINDING EXTERIOR HOTEL SANTIKA BATAM | HOTEL SANTIKA BATAM | - | - | - | - | 114.000.000 |
PEKERJAAN PENYELIDIKAN TANAH UNTUK PEMBANGUNAN DERMAGA PELABUHAN DI KAWASAN COASTAL AREA DI TANJUNG BALAI KARIMUN KEPULAUAN RIAU | TANJUNG BALAI KARIMUN, KEPULAUAN RIAU | - | - | - | - | 204.600.000 |
PEKERJAAN PERBAIKAN REVETMENT DI LAHAN B KAWASAN KARIMUN GOLDCOAST | TANJUNG BALAI KARIMUN | - | - | - | - | 75.473.575 |
PEKERJAAN PONDASI BORED PILE PROYEK MARCS BOULEVARD - BATAM | BATAM CENTRE | - | - | - | - | 5.628.120.000 |
PEKERJAAN PRESERVASI JALAN NONGSA-BATU AMPAR-TEMBESI-GALANG | NONGSA-BATU AMPAR-TEMBESI-GALANG | - | - | - | - | 46.884.692.420 |
PEKERJAAN RESERVOIR DAN RUMAH POMPA - THE NOVE, NUVASA BAY-BATAM | NUVASA BAY | - | - | - | - | 3.250.000.000 |
PEKERJAAN SALURAN BETON DI FACTORY A LOT 03 KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 53.845.773 |
PEKERJAAN SALURAN DI KAV BARU RT 03 RW 04 | KEL SEI LANGKAI KEC SAGULUNG | - | - | - | - | 109.935.800 |
PEKERJAAN SALURAN DI KAV BARU RT 04 RW 07 | KEL SEI LANGKAI KEC SAGULUNG | - | - | - | - | 109.902.700 |
PEKERJAAN SOIL INVESTIGASI (OFFSHORE) | KABIL | - | - | - | - | 273.000.000 |
PEKERJAAN STRUKTUR ARSITEKTUR DAN PLUMBING PROYEK PT. HOTEL OZON INTERNATIONAL | PT. HOTEL OZON INTERNATIONAL | - | - | - | - | 54.200.000.000 |
PEKERJAAN STRUKTUR BANGUNAN VILLA PANBIL BLOK J NO. 01 KAWASAN VILLA PANBIL | MUKA KUNING | - | - | - | - | 57.000.000 |
PEKERJAAN SWAKELOLA GEDUNG SERBAGUNA RT 02 RW 03 (POKMAS PELITA 2) | GEDUNG SERBAGUNA RT 02 RW 03 | - | - | - | - | 99.992.000 |
PEKERJAAN SWAKELOLA GORONG-GORONG RT 01 RW 02 KELURAHAN KAMPUNG PELITA (POKMAS PELITA 4) | RT 01 RW 02 KELURAHAN KAMPUNG PELITA | - | - | - | - | 21.249.000 |
PEKERJAAN SWAKELOLA JERAMBAH RT 19 RW 05 KASU (POKMAS DAU KASU 2) | JERAMBAH RT 19 RW 05 KASU | - | - | - | - | 91.542.455 |
PEKERJAAN UPAH FINISHING LANTAI 1 S/D LT. 3 DI RUSUN BLOK I TAHAP II | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING - BATAM | - | - | - | - | 430.000.000 |
PEKERJAAN WAREHOUSE TYPE A NO. 07 | HORIZON INDUSTRIAL PARK | - | - | - | - | 12.484.000.000 |
PEKERJAAN WAREHOUSE TYPE H LOT 01 | HORIZON INDUSTRIAL PARK | - | - | - | - | 3.741.000.000 |
PELAKSANAAN PAKET PEKERJAAN LANJUTAN PEMBANGUNAN PUSKESMAS SIANTAN SELATAN (SILPA DAK FISIK TA 2019) | PUSKESMAS SIANTAN SELATAN | - | - | - | - | 5.198.588.473 |
PELEBARAN JALAN MENAMBAH LAJUR JALAN DIPONEGORO | SP. SEI. HARAPAN - SP. BASECHAMP BATU AJI | - | - | - | - | 23.816.827.818 |
PELEBARAN JALAN MENAMBAH LAJUR JALAN TEMBESI - TANJUNG BERIKAT | TEMBESI - TANJUNG BERIKAT | - | - | - | - | 20.198.954.100 |
PELEBARAN MENAMBAH LAJUR JALAN TEMBESI-TANJUNG BERIKAT | JL. LETJEN S. PARMAN BLOK R2 NO. 1-11 TG. PIAYU | - | - | - | - | 9.288.350.909 |
PEMANCANGAN PROYEK PLBN TERPADU SERASAN | SERASAN | - | - | - | - | 2.400.000.000 |
PEMANGKASAN POHON DI BAWAH SUTM | AREA BATAM CENTRE DAN NAGOYA | - | - | - | - | 44.935.000 |
PEMANGKASAN POHON DI BAWAH SUTM | AREA TIBAN | - | - | - | - | 18.610.000 |
PEMANGKASAN POHON DIBAWAH SUTM | AREA BATAM CENTRE DAN NAGOYA | - | - | - | - | 125.105.000 |
PEMANGKASAN POHON DIBAWAH SUTM | AREA TIBAN | - | - | - | - | 28.960.000 |
PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT AREA BATAM TAHUN 2020 TAHAP II | AREA BATAM | - | - | - | - | 607.273.246 |
PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT AREA BATAM TAHUN 2020 TAHAP III | AREA BATAM | - | - | - | - | 271.017.937 |
PEMASANGAN PIPA DINAS DAN MRS CALON PELANGGAN HOTEL GREN ALIA | JAKARTA, HOTEL GREN ALIA | - | - | - | - | 230.000.000 |
PEMASANGAN PROTEKSI PETIR INDEPENDENT GROUND WIRE SYSTEM TRASMISI 150KV | AREA BATAM | - | - | - | - | 1.710.000.000 |
PEMASANGAN RECLOSER | BATAM TERSEBAR | - | - | - | - | 32.348.536 |
PEMASANGAN SKTM DAN PERALATAN GARDU | PT H-TECH OILFIELD - JL. HANG KESTURI VI NO. 11 KIE | - | - | - | - | 185.890.500 |
PEMBANGUNAN 300M WHARF AT WEST SIDE RECLAIMED LAND | PT DOK WARISAN PERTAMA, TANJUNG UNCANG | - | - | - | - | 33.487.566.814 |
PEMBANGUNAN BALAI PERTEMUAN WARGA RT.4/RW.13 KAVLING BUKIT KAMBOJA, SEI PELUNGGUT | RT.4/RW.13 KAVLING BUKIT KAMBOJA, SEI PELINGGUT | - | - | - | - | 144.587.273 |
PEMBANGUNAN BALAI WARGA PERUMAHAN BAGAMAN RW.18, TANJUNG UNCANG BATU AJI | RW.18, TANJUNG UNCANG BATU AJI | - | - | - | - | 127.185.455 |
PEMBANGUNAN BANGUNAN PELINTAS GRAHA NUSA BATAM | GRAHA NUSA BATAM | - | - | - | - | 615.317.300 |
PEMBANGUNAN BANGUNAN PELINTAS KAVLING MANDIRI | KAVLING MANDIRI | - | - | - | - | 924.876.300 |
PEMBANGUNAN BATU MIRING BENGKONG MAHKOTA RT 03 RW 04 (POKMAS LAUT 27) | RT 3 / RW 4 BENGKONG LAUT | - | - | - | - | 37.488.000 |
PEMBANGUNAN D.I BUKIT LANGKAP (LANJUTAN) DI KAB. LINGGA | DESA BUKIT LANGKAP KECAMATAN LINGGA TIMUR, KABUPATEN LINGGA PROVINSI KEPULAUAN RIAU | - | - | - | - | 12.288.355.455 |
PEMBANGUNAN DAN PENINGKATAN SISTEM PENGELOLAAN DRAINASE SALURAN RT 03, RW 01, BLOK B, GMP | DURIANGKANG | - | - | - | - | 139.950.500 |
PEMBANGUNAN DRAINASE LINGKUNGAN U40 BENGKONG RATU RT 01 RW 06 (POKMAS LAUT 25) | RT 1 / RW 6 BENGKONG LAUT | - | - | - | - | 52.481.000 |
PEMBANGUNAN DRAINASE LINGKUNGAN U40 KOMP. YKB RT 03 RW 11 (POKMAS LAUT 26) | RT 3 / RW 11 BENGKONG LAUT | - | - | - | - | 76.984.000 |
PEMBANGUNAN DRAINASE RT.005 RW.007 KEL. SUNGAI LEKOP (310 M) (POKMAS SEI LEKOP 07) | RT.005 RW.007 (310 M) KEL. SUNGAI LEKOP | - | - | - | - | 66.808.000 |
PEMBANGUNAN DRAINASE RW 13 KEL SADAI KEC. BENGKONG | BENGKONG | - | - | - | - | 154.454.546 |
PEMBANGUNAN DRAINASE U30 KARDIYAN RT 02 RW 01 AIR RAJA (AIR RAJA DAU 1.A) | RT 02 RW 01 KEL AIR RAJA | - | - | - | - | 204.504.547 |
PEMBANGUNAN DRAINASE U30 PERUMAHAN BANDAR SRIMAS RT 02 RW 12 (POKMAS TUNAS MUDA) | RT 02 RW 12 KEL. SEI PANAS | - | - | - | - | 92.282.000 |
PEMBANGUNAN DRAINASE U40 DI KAMPUNG TUA BAKAU SERIP RT 01,02 RW 10 (BASSOK BERSATU) | RT 1 / RW 10 SAMBAU | - | - | - | - | 64.558.000 |
PEMBANGUNAN DRAINASE U40 DI RT 02 RW 01 SETOKOK (POKMAS SETOKOK 37) | RT 02 RW 01 KEL SETOKOK | - | - | - | - | 83.662.000 |
PEMBANGUNAN DRAINASE U40 DI RT 03 RW 16 (KENANGA DAU 1) | RT 3 / RW 16 TANJUNG BUNTUNG | - | - | - | - | 66.488.000 |
PEMBANGUNAN DRAINASE U40 RT 05 RW 10 JL. BERINGIN BENGKONG HARAPAN II (POKMAS INDAH 43) | RT 5 / RW 10 BENGKONG INDAH | - | - | - | - | 167.979.000 |
PEMBANGUNAN EMBUNG AIR BAKU AIR GEMURUH (LANJUTAN) DI KAB. LINGGA | DESA BATU BERDAUN KECAMATAN SINGKEP BARAT | - | - | - | - | 3.519.271.818 |
PEMBANGUNAN FASUM DI TAMAN LESTARI BLOK C RT 001 RW 025 KEL. KIBING KEC. BATU AJI | TAMAN LESTARI, KIBING, BATU AJI | - | - | - | - | 127.262.182 |
PEMBANGUNAN FASUM RT.1/RW.18 PERUMAHAN PERMATA RHABAYU, TEMBESI | TEMBESI | - | - | - | - | 145.422.727 |
PEMBANGUNAN GARDU BETON 3,5 M2 X 5,5 M2 | PT GLORINDO BANGUNGRAHA MEGAH-KK RUKO & PR GLORY ROYAL RESIDANCE TIBAN | - | - | - | - | 146.055.910 |
PEMBANGUNAN GARDU BETON 3,5 M2 X 5,5 M2 | PT MAHKOTA PERMATA MITRA - KK RUKO & PR CENTRAL RAYA TIBAN | - | - | - | - | 146.055.910 |
PEMBANGUNAN GARDU BETON 3,5 M2 X 5,5 M2 | PT MULIA REALTY BATINDO-KK PR DEVELY RESINDENCE BATAM CENTRE | - | - | - | - | 146.055.910 |
PEMBANGUNAN GARDU BETON 3,5M2 X 5,5 M2 | PT REXVIN PUTRA MANDIRI-KK PR PRASETYA RESIDENCE NONGSA | - | - | - | - | 146.055.910 |
PEMBANGUNAN GARDU BETON 3,5M2 X 5,5M2 | PT. ANUGERAH GRIYA UTAMA - KK PR CITRA RENGGALI MARINA, TANJUNG UNCANG | - | - | - | - | 146.055.910 |
PEMBANGUNAN GARDU KIOS UNTUK PENINGKATAN KEHANDALAN OPERASIONAL | TANJUNG UMA | - | - | - | - | 189.563.580 |
PEMBANGUNAN GEDUNG LABORATORIUM TERPADU | MAN INSAN CENDEKIA HALMAHERA BARAT | - | - | - | - | 6.593.805.455 |
PEMBANGUNAN GEDUNG SERBAGUNA PERUM RHABAYU ASRI RT 02 RW 14 (PIAYU TERUS MAJU 18) | RT 2 / RW 14 TANJUNG PIAYU | - | - | - | - | 89.724.400 |
PEMBANGUNAN GEDUNG SERBAGUNA RT 01 RW 04 SEI RAYA (POKMAS SEMBULANG 22) | RT 01 RW 04 SEI RAYA KEL. SEMBULANG | - | - | - | - | 100.292.000 |
PEMBANGUNAN GUDANG 23 M X 60 M DI PT. HAIKKI GREEN | KAWASAN PENGOLAHAN LIMBAH INDUSTRI B3 - KABIL | - | - | - | - | 855.000.000 |
PEMBANGUNAN GUDANG INDUSTRI DI TUNAS KABIL SEBANYAK 3 UNIT YAKNI TYPE 6A, 2B, 2C | TUNAS KABIL | - | - | - | - | 307.700.000 |
PEMBANGUNAN JALAN DAN LENGAN SIMPANG BATU AMPAR TAHAP 1 | BATU AMPAR | - | - | - | - | 22.281.135.400 |
PEMBANGUNAN JALAN KOLEKTOR BUNDARAN MADANI S.D BENGKONG SADAI | BATAM KOTA, BENGKONG | - | - | - | - | 23.590.632.000 |
PEMBANGUNAN JALAN KOLEKTOR DAN JEMBATAN KAWASAN INDUSTRI SEKUPANG (MENUJU KAWASAN BRITOIL) TAHAP 1 | KECAMATAN SEKUPANG | - | - | - | - | 13.345.868.000 |
PEMBANGUNAN JALAN TELUK BUTON - SEI TEKAN | SEI TEKAN | - | - | - | - | 33.553.658.182 |
PEMBANGUNAN JALUR KEDUA JALAN HANG KESTURI TAHAP 1 (SIMP. KABIL - BATU BESAR) | NONGSA | - | - | - | - | 35.455.263.000 |
PEMBANGUNAN JERAMBAH BETON DI RT 01 RW 04 PULAU NIPAH (POKMAS SETOKOK 36) | RT 01 RW 04 PULAU NIPAH KEL SETOKOK | - | - | - | - | 210.675.000 |
PEMBANGUNAN JERAMBAH BETON RT 05 RW 02 (PULAU BULUH 25) | RT 05 RW 02 KEL PULAU BULUH | - | - | - | - | 119.605.000 |
PEMBANGUNAN JERAMBAH BETON RT 08 RW 03 (PULAU BULUH 26) | RT 08 RW 03 KEL PULAU BULUH | - | - | - | - | 180.807.000 |
PEMBANGUNAN JERAMBAH LINGKUNGAN KAMPUNG BERENDAM RT 05 RW 01 (POKMAS TANJUNG RIAU 5) | RT 05 RW 01 KEL. TANJUNG RIAU | - | - | - | - | 164.726.000 |
PEMBANGUNAN JERAMBAH LINGKUNGAN TANJUNG RIAU RT 04 RW 01 (POKMAS TANJUNG RIAU 4) | RT 04 RW 01 KEL. TANJUNG RIAU | - | - | - | - | 110.357.000 |
PEMBANGUNAN MASJID BANDARA HANG NADIM | BANDARA HANG NADIM | - | - | - | - | 39.937.665.520 |
PEMBANGUNAN SEDIMENT TRAP DAN TRASH RACK (STTR) INLET-4 WADUK DURIANGKANG | DURIANGKANG | - | - | - | - | 11.916.319.600 |
PEMBANGUNAN SEDIMENTASI TRAP DAN TRASH RACK WADUK SEI HARAPAN | WADUK SEI HARAPAN | - | - | - | - | 12.175.000.000 |
PEMBANGUNAN SEMENISASI JALAN BETON RT 05 RW 01 AIR BULUH (BULANG LINTANG 28) | RT 05 RW 01 AIR BULUH KEL. BULANG LINTANG | - | - | - | - | 110.599.000 |
PEMBANGUNAN SEMENISASI JALAN BETON RT 08 RW 02 BULANG KEBAM (POKMAS BULANG LINTANG 30) | RT 08 RW 02 BULANG KEBAM KEL. BULANG LINTANG | - | - | - | - | 98.927.579 |
PEMBANGUNAN SEMENISASI JALAN BETON RT 09 RW 02 TANJUNG KUBU (BULANG LINTANG 29) | RT 09 RW 02 TANJUNG KUBU KEL. BULANG LINTANG | - | - | - | - | 99.023.579 |
PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN KAV. NATO PERMATA RT. 03, 04/RW. 02 (583 M2) (POKMAS SEI LANGKAI 02) | KAV. NATO PERMATA RT. 03, 04/RW. 02 | - | - | - | - | 174.889.000 |
PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN PERUM. MUKA KUNING PRATAMA RT. 01, 02/RW. 24 (520 M2) (POKMAS SEI LANGKAI 24) | PERUM. MUKA KUNING PRATAMA RT. 01, 02/RW. 24 KELURAHAN SUNGAI LANGKAI | - | - | - | - | 155.975.000 |
PEMBANGUNAN SEMENISASI JALAN UTAMA RT 03 RW 02 TG. KALOK (TANJUNG KALOK 2) | RT 3 / RW 2 SUBANG MAS | - | - | - | - | 143.135.455 |
PEMBANGUNAN SMELTER TIMAH DI TANJUNG UNCANG | TANJUNG UNCANG | - | - | - | - | 21.481.155.343 |
PEMBANGUNAN SPAM PULAU AIR GARA DAN PULAU BERTAM KELURAHAN KASU KECAMATAN BELAKANG PADANG (DAK AFIRMASI)PADANG (DAK AFIRMASI) | PULAU AIR GARA DAN PULAU BERTAM KELURAHAN KASU KECAMATAN BELAKANG PADANG (DAK AFIRMASI)PADANG (DAK AFIRMASI) | - | - | - | - | 7.976.272.829 |
PEMBANGUNAN SPAM PULAU TEMOYONG KELURAHAN TEMOYONG KEC. BULANG (DAK AFIRMASI) | PULAU TEMOYONG | - | - | - | - | 8.144.431.389 |
PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10 KK) | KEL. REMPANG CATE KEC. GALANG (DAK REGULER) | - | - | - | - | 477.500.000 |
PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10KK) (KELOMPOK SWADAYA MASYRAKAT SEMBULANG JAYA) | KEL SEMBULANG KEC GALANG | - | - | - | - | 250.000.000 |
PEMBANGUNAN TAXIWAY DAN APRON 04 BANDARA HANG NADIM BATAM | JL. HANG NADIM, NO. 1 | - | - | - | - | 155.146.598.060 |
PEMBANGUNAN/REHABILITASI DRAINASE RT 04 RW 07 (PIAYU TERUS MAJU 19) | RT 4 / RW 7 TANJUNG PIAYU | - | - | - | - | 58.873.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. NGENANG KEC. NONGSA (POKMAS NGENANG MAJU) | KEL. NGENANG, KEC. NONGSA | - | - | - | - | 750.186.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 01 RW 01 TANJUNG GUNDAP (GUNDAP JAYA) | RT 01 RW 01 TANJUNG GUNDAP KEL. TEMBESI | - | - | - | - | 134.942.053 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RW 11 KAVLING KAMBOJA KEL. SUNGAI PELUNGGUT (603 M2) (POKMAS SP 11) | JALAN LINGKUNGAN RW 11 KAVLING KAMBOJA KEL. SUNGAI PELUNGGUT | - | - | - | - | 180.900.000 |
PEMBERSIHAN ISOLATOR DAN PENGENCANGAN BAUT PERALATAN TOWER TRANSMISI 150 KV | AREA BATAM | - | - | - | - | 445.870.406 |
PEMBONGKARAN 3 UNIT SILO KAP.400 MT PLATFORM, CONVEYOR & PENYEDIAAN OPERATOR CRAWLER CRANCE | PULAU BULAN , BULANG BATAM | - | - | - | - | 238.000.000 |
PEMBONGKARAN SHOP OFFICE DAN PEMINDAHAN STORE VALLEN DAN TOOL CRIB | JL BRIGJEN KATAMSO KM.6 TANJUNG UNCANG | - | - | - | - | 600.250.000 |
PEMELIHARAAN BERKALA JALAN PROVINSI PADA RUAS JALAN SIMP. MARINA CITY-SIMP. BASE CAMP KOTA BATAM | RUAS JALAN SIMP. MARINA CITY-SIMP. BASE CAMP KOTA BATAM | - | - | - | - | 21.044.516.364 |
PEMELIHARAAN BERKALA JL PERUM BIDA AYU PINTU 2 | JL PERUM BIDA AYU PINTU 2 | - | - | - | - | 1.990.657.870 |
PEMELIHARAAN BERKALA JL RUSUN PUTRA JAYA | JL RUSUN PUTRA JAYA | - | - | - | - | 1.658.864.227 |
PEMELIHARAAN BERKALA JL. PERUM BIDA AYU PINTU 3 | JL. PERUM BIDA AYU PINTU 3 | - | - | - | - | 2.440.056.271 |
PEMELIHARAAN BERKALA JL. UTAMA BUKIT KEMUNING | JL. UTAMA BUKIT KEMUNING | - | - | - | - | 3.870.827.907 |
PEMELIHARAAN DAN PERAWATAN TAMAN JALAN ARTERI DAN ROW WILAYAH PERAWATAN PERTAMANAN BP BATAM (TNEDER ULANG) | TAMAN JALAN ARTERI DAN ROW WILAYAH PERAWATAN PERTAMANAN BP BATAM | - | - | - | - | 1.470.000.000 |
PEMELIHARAAN PAGAR DAERAH TANGKAPAN AIR WADUK SEI HARAPAN | WADUK SEI HARAPAN | - | - | - | - | 3.841.962.000 |
PEMOTONGAN TANAH CADAS, BEBATU, BIASA & PENIMBUNAN SERTA PEMATANGAN LAHAN UNTUK PEMBANGUNAN FACTORY | PANBIL INDUSTRIAL ESTATE, MUKAKUNING | - | - | - | - | 52.347.128.000 |
PENATAAN BANGUNAN FASUM VOLLEY BALL KOMPLEK SAKURA PERMAI RW 004 KELURAHAN SERAYA BATU AMPAR, BATAM | KOMPLEK SAKURA PERMAI KEL. SERAYA, BATU AMPAR | - | - | - | - | 139.964.100 |
PENATAAN FASUM PERUMAHAN BANDARA MAS BATAM | PERUMAHAN BANDARA MAS BATAM | - | - | - | - | 99.905.000 |
PENATAAN FASUM PERUMAHAN CIPTA PERMATA BATAM | PERUMAHAN CIPTA PERMATA BATAM | - | - | - | - | 119.983.000 |
PENATAAN JALAN PERUMAHAN CIPTA PERMATA BATAM | PERUMAHAN CIPTA PERMATA BATAM | - | - | - | - | 119.978.000 |
PENATAAN LINGKUNGAN BALOI CENTER BATAM | KAWASAN LINGKUNGAN BALOI CENTER BATAM | - | - | - | - | 119.978.000 |
PENATAAN LINGKUNGAN BSI RESIDENCE BATAM | BSI RESIDENCE BATAM | - | - | - | - | 119.978.000 |
PENATAAN LINGKUNGAN HANG LEKIR BATAM | PERUMAHAN HANG LEKIR BATAM | - | - | - | - | 119.978.000 |
PENATAAN LINGKUNGAN LAPANGAN OLAHRAGA (FASUM) PERUM BUMI SAKINAH RT 2 RW 11 | PERUM BUMI SAKINAH | - | - | - | - | 117.066.364 |
PENATAAN LINGKUNGAN PERUMAHAN BINA UMMAH RW.11, KIBING BATU AJI | RW.11, KIBING BATU AJI | - | - | - | - | 127.152.727 |
PENATAAN LINGKUNGAN PERUMAHAN CIPTA REGENCY BATAM | PERUMAHAN CIPTA REGENCY BATAM | - | - | - | - | 119.935.000 |
PENATAAN LINGKUNGAN PERUMAHAN REXVIN RT.11/RW.19, SUNGAI LANGKAI SAGULUNG | SAGULUNG | - | - | - | - | 127.227.636 |
PENATAAN LINGKUNGAN RW 10 BALOI PERMAI BATAM | LINGKUNGAN RW 10 BALOI PERMAI | - | - | - | - | 119.984.000 |
PENATAAN LINGKUNGAN RW. 14 PERUMAHAN PUTERI HIJAU, SEI LANGKAI | SEI LANGKAI | - | - | - | - | 159.936.700 |
PENATAAN LINGKUNGAN RW.11 PERUMAHAN TIBAN MAS, TIBAN LAMA | RW.11 TIBAN LAMA | - | - | - | - | 181.760.909 |
PENATAAN LINGKUNGAN RW.8 KAVLING SERAYA SEI LANGKAI | SEI LANGKAI | - | - | - | - | 169.905.600 |
PENGADAAN DAN PEAMSANGAN SKTM DAN PERALATAN GARDU | PT TARUNA MADYA PRATAMA - KK PR WINNER DELUXE NONGSA | - | - | - | - | 123.839.104 |
PENGADAAN DAN PEMASANGAN JTM DAN PERALATAN GARDU | PT BATAM RIAU BERTUAH - KK PR GOLDEN PARK NONGSA | - | - | - | - | 76.360.788 |
PENGADAAN DAN PEMASANGAN JTM DAN PERALATAN GARDU | PT BUANA CIPTA PROPERTINDO - KK PR CIPTA VILLAGE CLUSTER HALIMUN MARINA | - | - | - | - | 32.687.616 |
PENGADAAN DAN PEMASANGAN JTM-SKTM DAN PERALATAN GARDU | PT MITRA BINTAN SUKSES - KK PR TIBAN HARMONI SEKUPANG | - | - | - | - | 221.435.260 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN JTM-SKTM 20 KV | KAWASAN PURI INDUSTRIAL PARK 2000 | - | - | - | - | 347.362.270 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM-SKTM 20 KV | FLEXY PT DE HONG PAPER INDUSTRY - JL SEI BINTI SAGULUNG | - | - | - | - | 59.267.268 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM-SKTM 20 KV | PT SURYA PERDANA SUKSES - JL JEMBATAN V PANTAI MELUR GALANG | - | - | - | - | 132.352.646 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20 KV | PT VOLEX INDONESIA - JL IR SUTAMI KAWASAN INDUSTRI SEKUPANG | - | - | - | - | 30.925.464 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20KV | PT MCDERMOTT INDONESIA - JL BAWAL BATU AMPAR | - | - | - | - | 8.644.000 |
PENGADAAN DAN PEMASANGAN PERLATAN GARDU & SKTM LAYANAN PREMIUM PLATINUM | PT BEST ETERNITY RESOURCES TECHNOLOGY - JL. BRIGJEN KATAMSO TANJUNG UNCANG | - | - | - | - | 625.264.500 |
PENGADAAN DAN PEMASANGAN PLAFOND DI RUANG KAPEL RUMAH SUSTER RS. SANTA ELISABETH | RS. ELISABET BATAM KOTA | - | - | - | - | 31.583.000 |
PENGADAAN DAN PEMASANGAN PLAFOND DI RUSUN TAHAP - II BLOK H | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 57.419.356 |
PENGADAAN DAN PEMASANGAN PLAFOND DI RUSUN TAHAP-II BLOK G | KAWASAN PANBIL INDUSTRIAL MUKA KUNING | - | - | - | - | 57.419.356 |
PENGADAAN DAN PEMASANGAN PLAFOND DI RUSUN TAHAP-II BLOK I KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 53.898.300 |
PENGADAAN DAN PEMASANGAN SKTM 20KV DAN PERALATAN GARDU | PT PRIMA KARYA ASIH - KK PR GESYA ENTERNAL MARINA CITY | - | - | - | - | 153.645.506 |
PENGADAAN DAN PEMASANGAN SKTM DAN PERALATAN GARDU | PT MAHKOTA PERMATA MITRA - KK RUKO DAN PR CENTRAL RAYA TIBAN | - | - | - | - | 147.524.310 |
PENGADAAN DAN PEMASANGAN SKTM DAN PERALATAN GARDU | PENYAMBUNGAN BARU MALL PT AESLER GROUP INTERNATIONAL - JALAN LAKSAMANA BINTAN, BATAM CENTRE | - | - | - | - | 638.220.900 |
PENGADAAN DAN PEMBANGUNAN TOWNHOUSE (90) PAPA MAMA 2 | JLN ABUYALTAMA | - | - | - | - | 2.430.000.000 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI FACTORY A LOT 03 | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 90.953.990 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI FACTORY C2 LOT 06 | KAWASAN PANBIL INDUSTRIAL MUKA KUNING | - | - | - | - | 64.192.690 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK E | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 172.784.136 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK F | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 172.784.136 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK G | KAWASAN PANBIL INDUSTRIAL MUKA KUNING | - | - | - | - | 172.784.136 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK H | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 172.784.136 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK I KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 172.784.136 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK J KAWASAN PANBIL INDUSTRIAL, MUKA KUNING - BATAM | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING - BATAM | - | - | - | - | 172.784.136 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI VILLA PANBIL BLOK AA NO. 01 KAWASAN VILLA PANBIL, MUKA KUNING | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 102.769.680 |
PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH | RUMAH SAKIT UMUM DAERAH KOTA TANJUNG PINANG | - | - | - | - | 2.050.545.500 |
PENGECATAN DINDING DALAM DAN LUAR DI RENOVASI VILLA PANBIL BLOK A NO. 03 | KAWASAN PANBIL INDUSTRIAL MUKA KUNING | - | - | - | - | 104.796.360 |
PENINGAKATAN JALAN SEMENISASI KAVLING BARU | RT 04 RW 05 KEL SUNGAI LANGKAI KEC SAGULUNG | - | - | - | - | 139.855.700 |
PENINGKATAN JALAN SEMENISASI (PERUM MUKA KUNING INDAH I RT 01/ RW 04) | MUKA KUNING INDAH | - | - | - | - | 122.066.364 |
PENINGKATAN JALAN SEMENISASI DI KAV TUNAS REGENCY RT 01 RW 14 | KEL. SEI BINTI, KEC. SAGULUNG | - | - | - | - | 127.241.273 |
PENINGKATAN JALAN SEMENISASI JALAN UTAMA KAV TUNAS REGENCY RW 14 | KEL. SUNGAI BINTI, KEC. SAGULUNG | - | - | - | - | 109.069.909 |
PENINGKATAN JALAN SEMENISASI JL. UTAMA KAVLING SEI LEKOP BLOK A-B-C | KEL. SEI LEKOP, KEC. SAGULUNG | - | - | - | - | 127.149.455 |
PENINGKATAN JALAN SEMENISASI KAVLING BARU RT 03 RW 07 | KEL. SUNGAI LANGKAI, KEC. SAGULUNG | - | - | - | - | 127.259.546 |
PENINGKATAN JALAN SEMENISASI PERUM PJB RT 09 RW 07 BATAM | PERUM PJB | - | - | - | - | 76.106.364 |
PENINGKATAN JALAN SEMENISASI RT 01 RW 08 | KEL. SUNGAI LANGKAI, KEC. SAGULUNG | - | - | - | - | 127.229.091 |
PENINGKATAN JALAN SEMENISASI RT 03 RW 05 | KEL. SEI LEKOP, KEC. SAGULUNG | - | - | - | - | 127.247.636 |
PENINGKATAN JALAN SEMENISASI RT 03 RW 08 | KEL. SAGULUNG KOTA, KEC. SAGULUNG | - | - | - | - | 127.234.818 |
PENINGKATAN JALAN SEMENISASI RT 8 RW 3 | KEL. SUNGAI PELUNGGUT, KEC. SAGULUNG | - | - | - | - | 127.140.000 |
PENINGKATAN TPA SEMEMAL | KARIMUN | - | - | - | - | 19.507.713.000 |
PENYEMPURNAAN EARTH WIRE SYSTEM TRANSMISI 150 KV | MUKA KUNING - TG. KASAM | - | - | - | - | 134.600.000 |
PERBAIKAN DAN PEMELIHARAAN KAPAL | JL BRIGJEND KATAMSO KM.6 TANJUNG UNCANG | - | - | - | - | 681.300.000 |
PERBAIKAN DERMAGA SELATAN PERLABUHAN BATU AMPAR | BATU AMPAR | - | - | - | - | 21.059.686.532 |
PERBAIKAN GORONG-GORONG CORRUGATED STEEL YANG MELINTASI RUNWAR DAN TAXIWAY | BANDARA HANGNADIM | - | - | - | - | 19.898.332.000 |
PERBAIKAN SALURAN PARIT DEKAT SERANDANG RUSAK, PEMBONGKARAN & PEMASANGAN CANOPY DAN PERBAIKAN PLAFON | PT PLN BATAM | - | - | - | - | 169.149.874 |
PIPING WORK FOR NEW PASTILLATION EOMB + PIPING WORK HYDRANT PIPE MODIFICATION DI DALAM LOKASI PABRIK PT. ECOGREEN OLEOCHEMICALS BATAM | JL. HASANUDIN, KABIL | - | - | - | - | 906.400.000 |
PONDASI PIPE RACK 210 | JL. PELABUHAN KAV - 1 KABIL | - | - | - | - | 1.380.000.000 |
PRESERVASI JALAN NONGSA - BATU AMPAR - TEMBESI - GALANG (PULANG BATAM - GALANG) | AREA BATAM - GALANG | - | - | - | - | 7.686.693.455 |
PRESERVASI JEMBATAN NONGSA - BATU AMPAR - TEMBESI - GALANG (PULAU BATAM - GALANG) | AREA BATAM | - | - | - | - | 2.679.810.000 |
PROJECT CANOPY CTAR: NEW GUTTER | KAWASAN INDUSTRI TERPADU KABIL | - | - | - | - | 35.844.000 |
PROPOSED EXTENSION ROOF LINE 7, QUOTATION REF. 063/QUO-KM/CT/09/2020-REV.02 | JL. HANG KESTURI 1 NO. 2 | - | - | - | - | 455.000.000 |
PROYEK BANGUNAN GUDANG 3# DAN KANOPI TENDA HUJAN BA(2) INDONESIA | JALAN BRIGJEN KATAMSO, LOT 8 KELURAHAN TANJUNG UNCANG KECAMATAN BATU AJI | - | - | - | - | 22.318.000.000 |
PROYEK PEMBANGUNAN BANGUNAN GABUNGAN BA (2) | JALAN BRIGJEN KATAMSO LOT 8 KEL TANJUNG UNCANG BATU AJI | - | - | - | - | 17.200.000.000 |
PROYEK PEMBANGUNAN WORKSHOP PRODUKSI TAHAP II BA (2) | JL BRIGJEN KATAMSO LOT 8 KEL TANJUNG UNCANG KEC BATU AJI | - | - | - | - | 31.630.000.000 |
RAWABI 503 H80067 | PT. UNITED SINDO PERKASA JL. RAYA PELABUHAN LAMA KABIL, KABIL - BATAM | - | - | - | - | 800.000.000 |
RE-BULDING SECURITY POST, RE-FENCING AT WAREHOUSE T20-25 AREA & INSTALLATION OF FENCING AT WAREHOUSE | JL. HANG KESTURI I NO. 14 | - | - | - | - | 67.829.190 |
REHAB GEDUNG SERBAGUNA RT 02 RW 01 (POKMAS PULAU ABANG DAU 3) | RT 02 RW 01 KEL. PULAU ABANG | - | - | - | - | 108.615.363 |
REHABILITASI RUANG KELAS SMPN 34 BATAM | SMPN 34 BATAM KEC NONGSA | - | - | - | - | 19.500.000 |
REHABILITASI RUANG LABORATORIUM IPA SMPN 47 BATAM | SMPN 47 BATAM KECAMATAN SEKUPANG | - | - | - | - | 294.417.000 |
REINSTATE BUILDING FOR CIVIL, MECHANICAL & ELECTRICAL WORK | BATAMINDO INDUSTRIAL PARK, MUKA KUNING | - | - | - | - | 2.691.810.000 |
RELOKASI JARINGAN TEGANGAN MENENGAH | SUTM ALFATEH TELUK MATA IKAN & PT SNEPAC BARELANG | - | - | - | - | 298.075.409 |
RELOKASI KUBIKEL | GARDU MANDRA GUNA GEMA SAKTI DAN GARDU HARRIS RESORT | - | - | - | - | 18.640.000 |
RENOVASI GARASI, REPAIR DINDING DAN PIPA AIR HUJAN DI VILLA PANBIL BLOK S.15 KAWASAN VILLA PANBIL | MUKA KUNING | - | - | - | - | 19.500.000 |
RENOVASI MASJID MUJAHIDIN RW.7 PERUM MKGR, KIBING | RW.7 PERUM MKGR, KIBING | - | - | - | - | 145.111.818 |
RENOVASI MASJID NADIM RAYA | KAWASAN MASJID NADIM RAYA BATAM | - | - | - | - | 170.000.000 |
RENOVASI MASJID PERUMAHAN GRIYA PANORAMA PERMAI | PERUMAHAN GRIYA PANORAMA PERMAI | - | - | - | - | 171.766.000 |
RENOVASI MASJID TAMAN RAYA BATAM CENTRE | KAWASAN MASJID TAMAN RAYA BATAM CENTRE | - | - | - | - | 169.893.000 |
RENOVASI MUSHOLLA MIN 2 SAGULUNG BATAM | SAGULUNG | - | - | - | - | 127.233.091 |
RENOVASI RUMAH CEMARA TIANG NO. 52 SUKAJADI | PERUMAHAN SUKAJADI | - | - | - | - | 27.272.727 |
RENOVASI TPQ AN NUR RW.26 PERUMAHAN PONDOK PERMATA, TEMBESI | TEMBESI | - | - | - | - | 84.945.900 |
RENOVASI/REHAB GEDUNG SERBAGUNA SIJANTUNG (POKMAS SIJANTUNG SEHATI 4) | GEDUNG SERBAGUNA SIJANTUNG KEL. SIJANTUNG | - | - | - | - | 99.988.632 |
REPAIR ROOF AT FINANCE UP-SETTER | JL. HANG KESTURI I NO. 2 | - | - | - | - | 124.235.000 |
REPLACEMENT TRUNKING AND SUPPLY VERTICAL LADDER FOR QD AT FTY 3-1 | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | - | - | - | - | 10.000.000 |
REVITALISASI GEDUNG SEKOLAH DUTA CENDIKIA YAYASAN GENERASI RAJAWALI BATAM | BATAM | - | - | - | - | 127.203.546 |
REVITALISASI GEDUNG SEKOLAH MINGGU GEREJA GPT JEMAAT FILADELFIA | BATU AJI BARU | - | - | - | - | 127.152.727 |
REVITALISASI GEDUNG SEKOLAH MINGGU GEREJA METHODIST INDONESIA KAVLING BARU (LANJUTAN) | BATAM | - | - | - | - | 127.180.000 |
REVITALISASI GEDUNG SEKOLAH PAMOR NUSANTARA | KEC. BATU AJI | - | - | - | - | 127.220.909 |
REVITALISASI GEREJA DAN RUMAH DINAS BNKP JEMAAT FILADELFIA KAVLING BUKIT SEROJA DAPUR12 (LANJUTAN) | BUKIT SEROJA DAPUR12 | - | - | - | - | 127.198.364 |
REVITALISASI JARINGAN LISTRIK TERMINAL 1 | JL HANG NADIM NOMOR 1 , BATU BESAR | - | - | - | - | 52.848.671.000 |
REVITALISASI PASTOR GBIS JEMAAT BUKIT DOA BATU AJI BARU (LANJUTAN) | BATU AJI | - | - | - | - | 127.203.273 |
REVITALISASI RUMAH IBADAH GKPI TRANS BARELANG (LANJUTAN) | TRANS BARELANG | - | - | - | - | 127.255.455 |
REVITALISASI RUMAH IBADAH GPI BATU AJI BARU | KEC. SAGULUNG | - | - | - | - | 127.203.182 |
REVITALISASI RUMAH IBADAH HKBP TEMBESI TRANS BARELANG (LANJUTAN) | TEMBESI TRANS BARELANG | - | - | - | - | 312.952.155 |
ROOF REPAIR AT SURFACE TREATMENT COUPLING SHOP AREA | JL. HANG KESTURI I NO. 2 | - | - | - | - | 24.800.000 |
SALURAN SAMPING KANTOR DISTRIK XX KECAMATAN BATAM KOTA | KECAMATAN BATAM KOTA | - | - | - | - | 150.300.000 |
SEMENISASI BELAKANG POS KAMLING MENUJU TIBAN GLOBAL POKMAS LELE | RT 01 RW 03 KELURAHAN TIBAN INDAH | - | - | - | - | 52.204.900 |
SEMENISASI BOTANIA 43 | BOTANIA | - | - | - | - | 119.894.600 |
SEMENISASI DI BENGKONG WAHYU RT 02 RW 17 KEL. TJ. BUNTUNG BENGKONG | BENGKONG | - | - | - | - | 156.190.000 |
SEMENISASI GANG BLOK J 125 KSB MENTARAU RT 007 RW 010 POKMAS LESTARI 1 | RT 007 RW 010 KELURAHAN PATAM LESTARI | - | - | - | - | 144.971.200 |
SEMENISASI GRAND BSI | BELIAN, BATAM KOTA | - | - | - | - | 49.962.900 |
SEMENISASI JALAN BENGKONG INDAH SWADEBI RT 02 RW 02 (TANJAK 1 - 2020) | RT 2 / RW 2 SADAI | - | - | - | - | 136.149.000 |
SEMENISASI JALAN BETON PERUM.LEGENDA BALI RT 01 RW 13 (POKMAS BALI INDAH) | PERUM.LEGENDA BALI RT 01 RW 13 KEL BALOI | - | - | - | - | 41.302.000 |
SEMENISASI JALAN BETON PERUM.LEGENDA MALAKA RT 03 RW 03 (POKMAS KARYA UNGGUL) | PERUM.LEGENDA MALAKA RT 03 RW 03 KEL BALOI PERMAI | - | - | - | - | 143.999.000 |
SEMENISASI JALAN BETON PERUM.PURI LEGENDA RT 02 RW 07 (POKMAS PURI) | PURI LEGENDA RT 02 RW 07 (POKMAS PURI) | - | - | - | - | 143.999.000 |
SEMENISASI JALAN BETON RT 01 RW 01 SUBANG MAS DARI POSYANDU KE RUMAH PAK DAHLAN (POKMAS SUBANG MAS 3) | RT 01 RW 01 KEL SUBANG MAS | - | - | - | - | 69.988.182 |
SEMENISASI JALAN BLOK A-B JALAN PASAR RT 01 RW 01 ( POKMAS PELITA MADANI 1 ) | KELURAHAN KAMPUNG PELITA | - | - | - | - | 37.385.700 |
SEMENISASI JALAN GN. KERINCI ( POKMAS PELITA MADANI 2 ) | KELURAHAN KAMPUNG PELITA | - | - | - | - | 48.156.900 |
SEMENISASI JALAN JALAN MENUJU RUMAH WAK DAUD RT 02 RW 01 KAMP.TENGAH (POKMAS DAU TG SARI V) | RT 02 RW 01 KAMP.TENGAH KEL. TANJUNG SARI | - | - | - | - | 14.313.908 |
SEMENISASI JALAN JLN. PEPAYA RT 03 RW 11, KAVLING SENJULUNG | KABIL, NONGSA | - | - | - | - | 119.483.636 |
SEMENISASI JALAN KAV LAMA RT 07 RW 10 KELURAHAN SAGULUNG KOTA (POKMAS 1007) | KAV LAMA RT 07 RW 10 KELURAHAN SAGULUNG KOTA | - | - | - | - | 196.157.000 |
SEMENISASI JALAN KEDELAI RT.001 RW.011 ( POKMAS KEDELAI 1 ) | LUBUK BAJA KOTA | - | - | - | - | 57.682.900 |
SEMENISASI JALAN KOMP. NAGOYA PERMAI RT 01 RW 05 DEPAN RUMAH KETUA RW 05 (POKMAS NAGOYA PERMAI III) | JALAN KOMP. NAGOYA PERMAI RT 01 RW 05 DEPAN RUMAH KETUA RW 05 | - | - | - | - | 119.951.000 |
SEMENISASI JALAN KOMP. ORCHID CENTER RT 02 RW 06 (ORCHID CENTRE I) | RT 02 RW 06 KEL. SUNGAI JODOH | - | - | - | - | 118.424.200 |
SEMENISASI JALAN KOMP.NAGOYA PERMAI SAMPING PEGADAIAN RT 01 RW 05 (POKMAS NAGOYA PERMAI IV) | RT 1 / RW 5 LUBUK BAJA KOTA | - | - | - | - | 151.784.000 |
SEMENISASI JALAN KOMP.WINNER RT 03 RW 05 (POKMAS 01 BALOI INDAH) | RT 3 / RW 5 BALOI INDAH | - | - | - | - | 164.976.000 |
SEMENISASI JALAN KOMPLEK NAGOYA PERMAI BLOK A RT.001 RW.005 ( POKMAS NAGOYA PERMAI ) | LUBUK BAJA KOTA | - | - | - | - | 179.173.500 |
SEMENISASI JALAN KOMPLEK TAMAN NAGOYA INDAH RT 02 RW 08 (POKMAS TAMAN NAGOYA (DAU)) | KOMPLEK TAMAN NAGOYA INDAH RT 02 RW 08 | - | - | - | - | 119.395.000 |
SEMENISASI JALAN LINGKAR RT 01 RW 01 SUBANG MAS DARI RUMAH DINAS GURU SAMPAI KE JALAN UTAMA (POKMAS SUBANG MAS 1) | RT 01 RW 01 KEL SUBANG MAS | - | - | - | - | 63.622.729 |
SEMENISASI JALAN LINGKUNGAN BLOK IV GANG 1 RT 003 RW 002 ( BALAM ) | BATU SELICIN | - | - | - | - | 198.287.100 |
SEMENISASI JALAN LINGKUNGAN KAV.SAGULUNG BARU ASRI RT 03 RW 17 (POKMAS SEI BINTI RT. 03 RW. 170 | KAV.SAGULUNG BARU ASRI RT 03 RW 17 KEL. SEI BINTI | - | - | - | - | 197.073.000 |
SEMENISASI JALAN LINGKUNGAN KAV.SAGULUNG BARU RT 01 RW 03 (POKMAS SEI BINTI RT. 01 RW. 03) | KAV.SAGULUNG BARU RT 01 RW 03 KEL. SEI BINTI | - | - | - | - | 131.970.000 |
SEMENISASI JALAN LINGKUNGAN KP. BATU PUTIH RT 01 RW 04 (POKMAS 200 | RT 01 RW 04 KEL. KARAS | - | - | - | - | 117.566.174 |
SEMENISASI JALAN LINGKUNGAN LANJUTAN PERUMAHAN TIBAN KOPERASI RT 03 RW 07 (POKMAS BOUGENVILLE 20) | PERUMAHAN TIBAN KOPERASI RT 03 RW 07 | - | - | - | - | 53.920.000 |
SEMENISASI JALAN LINGKUNGAN PEMUKIMAN KP. PADANG PENAGA RT 01 RW 06 (POKMAS 17) | RT 01 RW 06 KEL. KARAS | - | - | - | - | 101.750.000 |
SEMENISASI JALAN LINGKUNGAN PERMUKIMAN BLOK D2 RT 06 RW 01 KAV. SERAYA INDAH (SERAYA SAMBAU 3) | BLOK D2 RT 06 RW 01 KAV. SERAYA INDAH KEL. SAMBAU | - | - | - | - | 88.726.666 |
SEMENISASI JALAN LINGKUNGAN PERMUKIMAN D1 RT 07 RW 04 KAV.NONGSA (POKMAS KUDA HITAM) | RT 07 RW 04 KAV.NONGSA KEL. SAMBAU | - | - | - | - | 89.590.000 |
SEMENISASI JALAN LINGKUNGAN PERMUKIMAN WILAYAH RT 02 RW 07 TELUK MATA IKAN (POKMAS MATA IKAN) | RT 02 RW 07 TELUK MATA IKAN KEL. SAMBAU | - | - | - | - | 89.590.000 |
SEMENISASI JALAN LINGKUNGAN PERUM BUMI KENCANA (POKMAS BUMI KENCANA) | RT 05 RW 28 PERUM BUMI KENCANA KEL BULIANG | - | - | - | - | 131.530.000 |
SEMENISASI JALAN LINGKUNGAN PERUM GRIYA PRIMA (POKMAS GRIYA PRIMA MANDIRI) | RT 06 RW 014 KEL BULIANG | - | - | - | - | 182.637.895 |
SEMENISASI JALAN LINGKUNGAN PERUM. PURI MALAKA RT 02 RW 09 (POKMAS BOUGENVILLE 18) | PERUM. PURI MALAKA RT 02 RW 09 KEL. TIBAN BARU | - | - | - | - | 74.758.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 01 RW 03 (POKMAS BOUGENVILLE 17) | PERUM. TAMAN SARI HIJAU RT 01 RW 03 | - | - | - | - | 56.504.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 02 RW 03 (POKMAS BOUGENVILLE 19) | PERUM. TAMAN SARI HIJAU RT 02 RW 03 | - | - | - | - | 143.961.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ALAM RAYA RT. 02 RW. 15 (POKMAS ALAM RAYA 2) | PERUMAHAN ALAM RAYA RT. 02 RW. 15 KELURAHAN BELIAN | - | - | - | - | 155.993.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BALOI DITPAM RT 01 RW 03, 364 M2 (POKMAS SUKAJADI BERSERI) | PERUMAHAN BALOI DITPAM RT 01 RW 03 | - | - | - | - | 109.097.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BALOI DITPAM RT 01 RW 03, 580 M2 (POKMAS SUKAJADI SUKSES) | PERUMAHAN BALOI DITPAM RT 01 RW 03 | - | - | - | - | 173.944.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA KOTA MAS RT 02 RW 15 (POKMAS TELUK TERING 36) | PERUMAHAN CITRA KOTA MAS RT 02 RW 15 KEL. TELUK TERING | - | - | - | - | 140.400.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GRAHA NUSA PERMAI RT 01 RT 02RT 03 RW 13 (POKMAS CIKITSU) | PERUMAHAN GRAHA NUSA PERMAI RT 01 RT 02RT 03 RW 13 KELURAHAN BELIAN | - | - | - | - | 155.986.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN NUSA JAYA RT 02 RW 05 (POKMAS GARUDA JAYA) | RT 02 RW 05 KEL. SEI PANAS | - | - | - | - | 85.399.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN BUANA INDAH RT 02 RW 03 (POKMAS MANGGIS) | RT 02 RW 03 KEL. SEI PANAS | - | - | - | - | 102.486.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN VILLA BUKIT INDAH RT 01 RW 08 (POKMAS TELUK TERING 35) | PERUMAHAN VILLA BUKIT INDAH RT 01 RW 08 KEL KEL. TELUK TERING | - | - | - | - | 180.000.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN VILLA PESONA ASRI RT 04 RW 10 KELURAHAN BELIAN, KEC BATAM KOTA | BATAM KOTA | - | - | - | - | 139.903.500 |
SEMENISASI JALAN LINGKUNGAN PL.NGUAN RT 01 RW 04 (POKMAS GALANG BARU DAU 3) | RT 01 RW 04 KEL. GALANG BARU | - | - | - | - | 63.632.729 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG I RW 05 (POKMAS PERKUTUT) | RW 05 KEL MANGSANG PURI AGUNG I | - | - | - | - | 179.834.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 02 POKMAS ANGGUR 1 | RT 01 RW 02 KELURAHAN TIBAN LAMA | - | - | - | - | 97.906.600 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 03 POKMAS BELIMBING III | RT 01 RW 03 KELURAHAN TIBAN LAMA | - | - | - | - | 46.156.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 04 (PIAYU TERUS MAJU 17) | JALAN LINGKUNGAN RT 02 RW 04 KEL. TANJUNG PIAYU | - | - | - | - | 193.395.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 04 (POKMAS SEI LEKOP 04) | RT 02 RW 04 KEL. SEI LEKOP | - | - | - | - | 116.950.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 06 (BAYAN) | RT 2 / RW 6 MANGSANG | - | - | - | - | 163.398.000 |
SEMENISASI JALAN LINGKUNGAN RT 04 RW 01 TEBING TINGGI (REMPANG 11) | RT 04 RW 01 TEBING TINGGI KEL. REMPANG CATE | - | - | - | - | 69.993.000 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 02 KEL. BATU MERAH (POKMAS BATU MERAH 2D) | JALAN LINGKUNGAN RT 05 RW 02 KEL. BATU MERAH | - | - | - | - | 43.494.500 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 08 DURIANGKANG (POKMAS MATAHARI I) | RT 05 RW 08 KEL DURIANGKANG | - | - | - | - | 179.750.000 |
SEMENISASI JALAN LINGKUNGAN RT 06 RW 06 DURIANGKANG | RT 06 RW 06 KEL DURIANGKANG KEC SEI BEDUK | - | - | - | - | 163.411.579 |
SEMENISASI JALAN LINGKUNGAN RT 12 RW 03 KEL. BATU MERAH (POKMAS BATU MERAH 3D) | LINGKUNGAN RT 12 RW 03 KEL. BATU MERAH | - | - | - | - | 35.950.700 |
SEMENISASI JALAN LINGKUNGAN RT 20 RW 06 KEL. BATU MERAH (POKMAS BATU MERAH 1D) | LINGKUNGAN RT 20 RW 06 KEL. BATU MERAH | - | - | - | - | 80.995.700 |
SEMENISASI JALAN LINGKUNGAN RT 24 RW 07 (POKMAS BATU MERAH 4D) | RT 24 RW 07 KEL. BATU MERAH | - | - | - | - | 117.274.500 |
SEMENISASI JALAN LINGKUNGAN RT.001 RW.013 KEL. SUNGAI LEKOP (400 M) (POKMAS SEI LEKOP 13) | RT.001 RW.013 (400 M) KEL. SUNGAI LEKOP | - | - | - | - | 119.826.000 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW.08 PERMATA BALOI ( POKMAS 1 BALOI INDAH ) | BALOI INDAH | - | - | - | - | 211.886.400 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW.03 ( POKMAS 2 BALOI INDAH ) | BALOI INDAH | - | - | - | - | 147.227.300 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW.09 ( POKMAS 3 BALOI INDAH ) | BALOI INDAH | - | - | - | - | 85.393.000 |
SEMENISASI JALAN LINGKUNGAN RT.07 RW.02 KEL BATU MERAH (POKMAS BATU MERAH 5D) | JALAN LINGKUNGAN RT.07 RW.02 KEL BATU MERAH | - | - | - | - | 42.262.400 |
SEMENISASI JALAN PATAM INDAH RT 07 RW 01 (POKMAS PATAM 1) | PATAM INDAH RT 07 RW 01 | - | - | - | - | 89.783.000 |
SEMENISASI JALAN PELITA 1 RT 03 RW 03 ( POKMAS PELITA MADANI 3 ) | KELURAHAN KAMPUNG PELITA | - | - | - | - | 66.875.600 |
SEMENISASI JALAN PEPAYA II RT.001 RW.011 ( POKMAS PEPEYA PERMAI ) | LUBUK BAJA KOTA | - | - | - | - | 122.351.900 |
SEMENISASI JALAN PERUM ANGGREK RT 001 RW 12 (POKMAS RINJANI 2) | PERUM ANGGREK RT 001 RW 12 | - | - | - | - | 161.679.000 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.02 RW.08 POKMAS MERPATI 1 | RT 02 RW 08 KELURAHAN SUNGAI HARAPAN | - | - | - | - | 69.813.700 |
SEMENISASI JALAN PERUM PONDOK PELANGI RT 004/RW 09 (POKMAS RINJANI 3) | PERUM PONDOK PELANGI RT 004/RW 09 | - | - | - | - | 19.182.000 |
SEMENISASI JALAN PERUM PONDOK PRATIWI I RT 02 RW 10 POKMAS GARUDA 2 | RT 02 RW 10 KELURAHAN SUNGAI HARAPAN | - | - | - | - | 134.476.100 |
SEMENISASI JALAN PERUM SIRIAON REGENCY BLOK C,D,E RT 002 RW 011 POKMAS BANDENG | RT 002 RW 011 KELURAHAN TIBAN INDAH | - | - | - | - | 194.337.000 |
SEMENISASI JALAN PERUM SIRION RT 02/RW 11 (POKMAS RINJANI 1) | PERUM SIRION RT 02/RW 11 | - | - | - | - | 152.229.000 |
SEMENISASI JALAN PERUM TAMAN PUTRI FORTUNA BLOK A S/D D RT.3 RW.8 MERPATI 4 | RT 03 RW 08 KELURAHAN SUNGAI HARAPAN | - | - | - | - | 137.112.800 |
SEMENISASI JALAN PERUM TIBAN ANGGREK RT 01 RW 12 POKMAS PATEN | RT 01 RW 12 KELURAHAN TIBAN INDAH | - | - | - | - | 74.736.200 |
SEMENISASI JALAN PERUMAHAN BUKIT TIBAN PERMAI RT 01 RW 15 POKMAS BOUGENVILE 10 | RT 01 RW 15 KELURAHAN TIBAN BARU | - | - | - | - | 91.798.300 |
SEMENISASI JALAN PERUMAHAN SAKURA PERMAI RT 03 RW 04, KELURAHAN SERAYA, BATU AMPAR, BATAM | PERUMAHAN SAKURA PERMAI RT 03 RW 04, KELURAHAN SERAYA, BATU AMPAR | - | - | - | - | 84.741.000 |
SEMENISASI JALAN PERUMAHAN TIBAN BUKIT ASRI RT 01 RW 10 POKMAS BOUGENVILE 3 | RT 01 RW 10 KELURAHAN TIBAN BARU | - | - | - | - | 114.283.400 |
SEMENISASI JALAN PERUMAHAN TIBAN IMPIAN RT 02 RW 17 POKMAS BOUGENVILE 12 | RT 02 RW 17 KELURAHAN TIBAN BARU | - | - | - | - | 103.601.300 |
SEMENISASI JALAN PERUMAHAN TIBAN KOPERASI RT 02 RW 07 POKMAS BOUGENVILE 1 | RT 02 RW 07 KELURAHAN TIBAN BARU | - | - | - | - | 102.262.200 |
SEMENISASI JALAN PERUMAHAN TIBAN KOPERASI RT 03 RW 07 POKMAS BOUGENVILE 4 | RT 03 RW 07 KELURAHAN TIBAN BARU | - | - | - | - | 104.149.100 |
SEMENISASI JALAN PERUMAHAN VILLA ALAM LESTARI II RT 02 RW 12 POKMAS BOUGENVILE 13 | RT 02 RW 12 KELURAHAN TIBAN BARU | - | - | - | - | 107.255.500 |
SEMENISASI JALAN PULAU SEKANAK RT 01 RW 04 | PULAU SEKANAK RT 01 RW 04 KEL. PULAU ABANG | - | - | - | - | 34.997.355 |
SEMENISASI JALAN RT 002 RW 004 POKMAS LESTARI 4 | RT 002 RW 004 KELURAHAN PATAM LESTARI | - | - | - | - | 62.181.900 |
SEMENISASI JALAN RT 01 RW 03 POKMAS BELIMBING I | RT 01 RW 03 KELURAHAN TIBAN LAMA | - | - | - | - | 37.670.600 |
SEMENISASI JALAN RT 01, RT 04 RW 03 LEGENDA MALAKA, BALOI PERMAI BATAM KOTA | RT 01, RT 04 RW 03 LEGENDA MALAKA, BALOI PERMAI BATAM KOTA | - | - | - | - | 139.899.100 |
SEMENISASI JALAN RT 02 RW 01 TANJUNG PANA KELURAHAN PEMPING (POKMAS TANJUNG PANA 2) | JALAN RT 02 RW 01 TANJUNG PANA KELURAHAN PEMPING | - | - | - | - | 181.359.700 |
SEMENISASI JALAN RT 02 RW 02 KELURAHAN TIBAN LAMA (POKMAS ANGGUR III) | RT 02 RW 02 KELURAHAN TIBAN LAMA | - | - | - | - | 80.375.000 |
SEMENISASI JALAN RT 02 RW 02 POKMAS ANGGUR 2 | RT 02 RW 02 KELURAHAN TIBAN LAMA | - | - | - | - | 84.165.400 |
SEMENISASI JALAN RT 02 RW 03 KELURAHAN TIBAN LAMA (POKMAS BELIMBING) | RT 02 RW 03 KELURAHAN TIBAN LAMA | - | - | - | - | 8.895.000 |
SEMENISASI JALAN RT 02 RW 04 KAMP.TANJUNG (POKMAS POKMAS DAU TG SARI III) | RT 02 RW 04 KAMP.TANJUNG KEL TANJUNG SARI | - | - | - | - | 11.453.384 |
SEMENISASI JALAN RT 02 RW 06 KOMPLEK ANGGREK PERMAI BLOK I (POKMAS 02 BALOI INDAH) | RT 02 RW 06 KOMPLEK ANGGREK PERMAI BLOK I | - | - | - | - | 154.758.000 |
SEMENISASI JALAN RT 02 RW 23 PERUM CENDANA KELURAHAN BELIAN KOTA BATAM | RT 02 RW 23 PERUM CENDANA KELURAHAN BELIAN | - | - | - | - | 139.934.900 |
SEMENISASI JALAN RT 03 RW 01 KAMP.TENGAH (POKMAS DAU TG SARI IV) | RT 03 RW 01 KAMP.TENGAH KEL. TANJUNG SARI | - | - | - | - | 125.993.463 |
SEMENISASI JALAN RT 03 RW 03 POKMAS BELIMBING II | RT 03 RW 03 KELURAHAN TIBAN LAMA | - | - | - | - | 67.069.200 |
SEMENISASI JALAN RT 03 RW 13 PERUM MUKA KUNING PARADISE BUKIT TEMPAYAN | KECAMATAN BATU AJI | - | - | - | - | 139.918.400 |
SEMENISASI JALAN RT 04 RW 07 (SABAR) | RT 4 / RW 7 TANJUNG UMA | - | - | - | - | 29.992.000 |
SEMENISASI JALAN RT 04 RW 11 POKMAS SALAK 3 | RT 04 RW 11 KELURAHAN TIBAN LAMA | - | - | - | - | 151.108.100 |
SEMENISASI JALAN RT. 01/ RW. 02 MONGKOL (POKMAS MONGKOL 7) | JALAN RT. 01/ RW. 02 MONGKOL | - | - | - | - | 128.539.118 |
SEMENISASI JALAN RT. 02 RW 01. KEL TANJUNG UMA (POKMAS MANGGA) | KELURAHAN TANJUNG UMA | - | - | - | - | 20.502.900 |
SEMENISASI JALAN RT. 02 RW. 05 KEL. TANJUNG UMA (POKMAS ANGGREK 11) | JALAN RT. 02 RW. 05 KEL. TANJUNG UMA | - | - | - | - | 29.991.000 |
SEMENISASI JALAN RT. 04 RW. 01 KELURAHAN TANJUNG UMA (POKMAS MAWAR BIRU) | JALAN RT. 04 RW. 01 KELURAHAN TANJUNG UMA | - | - | - | - | 88.414.000 |
SEMENISASI JALAN RT.01 RW.01 (POKMAS RAMBUTAN) | KELURAHAN TANJUNG UMA | - | - | - | - | 22.368.500 |
SEMENISASI JALAN RT.01 RW.09 (POKMAS KPN) | KELURAHAN TANJUNG UMA | - | - | - | - | 138.206.200 |
SEMENISASI JALAN RT.01 RW.11 BLOK E. KAVLING SENJULUNG | KEL. KABIL, KEC. NONGSA | - | - | - | - | 131.272.000 |
SEMENISASI JALAN RW 08 PERUM TAMAN MEDITERANIA | PERUM TAMAN MEDITERANIA | - | - | - | - | 139.917.700 |
SEMENISASI JALAN SAMPING LAPANGAN VOLLY BLOK IV RT 002 RW 002 ( MERPATI ) | BATU SELICIN | - | - | - | - | 208.577.600 |
SEMENISASI JALAN TAMAN SADE RT 003 RW 004 (POKMAS PATAM 2) | TAMAN SADE RT 003 RW 004 | - | - | - | - | 53.920.000 |
SEMENISASI JALAN UTAMA JL.KARTINI 1 GG MULIA RT.04 RW.02 POKMAS KEPUDANG 5 | RT 04 RW 02 KELURAHAN SUNGAI HARAPAN | - | - | - | - | 111.753.400 |
SEMENISASI JALAN UTAMA JL.KARTINI 4 GG MULIA RT 04 RW 02 POKMAS KEPUDANG 4 | RT 04 RW 02 KELURAHAN SUNGAI HARAPAN | - | - | - | - | 133.739.100 |
SEMENISASI JL. TIBAN KENCANA RW 04 POKMAS SELAR | RT 003 RW 04 KELURAHAN TIBAN INDAH | - | - | - | - | 149.273.300 |
SEMENISASI MASYEBA PERMAI RT 001 RW 011 POKMAS LESTARI 2 | RT 001 RW 011 KELURAHAN PATAM LESTARI | - | - | - | - | 116.196.300 |
SEMENISASI PATAM ASRI RT 006 RW 001 POKMAS LESTARI 3 | RT 006 RW 001 KELURAHAN PATAM LESTARI | - | - | - | - | 124.481.500 |
SEMENISASI PERUM PONDOK PELANGI 2 BLOK F RT 004 RW 09 POKMAS TONGKOL | RT 004 RW 09 KELURAHAN TIBAN INDAH | - | - | - | - | 219.351.000 |
SEMENISASI PERUM SIRIAON REGENCY BLOK J POKMAS KEMBUNG | RT 002 RW 011 KELURAHAN TIBAN INDAH | - | - | - | - | 24.643.300 |
SEMENISASI PERUM TIBAN BERLIAN BLOK A-B RT. 001 RW 13 POKMAS TUNA | RT 001 RW 013 KELURAHAN TIBAN INDAH | - | - | - | - | 74.736.200 |
SEMENISASI PERUM TIBAN BERLIAN RT 004 RW 13 POKMAS BENGGOL | RT 004 RW 013 KELURAHAN TIBAN INDAH | - | - | - | - | 94.788.100 |
SEMENISASI PERUM TIBAN BTN BLOK L 22- L35 POKMAS GURAME | RT 004 RW 013 KELURAHAN TIBAN INDAH | - | - | - | - | 97.268.600 |
SEMENISASI PERUM TIBAN INDAH PERMAI BLOK D2 50 M RT 005 P RW 05 POKMAS BAWAL | RT 005 RW 005 KELURAHAN TIBAN INDAH | - | - | - | - | 74.736.200 |
SEMENISASI PERUMAHAN HANGTUAH RW 6 KEL. BALOI PERMAI | BALOI PERMAI | - | - | - | - | 111.317.909 |
SEMENISASI PURI LEGENDA | PURI LEGENDA | - | - | - | - | 119.942.600 |
SEMENISASI TAMAN LESTARI BLOK A RW.15 | KECAMATAN BATU AJI | - | - | - | - | 169.339.000 |
SEMENISASI TAMAN RATA TAHAP I | NONGSA | - | - | - | - | 119.784.500 |
SEMENISASI TIBAN BERLIAN RT 004 RW013 POKMAS KAKAP | RT 004 RW 013 KELURAHAN TIBAN INDAH | - | - | - | - | 93.513.200 |
SEMENISASI TIBAN DAMAI JALAN UTAMA POKMAS BARONANG | RT 004 RW 07 KELURAHAN TIBAN INDAH | - | - | - | - | 74.736.200 |
SEMENISASI TIBAN DAMAI RT 004 RW 07 POKMAS CAKALANG | RT 004 RW 07 KELURAHAN TIBAN INDAH | - | - | - | - | 74.736.200 |
SERVICES, ADDITIONAL ELECTRICK ROLLING DOOR FOR PROJECT STRUCTURE OVER HEAD CRANE | KAWASAN INDUSTRI TERPADU KABIL | - | - | - | - | 91.000.000 |
SOLDIER PILE WORK AND SETTLEMENT MARKER FOR SLOPE STABILITY PROJECT | MONTIGO RESORT, NONGSA | - | - | - | - | 804.693.000 |
STRUKTUR ARSITEK PLUMBING DI PROYEK CITRA PLAZA NAGOYA BATAM | NAGOYA BATAM | - | - | - | - | 382.157.008.605 |
SUPPLY AND INSTALL METAL ROOF SHEET | JL. HANG KESTURI 1 NO. 2 | - | - | - | - | 31.011.000 |
SUPPLY AND INSTALLATION OF ELECTRICAL WORKS FOR PT. INFINEON TECHNOLOGIES BATAM | PT. INFINEON TECHNOLOGIES BATAM - LOT 328 MUKAKUNING | - | - | - | - | 39.800.000.000 |
SUPPLY LABOUR, MATERIAL, TOOLS AND EQUIPMENT FOR PROPOSED DESIGN AND BUILT ROAD, PAVING, FOOTPATH AND DRAINAGE WORKS, COMPLETE WITH BOX CULVERT AT PLOT B2, | MARINA CITY | - | - | - | - | 3.737.600.000 |
TO INSTALL EXHAUST FAN WORKS AND SUPPORTING WORKS AT FACTORY 2- CAPACITOR | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | - | - | - | - | 389.040.736 |
TO INSTALL RACK FOR NEW DOCUMENT AT FACTORY 2 - CAPACITOR | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | - | - | - | - | 469.750.000 |
TO REPLACE GLASS WOOL DUCT AC 3.1 SDU - 012 & 020A AT PCC AUTO AREA | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | - | - | - | - | 74.187.500 |
TO SUPPLY & INSTALL AIRCON FOR SHIFT LEADER, SPREPART ROOM, NEW DOCUMENT, (OPSI C) | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | - | - | - | - | 561.820.000 |
TO SUPPLY & INSTALL MECHANICAL FACILITIES WORK FOR NEW MACHINE OCT 2020 AT FACTORY 1 - CAPACITOR | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | - | - | - | - | 526.861.200 |
TO SUPPLY & INSTALL MECHANICAL FACILITIES WORK FOR NEW MACHINE OCT 2020 AT FACTORY 2 - CAPACITOR | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | - | - | - | - | 370.000.000 |
STRUKTUR ARSITEK PLUMBING DI PROYEK CITRA PLAZA NAGOYA BATAM | NAGOYA BATAM | - | - | - | - | 382.157.008.605 |
PEKERJAAN UPAH BOBOK DI LANTAI 4 PANBIL MALL | KAWASAN COMERCIAL PANBIL, MUKA KUNING | - | - | - | - | 24.572.000 |
PEKERJAAN PENGADAAN DAN PEMASANGAN CONWOOD DI VILLA PANBIL BLOK DD NO. 33 | KAWASAN VILLA PANBIL, MUKA KUNING - BATAM | - | - | - | - | 26.000.100 |
PPEKERJAAN PENGADAAN DAN PEMASANGAN CONWOOD DI VILLA PANBIL BLOCK DD NO.33 | KAWASAN VILLA PANBIL, MUKA KUNING - BATAM | - | - | - | - | 55.281.400 |
PENGECATAN EXTERIOR,INTERIOR & PLAT DAK BETON DI PERUMAHAN GRAND SUMMIT BATAM | GRAND SUMMIT BATAM | - | - | - | - | 55.884.357 |
GRAND LAGOI HOTEL (TOWER B ROOF RETARING) | JL.GURINDAM DUA BELAS PLOT 27 & 29, SEBONG LAGOI BINTAN | - | - | - | - | 901.452.700 |
PEMBONGKARAN TANGKI EKSISTING, BANGUNAN. BAK LOADING SHED, PAGAR BRC, TIANG LISTRIK, DAN JALUR PIPA | LAMPUNG | - | - | - | - | 285.000.000 |
PEKERJAAN PENGADAAN DAN PEMASANGAN KITCHEN & EARDOBE DI KAMAR TYPE 1 BRA,1BRB,2BRB,1BRC, DIKAMAR LT.21 (22 KAMAR) TOWER B APARTEMENT | MUKA KUNING - BATAM | - | - | - | - | 682.999.000 |
PEKERJAAN PENGADAAN DAN PEMASANGAN MEJA TV DI LANTAI 19 S/D LT.23 APARTEMENT TOWER B APARTEMENT PANBIL RESIDENCE | MUKA KUNING - BATAM | - | - | - | - | 134.400.000 |
PEKERJAAN UPAH FINISHING BANGUNAN DIFACTORY SHIMANO | DIKAWASAN PANBIL INDUSTRIAL,MUKA KUNING- BATAM | - | - | - | - | 59.276.460 |
PEKERJAAN UPAH PENGECORAN ATAU LEVELING LANTAI LOADING DOCK DI FACTPRY SHIMANO | DIKAWASAN PANBIL INDUSTRIAL, MUKA KUNING- BATAM | - | - | - | - | 22.722.660 |
PEMBANGUNAN TAHAP 4 TBR & PEMBANGUNAN HILL SIDE VILA TPI | DESA SUGIE,KECAMATAN MORO,MENTANGUN | - | - | - | - | 9.678.062.920 |
MARKA JALAN | KAWASAN INDUSTRI TERPADU KABIL | - | - | - | - | 60.450.000 |
MAINTENANCE PROJECT & APP MEZANINE FACT NO.2 PROJECT | PURI INDUSTRIAL PARK 2000 BATAM CENTER | - | - | - | - | 9.100.000.000 |
PEMOTONGAN TIANG PANCA DI VILLA PANBIL BLOK AA NO.02 | VILLA PANBIL BLOK AA NO.02 | - | - | - | - | 5.450.000 |
PAVING BLOCK DAN PEMASANGAN KERAMIK AREA TANGGA DI POWER POINT | POWER PLANT | - | - | - | - | 7.746.950 |
PEKERJAAN PENGADAAN & PEMASANGAN TIANG PJU AKSES TAMAN WISATA ALAM | KAWASAN VILLA PANBIL, MUKA KUNING - BATAM | - | - | - | - | 175.000.000 |
PEKERJAAN PENAMBAHAN SHELLER DAN LANAI FACTORY B2 LOT 09-10 | PANBIL INDUSTIAL | - | - | - | - | 30.039.509 |
PEKERJAAN UPAH BOBOKAN KERAMIK LANTAI 3 PANBIL MALL | KAWASAN PANBIL COMERCIAL, MUKA KUNING - BATAM | - | - | - | - | 57.756.008 |
PEKERJAAN UPAH PEMBUATAN AFRON BELAKANG POWER PLANT | PANBIL INDUSTIAL | - | - | - | - | 11.422.700 |
PEKERJAAN PENAMBAHAN SHALLAR TRAFE DI POWER PLANT | KAWASAN INDUSTRIAL ESTATE PANBIL | - | - | - | - | 12.997.261 |
REMOVE AND REINSTALL BYPASS GAS INSTALATION | PT PANASONIC INDUSTRIAL DEVICE BATAM | - | - | - | - | 6.500.000 |
PEKERJAAN PENGADAAN DAN PEMASANGAN PINTU SLIDING DOOR DI LANTAI 15 TOWER A | CONDOTEL PANBIL RECIDENCE | - | - | - | - | 28.890.000 |
PEKERJAAN PENGADAAN DAN PEMASANGAN KACA CURTAINWALL DI LT.GF APARTEMEN TOWER B | APARTEMENT PANBIL RESIDENT | - | - | - | - | 72.980.000 |
PERKUATAN TANGKI MS 1160M (5 UNIT) PROYEK PT MUSIM MAS SITE B PELABUHAN KABIL | JALAN RAYA PELABUHAN CPO KABIL, BATAM | - | - | - | - | 117.500.000 |
UPGRADING WORK TO WORKSHOP AT EX. H-TECH | JALAN HANG KESTURI I NO. 2, KABIL | - | - | - | - | 2.766.273.543 |
PEKERJAAN WATER PROOFING "MEMBRANE ONDULINE" 3MM GUTTER DAK PANBILL MALL | KAWASAN VILLA PANBIL, MUKA KUNING - BATAM | - | - | - | - | 29.054.200 |
PEKERJAAN WATERPROOFING "MEMBRANE ONDULINE" | PANBILL MALL | - | - | - | - | 13.720.000 |
PEKERJAAN ATAP DI ANTARA FACTORY B2 LOT 09 & LOT 10 | KAWASAN INDUSTRI PANBIL | - | - | - | - | 64.389.857 |
BONGKAR ROLLING DOOR, PARTISI DAN RANGKA SEKAT DINDING | PANBIL | - | - | - | - | 4.500.002 |
PEKERJAAN UPAH PEMASANGAN PINTU DAN JENDELA DI VILLA PANBIL BLOK U NO.46 | KAWASAN VILLA PANBIL | - | - | - | - | 43.833.250 |
PEKERJAAN BESI DALAM PEMBANGUNAN WAREHOUSE TYPE A5 | TANJUNG UNCANG | - | - | - | - | 363.067.500 |
PENGADAAN DAN PEMASANGAN JTM SUTM DAN KAWAT GSW PADA JALUR SUTM | JEMBATAN 6 SD SIMPANG KP AIR LINKA PULAU GALANG BARU BARELANG | - | - | - | - | 156.577.500 |
PEKERJAAN PENGADAAN & PEMASANGAN KITCHEN SET DI POWER PLANT | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 22.000.000 |
PEKERJAAN FINISHING LANTAI 3 PANBIL MALL | KAWASAN COMERCIAL PANBIL, MUKA KUNING | - | - | - | - | 36.568.460 |
PENGADAAN DAN PEMASANGAAN MEJA LIPAT LAPIS DI LT.19 & 21 APARTEMENT TOWER B | APARTEMENT PANBIL RESIDENT | - | - | - | - | 40.960.000 |
OFFICE RENOVATION SERVICE | DI PT MCDERMOTT | - | - | - | - | 200.395.000 |
PEKERJAAN STRUKTUR GRID AS 1-13 DI FACTORY C2 LOT 05 | KAWASAN VILLA PANBIL, MUKA KUNING - BATAM | - | - | - | - | 295.774.908 |
ADD MEZZANINE FACTORY 2 PROJECT | PURI INDUSTRIAL PARK 2000 BLOK A,BATAM CENTER | - | - | - | 2019 | 3.649.000.000 |
PEKERJAAN PENGADAAN DAN PEMASANGAN PARQUETE DI VILLA PANBIL BLOK DD 33 | KAWASAN VILLA PANBIL | - | - | - | - | 23.760.000 |
PEKERJAAN PENGADAAN DAN PEMASANGAN PARQUETE DI VILLA PANBIL BLOK DD 32 | KAWASAN VILLA PANBIL | - | - | - | - | 23.762.880 |
PENGADAAN DAN PEMASANGAN SKTM DAN PERALATAN GARDU | PT. RETZEN INDONUSA-KK APARTEMEN ONE RESIDENCE-BATAM CENTRE | - | - | - | - | 13.216.500 |
BORED PILE TOWER 1 & 2 PROJECT THE HAVEN BINTAN | BINTAN, LAGOI | - | - | - | - | 6.085.080.000 |
ENERGY MONITORING SYSTEM WITH EVR ECO & PRODUCTION | PANASONIC INDUSTRIAL DEVICES BATAM, PURI INDUSTRIAL PARK 2000 KEL III BATAM CENTRE | - | - | - | - | 552.500.000 |
PEKERJAAN SALURAN GORONG- GORONG & MAINHOLE VILLA PANBIL BLOK AA NO. 2 S/D AA. 5 DAN AA. 9 S/D AA. 12, KAWASAN VILLA PANBIL, MUKA KUNING | VILLA PANBIL BLOK AA NO. 2 S/D AA. 5 DAN AA. 9 S/D AA. 12, KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 21.938.000 |
PEKERJAAN BAJA UNTUK BANGUNAN WORKSHOP | WORKSHOP FACTORY PT BINTAN BERSATU APPAREL, BATAM CENTRE | - | - | - | - | 1.011.006.000 |
PRESERVASI JALAN NONGSA- BATU AMPAR-TEMBESI-GALANG | BATAM | - | - | - | - | 39.534.051.818 |
NEW PACKING FACILITY PROJECT | JL. RAYA PELABUHAN KABIL, KM 12.5, KABIL, NONGSA | - | - | - | - | 72.000.000.000 |
PEMELIHARAAN GARDU DISTRIBUSI | BATAM TERSEBAR | - | - | - | - | 50.450.000 |
PENGADAAN DAN PEMASANGAN SKTM DAN SISIP PERALATAN GARDU | PT. GLORY PROPERTINDO PR TUNAS REGENCY CLUSTER AMARITIS | - | - | - | - | 108.837.000 |
PENARIKAN SKTM DAN PENGISIAN PERALATAN GARDU HUBUNG | GARDU HUBUNG REMPANG (RPG) | - | - | - | - | 37.672.800 |
PENGADAAN DAN PEMASANGAN SKTM | PT. CITRA BUANA PERKASA KK HARBOURBAY DOWN TOWN BT. AMPAR | - | - | - | - | 58.913.525 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL DAN PERALATAN JTM-SKTM, JTM-SUTM DAN KAWAT GSW PADA JALUR SUTM | KP. AIR LINGKA, BARELANG, GALANG BARU, JEMBATAN 6 | - | - | - | - | 81.190.900 |
PENGADAAN DAN PEMASANGAN SKTM DAN SISIP PERALATAN GARDU | PT. MULIA REALTY BATINDO PR DEVELY RES NONGSA | - | - | - | - | 48.812.000 |
PENGADAAN DAN PEMASANGAN SKTM DAN PERALATAN GARDU | PT. BATAM CIPTA INDUSTRI WORKSHOP B. AMPAR | - | - | - | - | 96.839.250 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PENGUKURAN TM, JTM-SKTM, JTM-SUTM, KAWAT GSW PADA JALUR SUTM, GARDU PORTAL & PERALATAN | KELURAHAN SEMBULANG BARELANG | - | - | - | - | 181.429.150 |
PENGADAAN DAN PEMASANGAN SKTM DAN PERALATAN GARDU | PT. ENERCO RPO INTERNASIONAL KI KABIL NONGSA | - | - | - | - | 83.134.900 |
PEMELIHARAAN SUTM | AREA BATU AJI | - | - | - | - | 20.250.000 |
PEKERJAAN PERBAIKAN MUSHOLA DAN PANTRY DI PLTMG PANARAN | PLTMG PANARAN | - | - | - | - | 50.285.094 |
PEMASANGAN BATU MIRING, PAGAR, DAN PENGECORAN LANTAI TOWER TRANSMISI 150 KV | T.08 SUTT TANJUNG KASAM - BATU BESAR | - | - | - | - | 484.212.138 |
PENGADAAN DAN PEMASANGAN SKTM | KK KSB NUSA JAYA SAMBAU RT 002/004 | - | - | - | - | 141.345.875 |
PENGADAAN DAN PEMASANGAN SKTM | PT. FRES TYFINA PR TAMAN HARAPAN INDAH SEI HARAPAN SEKUPANG | - | - | - | - | 95.086.750 |
PENGADAAN DAN PEMASANGAN SKTM DAN PERALATAN GARDU HANG FUNG METAL INDONESIA | PT. KSA JL SUNGAI BINTI SAGULUNG BATAM | - | - | - | - | 14.426.500 |
RAMP JALAN MASUK DI FACTORY C2 LOT 05, KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | - | - | 22.563.700 |
PEKERJAAN UPAH STUKTUR VILA PANBIL BLOK AA NO.02 | KAWASAN VILLA PANBIL, MUKA KUNING - BATAM | - | - | - | - | 441.320.864 |
PEKERJAAN PERKERASAN JALAN MASUK TAMAN WISATA ALAM KAWASAN VILLA PANBIL MUKA KUNING | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 96.685.500 |
PEKERJAAN PONDASI GAPURA DI TAMAN WISATA ALAM, KAWASAN VILLA PANBIL, MUKA KUNING | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 19.079.797 |
RELOKASI KUBIKEL DARI GD GIANT MEGA LEGENDA (BERHENTI LANGGANAN) KE GD PT YEO SAN (KUBIKEL KORONA) | GD MEGA LEGENDA BATAM CENTER & GD PT YEO SAN BATU AJI | - | - | - | - | 9.635.000 |
PEKERJAAN LANJUTAN PONDASI DAN STRUKTUR TAHAP II GEDUNG PASTORAN PAROKI MBPA | PAROKI MARIA BUNDA PEMBANTU ABADI, SAGULUNG | - | - | - | - | 600.000.000 |
PENGERJAAN PENGECATAN DINDING LUAR DAN DALAM DI PANBIL MALL KAWASAN PANBIL COMERCIAL, MUKA KUNING | KAWASAN PANBIL COMERCIAL, MUKA KUNING | - | - | - | - | 245.891.000 |
PENGGANTIAN DAN PEMASANGAN JEMBATAN KABEL SKTM 20KV | BATAM TERSEBAR | - | - | - | - | 65.038.500 |
PEMELIHARAAN TAMAN JALAN ARTERI DAN ROW | BADAN PENGUSAHAAN KAWASAN PERDAGANGAN BEBAS DAN PE | - | - | - | - | 1.365.800.270 |
PEKERJAAN PENGADAAN DAN PEMASANGAN PARQUETTE DI VILLA PANBIL BLOK U NO. 46 | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 39.138.750 |
SEMENISASI JALAN LINGKUNGAN BELONGKENG RT 03/RW 04 KEL. REMPANG CATE KEC,. GALANG | RT 003/004 BELONGKENG KEL. REMAPNG CATE | - | - | - | - | 85.827.082 |
SEMENISASI JALAN RT.002 RW.004 SEI RAYA | RT. 002 / 004 SEI RAYA KELURAHAN SEMBULANG | - | - | - | - | 207.652.315 |
SEMENISASI JALAN LINGKUNGAN CATE RT.02 RW. 01 | RT. 001/001 CATE KEL. REMPANG CATE | - | - | - | - | 109.296.683 |
SEMENISASI JALAN LINGKUNGAN PASIR PANJANG RT. 01 / RW. 03 | RT. 001/ 003 PASIR PANJANG KEL. REMPANG CATE | - | - | - | - | 216.091.052 |
PEKERJAAN FINISHING DINDING VILLA PANBIL BLOK AA NO. 01, KAWASAN VILLA PANBIL MUKA KUNING, BATAM | KAWASAN VILLA PANBIL MUKA KUNING, BATAM | - | - | - | - | 266.532.350 |
SEMENISASI JALAN RT 002 / RW 002. CAMPING (POKMAS SEMBULANG 6) | RT 002 / RW 002 CAMPING, KELURAHAN SEMBULANG | - | - | - | - | 258.253.158 |
SEMENISASI JALAN RT 001 RW 003 KUALA BULUH | RT 001 RW 003 KUALA BULUH KEL SEMBULANG | - | - | - | - | 196.647.894 |
SEMENISASI JALAN LINGKUNGAN TANJUNG KELINGKING RT 03/ RW 02 (POKMAS 3 TG. KELINGKING) | RT 003/ 002 CATE KEL. REMPANG CATE | - | - | - | - | 87.972.750 |
PENGADAAN DAN PEMASANGAN SKTM DAN PERALATAN GARDU | PT. BATAM SLOP & SLUDGE TREATMENT, BARELANG | - | - | - | - | 98.623.100 |
SEMENISASI JALAN LINGKUNGAN TANJUNG KERTANG RT. 01 / RW. 02 (POKMAS 4 TANJUNG KERTANG) | RT 001 / 002 TANJUNG KERTANG KEL. REMPANG CATE | - | - | - | - | 122.127.052 |
SEMENISASI JALAN LINGKUNGAN TEBING TINGGI RT. 04 / RW. 01(POKMAS 5 TEBING TINGGI) | RT 004 / 001 TEBING TINGGI KEL. REMPANG CATE | - | - | - | - | 85.834.000 |
ENERGY MONITORING SYSTEM FOR POWER HOUSE ADDITIONAL & INSTALLATION (HARDWARE & INSTALLATION WIRING ACCESSORIES 1 LOT LABOUR SECTION 1 LOT) | PT. PANASONIC INDUSTRIAL DEVICES BATAM | - | - | - | - | 35.000.000 |
PEKERJAAN PEMBANGUNAN WAREHOUSE 106 X 23 M, PEKERJAAN PEMBANGUNAN WAREHOUSE 112 X 69 M & PEKERJAAN PEMBANGUNAN DRAINAGE | KAWASAN INDUSTRIAL KENDAL, SEMARANG | - | - | - | - | 2.700.000.000 |
MEKANIKAL DAN ELEKTRIKAL PT. BINTAN BERSATU APPAREL INDONESIA | JLN. ENGKU PUTRI NO. 12 KEL. BELIAN | - | - | - | - | 9.852.076.481 |
REHABILITASI GD DISTRIBUSI BETON | GARDU BETON KDA1, KDA2, TIBAN KOPERASI DAN PALM | - | - | - | - | 124.012.493 |
PEKERJAAN TANAH GALIAN DAN TIMBUNAN | PROYEK PEMBANGUNAN JALAN TOL TRANS SUMATERA RUAS SIGLI - BANDA ACEH | - | - | - | - | 167.196.024.920 |
PEREMAJAAN PENGUKURAN APP UNTUK PENEKANAN LOSSES | BATAM TERSEBAR | - | - | - | - | 43.912.000 |
PEKERJAAN INSTALASI SCAFFOLDING | KAWASAN INDUSTRI TERPADU KABIL JL. HANG KESTURI KAV. 3A | - | - | - | - | 20.511.400 |
PERBAIKAN GROUNDING PADA GARDU BETON | SELURUH KOTA BATAM | - | - | - | - | 91.400.000 |
JERAMBAH BETON BATU MERAH 14 | RT 18 RW 05 KELURAHAN BATU MERAH | - | - | - | - | 179.682.200 |
MECHANICAL SYSTEM KHUSUS KAPAL REPAIRING/DOCKING | JL. BRIGJEND KATAMSO KM.6 TANJUNG UNCANG | - | - | - | - | 200.000.000 |
DRAINASE BATU MERAH 21 | RT 19 RW 06 KEL BATU MERAH | - | - | - | - | 15.162.000 |
PEMBUATAN BATU MIRING RT 12 RW 03 (POKMAS BATUMERAH 4D) | RT. 12 RW.03 KEL.BATU MERAH KEC. BATU AMPAR | - | - | - | - | 49.646.000 |
BATU MIRING RT 23 RW 07 (POKMAS BATUMERAH 5D) | RT 23 RW 07 KEL. BATU MERAH KEC. BATU AMPAR | - | - | - | - | 45.054.000 |
SEMENISASI JALAN RT 27 RW 08 KELURAHAN BATU MERAH (POKMAS BATU MERAH 4) | RT 27 RW 08 KELURAHAN BATU MERAH | - | - | - | - | 63.238.300 |
DRAINASE BATU MERAH 18 | RT10 RW 03 KEL BATU MERAH | - | - | - | - | 13.353.000 |
SEMENISASI JALAN RT 30 RW 06 KELURAHAN BATU MERAH (POKMAS 5) | SEMENISASI JALAN RT 30 RW 06 KELURAHAN BATU MERAH | - | - | - | - | 127.261.600 |
DRAINASE BATU MERAH 19 | RT 08 RW 02 KEL BATU MERAH | - | - | - | - | 11.544.000 |
PAVING BLOK RT 25 RW 01 KELURAHAN BATU MERAH (POKMAS 7) | RT 25 RW 01 KELURAHAN BATU MERAH | - | - | - | - | 69.184.900 |
DRAINASE BATU MERAH 17 | RT 30 RW 06 KEL BATU MERAH | - | - | - | - | 24.749.000 |
PAVING BLOK RT 01 RW 08 KELURAHAN BATU MERAH (POKMAS BATU MERAH 8) | RT 01 RW 08 KELURAHAN BATU MERAH | - | - | - | - | 50.967.700 |
DRAINASE BATU MERAH 20 | RT 24 RW 07 KEL BATU MERAH | - | - | - | - | 21.015.000 |
PAVING BLOK RT 19 RW 06 KELURAHAN BATU MERAH (POKMAS BATU MERAH 9) | RT 19 RW 06 KELURAHAN BATU MERAH | - | - | - | - | 170.097.000 |
JERAMBAH BETON BATU MERAH 15 | RT 07 RW 02 KEL BATU MERAH | - | - | - | - | 179.722.800 |
PAVING BLOK RT 27 RW 08 KELURAHAN BATU MERAH (POKMAS BATU MERAH 10) | RT 27 RW 08 KELURAHAN BATU MERAH | - | - | - | - | 46.823.800 |
JERAMBAH RT 03 RW 01 KELURAHAN BATU MERAH (POKMAS BATU MERAH 11) | RT 03 RW 01 KELURAHAN BATU MERAH | - | - | - | - | 179.613.300 |
JERAMBAH BATU MERAH 12 | RT 06 RW 02 KEL BATU MERAH | - | - | - | - | 179.490.800 |
JERAMBAH BETON RT 13 RW 04 KELURAHAN BATU MERAH (POKMAS BATU MERAH 13) | RT 13 RW 04 KELURAHAN BATU MERAH | - | - | - | - | 161.120.800 |
DRAINASE RT 15 RW 04 KELURAHAN BATU MERAH (POKMAS BATU MERAH 16) | RT 15 RW 04 KELURAHAN BATU MERAH | - | - | - | - | 32.439.000 |
BATU MIRING RT 01 RW 08 (POKMAS BATU MERAH 3D) | RT 01 RW 08 KEL BATU MERAH KEC BATU AMAPAR | - | - | - | - | 99.250.000 |
SEMENISASI JALAN RT 23 RW 07 (POKMAS BATUMERAH 1) | RT 23 RW 07 KEL BATU MERAH KEC BATU AMPAR | - | - | - | - | 183.376.400 |
PAVING BLOCK RT 10 RW 03 (POKMAS BATUMERAH 1D) | RT 10 RW 03 KEL BATUMERAH KEC BATU AMPAR | - | - | - | - | 59.970.200 |
PAVING BLOCK RT 18 RW 05 (POKMAS BATUMERAH 2D) | RT 18 RW 05 KEL BATUMERAH KEC BATU AMPAR | - | - | - | - | 48.769.300 |
PAVING BLOCK RT. 04 RW. 01 (POKMAS BATUMERAH 2) | RT. 04 RW. 01 KEL. BATU MERAH KEC. BATU AMPAR | - | - | - | - | 32.233.400 |
SEMENISAI JALAN RT 12 RW 03 (POKMAS BATUMERAH 3) | 03/KS/PSPK- BM/BA/APBD/III/2019 | - | - | - | - | 90.290.700 |
PEMBANGUNAN GARDU BETON PLN BRIGHT BATAM | DI PT WIDYA CIPTA FORTUNA DAN SAGULUNG | - | - | - | - | 146.055.910 |
PEKERJAAN WATERPROOFING "SIKATOP 107" DI AREA TOILET, BALKON & DINDING TOILET LT. 19,20,21,23 & 25 APARTEMENT TOWER B APARTEMENT PANBIL RESIDENCE | CONDOTEL PANBIL (PANBIL PLAZA LANTAI 2 PANBIL COMERSIAL) MUKA KUNING | - | - | - | - | 60.209.000 |
PENGALIHAN KABEL SKTM (PLN BRIGHT) | SIMPANG BANK MANDIRI CAB NAGOYA | - | - | - | - | 54.166.666 |
CONCRETE MAIN READ FROM OUTPUT COATING RU (RACK J6) TO RACK 10, CONCRETE INSIDE RACK 20 RACKS | PT CITRA TUBINDO, TBK | - | - | - | - | 3.398.222.869 |
PEMBANGUNAN/REHABILITASI SEMENISASI JALAN PERUM. GMP THP I RT 002,003 RW 003 (POKMAS BANGUN BERSAMA SEJAHTERA) | RT 002,003 RW 003 KELURAHAN TANJUNG SENGKUANG | - | - | - | - | 160.793.000 |
PEMBANGUNAN/REHABILITASI SEMENISASI JALAN PERUM. GMP THP II RT 002,004 RW 004 (POKMAS GMP BERSATU) | RT 002,004 RW 004. KELURAHAN TANJUNG SENGKUANG | - | - | - | - | 181.844.000 |
SEMENISASI JALAN TANJUNG SENGKUANG POKMAS PISANG | TANJUNG SENGKUANG RT 001 RW 002 | - | - | - | - | 199.546.000 |
SEMENISASI JALAN AIR RAJA TANJUNG SENGKUANG POKMAS APEL | TANJUNG SENGKUANG RT 001 RW 009 | - | - | - | - | 47.136.000 |
PEMBANGUNAN SEMENISASI JALAN SEI TERING I RT 001 RW 006, 487.5 M2 (POKMAS TERING JAAYA I) | JALAN SEI TERING I RT 001 RW 006 KEL. TANJUNG SENGKUANG KEC. BATU AMPAR | - | - | - | - | 145.733.000 |
DRAINASE MARITIM SQUARE 02 | RT 004 / RW 06 KELURAHAN SUNGAI JODOH | - | - | - | - | 19.070.833 |
PEMBANGUNAN DRAINASE KAV. BUKIT MAKMUR RT 001 RW 013, 500 METER (POKMAS MAKMUR JAYA ) | KAV. BUKIT MAKMUR RT 001 RW 013 KEL. TANJUNG SEKUANG KEC. BATU AMPAR | - | - | - | - | 94.963.636 |
PEMBANGUNAN SEMENISASI JALAN RT.003 RW.017 | RT.003 RW.017 KEL. TANJUNG SENGKUANG KEC. BATU AMPAR | - | - | - | - | 94.467.000 |
SEMENISASI KOMP MARITIM SQUARE | RT 04 / RW 06 KELURAHAN SUNGAI JODOH | - | - | - | - | 115.811.579 |
SEMENISASI JALAN POKMAS MAJU MAJU RT 02 / RW 05 KELURAHAN SUNGAI JODOH | RT 02 / RW 05 KELURAHAN SUNGAI JODOH | - | - | - | - | 62.465.833 |
SEMENISASI JALAN 06/05 POKMAS PERMAI KELURAHAN SUNGAI JODOH | RT 06 /RW 06 KELURAHAN SUNGAI JODOH | - | - | - | - | 95.763.750 |
DRAINASE RT 002 / RW 005 KELURAHAN SUNGAI JODOH (POKMAS SUMBER AGUNG) | RT 002 / RW 005 KELURAHAN SUNGAI JODOH | - | - | - | - | 21.815.000 |
SEMENISASI JALAN RT 007 / RW 005 KELURAHAN SUNGAI JODOH (POKMAS MEKAR WANGI) | RT 007 / RW 005 KELURAHAN SUNGAI JODOH | - | - | - | - | 59.963.750 |
SEMENISASI JALAN BATU BESAR RT. 003 RW. 001 3000 M2 (POKMAS SRIKANDI) | RT. 003 RW. 001 KEL. BATU BESAR KEC. NONGSA | - | - | - | - | 97.951.800 |
SEMENISASI JALAN KAMPUNG MELAYU RT. 001 RW. 002 325 M2 (POKMAS MELATI I) | RT. 001 RW. 002 KEL. BATU BESAR KEC. NONGSA | - | - | - | - | 105.823.158 |
REPAIR ACP PANEL OF BUILDING FACADE | RADISSON GOLF & CONVENTION CENTER BATAM | - | - | - | - | 20.000.000 |
PEKERJAAN PENGECATAN DINDING LUAR, DALAM DAN PLAFOND VILLA PANBIL BLOK T NO. 07 KAWASAN VILLA PANBIL, MUKA KUNING | VILLA PANBIL BLOK T NO. 07 KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 128.767.915 |
PEKERJAAN PENGECATAN DINDING LUAR DAN DALAM DI VILLA PANBIL BLOK U NO. 47 | VILLA PANBIL BLOK U NO. 47, KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 30.618.320 |
PEKERJAAN PENGECATAN DINDING LUAR DAN DALAM DI VILLA PANBIL BLOK U NO. 46 KAWASAN VILLA PANBIL, MUKA KUNING | VILLA PANBIL BLOK U NO. 46 KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 27.540.131 |
PEKERJAAN PENGECATAN DINDING LUAR LUAR DAN DALAM DI VILLA PANBIL BLOK U NO. 45 KAWASAN VILLA PANBIL, MUKA KUNING | VILLA PANBIL BLOK U NO. 45 KAWASAN VILLA PANBIL, MUKA KUNING | - | - | - | - | 27.540.131 |
PENAMBAHAN PENTANAHAN GROUNDING DI TOWER TRANSMISI 150KV | PLN BATAM | - | - | - | - | 347.786.000 |
PERBAIKAN SARANA GEDUNG KANTOR GTRANBU, GI TANJUNG UNCANG DAN GIS KABIL | GI TANJUNG UNCANG DAN GIS KABIL | - | - | - | - | 59.382.150 |
PENGADAAN DAN PEMASANGAN SKTM | RUSUN PEGAWAI KANTOR IMIGRASI KELAS 1 DEPAN RUKO PURI SELEBRITI 1 BATU BESAR | - | - | - | - | 35.232.450 |
PEMASANGAN EARTH FAULT INDICATOR (EFI) PADA GARDU DISTRIBUSI TAHAP I TAHUN 2019 | BATAM TERSEBAR | - | - | - | - | 42.500.000 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL, JTM-SKTM | KANDANG AYAM A.N SYUKRI- JLN TRANS BARELANG SETELAH PANTAI MELAYU | - | - | - | - | 28.021.900 |
PENYAMBUNGAN BARU PT. MIROTA PARIWISATA DAN KELONG ALMIRA | TRANS BARELANG KEL SIJANTUNG RT.RW 02.01 | - | - | - | - | 16.274.500 |
PENGADAAN DAN PEMASANGAN SKTM | PT DYAN MENTARI ABADI - RUKO PASIR MAS JL. HANG JEBAT BT. BESAR | - | - | - | - | 40.576.850 |
PENARIKAN SKTM, PENGISIAN PERALATAN GARDU DISTRIBUSI & KWH PANTAU | GD BETON TIBAN HILL | - | - | - | - | 18.452.150 |
PENGADAAN DAN PEMASANGAN SKTM DAN PERALATAN GARDU PORTABLE | PT MULTIBANGUN ADHITAMA KONSTRUKSI - CITY NAGOYA PLAZA | - | - | - | - | 49.360.000 |
PELEBARAN TAMBAH LAJUR JALAN SP. KABIL - SP. JAM (JL. JEND. SUDIRMAN) (SP. KABIL) SEPANJANG 1 KM | SP. KABIL - SP. JAM (JL. JEND. SUDIRMAN) | - | - | - | - | 16.875.259.513 |
PENGADAAN DAN PEMASANGAN SKTM | RS BHAYANGKARA POLDA KEPRI - SAMPING PR AMERIA BATU BESAR | - | - | - | - | 47.371.550 |
PENGADAAN DAN PEMASANGAN SKTM | PT MITRA SUKSES RAYA - KK PR ANSLEY PARK BATAM CENTRE | - | - | - | - | 193.291.500 |
DRAINASE RT 02 RW 005, 530 METER (POKMAS SEI LEKOP 05) | RT 02 RW 005 KEL SEI LEKOP KEC SAGULUNG | - | - | - | - | 130.392.105 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 07, 660 M2 (POKMAS SEI LEKOP 07) | JALAN LINGKUNGAN RT 05 RW 07 SAGULUNG | - | - | - | - | 203.275.789 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 11, 660 M2 (POKMAS SEI LEKOP 11) | JALAN LINGKUNGAN RT 02 RW 11 SAGULUNG | - | - | - | - | 203.611.052 |
SEMENISASI JALAN KAVLING PATAM INDAH RT 007 RW 001, 396M?? (POKMAS R A KARTINI) | AVLING PATAM INDAH RT 007 RW 001 KEL. TIBAN KEC. SEKUPANG | - | - | - | - | 118.610.526 |
DRAINASE U40 BELAKANG MESJID NURUL HIDAYAH PERUM PESONA RHABAYU RT 001 RW 012, 265M (POKMAS M H THAMRIN) | BELAKANG MESJID NURUL HIDAYAH PERUM PESONA RHABAYU RT 001 RW 012, 265M | - | - | - | - | 60.189.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN CENDRAWASIH RT 002 RW 008, 490M?? | JALAN LINGKUNGAN TIBAN CENDRAWASIH RT 002 RW 008, 490M?? | - | - | - | - | 136.447.000 |
DRAINASE U40 BLOK I KSBMENTARAU RT 004 RW 010, 150M (POKMAS CUT NYAK DIEN) | BLOK I KSBMENTARAU RT 004 RW 010 KEL TIBAN KEC SEKUPANG | - | - | - | - | 36.000.000 |
SEMENISASI JALAN JALAN KARTINI 1 RT03 RW02 SUNGAI HARAPAN, 520M?? (POKMAS PUNAI) | JALAN KARTINI 1 RT03 RW02 SUNGAI HARAPAN | - | - | - | - | 150.328.000 |
DRAINASE U30 TIBAN CENDRAWASIH RT 002 RW 008, 210M (POKMAS PATTIMURA) | U30 TIBAN CENDRAWASIH RT 002 RW 008, 210M | - | - | - | - | 37.510.000 |
COR JALAN MASUK PERUM CIPTA GARDEN RT02 RW15 SUNGAI HARAPAN, 200M (POKMAS RAJAWALI) | PERUM CIPTA GARDEN RT02 RW15 SUNGAI HARAPAN, 200M | - | - | - | - | 61.049.000 |
PERBAIKAN DRAINASE U40 BLOK A DAN JMASYEBA PERMAI RT 001 RW 006, 100M (POKMAS BUNG HATTA) | BLOK A DAN JMASYEBA PERMAI RT 001 RW 006 KEL TIBAN KEC SEKUPANG | - | - | - | - | 24.682.916 |
PENGECORAN JALAN BLOK DD/EE PONDOK PRATIWI 2 RT04 RW10, 225M?? (POKMAS GARUDA) | JALAN BLOK DD/EE PONDOK PRATIWI 2 RT04 RW10, 225M?? | - | - | - | - | 68.424.000 |
DRAINASE U40 DEKAT FASUM BLOK C RT 005 RW 009, 200M (POKMAS SULTAN) | U40 DEKAT FASUM BLOK C RT 005 RW 009, 200M | - | - | - | - | 47.367.000 |
SEMENISASI JALAN LINGKUNGAN RT 04 RW 04 (SEI LEKOP 04) | RT 04 RW 04 KEL. SEI LEKOP KEC. SAGULUNG | - | - | - | - | 166.267.894 |
SEMENISASI JALAN MASYEBA GADING MAS RT01 RW12. 144M?? (POKMAS MERAK) | JALAN MASYEBA GADING MAS RT01 RW12. 144M?? | - | - | - | - | 44.614.000 |
SEMENISASI JALAN PERUM MASYEBA GADING MAS RT06 RW12 SUNGAI HARAPAN, 320M?? (POKMAS MALEO) | SEMENISASI JALAN PERUM MASYEBA GADING MAS RT06 RW12 SUNGAI HARAPAN, 320M?? | - | - | - | - | 95.065.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN I BLOK AA RT 001 RW 013, 660M?? (POKMAS HANG NADIM) | JALAN LINGKUNGAN TIBAN I BLOK AA RT 001 RW 013 KEL TIBAN KEC SEKUPANG | - | - | - | - | 195.944.210 |
SEMENISASI JALAN LINGKUNGAN JALAN KARTINI 2 RT01 RW02 SUNGAI HARAPAN, 380M?? (POKMAS MANYAR) | JALAN KARTINI 2 RT01 RW02 SUNGAI HARAPAN, 380M?? | - | - | - | - | 113.862.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 06 (SEI LEKOP 06) | RT 02 RW 06 KEL. SEI LEKOP KEC. SAGULUNG | - | - | - | - | 181.774.210 |
SEMENISASI JALAN LINGKUNGAN AKSES JALAN RT 001 RW 007 (POKMAS RAJA ALI HAJI FISABILILLAH) | RT 001 RW 007 KEL PATAM LESTARI | - | - | - | - | 84.527.916 |
SEMENISASI JALAN PERUM TAMANMELATI RAYA BLOK G2 S/D G12B RT 004 RW 009, 300M??(POKMAS SISINGA MANGARAJA) | PERUM TAMANMELATI RAYA BLOK G2 S/D G12B RT 004 RW 009, | - | - | - | - | 89.162.752 |
SEMENISASI JALAN PERUMMAYEBA PERMAI TAHAP 3 RT 002 RW 011 (POKMAS PRABU SILIWANGI) | RT 002 RW 011 KEL PATAM LESTARI | - | - | - | - | 139.062.631 |
SEMENISASI JALAN KAV. TIBANMADANI BLOK D, BLOK J DAN BLOK H RT 002 RW 004, 610.5M?? (POKMAS BUNG TOMO) | JALAN KAV. TIBANMADANI BLOK D, BLOK J DAN BLOK H RT 002 RW 004 KEL TIBAN KEC. SEKUPANG | - | - | - | - | 181.441.579 |
SEMENISASI JALAN LINGKUNGAN RT 04 RW 09 - SEI LEKOP 9 | RT 04 RW 09 SEI LEKOP KEC SAGULUNG | - | - | - | - | 168.055.000 |
SEMENISASI JALAN LINGKUNGAN, RT 03, RT 05 RW 03 - SEI LEKOP 3 | RT 03, RT 05 RW 03 SEI LEKOP 3 SAGULUNG | - | - | - | - | 111.114.210 |
LABOUR AND MATERIAL FOR MODIFY EXISTING PIPING & DISMATING EXISTING AIR DRIYER INCLUDE PIPING AND ACESSORIES | PT. PANASONIC INDUSTRIAL DEVICES BATAM | - | - | - | - | 55.530.000 |
LABOUR AND MATERIAL FOR INSTALLATION NEW AIR DRIYER | PT PANASONIC INDUSTRIAL DEVICES BATAM | - | - | - | - | 111.066.000 |
SEMENISASI JALAN LINGKUNGAN BALOI HARAPAN 2 KAMPUNG BAWEAN BLOK B RT 04 - BLOK C RT 05 RW 03 | LINGKUNGAN BALOI HARAPAN 2 KAMPUNG BAWEAN BLOK B RT 04 - BLOK C RT 05 RW 03 BENGKONG | - | - | - | - | 173.526.315 |
SEMENISASI JALAN LINGKUNGAN JI.BOUGENFILE - JL.FLAMBOYAN RT 05 RW 10 (POKMAS INDAH 25) | LINGKUNGAN JI.BOUGENFILE, JL.FLAMBOYAN RT 05 RW 10 BENGKONG | - | - | - | - | 133.368.420 |
SEMENISASI/PAVINGBLOK JALAN LINGKUNGAN (4 X 180 M) ( RT 05/RW 10 ) (POKMAS INDAH 14) | RT 05/RW 10 KEL BENGKONG INDAH KEC BENGKONG | - | - | - | - | 189.210.526 |
SEMENISASI/PAVINGBLOK JALAN LINGKUNGAN (4 X 180 M) ( RT 05/RW 10 ) | RT 05/RW 10 KEL BENGKONG INDAH KEC BENGKONG | - | - | - | - | 189.210.526 |
PEKERJAAN BORED PILE HOTEL HUANG HI - BATAM | NAGOYA | - | - | - | - | 11.000.000.000 |
SEMENISASI/PAVINGBLOK JALAN LINGKUNGAN RT 02/RW 10 (POKMAS INDAH 13) | RT 02 RW 10 KEL. BENGKONG INDAH KEC. BENGKONG | - | - | - | - | 122.000.000 |
SEMENISASI/PAVINGBLOK JALAN LINGKUNGAN (4 X 30 M) ( RT 02/RW 04 ) | KEL. BENGKONG INDAH RT 02/RW 04 | - | - | - | - | 37.850.833 |
SEMENISASI/PAVINGBLOK JALAN LINGKUNGAN-SEHATI 41 | RT 05/RW 10 | - | - | - | - | 166.736.842 |
SEMENISASI/PAVINGBLOK JALAN LINGKUNGAN-SEHATI 43 | RT 01/RW 02 | - | - | - | - | 172.000.000 |
SEMENISASI JALAN PERUM PUTRI TUJUH TAHAP II BLOK P DAN O RT 03 RW 05 BERBATAS MKGR 400M?? (POKMAS PUTRI TUJUH MAS) | JALAN PERUM PUTRI TUJUH TAHAP II BLOK P DAN O RT 03 RW 05 KEL. KIBING KEC. BATU AJI | - | - | - | - | 115.894.737 |
PEMBANGUNAN DRAINASE/ SALURAN-SEHATI 47 | RT 03/RW 15 | - | - | - | - | 40.060.000 |
SEMENISASI JALAN PERUM TAMAN LESTARI RW 013 400M?? (POKMAS LESTARI MAJU) | JALAN PERUM TAMAN LESTARI RW 013 KEL KIBING KEC BATU AJI | - | - | - | - | 117.578.947 |
PEMBANGUNAN / REHABILITASI DRAINASE PERUM PUTRI TUJUH TAHAP I RT 01 RW 04 (POKMAS PUTRI 7 THP I RW 004) | PERUM PUTRI TUJUH TAHAP I RT 01 RW 04 | - | - | - | - | 33.125.000 |
SEMENISASI/PAVINGBLOK JALAN LINGKUNGAN-SEHATI 44 | RT 1 RW 10 KELURAHAN TANJUNG BUNTUNG | - | - | - | - | 173.000.000 |
PEMBANGUNAN GARDU BETON UK. 3X4 M2 | PT PANA LINTAS SINDO LOGISTIKINDO-KK RUKO MEGA MAS BATAM CENTRE | - | - | - | - | 116.773.608 |
PEMBANGUNAN / REHABILITASI DRAINASE PERUM BUANA VIEW ASRI RT 02 RW 019 (POKMAS BV ASRI) | PERUM BUANA VIEW ASRI RT 02 RW 019 | - | - | - | - | 37.777.916 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG TUA TANJUNG BUNTUNG RT 02 RW 01 420 M2 (POKMAS DAU SEHATI 1) | LINGKUNGAN KAMPUNG TUA TANJUNG BUNTUNG RT 02 RW 01 420 M2 KEC. BENGKONG | - | - | - | - | 123.368.420 |
SEMENISASI JALAN PERUM PUTRI TUJUH TAHAP I RW04 344M?? (POKMAS PUTRI 7 THP I) | JALAN PERUM PUTRI TUJUH TAHAP I RW04 KEL. KIBING KEC BATU AJI | - | - | - | - | 102.269.000 |
DRAINASE U30 LINGKUNGAN PERUMAHAN GRIYA PRIMA RW 014 RT 03 BLOK F,G,H,I,K 200M (POKMAS GRIYA PRIMA MAJU) | LINGKUNGAN PERUMAHAN GRIYA PRIMA RW 014 RT 03 KEL. BULIANG KEC. BATU AJI | - | - | - | - | 36.625.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CIPTA SARANA BLOK C1 U40 500M2 (POKMAS SARANA INDAH) | LINGKUNGAN PERUMAHAN CIPTA SARANA BLOK C1 U40 KEL. BULIANG KEC. BATU AJI | - | - | - | - | 147.631.579 |
PEMBANGUNAN / REHABILITASI DRAINASE U-40 PERUM TEMBESI RAYA RW 020 (POKMAS TEMBESI RAYA) | PERUM TEMBESI RAYA RW 020 | - | - | - | - | 39.375.000 |
SEMENISASI JALAN LINGKUNGAN RT 07 / RW 02 (POKMAS DAU SEHATI 2) | JALAN LINGKUNGAN RT 07 / RW 02 | - | - | - | - | 62.672.916 |
SEMENISASI JALAN PERUM BUMI AGUNG PERMAI RT02, RT03 DAN RT 04 RW 021 400M?? | JALAN PERUM BUMI AGUNG PERMAI RT02, RT03 DAN RT 04 RW 021 | - | - | - | - | 114.052.631 |
PEMBANGUNAN / REHABILITASI DRAINASE U-30 PERUM TAMAN LESTARI RW 014, KELILING MASJID RAUDATUL JANNAH (225M) | PERUM TAMAN LESTARI RW 014, KELILING MASJID RAUDATUL JANNAH | - | - | Konstruksi | - | 44.041.666 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GENTA 2 RW01 RT 06 BLOK I, W, RT 06 BLOK M,N 612.50M2 | JALAN LINGKUNGAN PERUMAHAN GENTA 2 RW01 RT 06 BLOK I, W, RT 06 BLOK M,N | - | - | Konstruksi | - | 178.105.263 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN MAITRI INDAH RT 01 BLOK I W RT 06 BLOK M, N 600M?? | PERUMAHAN MAITRI INDAH RT 01 BLOK I W RT 06 BLOK M, N | - | - | Konstruksi | - | 174.789.474 |
PEMBANGUNAN JERAMBAH LINGKUNGAN PEMUKIMAN PULAU NANGA RT. 001 RW. 002 (POKMAS GALANG BARU 11) | LINGKUNGAN PEMUKIMAN PULAU NANGA RT. 001 RW. 002 | - | - | Konstruksi | - | 75.304.545 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN PLUTO - MAJU BERSAMA 05 | PERUMAHAN PLUTO RT 02 RW 05 | - | - | Konstruksi | - | 149.004.211 |
PROYEK LANJUTAN PENYAMBUNGAN JALAN PAVING BLOK KAMPUNG PADANG PENAGA (POKMAS KARAS 1) | PAVING BLOK KAMPUNG PADANG PENAGA | - | - | Konstruksi | - | 88.912.729 |
JALAN SEMENISASI DARI WARUNG DAYANG S/D PELANTAR NELAYAN KP. RANGA (POKMAS KARAS 2) | WARUNG DAYANG S/D PELANTAR NELAYAN KP. RANGA | - | - | Konstruksi | - | 155.796.363 |
JALAN SEMENISASI DARI RUMAH JAAFAR S/D RUMAH SELAMAT KP. KETAPANG (POKMAS KARAS 3) | RUMAH JAAFAR S/D RUMAH SELAMAT KP. KETAPANG | - | - | Konstruksi | - | 103.777.274 |
PEMBUATAN JALAN LINGKUNGAN SEMENISASI KAMPUNG DARAT PULAU (POKMAS 4) | KAMPUNG DARAT PULAU | - | - | Konstruksi | - | 131.519.089 |
SEMENISASI JALAN LINGKUNGAN TAMAN CARINA - TAMAN CARINA I | TAMAN CARINA RT 01 RW 02 | - | - | Konstruksi | - | 145.984.211 |
SEMENISASI JALAN RT. 002 RW. 002 PULAU PANJANG (PULAU PANJANG SETIA 3) | RT. 002 RW. 002 PULAU PANJANG | - | - | Konstruksi | - | 138.443.158 |
SEMENISASI JALAN RT. 003 RW. 003 PULAU PANJANG (PULAU PANJANG SETIA 4) | RT. 003 RW. 003 PULAU PANJANG | - | - | Konstruksi | - | 31.453.334 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA INDOMAS I - POKMAS CITRA INDOMAS 1 SEJAHTERA | PERUMAHAN CITRA INDOMAS I RT 02 RW 15 | - | - | Konstruksi | - | 134.402.105 |
PEMBUATAN JALAN PAVING BLOK PROYEK LANJUTAN (POKMAS KARAS 5) | JALAN PAVING BLOK PROYEK LANJUTAN | - | - | Konstruksi | - | 131.519.089 |
SEMENISASI JALAN RT. 004 RW. 003 PULAU PANJANG (PULAU PANJANG SETIA 5) | RT. 004 RW. 003 PULAU PANJANG | - | - | Konstruksi | - | 152.669.089 |
JALAN SEMENISASI DARI RUMAH DABOK S/D RUMAH SELAMAT KP. PADANG RT. 02 RW. 03 (POKMAS KARAS 6) | RUMAH DABOK S/D RUMAH SELAMAT KP. PADANG RT. 02 RW. 03 | - | - | Konstruksi | - | 103.780.911 |
JERAMBAH BETON RT. 001 RW. 004 AIR NAGA, DAPUR 3 (AIR NAGA SETIA 1) | RT. 001 RW. 004 AIR NAGA, DAPUR 3 | - | - | Konstruksi | - | 181.491.815 |
JERAMBAH CAROS (POKMAS KARAS 7) | JERAMBAH CAROS | - | - | Konstruksi | - | 192.036.363 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN CIPTA INDAH I - POKMAS TAMAN CIPTA INDAH 1 | PERUMAHAN TAMAN CIPTA INDAH I RT 02 RW 11 | - | - | Konstruksi | - | 95.074.167 |
JERAMBAH PULAU ABANG RT.001/RW.001, 120M?? | PULAU ABANG RT.001/RW.001 | - | - | Konstruksi | - | 226.085.468 |
JERAMBAH BETON RT. 002 RW. 004 AIR NAGA, DAPUR 3 (AIR NAGA SETIA 2) | RT. 002 RW. 004 AIR NAGA, DAPUR 3 | - | - | Konstruksi | - | 142.528.182 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN FANINDO RT03 RW16 - POKMAS FANINDO JAYA | PERUMAHAN FANINDO RT03 RW 16 500M?? | - | - | Konstruksi | - | 141.252.105 |
SEMENSASI JALAN LINGKUNGAN MARINA GARDEN - POKMAS RAJAWALI MARINA GARDEN | MARINA GARDEN RT 6 RW 12 | - | - | Konstruksi | - | 115.443.158 |
JERAMBAH PULAU ABANG RT. 001 RW. 001, 90M?? (POKMAS PULAUABANG 10) | PULAU ABANG RT. 001 RW. 001 | - | - | Konstruksi | - | 169.596.363 |
SEMENISASI JALAN LINGKUNGAN PERMATA LAGUNA - POKMAS PERMATA LAGUNA MAJU | PERMATA LAGUNA RT 01/02 RW 17 | - | - | Konstruksi | - | 126.681.053 |
SEMENISASI JALAN LINGKUNGAN PERMUKIMAN DARI MASJID KE SEKOLAH PULAU SEMBUR RT. 001 RW. 001 (GALANG BARU 1) | PULAU SEMBUR RT. 001 RW. 001 | - | - | Konstruksi | - | 38.129.091 |
JALAN BETON PULAU ABANG RT. 001 RW. 001, 359M?? (POKMASPULAU ABANG 11) | JALAN BETON PULAU ABANG RT. 001 RW. 001 | - | - | Konstruksi | - | 124.370.000 |
SEMENISASI JALAN LINGKUNGAN TELUK PANDAN - POKMAS BINASOSIAL TELUK PANDAN | TELUK PANDAN RT 02 RW 14 | - | - | Konstruksi | - | 144.996.842 |
SEMENISASI JALAN LINGKUNGAN YOSE SADE INDAH - POKMASYOSE BERJAYA | YOSE SADE INDAH RT 01 RW 07 | - | - | Konstruksi | - | 61.577.083 |
SEMENISASI JALAN LINGKUNGAN PERMUKIMAN MASYARAKAT RT. 002 RW. 006 (GALANG BARU 2) | RT. 002 RW. 006 KELURAHAM GA;ANG BARU | - | - | Konstruksi | - | 69.387.273 |
JERAMBAH PULAU ABANG RT. 001 RW. 001, 75M?? (POKMAS PULAUABANG 12) | PULAU ABANG RT. 001 RW. 001 | - | - | Konstruksi | - | 141.386.363 |
PEMBANGUNAN JERAMBAH LINGKUNGAN PEMUKIMAN PULAUNGUAN - | PULAU NGUAN RT. 001 RW. 004 | - | - | Konstruksi | - | 169.440.911 |
SEMENISASI JALAN LINGKUNGAN PERMUKIMAN TANJUNG PENGAPIT RT. 001 RW. 003 (GALANG BARU 3) | KELURAHAN GALANG BARU RT. 001 RW. 003 | - | - | Konstruksi | - | 69.348.182 |
JERAMBAH PULAU ABANG RT. 002 RW. 001, 75M?? (POKMAS PULAUABANG 13) | PULAU ABANG RT. 002 RW. 001 | - | - | Konstruksi | - | 141.392.726 |
DRAINASE U30 KAMPUNG RANGA- POKMAS KARAS 8 | KAMPUNG RANGA | - | - | Konstruksi | - | 66.820.908 |
LANJUTAN SEMENISASI JALAN LINGKUNGAN PERMUKIMAN PULAU KOREK RT. 004 RW. 001 (GALANG BARU 4) | KELURAHAN GALANG BARU RT. 004 RW. 001 | - | - | Konstruksi | - | 69.348.182 |
JERAMBAH (LANJUTAN) PULAU ABANG RT.002 RW.001, 78,36M??(POKMAS PULAU ABANG 14) | PULAU ABANG RT.002 RW.001 | - | - | Konstruksi | - | 141.392.726 |
SEMENISASI JALAN LINGKUNGAN PERMUKIMAN AIR LINGKA RT. 001RW. 005 (GALANG BARU 6) | KELURAHAN GALANG BARU RT. 001 RW. 006 | - | - | Konstruksi | - | 52.055.455 |
SEMENISASI JALAN RT. 001 RW.001 SIJANTUNG - POKMAS SIJANTUNGSETIA 1 | RT. 001 RW.001 SIJANTUNG | - | - | Konstruksi | - | 120.758.168 |
SEMENISASI JALAN RT. 002 RW.001 SIJANTUNG - POKMAS SIJANTUNGSETIA 2 | RT. 002 RW.001 SIJANTUNG | - | - | Konstruksi | - | 190.779.089 |
SEMENISASI JALAN LINGKUNGAN PERMUKIMAN MASYARAKAT KAMPUNG BARU RT. 001 RW. 006 (GALANG BARU 5) | KELURAHAN GALANG BARU RT. 001 RW. 006 | - | - | Konstruksi | - | 54.653.636 |
JERAMBAH PULAU PETONG RT. 001 RW. 003, 123M?? (POKMASPULAU ABANG 15) | PULAU PETONG RT. 001 RW. 003 | - | - | Konstruksi | - | 231.764.547 |
DRAINASE U40 RT. 001 RW. 002 PULAU PANJANG - | RT. 001 RW. 002 PULAU PANJANG | - | - | Konstruksi | - | 75.005.454 |
SEMENISASI JALAN RT. 001 RW. 002 PULAU PANJANG - POKMASPULAU PANJANG SETIA 2 | RT. 001 RW. 002 PULAU PANJANG | - | - | Konstruksi | - | 97.177.271 |
PEMBANGUNAN JERAMBAH LINGKUNGAN PEMUKIMAN (108 M X 1.8 M) TELUK NIPAH RT. 002 RW.002 (GALANG BARU 7) | KELURAHAN GALANG BARU RT. 002 RW. 002 | - | - | Konstruksi | - | 169.423.636 |
PEMBANGUNAN JERAMBAH LINGKUNGAN PEMUKIMANKAMPUNG BARU RT. 001 RW. 006 (GALANG BARU 8) | KELURAHAN GALANG BARU RT. 001 RW. 006RT. 001 RW. 006 | - | - | Konstruksi | - | 244.745.455 |
PEMBANGUNAN JERAMBAH LINGKUNGAN PEMUKIMAN PULAU NANGA RT. 001 RW. 002 (GALANGBARU 10) | KELURAHAN GALANG BARU RT. 001 RW. 002 | - | - | Konstruksi | - | 169.438.182 |
SEMENISASI JALAN RT. 002 RW. 004 AIR NAGA, DAPUR 3 (AIR NAGASETIA 4) | KELURAHAN SIJANTUNG RT. 002 RW. 004 | - | - | Konstruksi | - | 52.084.545 |
PEMBANGUNAN GARDU BETON UK. 3X4 M | KK. KP KELEMBAK RT. 004/001 DEPAN KANTOR BIN LAMA NONGSA | - | - | Konstruksi | - | 116.773.609 |
PEMASANGAN PAGAR PENGAMAN BRC PADA GARDU PORTAL EXISTING | H-TECH OILFIELD BATAM TERSEBAR | - | - | Konstruksi | - | 100.462.292 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN MUKA KUNING INDAH I - POKMAS AJANG KARYASWADAYA | PERUMAHAN MUKA KUNING INDAH I BLOK T, S, R | - | - | Konstruksi | - | 175.105.263 |
PEMBANGUNAN DAN INSTALASI GD PAKET PORTABLE (KONTAINER 20 FEET) | PT USDA SEROJA JAYA - KAWASAN INDUSTRI SEI LEKOP | - | - | Konstruksi | - | 105.732.516 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GRIYA PRATAMA - POKMAS MITRA PRATAMA | PERUMAHAN GRIYA PRATAMA RT01 BLOK A-B | - | - | Konstruksi | - | 116.105.263 |
SEMENISASI JALAN - POKMAS SADAI 1 | RT 07/RW 01 | - | - | Konstruksi | - | 196.105.263 |
SEMENISASI JALAN - POKMAS SADAI 2 | RT 03/RW 03 | - | - | Konstruksi | - | 196.157.895 |
REHAB SEMENISASI JALAN RT. 001 RW. 001 (POKMAS AIR RAJA 1) | JALAN RT. 001 RW. 001 KECAMATAN GALANG | - | - | Konstruksi | - | 140.433.637 |
SEMENISASI JALAN NGASMO RT. 002 RW. 001 (POKMAS AIR RAJA 2) | SEMENISASI JALAN NGASMO RT. 002 RW. 001 KEL. AIR RAJA KEC. GALANG | - | - | Konstruksi | - | 173.381.815 |
REHAB SEMENISASI JALAN MASJID AL HIJRAH RT. 003 RW.001 (POKMAS AIR RAJA 3) | JALAN MASJID AL HIJRAH RT. 003 RW. 001 KEL. AIR RAJA KEC. GALANG | - | - | Konstruksi | - | 260.086.363 |
REHAB SEMENISASI JALAN NASRUN S/D NARMAN RT. 001 RW. 002 (POKMAS AIR RAJA 4) | JALAN NASRUN S/D NARMAN RT. 001 RW. 002 KEL. AIR RAJA KEC. GALANG | - | - | Konstruksi | - | 234.768.185 |
SEMENISASI JALAN - POKMAS SADAI 3 | RT 03/RW 07 | - | - | Konstruksi | - | 215.684.211 |
SEMENISASI JALAN ANUAR S/D MENCARAS RT. 002 RW. 002 (POKMAS AIR RAJA 5) | JALAN ANUAR S/D MENCARAS RT. 002 RW. 002 KEL. AIR RAJA KEC. GALANG | - | - | Konstruksi | - | 208.062.726 |
DRAINASE U30 DEPAN JALAN FACHRI RT. 001 RW. 002 (POKMASAIR RAJA 6) | JALAN FACHRI RT. 001 RW. 002 KEL. AIR RAJA KEC. GALANG | - | - | Konstruksi | - | 164.889.089 |
SEMENISASI JALAN - POKMAS SADAI 4 | RT 02/RW 10 | - | - | Konstruksi | - | 215.736.842 |
REHAB JALAN RT. 001 RW. 001 SUBANG MAS, 500M?? (POKMASSUBANG MAS 6) | JALAN RT. 001 RW. 001 SUBANG MAS KEL. SUBANG MAS KEC. GALANG | - | - | Konstruksi | - | 174.511.815 |
DRAINASE / PARIT - POKMAS SADAI 5 | RT 01,02/RW 20 | - | - | Konstruksi | - | 39.816.000 |
REHAB JALAN LINGKUNGAN RT.002 RW. 001 SUBANG MAS,497.74M?? (POKMAS SUBANG MAS7) | LINGKUNGAN RT. 002 RW. 001 SUBANG MAS KEL. SUBANG MAS KEC. GALANG | - | - | Konstruksi | - | 173.734.542 |
SEMENISASI JALAN UTAMA PENGHUBUNG KEL. SUBANG MAS- KEL. AIR RAJA PENURUN RT. 006 RW. 001 (POKMAS SUBANG MAS 8) | JALAN UTAMA PENGHUBUNG KEL. SUBANG MAS-KEL. AIR RAJA PENURUN RT. 006 RW. 001 KEC. GALANG | - | - | Konstruksi | - | 521.336.360 |
PEMBANGUNAN / REHABILITASI DRAINASE PERUM MKGR - POKMAS BINA UMMAH 24 KEL | PERUM MKGR BLOK BERKAH 8,10,11, DAN 13 | - | - | Konstruksi | - | 25.833.333 |
SEMENISASI JALAN PERUM MKGR- POKMAS BERKAH BERKARYA 24 | PERUM MKGR BLOK BERKAH 17C RW24 | - | - | Konstruksi | - | 50.000.000 |
DRAINASE JALAN SUBANG MAS KE PENURUN SUBANG MAS, 700M(POKMAS SUBANG MAS 9) | JALAN SUBANG MAS KE PENURUN SUBANG MAS KEL. SUBANG MAS KEC. GALANG | - | - | Konstruksi | - | 312.109.089 |
CONCRETE SLAB AND PIPE DRAIN | KABIL INDUSTRIAL ESTATE | - | - | Konstruksi | - | 980.797.390 |
PEMASANGAN PAGAR PENGAMAN BRC PADA GARDU PORTAL EXISTING | GARDU PORTAL BATAM TERSEBAR TAHAP II 2019 | - | - | Konstruksi | - | 83.776.910 |
PEMBANGUNAN GARDU BETON 3,5 M X 5,5 M | PT MITRA SUKSES RAYA - KK PR ANSLEY PARK BATAM CENTRE | - | - | Konstruksi | - | 146.055.910 |
SEMENISASI JALAM PERUM MKGR- POKMAS SUGANDI MADANI | PERUM MKGR RT 07 RW 07 | - | - | Konstruksi | - | 155.052.632 |
PELEBARAN TAMBAH LAJUR JALAN DIPONEGORO (SP. SEI HARAPAN - SP. BASECAMP BATUAJI) | SP. SEI HARAPAN - SP. BASECAMP BATU AJI | - | - | Konstruksi | - | 34.639.895.424 |
PERBAIKAN KUBAH KANTOR PLN BATAM | PLN BATAM | - | - | Konstruksi | - | 70.094.000 |
SEMENISASI JALAN TANJUNG RIAU - POKMAS MANGGIS 6 | RT 001 RW 005 TANJUNG RIAU | - | - | Konstruksi | - | 76.102.000 |
SEMENISASI JALAN UK. 4 X 112 METER BLOK E1(6-10), BLOK E3 (1- 5), BLOK F1 (10-15) RT 001 RW 011(POKMAS MANGGIS 7) | BLOK E1(6-10), BLOK E3 (1-5), BLOK F1 (10-15) RT 001 RW 011 KEL TANJUNG RIAU KEC SEKPANG | - | - | Konstruksi | - | 130.610.000 |
SEMENISASI JALAN UK. LEBAR 4 X 100 METER RT 001 RW 018(POKMAS MANGGIS 5) | RT 001 RW 018 KEL TANJUNG RIAU KEC, SEKUPANG | - | - | Konstruksi | - | 116.173.157 |
SEMENISASI/PAVINGBLOK JALAN LINGKUNGAN BENGKONG KODIM RT01 RW05 (DEPAN MASJID AL- HIKMAH) (POKMAS LAUT 12) | BENGKONG KODIM RT01 RW05 | - | - | Konstruksi | - | 56.014.166 |
SEMENISASI JALAN UK. LEBAR 2,5 X 100 METER RT 001 RW 006(POKMAS MANGGIS 4) | RT 001 RW 006 KEL. TANJUNG RIAU KEC. SEKUPANG | - | - | Konstruksi | - | 75.004.166 |
SEMENISASI JALAN KAMPUNG BUKIT RT 002 RW 006 UKURAN 4 X 150 METER (POKMAS MANGGIS 3) | JALAN KAMPUNG BUKIT RT 002 RW 006 KEL. TANJUNG RIAU KEC. SEKUPANG | - | - | Konstruksi | - | 175.588.946 |
SEMENISASI/PAVINGBLOK JALAN LINGKUNGAN BENGKONG PERMAI RT04 RW03 (POKMAS LAUT 10) | BENGKONG PERMAI RT04 RW03 | - | - | Konstruksi | - | 174.736.842 |
SEMENISASI/PAVINGBLOK JALAN LINGKUNGAN BENGKONG LAUT RT04 RW01 (POKMAS LAUT 9) | BENGKONG LAUT RT04 RW01 | - | - | Konstruksi | - | 173.842.105 |
SEMENISASI JALAN 4 X 85 METER BLOK B2 (5-16) PERUM TAMAN LAGUNA INDAH RT 005 RW 011 (POKMAS MANGGIS 2) | BLOK B2 (5-16) PERUM TAMAN LAGUNA INDAH RT 005 RW 011 KEL. TANJUNG RIAU KEC. SEKUPANG | - | - | Konstruksi | - | 99.084.165 |
SEMENISASI/PAVINGBLOK JALAN LINGKUNGAN BENGKONG LAUT RT04 RW01 (POKMAS LAUT 8) | BENGKONG LAUT RT04 RW01 | - | - | Konstruksi | - | 171.526.315 |
SEMENISASI JALAN KAMPUNG BUKIT UK. LEBAR 3 X 150 METER RT 003 RW 006 (POKMAS MANGGIS1) | RT 003 RW 006 KEL TANJUNG RIAU KEC SEKUPANG | - | - | Konstruksi | - | 75.004.165 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN VILLA MUKA KUNING INDAH I BLOK DG 105 (POKMASGENTA BERSERI) | PERUMAHAN VILLA MUKA KUNING INDAH I BLOK DG 105 | - | - | Konstruksi | - | 34.500.000 |
DRAINASE U30 SAKURA GARDEN RT 01 RW 04 (U30) (POKMASKAMPUNG SERAYA II) | RT 01 RW 04 KEL. KAMPUNG SERAYA KEC. BATU AMAPAR | - | - | Konstruksi | - | 52.900.833 |
SEMENISASI JALAN UKURAN LEBAR 2,5 X 100 METER KAMPUNG PONJEN RT 002 RW 005 (POKMASMANGGIS 12) | KAMPUNG PONJEN RT 002 RW 005 | - | - | Konstruksi | - | 75.004.166 |
SEMENISASI KAMPUNG BARU UKURAN LEBAR 2,5 X 40 METER RT 001 RW 004 (POKMAS MANGGIS11) | KAMPUNG BARU RT 001 RW 004 KEL. TANJUNG RIAU | - | - | Konstruksi | - | 32.439.166 |
DRAINASE U40 SERAYA GARDEN RT 01 RW 03 (U40) (POKMASSERAYA III) | RT 01 RW 03 KEL. KAMPUNG SERAYA KEC. BATU AMPAR | - | - | Konstruksi | - | 44.725.833 |
REHABILITASI JALAN LINGKUNGAN UK. 4 X 70 METER RT 001 RW 017PERUM JUPITER RESIDENCE (POKMAS MANGGIS 10) | RT 001 RW 017 PERUM JUPITER RESIDENCE | - | - | Konstruksi | - | 82.265.834 |
DRAINASE U30 LANJUTAN SERAYA KAVLING RT 01 RW 01 (U30) (POKMAS SERAYA I) | RT 01 RW 01 KEL. KAMPUNG SERAYA KEC. BATU AMPAR | - | - | Konstruksi | - | 22.132.916 |
SEMENISASI JALAN UK.LEBAR 1,5 X 170 METER PULAU SERAYA RT 001 RW 009 (POKMAS MANGGIS 9) | PULAU SERAYA RT 001 RW 009 KEL. TANJUNG RIAU | - | - | Konstruksi | - | 76.237.084 |
REHABILITASI SEMENISASI JALAN UKURAN LEBAR 4 X 100 METER PERUM KOTA MAS MARINA RT 002 RW 018 (POKMAS MANGGSI 8) | PERUM KOTA MAS MARINA RT 002 RW 018 KEL. TANJUNG RIAU | - | - | Konstruksi | - | 116.173.158 |
JERAMBAH BETON KAMPUNG TANJUNG, RT.002 RW.004 (PELANTAR SAMPING RUMAH SDR. KANCIL), 86.50 METER PERSEGI (POKMAS TANJUNG SARI10) | RT.002 RW.004 KEL. TANJUNG SARI | - | - | Konstruksi | - | 179.140.600 |
JERAMBAH BETON KAMPUNG TANJUNG, RT.001 RW.004 (PELANTAR MUSTAFA), 83 METERPERSEGI (POKMAS TANJUNG SARI 9) | RT.001 RW.004 KEL. TANJUNG SARI | - | - | Konstruksi | - | 171.892.826 |
JERAMBAH BETON DAPUR ARANG, RT.005 RW.004, 80 METER PERSEGI (POKMAS TANJUNG SARI7) | RT.005 RW.004 KEL. TANJUNG SARI | - | - | Konstruksi | - | 165.679.347 |
JERAMBAH BETON (TAHAP II) DAPUR ARANG, RT.005 RW.004 (PELANTAR SAMPING RUMAH SDR. JUJUD), 76 METER PERSEGI(POKMAS TANJUNG SARI 8) | RT.005 RW.004 KEL. TANJUNG SARI | - | - | Konstruksi | - | 157.395.337 |
SEMENISASI JALAN PULAU SEKANAK RT.01/RW.04, 490 METERPERSEGI (POKMAS SEKANAK RAYA 12) | JALAN PULAU SEKANAK RT.01/RW.04 KEL. SEKANAK RAYA | - | - | Konstruksi | - | 186.933.337 |
SEMENISASI JALAN/GANG BUKIT BAITUL MAKMUR (LANJUTAN) KAMPUNG JAWA RT. 03/RW. 02, 417 METER PERSEGI (POKMASSEKANAK RAYA 14) | SEMENISASI JALAN/GANG BUKIT BAITUL MAKMUR (LANJUTAN) KAMPUNG JAWA RT. 03/RW. 02, 417 METER PERSEGI | - | - | Konstruksi | - | 159.085.421 |
SEMENISASI JALAN KAMPUNG JAWA RT.01/RW.02, 451 METER PERSEGI (POKMAS SEKANAKRAYA 16) | JALAN KAMPUNG JAWA RT.01/RW.02 KEL. SEKANAK RAYA | - | - | Konstruksi | - | 172.052.500 |
SEMENISASI JALAN BARU RT.01/RW.01 DAN RT.04/RW.02, 400 METER PERSEGI (POKMASPECONG 7) | JALAN BARU RT.01 /RW.01 DAN RT.04/RW.02 KEL. PECONG | - | - | Konstruksi | - | 152.599.585 |
REHAB/PENEBALAN SEMENISASI JALAN RT.01 DAN RT.02/RW.01, 396METER PERSEGI (POKMAS PECONG 8) | JALAN RT.01 DAN RT.02/RW.01 KEL. PECONG | - | - | Konstruksi | - | 151.073.305 |
JERAMBAH RT 13/RW 05 GERANTING, 112 METER PERSEGI (POKMAS PULAU TERONG 12) | RT 13/RW 05 GERANTING KEL. PULAU TERONG | - | - | Konstruksi | - | 231.951.421 |
JERAMBAH GERANTING RT 12 / RW 05, 75 METER PERSEGI (POKMAS PULAU TERONG 14) | GERANTING RT 12 / RW 05 KEL. PULAU TERONG | - | - | Konstruksi | - | 155.321.263 |
JERAMBAH RT 03/RW 02 PL TERONG, 120 METER PERSEGI (POKMAS PULAU TERONG 15) | RT 03/RW 02 KEL. PULAU TERONG | - | - | Konstruksi | - | 248.518.437 |
PEMBANGUNAN JERAMBAH RT 03 RW 01 KELURAHAN KASU, 67 METER PERSEGI (POKMAS KASU14) | RT 03 RW 01 KELURAHAN KASU | - | - | Konstruksi | - | 138.755.621 |
PEMBANGUNAN JERAMBAH RT 01 RW 01 KELURAHAN KASU, 65 METER PERSEGI (POKMAS KASU16) | RT 01 RW 01 KELURAHAN KASU | - | - | Konstruksi | - | 134.612.811 |
PEMBANGUNAN JERAMBAH RT 11 RW 03 KELURAHAN KASU, 65 METER PERSEGI (POKMAS KASU18) | RT 11 RW 03 KELURAHAN KASU | - | - | Konstruksi | - | 134.613.600 |
PEMBANGUNAN JERAMBAH PL.GARA RT 22 RW 06 KELURAHAN KASU, 90 METER PERSEGI(POKMAS KASU 19) | PL.GARA RT 22 RW 06 KELURAHAN KASU | - | - | Konstruksi | - | 186.389.811 |
SEMENISASI JALAN MONGKOL RT 02 RW 02 KELURAHAN PEMPING,651 METER PERSEGI (POKMAS PEMPING 4) | JALAN MONGKOL RT 02 RW 02 KELURAHAN PEMPING | - | - | Konstruksi | - | 248.355.968 |
SEMENISASI JALAN RT 03 RW 01 KELURAHAN PEMPING, 745 METER PERSEGI (POKMAS PEMPING 5) | JALAN RT 03 RW 01 KELURAHAN PEMPING | - | - | Konstruksi | - | 284.216.132 |
SEMENISASI JALAN MONGKOL RT 02 RW 02 KELURAHAN PEMPING,651 METER PERSEGI (POKMAS PEMPING 6) | JALAN MONGKOL RT 02 RW 02 KELURAHAN PEMPING | - | - | Konstruksi | - | 248.355.732 |
JERAMBAH / PELANTAR BETON ( LANJUTAN ) TANJUNG PANA RT 02 RW 01 KELURAHAN PEMPING, 100METER PERSEGI (POKMAS PEMPING 8) | TANJUNG PANA RT 02 RW 01 KELURAHAN PEMPING | - | - | Konstruksi | - | 207.098.685 |
SALURAN DRAINASE U40 (POKMAS CAMAR) | PERUM MELATI GARDEN RT. 03 RW. 13 KEL. SUNGAI HARAPAN KEC. SEKUPANG | - | - | Konstruksi | - | 11.073.000 |
SEMENISASI JALAN PONDOK AWAL INDAH RT. 02. RW. 08(POKMAS KASTURI) | JALAN PONDOK AWAL INDAH RT. 02. RW. 08 KEL. SUNGAI HARAPAN KEC SEKUPANG | - | - | Konstruksi | - | 46.412.083 |
PEMBANGUNAN DRAINASE U30 TANJUNG SENGKUANG RT.002/RW.012 (POKMAS TUNASMUDA) | TANJUNG SENGKUANG RT.002/RW.012 | - | - | Konstruksi | - | 15.057.916 |
SEMENISASI JALAN TAMAN PUTRI FORTUNA RT 03 RW 08 (POKMASPUYUH) | JALAN TAMAN PUTRI FORTUNA RT 03 RW 08 KEL. SUNGAI HARAPAN KEC SEKUPANG | - | - | Konstruksi | - | 119.747.895 |
PEMBANGUNAN SEMENISASI JALAN PERUM. PALEM RAYA RT.003/RW.017 (POKMAS AL MAQFIROH) | PERUM. PALEM RAYA RT.003/RW.017 | - | - | Konstruksi | - | 123.654.211 |
SEMENISASI JALAN BLOK H DAN I TAMAN KARTINI RT 03 RW 14RAYA (POKMAS WALET) | ALAN BLOK H DAN I TAMAN KARTINI RT 03 RW 14 RAYA KEL SUNGAI HARAPAN KEC SEKUPANG | - | - | Konstruksi | - | 196.055.789 |
JERAMBAH DARI RUMAH MUHTAR - BONG JENG RT. 002 RW. 003 KUALA BULUH (POKMASSEMBULANG 10) | RT. 002 RW. 003 KUALA BULUH KEL. SEMBULANG | - | - | Konstruksi | - | 291.980.000 |
PEMBANGUNAN SEMENISASI TANJUNG SENGKUANG BLOK E RT.005/RW.011 (POKMAS SUKUNXI) | TANJUNG SENGKUANG BLOK E RT.005/RW.011 KEL. TANJUNG SENGKUANG KEC BATU AMPAR | - | - | Konstruksi | - | 118.256.842 |
PEMBANGUNAN/REHABILITASI JERAMBAH BETON CATE RT. 01 / RW. 01 (POKMAS 7 CATE) | RT. 01 / RW. 01 KEL. REMPANG CATE | - | - | Konstruksi | - | 225.736.842 |
PEMBANGUNAN SEMENISASI JALAN PERUM. TERING RAYA RT.002/RW.018 (POKMAS RAMBUTAN 18) | JALAN PERUM. TERING RAYA RT.002/RW.018 KEL. TANJUNG SENGKUANG KEC. BATU AMPAR | - | - | Konstruksi | - | 190.657.895 |
PEMBANGUNAN/REHABILITASI JERAMBAH BETON MONGGAK RT. 02 / RW. 04 (POKMAS 8 MONGGAKRT 02) | MONGGAK RT. 02 / RW. 04 KEL. REMPANG CATE | - | - | Konstruksi | - | 225.735.263 |
PEMBANGUNAN SEMENISASI JALAN TANJUNG SENGKUANG RT.006/RW.001 (POKMAS MANGGAII) | JALAN TANJUNG SENGKUANG RT.006/RW.001 KEL. TANJUNG SENGKUANG KEC. BATU AMPAR | - | - | Konstruksi | - | 193.231.053 |
SEMENISASI JALAN RT. 002 RW. 002 PASIR MERAH (POKMASSEMBULANG 9) | RT. 002 RW. 002 PASIR MERAH KEL. SEMBULANG | - | - | Konstruksi | - | 422.661.053 |
PEMBANGUNAN/REHABILITASI JERAMBAH BETON MONGGAK RT. 01 / RW. 04 (POKMAS 9 MONGGAKRT 01) | MONGGAK RT. 01 / RW. 04 KEL. REMPANG CAET | - | - | Konstruksi | - | 225.726.842 |
PEMBANGUNAN SEMENISASI JALAN TANJUNG SENGKUANG RT.004/RW.001 (POKMAS KAPLINGPASIR MANTANG) | JALAN TANJUNG SENGKUANG RT.004/RW.001 KEL. TANJUNG SNEGKUANG KEC. BATU AMPAR | - | - | Konstruksi | - | 136.245.263 |
PEMBANGUNAN SEMENISASI JALAN PERUM. SENGLUANG RAYA RT.001/RW.014 (POKMAS JENDELA14) | RT.001/RW.014 KEL. TANJUNG SENGKUANG | - | - | Konstruksi | - | 139.405.263 |
SEMENISASI JALAN LINGKUNGAN PERUM. SIRIAON - POKMAS MERAPI INDAH | PERUM. SIRIAON RT.002 RW.11 | - | - | Konstruksi | - | 212.134.000 |
SEMENISASI JALAN PERUM MASYEBA GADING MAS RT 03 RW12 (POKMAS KEPUDANG) | JALAN PERUM MASYEBA GADING MAS RT 03 RW 12 KEL. SUNGAI HARAPAN KEC. SEKUPANG | - | - | Konstruksi | - | 93.437.000 |
SEMENISASI JALAN LINGKUNGAN GPI. CLUSTER CENDANA - SEMENISASI JALAN LINGKUNGAN GPI. CLUSTER CENDANA | GPI. CLUSTER CENDANA RT.001 RW.10 | - | - | Konstruksi | - | 217.451.000 |
PEMASANGAN U40 200 METER, DI FASUM BLOK G DAN M, TAMAN KARTINI RAYA 2 RT10 RW10 SUNGAI HARAPAN (POKMASJALAK) | FASUM BLOK G DAN M, TAMAN KARTINI RAYA 2 RT10 RW10 SUNGAI HARAPAN KEC. SEKUPANG | - | - | Konstruksi | - | 45.207.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. HARAPAN INDAH - POKMAS RINJANI INDAH | PERUM. HARAPAN INDAH RT.004 RW.11 | - | - | Konstruksi | - | 217.361.000 |
PEKERJAAN INSTALASI SCAFFOLDING | JL. BUKIT GIRANG, PT. II BATU AMPAR | - | - | Konstruksi | - | 14.500.000 |
SEMENISASI JALAN LINGKUNGAN RW. 015 RT. 001- POKMAS SERUNI | RT. 001 RW. 015 | - | - | Konstruksi | - | 40.220.000 |
SEMENISASI JALAN LINGKUNGAN RW. 003 - POKMAS MELATI | RW. 003 MELIPUTI RT. 001 | - | - | Konstruksi | - | 88.267.000 |
SEMENISASI JALAN LINGKUNGAN RW. 017 - POKMAS SEROJA INDAH | RW. 017 MELIPUTI RT. 002 | - | - | Konstruksi | - | 78.479.000 |
SEMENISASI JALAN LINGKUNGAN RW 011 - POKMAS NURUDDIN | RW 011 MELIPUTI RT. 001, 002 | - | - | Konstruksi | - | 88.241.000 |
SUPPLY AND INSTALLATION OF ELECTRICAL WORKS FOR PT. INFINEON TECHNOLOGIES BATAM | PT. INFINEON TECHNOLOGIES BATAM - LOT 328 MUKAKUNING | - | - | Konstruksi | - | 39.800.000.000 |
SEMENISASI JALAN LINGKUNGAN - POKMAS TERATAI | RW 010 MELIPUTI RT. 004 | - | - | Konstruksi | - | 88.272.000 |
SEMENISASI JALAN LINGKUNGAN - POKMAS KELAPA PURNA YUDHA | RW 008 MELIPUTI RT. 002 | - | - | Konstruksi | - | 87.853.000 |
SEMENISASI JALAN LINGKUNGAN - POKMAS KIBOT | RW. 021 MELIPUTI RT. 004 | - | - | Konstruksi | - | 88.288.000 |
SEMENISASI JALAN GANG PULAU NGENANG - POKMAS KUDA LAUT | RT. 02 RW. 01 | - | - | Konstruksi | - | 88.412.729 |
SEMENISASI JALAN GANG PULAU NGENANG - POKMAS BETON JAYA | RT. 01 RW. 01 | - | - | Konstruksi | - | 104.031.816 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 03 RW 15(110 X 3 M) (POKMASDURIANGKANG 8) | JALAN LINGKUNGAN RT 03 RW 15 KEL. DURIANGKANG KEC. SEI BEDUK | - | - | Konstruksi | - | 107.909.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 04 RW 15(110 X 3.5 M) (POKMASDURIANGKANG 1) | JALAN LINGKUNGAN RT 04 RW 15 KEL DURIANGKANG KEC SEI BEDUK | - | - | Konstruksi | - | 125.887.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 05 RT 06RW 02 (147 X 3.4 M)(DURIANGKANG 9) | JALAN LINGKUNGAN RT 05 RT 06 RW 02 KEL. DURIANGKANG KEC. SEI BEDUK | - | - | Konstruksi | - | 163.494.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 5 RW 09(124 X 3 M) (DURIANGKANG 10) | JALAN LINGKUNGAN RT 5 RW 09 KEL DURIANGKANG KEC SEI BEDUK | - | - | Konstruksi | - | 121.629.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 04 RW 09(100 X 3 M) (DURIANGKANG 12) | JALAN LINGKUNGAN RT 04 RW 09 KEL DURIANGKANG KEC SEI BEDUK | - | - | Konstruksi | - | 98.095.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 07 RW 02(100 X 3 M) (DURIANGKANG 11) | JALAN LINGKUNGAN RT 07 RW 02 KEL DURIANGKANG KEC SEI BEDUK | - | - | Konstruksi | - | 98.092.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 04 RW 01(110 X 4 M) (POKMASDURIANGKANG 3) | JALAN LINGKUNGAN RT 04 RW 01 KEL. DURIANGKANG KEC SEI BEDUK | - | - | Konstruksi | - | 143.850.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 06 RW 13(192 X 3 M) (POKMASDURIANGKANG 2) | JALAN LINGKUNGAN RT 06 RW 13 KEL DURIANGKANG KEC SEI BEDUK | - | - | Konstruksi | - | 188.016.000 |
BUILD BRIDGE ON THE PUP JOINT PACKING/STORE AREA TOCONNECT WITH RFPC/CTAR AS PER QUOTATION (EXCLUDESLIDING GATE) | CITRA TUBINDO TBK | - | - | Konstruksi | - | 61.744.000 |
OPTIMALISASI SPAM NATUNA (BUNGURAN BARAT, CERUK, P.LAUT) | BUNGURAN BARAT, CERUK,P. LAUT NATUNA | - | - | Konstruksi | - | 6.925.654.529 |
PERBAIKAN ATAP, TALANG 165/166 BUILDING | ECOGREEN OLEOCHEMICALS | - | - | Konstruksi | - | 52.800.000 |
PENGADAAN DAN PEMASANGAN PERUBAHAN MCCUB & MATERIAL BANTU DI MARRIOT HOTEL | JL. DUYUNG HARBOUR BAY, BATU AMPAR | - | - | Konstruksi | - | 39.000.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BUKIT SAKINAH BLOK THURNISIA RW27/RT 04500M?? | PERUMAHAN BUKIT SAKINAH BLOK THURNISIA RW27/RT 04 | - | - | Konstruksi | - | 144.421.053 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 05 RW 13(POKMAS GURAMI) | JALAN LINGKUNGAN RT 05 RW 13 KEL. MANGSANG | - | - | Konstruksi | - | 161.856.053 |
DRAINASE U30 RT 02 RW 06 | KECAMATAN SEKUPANG | - | - | Konstruksi | - | 27.364.000 |
DRAINASE U30 RT 03 RW 07 | KECAMATAN SEKUPANG | - | - | Konstruksi | - | 19.449.000 |
PEMBANGUNAN/REHABILITASI DRAINASE LINGKUNGAN RT 04RW 07 (POKMAS KOI) | LINGKUNGAN RT 04 RW 07 KEL. MANGSANG | - | - | Konstruksi | - | 59.682.100 |
DRAINASE U30 RW 03 | KECAMATAN SEKUPANG | - | - | Konstruksi | - | 24.659.000 |
PEMBANGUNAN/REHABILITASI DRAINASE LINGKUNGAN RT 04 RW 02 (POKMAS LAUHAN) | LINGKUNGAN RT 04 RW 02 KEL. MANGSANG | - | - | Konstruksi | - | 74.739.801 |
DRAINASE U40 RT 01 & 02 RW 13 | KECAMATAN SEKUPANG | - | - | Konstruksi | - | 36.025.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 06 RW 17(POKMAS LELE) | JALAN LINGKUNGAN RT 06 RW 17 KEL. MANGSANG | - | - | Konstruksi | - | 196.199.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 05 RW 16(POKMAS MUJAHIR) | JALAN LINGKUNGAN RT 05 RW 16 KEL. MANGSANG | - | - | Konstruksi | - | 147.146.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 02 | KECAMATAN SEKUPANG | - | - | Konstruksi | - | 72.826.000 |
SEMENISASI JALAN LINGKUNGAN RT 01, 02 RW 15 | KECAMATAN SEKUPANG | - | - | Konstruksi | - | 54.336.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 13 | KECAMATAN SEKUPANG | - | - | Konstruksi | - | 55.961.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 10 | KECAMATAN SEKUPANG | - | - | Konstruksi | - | 59.714.000 |
DRAINASE U40 RT 02 RW 11 (POKMAS KUINI) | U40 RT 02 RW 11 KEL. TIBAN LAMA | - | - | Konstruksi | - | 20.146.000 |
DRAINASE U40 RT 01 RW 15 (POKMAS LANGSAT) | RT 01 RW 15 KEL. TIBAN LAMA | - | - | Konstruksi | - | 14.119.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 01 (POKMAS MANGGA) | JALAN LINGKUNGAN RT 02 RW 01 KEL. TIBAN LAMA | - | - | Konstruksi | - | 64.465.000 |
SEMENISASI JALAN LINGKUNGAN RT 04 RW 01 (POKMAS MANGGIS) | JALAN LINGKUNGAN RT 04 RW 01 KEL. TIBAN LAMA | - | - | Konstruksi | - | 87.538.000 |
DRAINASE U40 RT 02 RW 08 (POKMAS MARKISA) | RT 02 RW 08 KEL. TIBAN LAMA | - | - | Konstruksi | - | 36.025.000 |
SEMENISASI JALAN LINGKUNGAN RT 06 RW 12 (POKMAS MATOA) | JALAN LINGKUNGAN RT 06 RW 12 KEL. TIBAN LAMA | - | - | Konstruksi | - | 53.771.000 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 08 (POKMAS KELAPAGADING) | KELURAHAN TIBAN LAMA | - | - | Konstruksi | - | 99.240.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 & 03 RW 04 (POKMASMELON) | JALAN LINGKUNGAN RT 02 & 03 RW 04 KEL. TIBAN LAMA | - | - | Konstruksi | - | 134.459.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 01 RW 01(200 X 3 M) POKMASDURIANGKANG 4 | JALAN LINGKUNGAN RT 01 RW 01 KEL. DURIANGKANG | - | - | Konstruksi | - | 93.179.000 |
DRAINASE U30 RT 03 RW 08 (POKMAS RAMBAI) | KELURAHAN TIBAN LAMA | - | - | Konstruksi | - | 20.600.000 |
DRAINASE U30 RT 03 RW 10 (POKMAS SAWO) | KELURAHAN TIBAN LAMA | - | - | Konstruksi | - | 25.673.000 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 11 (POKMAS NANGKA) | JALAN LINGKUNGAN RT 03 RW 11 KEL. TIBAN LAMA | - | - | Konstruksi | - | 113.582.000 |
DRAINASE U30 RT 04 RW 01 (POKMAS PISANG) | KELURAHAN TIBAN LAMA | - | - | Konstruksi | - | 15.527.000 |
SEMENISASI JALAN LINGKUNGAN KAV. SAGULUNG BARU RT 05 RW 05, 390M?? | RT 05 RW 05 KEL. SEI BINTI | - | - | Konstruksi | - | 115.207.821 |
DRAINASE U40 RT 01 RW 11 (POKMAS RAMBUTAN) | KELURAHAN TIBAN LAMA | - | - | Konstruksi | - | 14.929.000 |
SEMENISASI JALAN LINGKUNGAN KAV. SAGULUNG BARU RT 03 RW 06, 240M?? (POKMAS SEI BINTI RT03 RW 06) | RT 03 RW 06 KEL. SEI BINTI | - | - | Konstruksi | - | 70.756.979 |
DRAINASE U40 RT 05 RW 01 (POKMAS PEPAYA) | KELURAHAN TIBAN LAMA | - | - | Konstruksi | - | 17.878.000 |
SEMENISASI KAV. SAGULUNG BARU BLOK C THP 2 RT 05 RW 07, 408 M?? (POKMAS SEI BINTI RT 05RW 07) | SAGULUNG BARU BLOK C THP 2 RT 05 RW 07 KEL. SEI BINTI | - | - | Konstruksi | - | 119.415.942 |
SEMENISASI JALAN LINGKUNGAN KAV. TUNAS REGENCY RT 03 RW 14, 650M?? (POKMAS SEI BINTI RT03 RW 14) | KAV. TUNAS REGENCY RT 03 RW 14 KEL. SEI BINTI | - | - | Konstruksi | - | 184.612.400 |
DRAINASE U30 RT 04 RW 02 (POKMAS STRAWBERRY) | KELURAHAN TIBAN | - | - | Konstruksi | - | 9.778.000 |
SEMENISASI JALAN LINGKUNGAN KAV. PANDAWA MANDIRI RT 02 RW 16, 450M?? (POKMAS SEI BINTI RT 02 RW 16) | KAV. PANDAWA MANDIRI RT 02 RW 16 KEL. SEI BINTI | - | - | Konstruksi | - | 133.030.100 |
SEMENISASI JALAN LINGKUNGAN KAV. SAGULUNG BARU ASRI RT 04 RW 17, 420M?? (POKMAS SEI BINTI RT 04 RW 17) | KAV. SAGULUNG BARU ASRI RT 04 RW 17 KEL. SEI BINTI | - | - | Konstruksi | - | 121.987.458 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 12 (POKMAS SIRSAK) | KELURAHAN TIBAN LAMA | - | - | Konstruksi | - | 17.473.000 |
SEMENISASI JALAN LINGKUNGAN PERUM GRIYA PERMAI RT 05 RW 01, 224M?? (POKMAS SEI BINTI RT05 RW 01) | PERUM GRIYA PERMAI RT 05 RW 01 KEL. SEI BINTI | - | - | Konstruksi | - | 64.832.879 |
SEMENISASI JALAN LINGKUNGAN KAV. SAGULUNG BARU RT 01 RW 04, 210M?? | RT 01 RW 04 KEL. SEI BINTI | - | - | Konstruksi | - | 64.903.334 |
SEMENISASI JALAN LINGKUNGAN PERUM GRIYA PERMAI RT 06 RW 01, 525M?? (POKMAS SEI BINTI RT06 RW 01) | PERUM GRIYA PERMAI RT 06 RW 01 KEL. SEI BINTI | - | - | Konstruksi | - | 147.999.600 |
SEMENISASI JALAN LINGKUNGAN RT 02 & 03 RW 10 (POKMASSEMANGKA) | KELURAHAN TIBAN LAMA | - | - | Konstruksi | - | 80.494.000 |
SEMENISASI JALAN LINGKUNGAN KAV. SAGULUNG BARU RT 03 RW 05, 458M?? | RT 03 RW 05 KEL. SEI BINTI | - | - | Konstruksi | - | 132.625.263 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 08 RW 02(POKMAS TOMANG) | KELURAHAN MANGSANG | - | - | Konstruksi | - | 78.475.000 |
PEMBANGUNAN/REHABILITASI DRAINASE LINGKUNGAN RT 05 RW 18 (POKMAS SIDAT) | KELURAHAN MANGSANG | - | - | Konstruksi | - | 82.778.184 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 01 RW 07(POKMAS PATIN) | KELURAHAN MANGSANG | - | - | Konstruksi | - | 117.708.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 02 RW 12(POKMAS ARWANA) | JALAN LINGKUNGAN RT 02 RW 12 KEL. MANGSANG | - | - | Konstruksi | - | 16.346.666 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 04 RW 06(POKMAS NILA) | KELURAHAN MANGSANG | - | - | Konstruksi | - | 196.198.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 04 RW 01(POKMAS BAUNG) | JALAN LINGKUNGAN RT 04 RW 01 KEL. MANGSANG | - | - | Konstruksi | - | 130.788.947 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RW 06(POKMAS TAWES) | KELURAHAN MANGSANG | - | - | Konstruksi | - | 196.193.000 |
PEMBANGUNAN/REHABILITASI DRAINASE LINGKUNGAN RT 02RW 09 (POKMAS BETOK) | RT 02 RW 09 KEL. MANGSANG | - | - | Konstruksi | - | 19.615.834 |
PEMBANGUNAN/REHABILITASI DRAINASE LINGKUNGAN RT 06 RW 02 (POKMAS CUPANG) | RT 06 RW 02 KEL. MANGSANG | - | - | Konstruksi | - | 73.093.334 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 03 RW 09(POKMAS GABUS) | RT 03 RW 09 KEL. MANGSANG | - | - | Konstruksi | - | 39.235.000 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 RT 02 RW 12 (254M) (DURIANGKANG 13) | KELURAHAN DURIANGKANG | - | - | Konstruksi | - | 86.753.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 01 RW 05(100 X 3 M) (POKMASDURIANGKANG 5) | KELURAHAN DURIANGKANG | - | - | Konstruksi | - | 98.095.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 04 RW 06(67 X 3 M) (POKMASDURIANGKANG 6) | KELURAHAN DURIANGKANG | - | - | Konstruksi | - | 65.396.666 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 01 RW 08(67 X 3 M) (POKMASDURIANGKANG 7) | KELURAHAN DURIANGKANG | - | - | Konstruksi | - | 65.376.000 |
PEMBANGUNAN / REHABILITASI DRAINASE U-40 PERUM GRIYA SURYA KHARISMA ( 205M)(POKMAS KARISMA) | KELURAHAN KIBING | - | - | Konstruksi | - | 51.375.000 |
INSPECTOR TRANSMISSION LINE 150KV | BATAM TERSEBAR | - | - | Konstruksi | - | 464.836.100 |
PEKERJAAN RETAINING WALL BETON DI FACTORY C2 LOT 05 | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 67.249.792 |
PEKERJAAN DUCTING DAN SUPPLY MOTOR EXHAUST FAN DI LT. 3 PANBIL MALL KAWASAN COMERCIAL PANBIL | KAWASAN COMEERSIAL PANBIL, MUKA KUNING | - | - | Konstruksi | - | 16.836.000 |
PEKERJAAN PEMBONGKARAN DUCTING DAN FCU PADA LT. 2 SERTA PEMASANGAN KEMBALIFCU DI LT. 1 PANBIL | KAWASAN COMERSIAL PANBIL, MUKA KUNING | - | - | Konstruksi | - | 33.250.000 |
PEKERJAAN RETAINING WALL BETON DI FACTORY C2 LOT 05 | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 44.247.202 |
PEKERJAAN PERBAIKAN DUCTING TOILET LT. 1 DAN PENAMBAHAN ACCESORIES FCU EXISTING DI PANBIL MALL | KAWASAN COMERSIAL PANBIL, MUKA KUNING | - | - | Konstruksi | - | 40.565.000 |
PEEENGGANTIAN CT 20KV | PLN BATAM | - | - | Konstruksi | - | 410.718.003 |
DRAINASE U30 BANDAR SRIMAS RT 01,02,03,04,05 RW 12, 200M(POKMAS MADANI) | RT 01,02,03,04,05 RW 12 KEL. SEI PANAS | - | - | Konstruksi | - | 66.290.000 |
SEMENISASI JALAN TAMAN BUANA INDAH RT 04 RW 03, 648M??(POKMAS MANGGA) | JALAN TAMAN BUANA INDAH RT 04 RW 03 KEL. SEI PANAS | - | - | Konstruksi | - | 204.308.000 |
SEMENISASI JALAN TAMAN BUANA INDAH RT 01 RW 03, 540M??(POKMAS NANAS) | JALAN TAMAN BUANA INDAH RT 01 RW 03 KEL. SEI PANAS | - | - | Konstruksi | - | 170.673.000 |
SEMENISASI JALAN PURI LOKA BLOK G RT 02 RW 11, 480M??POKMAS PURILOKA I) | JALAN PURI LOKA BLOK G RT 02 RW 11 KEL. SEI PANAS | - | - | Konstruksi | - | 158.347.000 |
SEMENISASI JALAN PURI LOKA BLOK EF RT 02 RW 11, 480M?? (POKMAS PURILOKA) | JALAN PURI LOKA BLOK EF RT 02 RW 11 KEL. SEI PANAS | - | - | Konstruksi | - | 158.347.000 |
DRAINASE U40 PERUM NUSA JAYA RT 03 RW 06, 200M (POKMAS JAYABERSAMA) | PERUM NUSA JAYA RT 03 RW 06 KEL. SEI PANAS | - | - | Konstruksi | - | 80.585.000 |
DRAINASE U30 BUKIT JODOH - KAMPUNG MELAYU RT 01 RW 02 (LANJUTAN), 100M (POKMASSERAI BERSATU) | BUKIT JODOH - KAMPUNG MELAYU RT 01 RW 02 KEL. SEI PANAS | - | - | Konstruksi | - | 34.814.000 |
DRAINASE U30 PERUMAHAN VILLA MAS RT 01 RW 09, 100M (POKMASVILLA MAS 1) | PERUMAHAN VILLA MAS RT 01 RW 09 KEL. SEI PANAS | - | - | Konstruksi | - | 33.976.000 |
DRAINASE U30 PERUMAHAN VILLA MAS RT 02 RW 09, 100M (POKMASVILLA MAS 2) | PERUMAHAN VILLA MAS RT 02 RW 09 KEL. SEI PANAS | - | - | Konstruksi | - | 34.395.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 02 RW 04(165 X 4 M) (POKMAS MAJU KARYA) | JALAN LINGKUNGAN RT 02 RW 04 (165 X 4 M) KEL. TANJUNG PIAYU | - | - | Konstruksi | - | 210.585.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 04 RW 10(210 X 3 M) (POKMAS KP. SETENGAR) | JALAN LINGKUNGAN RT 04 RW 10 KEL. TANJUNG PIAYU | - | - | Konstruksi | - | 205.885.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 01 RW 10 (200 X 3 M) (POKMAS PIAYU LAUT) | JALAN LINGKUNGAN RT 01 RW 10 KEL. TANJUNG PIAYU | - | - | Konstruksi | - | 192.985.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 02 RW 08(200 X 3 M) (POKMAS KAVLING BAGAN) | JALAN LINGKUNGAN RT 02 RW 08 KEL. TANJUNG PIAYU | - | - | Konstruksi | - | 190.493.000 |
SEMENISASI JALAN VOLUME 640 M2 GRIYA PELITA MAS RT.04 RW.02 (PELITA MADANI 4) | KECAMATAN LUBUK BAJA | - | - | Konstruksi | - | 199.631.579 |
SEMENISASI JALAN VOLUME 660M2 SAMPING RUMAH YATNA??? DEPAN RUMAH IKRIZAN BLOK C RT.02 RW.02 (PELITA MADANI 3) | KELURAHAN KAMPUNG PELITA | - | - | Konstruksi | - | 199.842.105 |
SEMENISASI JALAN VOLUME 440 M2 GRIYA PELITA MAS RT.05 RW.02 (PELITA MADANI 2) | KELURAHAN KAMPUNG PELITA | - | - | Konstruksi | - | 141.157.895 |
SEMENISASI JALAN VOLUME 480 M2 PELITA 7 DEPAN RUMAH SUATRI ??? DEPAN RUMAH BOGE RT.01 RW.02 (PELITA MADANI 1) | KELURAHAN KAMPUNG PELITA | - | - | Konstruksi | - | 153.736.842 |
SEMENISASI JALAN VOLUME 280M2 JL. GUNUNG KERINCI BALOI INDAH RT.001 RW.001 (PELITAMADANI 7) | KELURAHAN KAMPUNG PELITA | - | - | Konstruksi | - | 90.765.834 |
SEMENISASI JALAN VOLUME 320M2 GRIYA PELITA MAS RT.003 RW.002 (PELITA MADANI 5) | KELURAHAN KAMPUNG PELITA | - | - | Konstruksi | - | 103.315.789 |
DRAINASE U30 PERUMAHAN PONDOK ASRI RT 01 RW 04, 96M(POKMAS ASRI BAROKAH) | KELURAHAN SEI PANAS | - | - | Konstruksi | - | 33.136.000 |
SEMENISASI JALAN KOMPLEK PONDOK ASRI INDAH RT 01 RW 10,230M?? (POKMAS ASRI I) | KELURAHAN SEI PANAS | - | - | Konstruksi | - | 74.366.000 |
SEMENISASI JALAN KOMPLEK AKU TAHU RT 01 RW 13, 460M?? (ALJIHAD 2) | KELURAHAN SEI PANAS | - | - | Konstruksi | - | 140.628.000 |
DRAINASE U30 BUKIT JODOH RT 03 RW 01, 150M (POKMASBAHAGIA) | KELURAHAN SEI PANAS | - | - | Konstruksi | - | 49.714.000 |
DRAINASE U40 PERUMAHAN AKU TAHU RT 01,02 RW 05, 250M(POKMAS GARUDA JAYA) | KELURAHAN SEI PANAS | - | - | Konstruksi | - | 101.050.000 |
SEMENISASI JALAN KAMPUNG MELAYU BUKIT JODOH RT 04 RW01, 480M?? (POKMAS LESTARI) | KELURAHAN SEI PANAS | - | - | Konstruksi | - | 149.487.000 |
PEMELIHARAAN BERKALA JEMBATAN RAJA KECIL CS | BALOI VIEW | - | - | Konstruksi | - | 6.152.779.091 |
ENERGY MONITORING SYSTEM FOR POWER HOUSE ADDITIONAL FOR COMPRESSOR AND GASENGINE | PANASONIC INDUSTRIAL DEVICES BATAM | - | - | Konstruksi | - | 133.500.000 |
PENGADAAN DAN PEMASANGAN PANEL CONTROL ALARM/FAULT INDICATOR GI MUKA KUNING DANGI BATU BESAR | GI MUKA KUNING/GI BATU BESAR | - | - | Konstruksi | - | 88.200.000 |
SEMENISASI JALAN PERUMAHAN BUKIT RAYA RT 01,02 RW 38 (POKMAS BUKIT RAYA MAJU) | PERUMAHAN BUKIT RAYA RT 01,02 RW 38 | - | - | Konstruksi | - | 184.568.947 |
SEMENISASI JALAN PERUMAHAN ALAM RAYA RT 01 RW 15 (POKMASALAM RAYA) | PERUMAHAN ALAM RAYA RT 01 RW 15 | - | - | Konstruksi | - | 131.831.579 |
DRAINASE U40 PERUMAHAN TAMAN MARCHELIA RT 02 RW 09, 400M (POKMAS KAMPUNG TEDUH) | PERUMAHAN TAMAN MARCHELIA RT 02 RW 09 KEL. TAMAN BALOI KEC BATAM KOTA | - | - | Konstruksi | - | 177.347.000 |
SEMENISASI JALAN PERUMAHAN KAMPUNG BELIAN PANTAI RT 01 RW 02 (POKMAS BELIAN MAJU) | PERUMAHAN KAMPUNG BELIAN PANTAI RT 01 RW 02 | - | - | Konstruksi | - | 148.241.579 |
SEMENISASI JALAN PERUMAHAN TAMAN RAYA TAHAP II RT 01 RW 11, 500M??(POKMAS FLAMBOYAN) | JALAN PERUMAHAN TAMAN RAYA TAHAP II RT 01 RW 11 KEL. BELIAN KEC. BATAM KOTA | - | - | Konstruksi | - | 164.779.000 |
SEMENISASI JALAN PERUMAHAN BANDARA MAS RT 02 RW 20 (POKMAS BANDARA MAS JAYA) | ERUMAHAN BANDARA MAS RT 02 RW 20 | - | - | Konstruksi | - | 164.778.947 |
SEMENISASI JALAN PERUMAHAN TAMAN RAYA TAHAP III RT 03 RW 24, 500M?? (POKMAS KITA-KITA) | JALAN PERUMAHAN TAMAN RAYA TAHAP III RT 03 RW 24 KEL BELIAN KEC BATAM KOTA | - | - | Konstruksi | - | 164.779.000 |
SEMENISASI JALAN PERUM GRIYA BUANA INDAH RT 01 RW 14 (POKMAS GRIYA BENUA INDAH I) | PERUM GRIYA BUANA INDAH RT 01 RW 14 | - | - | Konstruksi | - | 157.115.789 |
SEMENISASI JALAN PERUMAHAN BUNGA RAYA RT 02,04 RW 27, 492M?? (POKMAS BUNGA RAYARW.27) | JALAN PERUMAHAN BUNGA RAYA RT 02,04 RW 27 KEL. BELIAN KEC. BATAM KOTA | - | - | Konstruksi | - | 162.149.000 |
SEMENISASI JALAN PERUMAHAN CENDANA RT 01 RW 09, 400M??(POKMAS KERJA NYATA CENDANA THP II) | JALAN PERUMAHAN CENDANA RT 01 RW 09 KEL BELIAN KEC BATAM KOTA | - | - | Konstruksi | - | 131.832.000 |
PEKERJAAN WAREHOUSE HORIZON INDUSTRIAL PARK | SUNGAI LEKOP - DAPUR 12, SAGULUNG | - | - | Konstruksi | - | 7.954.000.000 |
DRAINASE U40 PERUM CEMARA GARDEN RT 01 RW 16, 80M(POKMAS CEMARA 2) | PERUM CEMARA GARDEN RT 01 RW 16 KEL. TAMAN BALOI KEC BATAM KOTA | - | - | Konstruksi | - | 35.341.000 |
SEMENISASI JALAN PERUM TAMAN PUTRI INDAH RT 01 RW 05(POKMAS MERPATI INDAH) | PERUM TAMAN PUTRI INDAH RT 01 RW 05 | - | - | Konstruksi | - | 183.305.789 |
SEMENISASI JALAN PERUM PONDOK INDAH RT 01 RW 07 (POKMAS PONDOK INDAH 2) | PERUM PONDOK INDAH | - | - | Konstruksi | - | 130.926.842 |
SEMENISASI JALAN PERUMAHAN ANGGREK SARI RT 03 RW 15 (POKMAS ANGGREK SARI 1) | PERUMAHAN ANGGREK SARI RT 03 RW 15 | - | - | Konstruksi | - | 39.280.000 |
SEMENISASI JALAN PERUM ANGGREK MAS 1 BLOK D RT 04 RW 06, 32M?? (POKMAS KENANGA) | JALAN PERUM ANGGREK MAS 1 BLOK D RT 04 RW 06 KEL. TAMAN BALOI KEC. BATAM KOTA | - | - | Konstruksi | - | 10.474.000 |
SEMENISASI JALAN PERUMAHAN OMA BATAM RT 02 RW 12 (POKMAS OBC BERSATU) | PERUMAHAN OMA BATAM RT 02 RW 12 | - | - | Konstruksi | - | 197.762.632 |
SEMENISASI JALAN BETON VILLA HANG LEKIR RT 02 RW 05 BLOK BB(POKMAS BAGUS BERSAMA) | VILLA HANG LEKIR RT 02 RW 05 BLOK BB | - | - | Konstruksi | - | 184.582.632 |
SEMENISASI JALAN PERUMAHAN KHARISMA RESIDENCE RT 04 RW 45, 560M (POKMAS KHARISMAJAYA) | JALANPERUMAHAN KHARISMA RESIDENCE RT 04 RW 45, KEL BELIAN KEC BATAM KOTA | - | - | Konstruksi | - | 184.566.000 |
DRAINASE / SALURAN (U40) MEDITERANIA RT 05 RW 08 (POKMAS MEDITERANIA 05) | MEDITERANIA RT 05 RW 08 | - | - | Konstruksi | - | 87.168.750 |
SEMENISASI JALAN PERUMAHAN KAMPUNG BELIAN TUAK RT 01 RW 06, 420M?? (POKMAS KSB KP BELIAN TUA RW 06) | JALAN PERUMAHAN KAMPUNG BELIAN TUAK RT 01 RW 06 KEL BELIAN KEC BATAM KOTA | - | - | Konstruksi | - | 138.189.000 |
DRAINASE / SALURAN (U40)PERUM BIDA ASRI RT 03 RW 09 (POKMAS BIDA ASRIMEMBANGUN) | PERUM BIDA ASRI RT 03 RW 09 | - | - | Konstruksi | - | 87.168.750 |
SEMENISASI JALAN PERUM GARDEN MASYEBA RT 02 RW 05, 240M?? (POKMAS GARDENMASYEBA) | JALAN PERUM GARDEN MASYEBA RT 02 RW 05 KEL. TAMAN BALOI KEC BATAM KOTA | - | - | Konstruksi | - | 78.555.000 |
SEMENISASI JALAN BETON PERUM HANG TUAH RT 01 RW 06(PERUM TAMAN BULUH) | PERUM HANG TUAH RT 01 RW 06 | - | - | Konstruksi | - | 184.582.632 |
SEMENISASI JALAN PERUM CEMARA GARDEN RT 01 RW 16,240M?? (POKMAS CEMARA 1) | SEMENISASI JALAN PERUM CEMARA GARDEN RT 01 RW 16 KEL TAMAN BALOI KEC BATAM KOTA | - | - | Konstruksi | - | 78.555.000 |
SEMENISASI JALAN BETON LEGENDA MALAKA RT 03, 04 RW 03(POKMAS DC BERSATU0 | LEGENDA MALAKA RT 03, 04 RW 03 | - | - | Konstruksi | - | 197.762.632 |
SEMENISASI JALAN PERUM ANGGREK MAS 1 BLOK H RT 01 RW 06, 80M?? (POKMAS ANGGREKMAS UNGU) | JALAN PERUM ANGGREK MAS 1 BLOK H RT 01 RW 06 KEL TAMAN BALOI KEC BATAM KOTA | - | - | Konstruksi | - | 26.186.000 |
SEMENISASI JALAN BETON PERUMAHAN LEGENDA BALI RT 01 RW 13, 600M?? (POKMAS BALISEJAHTERA) | PERUMAHAN LEGENDA BALI RT 01 RW 13 KEL. BALOI PERMAI | - | - | Konstruksi | - | 197.763.000 |
SEMENISASI JALAN BETON LEGENDA MALAKA BLOK I DAN RT 05 RW 04, 580M?? (POKMAS LEGENDA INDAH) | LEGENDA MALAKA BLOK I DAN RT 05 RW 04 KEL. BALOI PERMAI | - | - | Konstruksi | - | 191.173.000 |
SEMENISASI JALAN BETON PURI LEGENDA RT 03, 04 RW 07, 560M?? (POKMAS PURI LEGENDA MADANI) | PURI LEGENDA RT 03, 04 RW 07 KEL. BALOI PERMAI | - | - | Konstruksi | - | 184.583.000 |
PEMBANGUNAN SEMENISASI JALAN TANJUNG SENGKUANG RT.002/RW.012 (POKMAS TUNASNUSANTARA) | JALAN TANJUNG SENGKUANG RT.002/RW.012 KEL. TANJUNG SENGKUANG | - | - | Konstruksi | - | 59.135.000 |
SEMENISASI JALAN LINGKUNGAN RW 003 MELIPUTI RT 001 (270M??)(POKMAS MELATI) | LINGKUNGAN RW 003 MELIPUTI RT 001 KEL. KABIL | - | - | Konstruksi | - | 30.549.000 |
PEMBANGUNAN SEMENISASI JALAN RT 03 RW 14 (POKMAS BADMINTON) | JALAN RT 03 RW 14 KEL. TANJUNG SENGKUANG | - | - | Konstruksi | - | 160.817.000 |
PEMBANGUNAN DRAINASE RT 02 RW 19 U40 DAN GORONG- GORONG (41M) (POKMASANGGREK) | RT 02 RW 19 KEL. TANJUNG SENGKUANG | - | - | Konstruksi | - | 16.116.666 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 01 RW 04(166 X 4 M) (POKMAS KARYA BERSAMA) | RT 01 RW 04 KEL. TANJUNG PIAYU | - | - | Konstruksi | - | 214.257.895 |
SEMENISASI JALAN PERUM. TIARA MANTANG RW. 05, 595M??POKMAS (SAKOT 10) | JALAN PERUM. TIARA MANTANG RW. 05 KEL. SAGULUNG KOTA | - | - | Konstruksi | - | 149.648.711 |
DRAINASE U30 PERUM. WISMA BUANA INDAH I RW.02, 300M(POKMAS SAKOT 16) | PERUM. WISMA BUANA INDAH I RW.02 KEL. SAGULUNG KOTA | - | - | Konstruksi | - | 148.482.742 |
SEMENISASI JALAN PERUM BALOI RANTAU RT 01 RW 04, 300M?? (POKMAS SUKAJADI SENTOSA 2) | PERUM BALOI RANTAU RT 01 RW 04 KEL. SUKAJADI | - | - | Konstruksi | - | 98.071.000 |
PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT AREA BATAM TAHUN 2019 TAHAP I | HARBOURBAY DAN GO CLEAN | - | - | Konstruksi | - | 683.845.225 |
SEMENISASI JALAN PERUMAHAN BALOI DITPAM RT 02 RW 03, 220M?? POKMAS SUKAJADI ASRI 3 | JALAN PERUMAHAN BALOI DITPAM RT 02 RW 03 KEL. SUKAJADI | - | - | Konstruksi | - | 71.922.000 |
DRAINASE U40 RT 05 RW 01 (POKMAS PEPAYA) | DRAINASE U40 RT 05 RW 01 KEL. TIBAN LAMA | - | - | Konstruksi | - | 14.317.000 |
SEMENISASI JALAN LINGKUNGAN SAKURA GARDEN (BLOK B12 - A12) RT 02 RW 04 (POKMAS KAMPUNGSERAYA VII) | JALAN LINGKUNGAN SAKURA GARDEN (BLOK B12 - A12) RT 02 RW 04 KEL. KAMPUNG SERAYA | - | - | Konstruksi | - | 90.012.000 |
DRAINASE U30 SAKURA GARDEN BLOK H RT 02 RW 04 (POKMASKAMPUNG SERAYA 4) | SAKURA GARDEN BLOK H RT 02 RW 04 KEL. KAMPUNG SERAYA | - | - | Konstruksi | - | 15.422.000 |
SEMENISASI JALAN LINGKUNGAN SAKURA PERMAI KAVLING RT 03 RW 04 (POKMAS KAMPUNGSERAYA V) | JALAN LINGKUNGAN SAKURA PERMAI KAVLING RT 03 RW 04 KEL KAMPUNG SERAYA | - | - | Konstruksi | - | 142.532.000 |
SEMENISASI JALAN LINGKUNGAN SAKURA GARDEN (BLOK F1-F2) RT 02 RW 04 (POKMAS KAMPUNGSERAYA 6) | JALAN LINGKUNGAN SAKURA GARDEN (BLOK F1-F2) RT 02 RW 04 KEL. KAMPUNG SERAYA | - | - | Konstruksi | - | 158.048.000 |
PEMBANGUNAN JERAMBAH BETON RT 009 RW 003, UKURAN 47X 1,5 M (POKMAS PULAU BULUH19) | RT 009 RW 003 KEL. PULAU BULUH | - | - | Konstruksi | - | 214.263.158 |
PENINGKATAN STRUKTUR JL. KAMPUNG BAGAN, JL. RAYA KAMPUNG BAGAN DAN JL. WTADURIANGKANG | JL. KAMPUNG BAGAN, JL. RAYA KAMPUNG BAGAN DAN JL. WTA DURIANGKANG | - | - | Konstruksi | - | 4.529.234.350 |
REHAB JALAN BETON (228 X 2,5) DARI SIMPANG MTS AL- MUKARRAMAH MENUJU KE SIMPANG LAPANGAN VOLLY RT.004/RW. 001 (POKMAS BULANGLINTANG 19) | SIMPANG MTS AL- MUKARRAMAH MENUJU KE SIMPANG LAPANGAN VOLLY RT.004/RW. 001 KEL. BULANG | - | - | Konstruksi | - | 216.684.211 |
REHAB JALAN BETON (155 X 2) DARI SIMPANG MASJID AL MUKHLISIN MENUJU KE DEPAN RUMAH AZMI RT. 006/ RW. 002 (POKMAS BULANG LINTANG 20) | SIMPANG MASJID AL MUKHLISIN MENUJU KE DEPAN RUMAH AZMI RT. 006/ RW. 002 KEL. BULANG LINTANG | - | - | Konstruksi | - | 118.105.263 |
REHAB JALAN BETON (150 X 2) DARI DEPEN RUMAH ABU SUDIN MENUJU KE RUMAH MISLAN RT.001/RW. 001 (POKMAS BULANGLINTANG 21) | DEPEN RUMAH ABU SUDIN MENUJU KE RUMAH MISLAN RT.001/RW. 001 KEL. BULANG LINTANG | - | - | Konstruksi | - | 114.315.789 |
REHAB JALAN BETON (200 X 2,5) DARI DEPAN RUMAH ABU BAKAR MENUJU KE RUMAH NGADIMAN RT. 002/ RW. 001 (POKMAS BULANG LINTANG 22) | DEPAN RUMAH ABU BAKAR MENUJU KE RUMAH NGADIMAN RT. 002/ RW. 001 KEL. BULANG LINTANG | - | - | Konstruksi | - | 190.631.579 |
SEMENISASI JALAN VOLUME 204M PERUM HAPPY GARDEN RT.002 RW.009 (POKMAS HAPPYSEJAHTERA 3) | PERUM HAPPY GARDEN RT.002 RW.009 KEL. BATU SELICIN KEC LUBUK BAJA | - | - | Konstruksi | - | 66.700.000 |
SEMINISASI JALAN BETON (70 X 2) JALAN UMUM MENUJU KE PEMUKIMAN MASYARAKAT RT. 05/ RW.01 (POKMAS BULANG LINTANG23) | JALAN UMUM MENUJU KE PEMUKIMAN MASYARAKAT RT. 05/ RW.01 KEL. BULANG LINTANG | - | - | Konstruksi | - | 53.395.000 |
SEMENISASI JALAN VOLUME 400M TAMAN ALAMANDA BLOK A RT.03 RW.06 (POKMAS ALAMANDASEJAHTERA) | TAMAN ALAMANDA BLOK A RT.03 RW.06 KEL. BATU SELICIN KEC. LUBUK BAJA | - | - | Konstruksi | - | 128.578.947 |
SEMENISASI JALAN BETON (285 X2) JALAN UMUM MENUJU KE PEMUKIMAN MASYARAKAT RT. 009/ RW. 002 (POKMAS BULANGLINTANG 24) | JALAN UMUM MENUJU KE PEMUKIMAN MASYARAKAT RT. 009/ RW. 002 KEL. BULANG LINTANG | - | - | Konstruksi | - | 163.894.737 |
SEMENISASI JALAN VOLUME 614M KOMP. LUCKY ESTATE RT.02 & 03 RW.07 (POKMAS LUCKYSEJAHTERA) | KOMP. LUCKY ESTATE RT.02 & 03 RW.07 KEL. BATU SELICIN KEC, LUBUK BAJA | - | - | Konstruksi | - | 196.000.000 |
JERAMBAH BETON ( 35 X 2) SAMPING RUMAH JEMI DAN SAMPING RUMAH ANANG RT. 008/RW. 002 (POKMAS BULANG LINTANG 25) | SAMPING RUMAH JEMI DAN SAMPING RUMAH ANANG RT. 008/ RW. 002 KEL. BULANG LINTANG | - | - | Konstruksi | - | 144.894.737 |
PEMBANGUNAN SEMENISASI JALAN VOLUME : 277 M X 1,5 MRT.01/ RT02 - RW.01 PULAU CENGKUI (POKMAS PANTAIGELAM 21) | RT.01/ RT02 - RW.01 PULAU CENGKUI KEL. PANTAI GELAM | - | - | Konstruksi | - | 158.473.685 |
PEMBANGUNAN JERAMBAH DENGAN UKURAN (28 M X 1,5 M) VOLUME = 42M?? PULAU LABU RT.07 RW.03 DARI RUMAH JAHAR, SARIYAH , RUDI, SAMPING RUMAHRAHMAT DAN RUMAH DAHLAN (POKMAS BATU LEGONG 23) | PULAU LABU RT.07 RW.03 DARI RUMAH JAHAR, SARIYAH , RUDI, SAMPING RUMAH RAHMAT DAN RUMAH DAHLAN KEL BATU LEGONG KEC BULANG | - | - | Konstruksi | - | 86.925.000 |
JERAMBAH BETON ( SAMBUNGAN) VOLUME : 90 M X 1,5 M DARI PANTAI TANJUNG CENGKUI LAMA MENUJU ANAK MATA SUNGAIKAMPUNG BARU (POKMAS PANTAI GELAM 22) | PANTAI TANJUNG CENGKUI LAMA MENUJU ANAK MATA SUNGAI KAMPUNG BARU KEL. PANTAI GELAM | - | - | Konstruksi | - | 279.631.579 |
PEMBANGUNAN JERAMBAH DENGAN UKURAN (50 M X 1,5 M) VOLUME = 75M?? PULAU AIR RT.02 RW.01 DARI RUMAH EDI, GUNTUR SAMPAI RUMAH AIRUL (POKMASBATU LEGONG 24) | PULAU AIR RT.02 RW.01 DARI RUMAH EDI, GUNTUR SAMPAI RUMAH AIRUL KEL. BATU LEGONG KEC BULANG | - | - | Konstruksi | - | 155.263.158 |
JERAMBAH BETON PENGHUBUNG RUMAH MASYARAKAT ( 3 TITIK) 90M X 1,5 M RT.02. RW.01 PULAU CENGKUI (POKMAS PANTAIGELAM 23) | RT.02. RW.01 PULAUCENGKUI KEL. PANTAI GELAM | - | - | Konstruksi | - | 93.300.000 |
PEMBANGUNAN JERAMBAH DENGAN UKURAN (30 M X 2 M) VOLUME =60M?? PULAU SERAYA RT.03 RW.02 DARI RUMAH ODAH,SUGIANTO SAMPAI KIMAN (POKMAS BATU LEGONG 25) | PULAU SERAYA RT.03 RW.02 DARI RUMAH ODAH, SUGIANTO SAMPAI KIMAN KEL. BATU LEGONG KEC. BULANG | - | - | Konstruksi | - | 124.157.895 |
JERAMBAH BETON 30 M X 1,5 M RT.04. RW.02 PULAU JALOH - (POKMAS PANTAI GELAM 24) | RT.04. RW.02 PULAU JALOH KEL. PANTAI GELAM | - | - | Konstruksi | - | 279.631.579 |
PEMBANGUNAN JERAMBAH DENGAN UKURAN (P :50 M X L :1,5M) TEBAL = 0,15 M VOLUME = 75M?? PULAU AIR RT.01 RW.01 DARI JALAN RUMAH TAMRINPENYAMBUNG JERAMBAH SAMPAI RUMAH M.IRVAN (POKMAS BATULEGONG 26) | PULAU AIR RT.01 RW.01 DARI JALAN RUMAH TAMRIN PENYAMBUNG JERAMBAH SAMPAI RUMAH M.IRVAN KELBATU LEGONG KEC BULANG | - | - | Konstruksi | - | 155.263.158 |
JERAMBAH BETON PENGHUBUNG RUMAH MASYARAKAT ( 3 TITIK )VOLUME : 90 M X 1,5 M RT.001 RW.001 CENGKUI (POKMASPANTAI GELAM 25) | RT.001 RW.001 CENGKUI KEL. PANTAI GELAM | - | - | Konstruksi | - | 279.631.579 |
PEMBANGUNAN JERAMBAH DENGAN UKURAN (30 M X 1,5 M) VOLUME = 45M?? PULAU SERAYART.03 RW.02 DARI SAMPING RUMAH MURTI, KOMONG,SARWAN DAN JAMINAH(POKMAS BATU LEGONG 27) | PULAU SERAYA RT.03 RW.02 DARI SAMPING RUMAH MURTI, KOMONG,SARWAN DAN JAMINAH KEL BATU LEGONG KEC BULANG | - | - | Konstruksi | - | 93.142.000 |
JERAMBAH BETON 60 M X 1,5 M RT.03. RW.02 PULAU JALOH (POKMAS PANTAI GELAM 26) | RT.03. RW.02 PULAU JALOH KEL. PANTAI GELAM | - | - | Konstruksi | - | 186.473.685 |
PEMBANGUNAN JERAMBAH DENGAN UKURAN (25 M X 1,5 M) VOLUME = 37,5M?? PULAU SERAYART.05 RW.02 DARI RUMAH RAMDAN,SALIHI DAN RUSMAN(POKMAS BATU LEGONG 28) | PULAU SERAYA RT.05 RW.02 DARI RUMAH RAMDAN,SALIHI DAN RUSMAN KEL. BATU LEGONG KEC BULANG | - | - | Konstruksi | - | 77.564.000 |
JERAMBAH BETON (3 TITIK ) VOLUME : 75 M X 1,5 M DI RT.06. RW.03 PULAU JALOH (POKMASGELAM 27) | RT.06. RW.03 PULAU JALOH KEL. PANTAI GELAM | - | - | Konstruksi | - | 233.052.632 |
PEMBANGUNAN JERAMBAH DENGAN UKURAN (37 M X 1,5 M) VOLUME = 55,50M?? PULAU LABURT.07 RW.03 DARI RUMAH RATTIYAH SAMPAI RUMAH ABU AMIN (POKMAS BATU LEGONG 29) | PULAU LABU RT.07 RW.03 DARI RUMAH RATTIYAH SAMPAI RUMAH ABU AMIN KEL BATU LEGONG KEC BULANG | - | - | Konstruksi | - | 114.789.474 |
PEMBANGUNAN JERAMBAH BETON RT 008 RW 003, UKURAN 69 X 1,5 M (POKMAS PULAU BULUH17) | RT 008 RW 003 KEL. PULAU BULUH | - | - | Konstruksi | - | 145.894.737 |
PEMBANGUNAN JERAMBAH DENGAN UKURAN (70 M X 1,5 M) VOLUME = 105M?? PULAU AIR RT.02 RW.01 SAMPING RUMAHPANDI, MAHADAN, DELI, BURHANUDDIN SAMPAI RUMAH AMINUDIN (POKMAS BATULEGONG 30) | PULAU AIR RT.02 RW.01 SAMPING RUMAH PANDI, MAHADAN, DELI, BURHANUDDIN SAMPAI RUMAH AMINUDIN KEL BATU LEGONG KEC BULANG | - | - | Konstruksi | - | 217.368.421 |
PEMBANGUNAN JERAMBAH BETON RT 008 RW 003, UKURAN 69 X 1,5 M (POKMAS PULAU BULUH18) | RT 008 RW 003 KEL. PULAU BULUH | - | - | Konstruksi | - | 214.263.158 |
PEMBANGUNAN JERAMBAH DENGAN UKURAN (25 M X 1,5 M) VOLUME = 36M?? PULAU SERAYA RT.04 RW.02 DARI RUMAH AMAT SAMPAI RUMAH AMIR (POKMASBATU LEGONG 31) | PULAU SERAYA RT.04 RW.02 DARI RUMAH AMAT SAMPAI RUMAH AMIR KEL BATU LEGONG KEC BULANG | - | - | Konstruksi | - | 74.481.000 |
SEMINISASI JALAN BETON (100 X 2) DARI SIMPANG SEKOLAH SD N 004 MENUJU KE RUMAH SYARIFUDINRT. 007/ RW. 002 (POKMAS BULANG LINTANG 17) | DARI SIMPANG SEKOLAH SD N 004 MENUJU KE RUMAH SYARIFUDIN RT. 007/ RW. 002 KEL BULANG LINTANG KEC BULANG | - | - | Konstruksi | - | 76.254.000 |
REHAB JALAN BETON (220 X 2,5) DARI SIMPANG RUMAH HASAN BASRI MENUJU KE SIMPANGRUMAH HAMIDAH RT. 003/ RW. 001 (POKMAS BULANG LINTANG 18) | DARI SIMPANG RUMAH HASAN BASRI MENUJU KE SIMPANG RUMAH HAMIDAH RT. 003/ RW. 001 KEL BULANG LINTANG KEC BULANG | - | - | Konstruksi | - | 209.210.526 |
PEMBANGUNAN JERAMBAH BETON RT 07 RW 03 UKURAN 69 X 1,5 M (POKMAS PULAU BULUH 20) | RT 07 RW 03 KEL. PULAU BULUH | - | - | Konstruksi | - | 214.263.158 |
PEMBANGUNAN JERAMBAH BETON RT 002 RW 001, SAMPING RUMAH RT 002, UKURAN 50 X 1,5 M (POKMAS PULAU BULUH 21) | RT 002 RW 001, SAMPING RUMAH RT 002 KEL. PULAU BULUH | - | - | Konstruksi | - | 155.263.158 |
PEMBANGUNAN JERAMBAH BETON RT 11 RW 003, UKURAN 50 X 1,5 M (POKMAS PULAU BULUH 22) | RT 11 RW 003 KEL. PULAU BULUH | - | - | Konstruksi | - | 155.157.895 |
SEMENISASI JALAN MENEJU SEKOLAH SDN 003 PULAU AKAR (DENGAN UKURAN 150 X 2 METER), 300M?? (POKMASSETOKOK 19) | JALAN MENEJU SEKOLAH SDN 003 PULAU AKAR KEL. SETOKOK | - | - | Konstruksi | - | 112.315.789 |
PEMBANGUNAN JERAMBAH BETON RT.06 RW.03 SELAT NENEK 100 X 1,5 M, 150M?? (POKMASTEMOYONG 13) | RT.06 RW.03 SELAT NENEK KEL. TEMOYONG | - | - | Konstruksi | - | 310.526.315 |
PEMBANGUNAN JERAMBAH BETON RT.04 RW.02 SELAT NENEK,80 X 1,5 M, 120M?? (POKMAS TEMOYONG 14) | RT.04 RW.02 SELAT NENEK KEL. TEMOYONG | - | - | Konstruksi | - | 248.421.053 |
PEMBANGUNAN JERAMBAH BETON RT.05 RW.02 SELAT NENEK 70 X 1,5 M, 112.5M?? (POKMASTEMOYONG 15) | RT.05 RW.02 SELAT NENEK KEL. TEMOYONG | - | - | Konstruksi | - | 232.894.737 |
PEMBANGUNAN JERAMBAH BETON RT.02 RW.04 TEMOYONG 100 X 1,5 M, 150M?? (POKMASTEMOYONG 16) | RT.02 RW.04 TEMOYONG | - | - | Konstruksi | - | 310.526.315 |
PEMBANGUNAN JERAMBAH BETON RT.08 RW.04 TEMOYONG 95 X 1,5 M, 142.5M?? (POKMASTEMOYONG 17) | RT.08 RW.04 TEMOYONG | - | - | Konstruksi | - | 295.052.632 |
PEMBANGUNAN JERAMBAH BETON RT.07 RW.03 PL.AWENG 100 X 1,5 M, 60M?? (POKMASTEMOYONG 18) | RT.07 RW.03 PL.AWENG KEL. TEMOYONG | - | - | Konstruksi | - | 124.210.526 |
DRAINASE U30 LINGKUNGAN PERUMAHAN RINDANG VILLAGE RW29 RT 02 BLOK E DAN F 300M(POKMAS KOMPAK BAHAGIA) | LNGKUNGAN PERUMAHAN RINDANG VILLAGE RW29 RT 02 BLOK E DAN F KEL. BULIANG | - | - | Konstruksi | - | 58.541.666 |
DRAINASE LINGKUNGAN MARINA GREEN RT 04 RW 018 200M (POKMAS MARINA GREEN ) | LINGKUNGAN MARINA GREEN RT 04 RW 018 KEL. TANJUNG UNCANG | - | - | Konstruksi | - | 40.000.000 |
PEMBANGUNAN/REHABILITASI DRAINASE U30 RT 06 RW 01 (POKMAS MATAHARI 4) | RT 06 RW 01 KEL. DURIANGKANG | - | - | Konstruksi | - | 41.996.000 |
PEMBANGUNAN INTAKE DAN JARINGAN TRANSMISI AIR BAKU SUNGAI CIKONDANG/PALASARI | KECAMATAN CIJERUK, KABUPATEN BOGOR | - | - | Konstruksi | - | 4.316.100.909 |
PEMBANGUNAN GARDU BETON 3,5 M X 5,5 M | PT. TARUNA MADYA PRATAMA - KK PR WINNER DELUXE NONGSA | - | - | Konstruksi | - | 146.055.910 |
PEMBANGUNAN GARDU BETON 3,5 M X 5,5 M | PT. FANINDO PROPERTINDO- KOMP. PERKANTORAN FANINDO SAMPING POLTEK BATAM CENTRE | - | - | Konstruksi | - | 146.055.910 |
PEMBANGUNAN JEMBATAN/PELANTAR BETON WILAYAH HINTERLAND TAHUNANGGARAN 2019 | WILAYAH HINTERLAND | - | - | Konstruksi | - | 1.565.671.342 |
PENATAAN JALAN SIMPANG TIBAN PRINCES - CIPTA LAND TIBANINDAH (TAHAP I) | BATAM | - | - | Konstruksi | - | 6.749.287.738 |
PENINGKATAN JALAN SP. FRANGKY - SP. BNI KOTA BATAM | BATAM | - | - | Konstruksi | - | 3.472.549.869 |
PENINGKATAN JALAN SIMP. APARTEMENT HARMONI - SIMP - IRINCO - SIMP. POLSEEK LUBUKBAJA (LANJUTAN) | BATAM | - | - | Konstruksi | - | 7.291.285.795 |
PENATAAN JALAN SIMP. PATUNG KUDA - SIMP. BENGKONG SEKEN (LANJUTAN) | JALAN SIMP. PATUNG KUDA - SIMP. BENGKONG SEKEN | - | - | Konstruksi | - | 14.244.753.042 |
PEMBANGUNAN BANGUNAN PELINTAS SIMP ALLIUM JODOH | SIMP HOTEL ALLIUM KEL JODOH KEC BATU AMPAR | - | - | Konstruksi | - | 4.600.381.767 |
PENINGKATAN KAPASITAS JALAN SIMP. TIBAN BTN | SIMP. TIBAN MC DERMOTT | - | - | Konstruksi | - | 2.590.060.740 |
FINISHING AS 1 (A-F) & AS F (1-25) DI FACTORY C2 LOT 05 KAWASANPANBIL INDUSTRIAL MUKA KUNING | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 261.884.080 |
RETAINING WALL BETON DI FACTORY C2 LOT 06 KAWASAN PANBIL INDUSTRIAL MUKAKUNING | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 69.427.812 |
PENGADAAN CCTV MONITORING GARDU DISTRIBUSI TAHAP II | BATAM | - | - | Konstruksi | - | 485.000.000 |
PEMBANGUNAN DAN PENINGKATAN STRUKTUR JALAN KOTA BATAM (DAK REGULER) TAHUN ANGGARAN 2019 | KAMPUNG DAPUR 3 | - | - | Konstruksi | - | 7.492.862.171 |
PEMBANGUNAN DAN PENINGKATAN STRUKTUR JALAN KOTA BATAM (DAK REGULER) TAHUN ANGGARAN 2019 | KAMPUNG BLONGKENG | - | - | Konstruksi | - | 5.878.513.094 |
PENINGKATAN JALAN WILAYAH II KOTA BATAM TAHUN ANGGARAN2019 | SIMPANG KABIL RAYA BATAM CENTRE | - | - | Konstruksi | - | 11.491.154.993 |
PENINGKATAN JL. GMP - LINTAS MANGSANG (LAKUTAN) | JL. GMP - LINTAS MANGSANG TANJUNG PIAYU | - | - | Konstruksi | - | 1.608.833.601 |
SEMENISASI JALAN LINGKUNGAN DI KAV. FLAMBOYAN RW.02, 396M?? (POKMAS SP 02) | JALAN LINGKUNGAN DI KAV. FLAMBOYAN RW.02 KEL. SEI PELUNGGUT | - | - | Konstruksi | - | 128.437.000 |
SEMENISASI JALAN VOLUME 320M?? RT.01 RW.04 (POKMAS 1/4) | RT.01 RW.04 KEL. TANJUNG UMA | - | - | Konstruksi | - | 104.526.315 |
SEMENISASI JALAN VOLUME 400M?? RT.01 RW.06 (POKMASDARI KITA UNTUK KITA) | RT.01 RW.06 KEL. TANJUNG UMA | - | - | Konstruksi | - | 143.631.579 |
SEMENISASI JALAN LINGKUNGAN PERUM BAMBU KUNING B20 RT 04 RW 01 350M?? (POKMAS BUKITTEMPAYAN 82) | PERUM BAMBU KUNING B20 RT 04 RW 01 KEL BUKIT TEMPAYAN KEC BATU AJI | - | - | Konstruksi | - | 107.157.895 |
SEMENISASI JALAN VOLUME 450M?? RT.02 RW.06 (POKMAS RT02 RW 06) | RT.02 RW.06 KEL. TANJUNG UMA | - | - | Konstruksi | - | 143.631.579 |
DRAINASE U40 VOLUME 300M RT.03 RW.06 (POKMAS RT 03 RW06 ) | RT.03 RW.06 KEL. TANJUNG UMA | - | - | Konstruksi | - | 104.631.579 |
PEMELIHARAAN BERKALA (OVERLAY) JL. SIMP. MANDALAY | SIMP. MANDALAY - SIMP. NATO) | - | - | Konstruksi | - | 2.528.528.136 |
SEMENISASI JALAN LINGKUNGAN PERUM MASYEBA INDAH BLOK V1 V24 RT 06 RW 04. 525M?? (POKMAS BUKIT TEMPAYAN 81) | PERUM MASYEBA INDAH BLOK V1 V24 RT 06 RW 04 KEL. BUKIT TEMPAYAN KEC BATU AJI | - | - | Konstruksi | - | 154.052.632 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PANCUR BIRU LESTARI I RT 01 RW 05(POKMAS MATAHARI I) | LINGKUNGAN PANCUR BIRU LESTARI I RT 01 RW 05 KEL. DURIANGKANG | - | - | Konstruksi | - | 40.466.000 |
SEMENISASI JALAN VOLUME 237,5 DI GANG PASAR RT.02 RW.02 (POKMAS BLOK 4 SEJAHTERA 1) | GANG PASAR RT.02 RW.02 KEL. BATU SELICIN | - | - | Konstruksi | - | 63.238.000 |
SEMENISASI JALAN LINGKUNGAN PERUM VILLA PARADISE BLOK V, W DAN POSYANDU RT 01 RW 09 574M?? (POKMAS BUKITTEMPAYAN 80) | PERUM VILLA PARADISE BLOK V, W DAN POSYANDU RT 01 RW 09 KEL BUKIT TEMPAYAN KEC BATU AJI | - | - | Konstruksi | - | 169.052.632 |
SEMENISASI JALAN PERUMAHAN NADIM RAYA RT 01 RW 51, 600M??(POKMAS NADIRA TAWAHAD) | JALAN PERUMAHAN NADIM RAYA RT 01 RW 51 KEL. BELIAN | - | - | Konstruksi | - | 197.745.000 |
SEMENISASI JALAN LINGKUNGAN PERUM BAMBU KUNING BLOK B25 DAN B28 RT 03 RW 12 600M?? (POKMAS BUKIT TEMPAYAN 79) | PERUM BAMBU KUNING BLOK B25 DAN B28 RT 03 RW 12 KEL. BUKIT TEMPAYAN KEC BATU AJI | - | - | Konstruksi | - | 175.315.789 |
DRAINASE U40 PERUMAHAN TAMAN MARCHELIA RT 04 RW 09,400M (POKMAS TANGGUH) | PERUMAHAN TAMAN MARCHELIA RT 04 RW 09 KEL. TAMAN BALOI | - | - | Konstruksi | - | 177.347.000 |
DRAINASE U 40 PERUM PERMATA HIJAU RT 01-RT 04 RW 06. 500M (POKMAS BUKIT TEMPAYAN 85) | PERUM PERMATA HIJAU RT 01-RT 04 RW 06 KEL. BUKIT TEMPAYAN | - | - | Konstruksi | - | 118.210.526 |
SEMENISASI JALAN LINGKUNGAN PERUM BAMBU KUNING BLOK C21 RT 04 RW 03 525M?? (POKMASBUKIT TEMPAYAN 84) | PERUM BAMBU KUNING BLOK C21 RT 04 RW 03 KEL. BUKIT TEMPAYAN | - | - | Konstruksi | - | 174.842.105 |
PEMBANGUNAN/REHABILITASI JALAN SEMEN/PAVING LINGKUNGAN PERMUKIMAN RT.02 RW.18 PERUM GRIYA BATUAJI ASRI, 450M?? (POKMAS SEILANGKAI 18) | PERMUKIMAN RT.02 RW.18 PERUM GRIYA BATUAJI ASRI KEL SEI LANGKAI KEC SAGULUNG | - | - | Konstruksi | - | 140.212.000 |
SEMENISASI JALAN LINGKUNGAN PERUM BAMBU KUNING BLOK C21 RT 04 RW 03 525M?? (POKMASBUKIT TEMPAYAN 83) | JALAN LINGKUNGAN PERUM BAMBU KUNING BLOK C21 RT 04 RW 03 KEL. BUKIT TEMPAYAN | - | - | Konstruksi | - | 153.789.474 |
PEKERJAAN RETAINING WALL BETON DI FACTORY C2 LOT 06 | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 91.234.348 |
PEMBANGUNAN/REHABILITASI JALAN SEMEN/PAVING LINGKUNGAN PERMUKIMAN RW.19, 400M?? (POKMAS SEILANGKAI 19) | PERMUKIMAN RW.19 KEL SEI LANGKAI KEC SAGULUNG | - | - | Konstruksi | - | 120.070.000 |
PEMBANGUNAN/REHABILITASI JALAN SEMEN/PAVING LINGKUNGAN PERMUKIMAN RW.08 KAV. SAGULUNG SUMBER SERAYA, 450M?? (POKMAS SEILANGKAI 08) | PERMUKIMAN RW.08 KAV. SAGULUNG SUMBER SERAYA KEL SEI LANGKAI KEC SAGULUNG | - | - | Konstruksi | - | 139.574.000 |
PEMBANGUNAN/REHABILITASI JALAN SEMEN/PAVING LINGKUNGAN PERMUKIMAN RT.02 RW.07 KAV. SAGULUNG SUMBER SARI, 450M?? (POKMAS SEILANGKAI 07) | PERMUKIMAN RT.02 RW.07 KAV. SAGULUNG SUMBER SARI KEL SEI LANGKAI KEC SAGULUNG | - | - | Konstruksi | - | 138.980.000 |
PEMBANGUNAN/REHABILITASI JALAN SEMEN/PAVING LINGKUNGAN PERMUKIMAN RT.03 RW.02 KAV. NATO PERMATA,480M?? (POKMAS SEI LANGKAI 02) | PERMUKIMAN RT.03 RW.02 KAV. NATO PERMATA KEL SEI LANGKAI KEC SAGULUNG | - | - | Konstruksi | - | 144.776.000 |
PEMBANGUNAN/REHABILITASI JALAN SEMEN/PAVING LINGKUNGAN PERMUKIMAN RT.05 RW.20 PERUM GRIYA BATUAJI ASRI, 450M?? (POKMAS SEILANGKAI 20) | PERMUKIMAN RT.05 RW.20 PERUM GRIYA BATUAJI ASRI KEL SEI LANGKAI KEC SAGULUNG | - | - | Konstruksi | - | 136.369.000 |
PEMBANGUNAN/REHABILITASI JALAN SEMEN/PAVING LINGKUNGAN PERMUKIMAN RT.03 RW.24 PERUM MUKA KUNING PRATAMA, 445M?? (POKMAS SEILANGKAI 24) | PERUM MUKA KUNING PRATAMA KEL SEI LANGKAI KEC. SAGULUNG | - | - | Konstruksi | - | 131.086.000 |
PEMBANGUNAN/REHABILITASI JALAN SEMEN/PAVING LINGKUNGAN PERMUKIMAN RW.25, 400M?? (POKMAS SEILANGKAI 25) | PERMUKIMAN RW.25 KEL SEI LANGKAI KEC SAGULUNG | - | - | Konstruksi | - | 122.146.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN FAMILY DREAM HOME RT.002 RW.015 | KEL. BATU BESAR | - | - | Konstruksi | - | 98.064.100 |
SEMENISASI JALAN LINGKUNGAN BATU BESAR RT.004 RW.001 | KEL. BATU BESAR | - | - | Konstruksi | - | 106.067.100 |
DRAINASE U40 VOLUME 135M JL. DURIAN & JL. RAMBUTAN RT.002RW.001 (POKMAS BLOK 2 SEJAHTERA 2) | KEL BATU SELICIN | - | - | Konstruksi | - | 44.552.000 |
PEMBANGUNAN DRAINASE U40 PERUMAHAN AKU TAHU RT 03 RW 05 (POKMAS PUAN BERDIKARI) | KEL BELIAN | - | - | Konstruksi | - | 127.723.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT 01 RW 08 (POKMAS BERKAH) | KEL SEI PANAS | - | - | Konstruksi | - | 175.759.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GRIYA KPN RT 01 RW 41 (POKMAS GRIYA MAJUBERSAMA) | KEL BELIAN | - | - | Konstruksi | - | 161.962.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN RAYA TAHAP IV RT 05 RW 42 (POKMAS TAMANRAYA BERSATU) | KEL BELIAN | - | - | Konstruksi | - | 155.963.000 |
SEMENISASI JALAN PERUMAHAN TAMAN RAYA TAHAP I RT 01,04 RW 07, 560M?? (POKMAS TAMAN RAYARW 07) | KEL BELIAN | - | - | Konstruksi | - | 184.566.000 |
PEMBANGUNAN/REHABILITASI SEMENISASI JALAN LINGKUNGAN RT 02 RW 24 (POKMAS TERATAI) | JALAN LINGKUNGAN RT 02 RW 24 KEL. MANGSANG | - | - | Konstruksi | - | 89.998.750 |
SEMENISASI JALAN PERUM ANGGREK MAS 1 BLOK I RT 02 RW 06, 40M?? (POKMAS SAPU LIDI) | KEL. TAMAN BALOI | - | - | Konstruksi | - | 13.093.000 |
PEMBANGUNAN/REHABILITASI SEMENISASI C (POKMASANGGREK) | JALAN LINGKUNGAN RT 03 RW 15 KEL. MANGSANG | - | - | Konstruksi | - | 89.998.818 |
PEMBANGUNAN/REHABILITASI DRAINASE U30 RT 02,03 RW 05(POKMAS PELABUHAN 5) | RT 02,03 RW 05 KEL. TANJUNG PIAYU | - | - | Konstruksi | - | 67.497.916 |
SEMENISASI JALAN PERUMAHAN TAMAN RAYA TAHAP III RT 01 RW 32, 560M?? (POKMAS MITRA JAYA) | KEL BELIAN | - | - | Konstruksi | - | 184.566.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BALOI DITPAM BLOK O DAN J RT 04, 05 RW 03 (POKMASSUKAJADI BERSINAR) | KEL SUKAJADI | - | - | Konstruksi | - | 184.757.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BALOI DITPAM RT 02 RW 03 (POKMAS SUKAJADIGEMILANG) | KEL SUKAJADI | - | - | Konstruksi | - | 110.374.000 |
PEMBANGUNAN DRAINASE U40 PERUM. BALOI DITPAM RT 01, 02 RW 03 (POKMAS SUKAJADIBERJAYA) | KEL SUKAJADI | - | - | Konstruksi | - | 16.430.000 |
PEMBANGUNAN DRAINASE U40 PERUM. BALOI RANTAU RT 01 RW 04 (POKMAS SUKAJADI BERKILAU) | KEL SUKAJADI | - | - | Konstruksi | - | 21.990.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GOLDEN LAND BLOKB RT 01 RW 13 (60M X 4M) (POKMAS GOLDEN LANDCEMERLANG) | KEL. TAMAN BALOI | - | - | Konstruksi | - | 71.983.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN EDEN PARK BLOK M, BLOK N RT 02 RW 12 (105M X 4M)(POKMAS EDEN PARK 2) | KEL. TAMAN BALOI | - | - | Konstruksi | - | 125.970.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN EDEN PARK BLOK O,BLOK P RT 03 RW 12 (99M X 4M) (EDEN PARK 3) | KEL SUKAJADI | - | - | Konstruksi | - | 119.972.000 |
SEMENISASI JALAN VOLUME 300M?? RT.02 RW.02 (POKMASPMKT 02) | KEL TANJUNG UMA | - | - | Konstruksi | - | 97.069.000 |
PEMBANGUNAN JERAMBAH DENGAN UKURAN (35 M X 1,5 M) VOLUME = 52,5M?? PULAU SERAYA RT.05 RW.02 DI SAMPING RUMAHPAK SULONG DAN NAHARUDIN (POKMAS BATU LEGONG 32) | KEL BATU LEGONG | - | - | Konstruksi | - | 108.631.579 |
PEMBANGUNAN/REHABILITASI DRAINASE U40 RT 01 RW 02 (POKMAS PANCUR 2) | RT 01 RW 02 KEL. TANJUNG PIAYU | - | - | Konstruksi | - | 32.998.750 |
PEMBANGUNAN GARDU BETON 3,5 M X 5,5 M | PLN BATAM | - | - | Konstruksi | - | 167.996.442 |
PEMBANGUNAN/REHABILITASI DRAINASE U30 PERUM MKGR BLOK AHLI RT 03 RW 010 (205M)(POKMAS KASIH IBU) | KEL. KIBING | - | - | Konstruksi | - | 40.791.666 |
SEMENISASI JALAN LINGKUNGAN BLOCK E RT 02 RW 13 (POKMASSEI LEKOP 013) | KEL. SEI LEKOP | - | - | Konstruksi | - | 95.717.129 |
SEMENISASI JALAN LINGKUNGAN BLOCK C RT 01 RW 11 (POKMASSEI LEKOP 011) | KEL SEI LEKOP | - | - | Konstruksi | - | 95.717.129 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 07 (POKMAS SEI LEKOP07) | KEL SEI LEKOP | - | - | Konstruksi | - | 95.717.129 |
DRAINASE U40 RT 006 RW 001 (POKMAS MANGGIS 16) | KEL TANJUNG RIAU | - | - | Konstruksi | - | 14.255.000 |
DRAINASE U40 RT 001 RW 001 (POKMAS MANGGIS 13) | KEL TANJUNG RIAU | - | - | Konstruksi | - | 15.015.000 |
REHABILITASI DRAINASE U.40 PERUM RICCI RT 002 RW 015(POKMAS MANGGIS 14) | KEL TANJUNG RIAU | - | - | Konstruksi | - | 23.681.000 |
DRAINASE U40 RT 003 RW 001 (POKMAS MANGGIS 15) | KEL TANJUNG RIAU | - | - | Konstruksi | - | 8.758.000 |
DRAINASE KAMPUNG BUKIT RT 004 RW 006 U30 (POKMASMANGGIS 17) | KEL TANJUNG RIAU | - | - | Konstruksi | - | 38.852.000 |
PEMBANGUNAN/REHABILITASI DRAINASE U30 RT 01,02 RW 15 (POKMAS BUDI KARYA MANDIRI) | RT 01,02 RW 15 KEL. TANJUNG PIAYU | - | - | Konstruksi | - | 74.997.917 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 01 RW 01(POKMAS SEPAKAT) | RT 01 RW 01 KEL. TANJUNG PIAYU | - | - | Konstruksi | - | 217.731.000 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 RT 03 RW 07 (250M) (POKMAS DAUN 3) | RT 03 RW 07 KEC. SEI BEDUK | - | - | Konstruksi | - | 68.689.500 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 01 RT 02 RW 11 (65 X 3.8 M) (POKMAS KAVBARU 11) | RT 01 RT 02 RW 11 KEL. TANJUNG PIAYU | - | - | Konstruksi | - | 80.765.834 |
SEMENISASI JALAN LINGKUNGAN RW.03 KAV. BUKIT KAMBOJA BLOK X2, 665M?? (POKMAS SP 03) | RW.03 KAV. BUKIT KAMBOJA KEL. SEI PELUNGGUT | - | - | Konstruksi | - | 210.513.158 |
SEMENISASI JALAN LINGKUNGAN DI KAV. BUKIT KAMBOJA RW.13, 660M?? (POKMAS SP 13) | KAV. BUKIT KAMBOJA RW.13 KEL. SEI PELUNGGUT | - | - | Konstruksi | - | 208.757.895 |
SEMENISASI JALAN LINGKUNGAN KAV. BUKIT KAMBOJA RW.11, 600M?? (POKMAS SP 11) | KAV. BUKIT KAMBOJA RW.11 KEL. SEI PELUNGGUT | - | - | Konstruksi | - | 195.564.211 |
SEMENISASI JALAN LINGKUNGAN DI KAV. MANDIRI BLOK E RW.12, 239M?? (POKMAS SP 12) | JALAN LINGKUNGAN DI KAV. MANDIRI BLOK E RW.12 | - | - | Konstruksi | - | 74.660.000 |
SEMENISASI JALAN LINGKUNGAN RT 6 RW 10 VILLA MUKA KUNING,600M?? (POKMAS W 56) | RT 6 RW 10 VILLA MUKA KUNING KEL. TEMBESI | - | - | Konstruksi | - | 172.852.000 |
SEMENISASI JALAN LINGKUNGAN RT 2 RW 1 TANJUNG GUNDAP, 450M?? (POKMAS SERUMPUN) | RT 2 RW 1 TANJUNG GUNDAP KEL. TEMBESI | - | - | Konstruksi | - | 135.811.000 |
PEMBANGUNAN DRAINASE LINGKUNGAN U40 RT 1 RW 14PERUM BUANA IMPIAN 120M, 120M (POKMAS BUANA I) | RT 1 RW 14 PERUM BUANA IMPIAN KEL. TEMBESI | - | - | Konstruksi | - | 32.548.000 |
PEMBANGUNAN DRAINASE LINGKUNGAN U30 TAMANANUGRAH RT 1 RW 15, 295M (POKMAS ANUGRAH MAJU) | TAMAN ANUGRAH RT 1 RW 15 KEL. TEMBESI | - | - | Konstruksi | - | 67.922.000 |
PEMBANGUNAN DRAINASE LINGKUNGAN U30 PERUM. SARI PADJAJARAN RT 3 RW 8, 278M(POKMAS PADJAJARAN) | PERUM. SARI PADJAJARAN RT 3 RW 8 KEL. TEMBESI | - | - | Konstruksi | - | 60.448.000 |
REHABILITASI DRAINASE LINGKUNGAN U30 RW 20 RT 1,2,3PERUM. SENTOSA PERDANA, 147M (POKMAS SENTOSAPERDANA) | RW 20 RT 1,2,3 PERUM. SENTOSA PERDANA KEL. TEMBESI | - | - | Konstruksi | - | 35.470.000 |
DRAINASE U40 PERUM. TIBAN BERLIAN RT.001 RW.13 (POKMASRAGATAN INDAH) | KEL TIBAN INDAH | - | - | Konstruksi | - | 34.380.000 |
SEMENISASI JALAN LINGKUNGAN RT 3 RW 5 TEMBESI LESTARI, 300 M?? (POKMAS SABAR MENANTI) | JALAN LINGKUNGAN RT 3 RW 5 TEMBESI LESTARI KEL. TEMBESI | - | - | Konstruksi | - | 90.973.000 |
SEMENISASI JALAN LINGKUNGAN RT.007 RW.03 (POKMAS KRAKATAU INDAH) | KEL TIBAN INDAH | - | - | Konstruksi | - | 117.649.000 |
SEMENISASI JALAN LINGKUNGAN GPI. CLUSTER CENDANA RT.001 RW.10 (POKMAS SINABUNGINDAH) | JALAN LINGKUNGAN GPI. CLUSTER CENDANA KEL. TIBAN INDAH | - | - | Konstruksi | - | 121.466.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN ANGGREK RT.001 RW.12 (POKMAS BATUR INDAH) | KEL TIBAN INDAH | - | - | Konstruksi | - | 117.790.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI RT.003/RW.05 (POKMAS LAWUINDAH) | JALAN LINGKUNGAN TIBAN INDAH PERMAI RT.003/RW.05 KEL. TIBAN INDAH | - | - | Konstruksi | - | 117.790.000 |
SEMENISASI JALAN VILLA BUKIT INDAH RT 01 RW 08, 400M?? (POKMAS TELUK TERING 12) | KEL TELUK TERING | - | - | Konstruksi | - | 131.990.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN KENCANA RT.003 RW.04 (POKMAS TIDAR INDAH) | JALAN LINGKUNGAN TIBAN KENCANA RT.003 RW.04 KEL. TIBAN INDAH | - | - | Konstruksi | - | 117.790.000 |
SEMENISASI JALAN KINTAMANI RT 04 RW 07, 480M?? (POKMAS TELUKTERING 11) | KEL TELUK TERING | - | - | Konstruksi | - | 158.392.000 |
SEMENISASI JALAN KINTAMANI RT 03 RW 07, 360M?? (POKMAS TELUKTERING 10) | KEL TELUK TERING | - | - | Konstruksi | - | 118.792.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN MITRA RAYA BLOK I RT 02 RW 05 (POKMAS TELUK TERING 30) | PERUMAHAN MITRA RAYA BLOK I RT 02 RW 05 KEL TELUK TERING KEC BATAM KOTA | - | - | Konstruksi | - | 47.988.000 |
DRAINASE U40 PERUM. CITRA BATAM RT 05 RW 01, 50M(POKMAS TELUK TERING 09) | KEL TELUK TERING | - | - | Konstruksi | - | 21.888.000 |
SEMENISASI JALAN BETON PERUMAHAN OMA RT 01 RW 12 (POKMAS OMA BATAM CENTER) | PERUMAHAN OMA RT 01 RW 12 KEL BALOI PERMAI KEC BATAM KOTA | - | - | Konstruksi | - | 77.981.000 |
SEMENISASI JALAN PERUM. CITRA BATAM RT 05 RW 01, 200M?? (POKMAS TELUK TERING 08) | KEL TELUK TERING | - | - | Konstruksi | - | 65.995.000 |
SEMENISASI JALAN BETON PERUMAHAN HANG TUAH RT 02RW 06 (POKMAS HANG TUAH) | PERUMAHAN HANG TUAH RT 02 RW 06 KEL BALOI PERMAI KEC BATAM KOTA | - | - | Konstruksi | - | 167.960.000 |
SEMENISASI JALAN BETON PERUMAHAN BIDA ASRI RT 01 RW09 (POKMAS BIDA DAMAI) | PERUMAHAN BIDA ASRI RT 01 RW 09 KEL BALOI PERMAI KEC BATAM KOTA | - | - | Konstruksi | - | 71.983.000 |
SEMENISASI JALAN (LANJUTAN) PERUM. CAKTUS GARDEN RW 13, 660M?? (POKMAS TELUK TERING15) | PERUM. CAKTUS GARDEN RW 13 KEL TELUK TERING KEC BATAM KOTA | - | - | Konstruksi | - | 217.539.000 |
PENINGKATAN JALAN SIMPANG GLOBAL YOS SUDARSO SERUNI | JALAN SIMPANG GLOBAL YPS SUDARSO -SERUNI | - | - | Konstruksi | - | 8.770.209.523 |
DRAINASE U30 PERUM. TAMAN SERUNI INDAH RT 03 RW 04, 350M(POKMAS TELUK TERING 14) | PERUM. TAMAN SERUNI INDAH RT 03 RW 04 KEL TELUK TERING KEC BATAM KOTA | - | - | Konstruksi | - | 132.776.000 |
DRAINASE U30 PERUM. TAMAN SERUNI INDAH RT 01 RW 04, 500M(POKMAS TELUK TERING 13) | TAMAN SERUNI INDAH RT 01 RW 04 KEL TELUK TERING KEC BATAM KOTA | - | - | Konstruksi | - | 190.885.000 |
SEMENISASI JALAN PEMUKIMAN RT 06 RW 06 TIBAN KOPERASI KELURAHAN TIBAN BARU KECAMATAN SEKUPANG VOLUME 75 X 4 M (POKMAS BOUGENVILLE3) | JALAN PEMUKIMAN RT 06 RW 06 TIBAN KOPERASI KELURAHAN TIBAN BARU KECAMATAN SEKUPANGVOLUME 75 X 4 M KEL TIBAN BARU KEC SEKUPANG | - | - | Konstruksi | - | 89.507.000 |
SEMENISASI JALAN LANJUTAN RT 03 RW 09 PURI MALAKA KELURAHAN TIBAN BARU KECAMATAN SEKUPANG . VOLUME 200 M X 4 M (POKMASBOUGENVILLE 2) | RT 03 RW 09 PURI MALAKA KELURAHAN TIBAN BARU KECAMATAN SEKUPANG . VOLUME 200 M X 4 M | - | - | Konstruksi | - | 197.877.000 |
DRAINASE U40 GPI. CENDANA RT.001 RW.10 (POKMAS OMSINIINDAH) | GPI. CENDANA RT.001 RW.10 KEL TIBAN INDAH KEC SKEUPANG | - | - | Konstruksi | - | 69.512.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN GANG ANGGUR RT 01 RW 12 (POKMASMATAHARI 2) | GANG ANGGUR RT 01 RW 12 KEL. DURIANGKANG | - | - | Konstruksi | - | 109.191.000 |
DRAINASE U40 PERUM. CITRA BATAM RT 01 RW 01, 150M (POKMAS TELUK TERING 07) | KEL TELUK TERING | - | - | Konstruksi | - | 65.455.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN DI RT 03 RW01 (POKMAS MATAHARI 3) | JALAN LINGKUNGAN DI RT 03 RW 01 KEL. DURIANGKANG | - | - | Konstruksi | - | 89.963.000 |
SEMENISASI JALAN LINGKUNGAN RT 2 RW 2 KAVLING PANARAN, 600M?? (POKMAS PANARAN MANDIRI) | KEL TEMBESI | - | - | Konstruksi | - | 175.733.000 |
SEMENISASI JALAN LINGKUNGAN RT 1 RW 3 TEMBESI LESTARI, 300M?? (POKMAS SEHATI) | JALAN LINGKUNGAN RT 1 RW 3 TEMBESI LESTARI | - | - | Konstruksi | - | 95.006.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PANCUR BIRU LESTARI I RT 01 RW 05(POKMAS MATAHARI 1) | JALAN LINGKUNGAN PANCUR BIRU LESTARI I RT 01 RW 05 KEL. DURIANGKANG | - | - | Konstruksi | - | 40.466.000 |
PEMBANGUNAN DRAINASE LINGKUNGAN U40 RT 06 RW 17 PERUM BUANA BUKIT PERMATA,120M (POKMAS PERMATA MANDIRI) | LINGKUNGAN U40 RT 06 RW 17 PERUM BUANA BUKIT PERMATA KEL. TEMBESI | - | - | Konstruksi | - | 34.933.000 |
PEMBANGUNAN DRAINASE U40 LINGKUNGAN PERUM TAMAN CIPTA ASRI RT 10 RW 12 (POKMASCHERRY BERSATU) | LINGKUNGAN PERUM TAMAN CIPTA ASRI RT 10 RW 12 KEL TEMBESI KEC SAGULUNG | - | - | Konstruksi | - | 32.701.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 02 RW 09(POKMAS 09 KP BAGAN) | JALAN LINGKUNGAN RT 02 RW 09 KEL. TANJUNG PIAYU | - | - | Konstruksi | - | 107.999.000 |
PEMBANGUNAN DRAINASE LINGKUNGAN U40 RT 2 RW 19PERUM PONDOK RHABAYU, 199M (POKMAS RHABAYU BERSIH) | LINGKUNGAN U40 RT 2 RW 19 PERUM PONDOK RHABAYU KEL. TEMBESI | - | - | Konstruksi | - | 60.096.000 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 04 (POKMAS LESTARIABADI) | JALAN LINGKUNGAN RT 03 RW 04 KEL TEMBESI KEC SAGULUNG | - | - | Konstruksi | - | 88.474.000 |
PEMBANGUNAN/REHABILITASI BATU MIRING KAVLING CLARA RT 01 RW 11 (POKMAS TELUK KERING32) | KAVLING CLARA RT 01 RW 11 KEL. TELUK KERING | - | - | Konstruksi | - | 29.998.000 |
SEMENISASI JALAN LINGKUNGAN RT 3 RW 3, 300M?? (POKMAS WARGA MANUNGGAL) | JALAN LINGKUNGAN RT 3 RW 3 KEL. TEMBESI | - | - | Konstruksi | - | 89.661.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN LOTUS GARDEN RT 01 RW 13 (POKMAS TELUK KERING31) | PERUMAHAN LOTUS GARDEN RT 01 RW 13 KEL. TELUK KERING | - | - | Konstruksi | - | 166.761.000 |
SEMENISASI JALAN LINGKUNGAN PERUM PERMATA RHABAYU RT 04 RW 18 (POKMAS PERMATARHABAYU) | PERUM PERMATA RHABAYU RT 04 RW 18 KEL TEMBESI KEC SSAGULUNG | - | - | Konstruksi | - | 184.660.000 |
PEMBANGUNAN DRAINASE LANJUTAN U 40 RW 17 TIBAN IMPIAN KELURAHAN TIBAN BARUKECAMATAN SEKUPANG (POKMAS BOUGENVILLE 8) | RW 17 TIBAN IMPIAN KELURAHAN TIBAN BARU KECAMATAN SEKUPANG | - | - | Konstruksi | - | 72.398.000 |
SEMENISASI JALAN PEMUKIMAN RT 01 RW 09 PURI MALAKA KELURAHAN TIBAN BARU KECAMATAN SEKUPANG. VOLUME 117 M X 4 M (POKMASBOUGENVILLE 5) | RT 01 RW 09 PURI MALAKA KELURAHAN TIBAN BARU KECAMATAN SEKUPANG | - | - | Konstruksi | - | 140.029.000 |
SEMENISASI JALAN RT 03 RW 03 TAMAN SARI HIJAU KELURAHAN TIBAN BARU KECAMATAN SEKUPANG. VOLUME 240 M X 4 X(POKMAS BOUGENVILLE 4) | RT 03 RW 03 TAMAN SARI HIJAU KELURAHAN TIBAN BARU KECAMATAN SEKUPANG | - | - | Konstruksi | - | 197.819.000 |
UPGRADE KEHANDALAN TRAFO (ASSESMENT TRAFO) | GARDU DISTRIBUSI, BATAM TERSEBAR | - | - | Konstruksi | - | 75.960.000 |
PEMASANGAN PAGAR PENGAMAN DAN PEMELIHARAAN FISIK GD. | MKGR DAN GRAHA NUSA BATAM | - | - | Konstruksi | - | 93.999.940 |
PEKERJAAN PENGADAAN KONSTRUKSI JARINGAN FIBER - PENGADAAN KONSTRUKSI CALONPELANGGAN - BEKASI | BEKASI | - | - | Konstruksi | - | 712.312.040 |
PEKERJAAN BOBOKAN KIOS MALL DI LT.2 DAN LT.3 PANBIL MALL | KAWASAN COMERSIAL PANBIL, MUKA KUNING | - | - | Konstruksi | - | 36.515.010 |
PEKERJAAN BOBOK DINDING PERTISI, LANTAI & PEMASANGAN KERAMIK DI LT. 3 PANBIL MALL | KAWASAN COMERSIAL PANBIL, MUKA KUNING | - | - | Konstruksi | - | 74.897.490 |
PEKERJAAN FINISHING AS 25 (A-F) & AS A (1-25) DI FACTORY C2 LOT05 | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 282.556.610 |
PENATAAN JALAN SIMP. BALOI CENTER - SIMP. KAMPUNG NELAYAN (LANJUTAN) | SIMP. BALOI CENTRE - SIMP. KAMPUNG NELAYAN | - | - | Konstruksi | - | 8.245.154.212 |
PENINGKATAN JALAN SIMP. POLSEK LUBUK BAJA/INDOMOBIL - SIMP. BALOI CENTRE (LANJUTAN) | SIMP. LUBUK BAJA/INDOMOBIL SIMP. BALOI CENTRE | - | - | Konstruksi | - | 7.274.499.936 |
DRAINASE U 40 AREA YAYASAN SEKOLAH EPATA RT 02 RW 13. 130M (POKMAS BUKIT TEMPAYAN86) | KEC BUKIT TEMPAYAN | - | - | Konstruksi | - | 35.517.916 |
DRAINASE U40 VOLUME 157M JL. DAHLIA & JL. FLAMBOYAN RT.001 & RT.003 RW.003 (POKMASFLAMBOYAN SEJAHTERA) | KEL BATU SELICIN | - | - | Konstruksi | - | 50.478.000 |
SEMENISASI JALAN VOLUME 244M?? KAMPUNG UTAMA BAWAH RT.001 RW.007 (POKMAS LUBUK 7) | KEL LUBUK BAJA KOTA | - | - | Konstruksi | - | 79.417.000 |
PEMBANGUNAN GARDU BETON 3,5 M X 5,5 M | PT SINARRIAU TERANGINDO- PR AGUNG PERMAI RESIDENCE BATAM CENTRE | - | - | Konstruksi | - | 146.055.910 |
PEKERJAAN PENGECATAN DINDING LUAR PANBIL PLAZA KAWASAN PANBIL COMERCIAL,MUKA KUNING | KAWASAN PANBIL COMERCIAL MUKA KUNING | - | - | Konstruksi | - | 143.457.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 18 KEL BENGKONG SADAI KEC BENGKONG (POKMAS TANJAK 1) | RT 02 RW 18 KEL BENGKONG SADAI KEC BENGKONG | - | - | Konstruksi | - | 113.315.789 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 20 KEL BENGKONG SADI KEC. BENGKONG (POKMASTANJAK 2) | RT 01 RW 20 KEL BENGKONG SADI KEC. BENGKONG | - | - | Konstruksi | - | 113.315.789 |
SEMENISASI JALAN KE POLINDES PULAU NIPAH (DENGAN UKURAN 80 METER X 2 METER) DARI DEPAN RUMAH PAK DAUT SAMPAI KE POLINDES RT.02 / RW.04 PULAU NIPAH, KELURAHAN SETOKOK,160M?? (POKMAS SETOKOK 20) | RT.02 / RW.04 PULAU NIPAH, KELURAHAN SETOKOK | - | - | Konstruksi | - | 56.243.000 |
PEMBANGUNAN JERAMBAH (DENGAN UKURAN 80 METER X 1,5 METER) SAMPING RUMAH SIMAN DAN MOGOT RT.1 / RW.1SETOKOK, KELURAHAN SETOKOK, 120M?? (POKMAS SETOKOK 21) | RT.1 / RW.1 SETOKOK, KELURAHAN SETOKOK | - | - | Konstruksi | - | 248.105.263 |
PEMBANGUNAN GEDUNG SERBAGUNA RT 08 RW 13 KEL BENGKONG SADAI KEC BENGKONG(POKMAS TANJAK 3) | RT 08 RW 13 KEL BENGKONG SADAI KEC BENGKONG | - | - | Konstruksi | - | 89.936.000 |
SEMENISASI JALAN LINGKUNGAN PERUM PGRI RT 02 RW 02 KEL SEI BINTI KEC SAGULUNG (POKMAS SEI BINTI RT 02 RW 12) | PERUM PGRI RT 02 RW 02KEL SEI BINTI KEC SAGULUNG | - | - | Konstruksi | - | 118.298.742 |
PEMBANGUNAN JERAMBAH (DENGAN UKURAN 80 METER X 1,5 METER) SEBELAH RUMAH KHAIRUL DAN PAK SAMAT RT.01 / RW.04 PULAU NIPAH, KELURAHANSETOKOK, 120M (POKMAS SETOKOK 24) | KEL SETOKOK | - | - | Konstruksi | - | 248.473.685 |
SEMENISASI JALAN LINGKUNGAN DI KAV. BUKIT KAMBOJA RW.15, 600M?? (POKMAS SP 15) | KEL SEI PELUNGGUT | - | - | Konstruksi | - | 183.525.000 |
PEMBANGUNAN JERAMBAH (DENGAN UKURAN 80 METER X 1,5 METER) SEBELAH RUMAH JAMEL RT.02 / RW.02 SETOKOK, KELURAHAN SETOKOK, 120M??(POKMAS SETOKOK 22) | RT.02 / RW.02 SETOKOK, KELURAHAN SETOKOK | - | - | Konstruksi | - | 248.421.053 |
SEMENISASI JALAN LINGKUNGAN KAV. BUKIT SEROJA RW.16, 475.2M?? (POKMAS SP 16) | KEL SEI PELUNGGUT | - | - | Konstruksi | - | 56.837.200 |
DRAINASE U30 KAV. BUKIT MELATI RW.06, 290M (POKMAS SP 06) | KEL SEI PELUNGGUT | - | - | Konstruksi | - | 63.165.666 |
PEMBANGUNAN JERAMBAH (DENGAN UKURAN 80 METER X 1,5 METER) SEBELAH RUMAH PAK UJI DAN IBU KAMISAH RT.02 / RW.05PULAU PANJANG KELURAHAN SETOKOK, 120M?? (POKMASSETOKOK 23) | RT.02 / RW.05 PULAU PANJANG KELURAHAN SETOKOK | - | - | Konstruksi | - | 248.473.685 |
PEMBANGUNAN GARDU BETON 3,5 M X 5,5 M | PT SEHATI KITA BERSAMA - PR PESONA BUKIT LAGUNA III TG.PIAYU | - | - | Konstruksi | - | 146.055.910 |
SEMENISASI JALAN LINGKUNGAN KAV. SAGULUNG BARU RT 02 RW 07 (POKMAS SEI BINTI RT 02 RW07) | LINGKUNGAN KAV. SAGULUNG BARU RT 02 RW 07 | - | - | Konstruksi | - | 60.505.000 |
SEMENISASI JALAN LINGKUNGAN KAV. SAGULUNG BARU RT 06 RW 05 (POKMAS SEI BINTI RT 06 RW05) | LINGKUNGAN KAV. SAGULUNG BARU RT 06 RW 05 | - | - | Konstruksi | - | 60.190.416 |
SEMENISASI JALAN LINGKUNGAN PERUM PGRI RT 02 RW 02 (SEI BINTI RT 02 RW 02) | LINGKUNGAN PERUM PGRI RT 02 RW 02 | - | - | Konstruksi | - | 59.926.666 |
DRAINASE U40 PERUMAHAN PONDOK INDAH RT 01 RW 07, 150M (POKMAS PONDOK INDAH 3) | PERUMAHAN PONDOK INDAH RT 01 RW 07 | - | - | Konstruksi | - | 66.570.834 |
ROUTINE YEARLY CLEANING STP 1 & STP 2. REEF:239/DACB/IV/2019 | PT PANASONIC INDUSTRIAL DEVICES BATAM | - | - | Konstruksi | - | 130.000.000 |
PENGADAAN DAN INSTALASI PLUMBING DI VILLA PANBIL BLOK AA NO. 02 DI KAWASAN VILLAPANBIL | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | Konstruksi | - | 180.811.000 |
PEKERJAAN KACA LAMINATED 6MM & TIANG ALM CURTAIN WALL & UPAH BONGKAR PASANG KACADI FACTORY WIK PULP ROOM | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 15.000.000 |
PENGADAAN DAN PEMASANGAN KUSEN ALUMINIUM PINTU & KACA DI FACTORY C2 LOT 05 KAWASANPANBIL INDUSTRIAL | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 462.869.000 |
PEKERJAAN RETAINING WALL BATU BRONJONG VILLA PANBIL BLOK AA KAWASAN VILLA PANBIL | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | Konstruksi | - | 57.350.000 |
PEMBUATAN SALURAN DI BELAKANG CHAPPEL | CHAPPEL BLOK B | - | - | Konstruksi | - | 2.070.000 |
JALAN SETAPAK DAN TANGGULAN DI CHAPPEL BLOK B | CHAPPEL BLOK B | - | - | Konstruksi | - | 10.274.450 |
PEKERJAAN PIPA AIR KOTOR, AIR BEKAS, AIR BERSIH DAN AIR HUJAN DI FACTORY C2 LOT 05 | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 214.017.414 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 RT 03 RW 03 (440M) (POKMAS PERJUANGAN) | KEL TANJUNG PIAYU | - | - | Konstruksi | - | 113.322.105 |
PEMASANGAN PAGAR PENGAMAN DAN PEMELIHARAAN FISIK GD | GARDU BETON PR KARTINI & PLAMO | - | - | Konstruksi | - | 90.311.129 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM20KV | PT SINARRIAU TERANGINDO, PR AGUNG PERMAI RESIDENCE BATAM CENTRE | - | - | Konstruksi | - | 91.483.750 |
PEMLIHARAAN GARDU TM, GARDU TR DAN GARDU PORTAL | BATAM TERSEBAR | - | - | Konstruksi | - | 50.450.000 |
SEMENISASI JALAN LINGKUNGAN RT 03 / RW 02 (POKMASSEJAHTERA) | RT 03 / RW 02 KEL SAMBAU KEC NONGSA | - | - | Konstruksi | - | 93.095.000 |
UPGRADE PHBTR | BATAM TERSEBAR | - | - | Konstruksi | - | 15.255.000 |
PENATAAN JARINGAN UTILITAS MILIK PLN BATAM | BATAM TERSEBAR | - | - | Konstruksi | - | 40.611.800 |
SEMENISASI JALAN LINGKUNGAN RT 02 / RW 05 (POKMAS USAHABERSAMA) | RT 02 / RW 05 KEL SAMBAU KEC NONGSA | - | - | Konstruksi | - | 29.408.750 |
PENGADAAN DAN PEMASANGAN GARDU SKTM 20KV | PT CIPTATAMA GRIYA PRIMA- KK RUKO DAN PERGUDANGAN CIPTA GRAND CITY TG. UNCANG | - | - | Konstruksi | - | 169.724.500 |
PEMASANGAN BARU DAN UPGRADE BAHAN ISOLATOR FCO DAN ARRESTER DARI KERAMIK MENJADI POLYMER PADA SUTM | PINUS, GAGAK DAN LUMBA- LUMBA | - | - | Konstruksi | - | 20.361.200 |
ROTASI TRAFO AKIBAT UNDERLOAD | GARDU MEGA LEGENDA, GARDU RTK, GARDU CENTRE VIEW | - | - | Konstruksi | - | 14.011.150 |
PEMELIHARAAN SUTM | AREA NAGOYA - TIBAN | - | - | Konstruksi | - | 13.500.000 |
PENGADAAN DAN PEMASANGAN SKTM 20KV DAN PERALATAN GARDU | PT ASSTAR RIAU DEVELOPER- KK PR ANSLEY PARK BATAM CENTRE | - | - | Konstruksi | - | 157.277.500 |
SEMENISASI JALAN LINGKUNGAN RT 04 / RW 01 (POKMAS KELEMBAKBERTUAH) | JALAN LINGKUNGAN RT 04 / RW 01KEL. SAMBAU | - | - | Konstruksi | - | 98.093.750 |
SEMENISASI JALAN LINGKUNGAN RT 05 / RW 03 (POKMAS BERKAHBERSAMA) | JALAN LINGKUNGAN RT 05 / RW 03 KEL. SAMBAU | - | - | Konstruksi | - | 81.675.000 |
PEMBANGUNAN JETTY DAN DOLPHIN | JL. BRIGJEN KATAMSO - TG. UNCANG | - | - | Konstruksi | - | 8.534.818.911 |
PEMASANGAN FIRE ALARM SYSTEM | TIBAN INDAH DAN NAGOYA | - | - | Konstruksi | - | 140.000.000 |
PEKERJAAN PONDASI PAGAR DEPAN GAPURA TAMAN WISATA ALAM, KAWASAN VILLA PANBL, MUKA KUNING | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | Konstruksi | - | 17.641.290 |
PEMELIHARAAN SUTM | AREA NAGOYA - TIBAN | - | - | Konstruksi | - | 16.250.000 |
PEMELIHARAAN SUTM | AREA BATU AJI | - | - | Konstruksi | - | 27.000.000 |
PEMELIHARAAN SUTM | AREA BATAM CENTRE | - | - | Konstruksi | - | 27.000.000 |
PEKERJAAN STRUKTUR GRID AS 13-20 DI FACTORY C2 LOT 06, KAWASAN PANBIL INDUSTRIAL,MUKA KUNING | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 36.584.984 |
PEKERJAAN STRUKTUR RUMAH SUSUN BLOK E KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 385.578.268 |
PEMBANGUNAN EMBUNG SERBAGUNA PULAU SETOKOK DIKOTA BATAM | KELURAHAN SETOKOK, KECAMATAN BULANG | - | - | Konstruksi | - | 8.196.169.499 |
PEKERJAAN PEMBANGUNAN SPAM PULAU JALOH KEL. PANTAI GELAM KEC. BULANG | PULAU JALOH | - | - | Konstruksi | - | 5.872.885.811 |
PENGADAAN DAN PEMASANGAN SKTM DI PT KALIBAN BANGUN INDONESIA | PT KALIBAN BANGUN INDONESIA PR WINNER SWEET HOME KP BAGAN TG PIAYU | - | - | Konstruksi | - | 79.452.250 |
PENGADAAN DAN PEMASANGAN SKTM DAN PERALATAN GARDU DI PT PANAL LINTAS SINDOLOGISTIKINDO | PT PANAL LINTAS SINDO LOGISTIKINDO, KK RUKO MEGA MAS BATAM CENTRE | - | - | Konstruksi | - | 126.213.250 |
PENGADAAN DAN PEMASANGAN SKTM 20 KV DAN PERALATAN GARDU DI PT SEHATI KITABERSAMA | PT SEHATI KITA BERSAMA - KK PR PESONA BUKIT LAGUNA TAHAP III TANJUNG PIAYU | - | - | Konstruksi | - | 92.087.000 |
PEMASANGAN FCO, ARRESTER & PASANG GROUNDING PADA JARINGAN SUTM & GD | BATAM TERSEBAR | - | - | Konstruksi | - | 87.311.000 |
PEMASANGAN FCO, ARRESTER & PASANG GROUNDING PADA JARINGAN SUTM & GD | BATAM TERSEBAR | - | - | Konstruksi | - | 60.405.500 |
PENARIKAN SKTM, PENGISIAN PERALATAN GARDU DISTRIBUSI &MANUVER JTR | GD SISIPAN BENGKONG ABADI GANG MELUR | - | - | Konstruksi | - | 22.803.900 |
PENGADAAN DAN PEMASANGAN SKTM DI GEREJA REFORMED INJILI INDONESIA BATAM | GEREJA REFORMED INJILI INDONESIA BATAM - DEPAN PINTU GERBANG PR CROWN HILL BATAM CENTRE | - | - | Konstruksi | - | 59.484.550 |
PENGADAAN DAN PEMASANGAN SKTM 20 KV DAN PERALATAN GARDU DI PT TARUNA MADYAPRATAMA | PT TARUNA MADYA PRATAMA - KK PR WINNER DELUXE NONGSA | - | - | Konstruksi | - | 96.532.250 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTABLE KONTAINER DI PT ALUSTEEL ENGINEERING INDONESIA | PT ALUSTEEL ENGINEERING INDONESIA | - | - | Konstruksi | - | 73.257.250 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL DI GPDI IMANUELBUKIT KARMEL | GPDI IMANUEL BUKIT KARMEL - JL. TRANS BARELANG BUKIT KARMEL JEMBATAN V | - | - | Konstruksi | - | 18.799.000 |
RECONECTORISASI JTR, SR & APP | BATAM | - | - | Konstruksi | - | 95.759.327 |
GARDU PAKET PORTABLE (KONTAINER) 20 FEET | JL. TODAK, BATU AMPAR | - | - | Konstruksi | - | 78.172.067 |
PEMBANGUNAN JALAN KOLEKTOR KAWASAN INDUSTRI KABIL (DARIPT. MUSIM MAS KE JL. HANG KESTURI) | JALAN DARI PT. MUSIM MAS KE JL. HANG KESTURI | - | - | Konstruksi | - | 7.507.287.012 |
PEMBANGUNAN JALAN BETON RT 07 RW 03 PULAU AWENG (400M??)(POKMAS TEMOYONG 19) | RT 07 RW 03 PULAU AWENG KEL TEMOYONG KEC BULANG | - | - | Konstruksi | - | 139.894.736 |
PEMBANGUNAN JALAN BETON RT 04 RW 02 SELAT NENEK (390M??)(POKMAS TEMOYONG 20) | RT 04 RW 02 KEL TEMOYONG KEC BULANG | - | - | Konstruksi | - | 136.368.421 |
PEMBANGUNAN DRAINASE LINGKUNGAN RT 03 RW 01 TEMOYONG (100M??) (POKMASTEMOYONG 21) | RT 03 RW 01 KEL TEMOYONG KEC. BULANG | - | - | Konstruksi | - | 39.709.000 |
PEMBANGUNAN JERAMBAH DENGAN UKURAN (P :50 M X L :1,5M) TEBAL = 0,15 M VOLUME = 75M?? PULAU AIR RT.01 RW.01 DARI JALAN RUMAH TAMRINPENYAMBUNG JERAMBAH SAMPAI RUMAH M.IRVAN (POKMAS BATULEGONG 26) | PULAU AIR RT.01 RW.01 KEL BATU LEGONG KEC BULANG | - | - | Konstruksi | - | 113.578.947 |
PEMBANGUNAN JERAMBAH BETON DI RT 05 RW 03 PULAUJALOH (33M??) (POKMAS PANTAI GELAM 28) | RT 05 RW 03 PULAU JALOH | - | - | Konstruksi | - | 62.636.000 |
PEMBANGUNAN JERAMBAH BETON DI RT 05 RW 03 PULAUJALOH (30M??) (POKMAS PANTAI GELAM 29) | RT 05 RW 03 PULAU JALOH | - | - | Konstruksi | - | 56.972.000 |
PEMBANGUNAN JERAMBAH BETON RT 03 RW 02 PULAU JALOH (35M??) (POKMAS PANTAI GELAM30) | RT 03 RW 02 PULAU JALOH | - | - | Konstruksi | - | 66.200.000 |
PEMBANGUNAN JERAMBAH BETON DI RT 04 RW 02 PULAUJALOH (22,5M??) (POKMAS PANTAI GELAM 31) | RT 04 RW 02 PULAU JALOH | - | - | Konstruksi | - | 42.416.000 |
PEMBANGUNAN JERAMBAH BETON DI RT 04 RW 02 PULAUJALOH (35M??) (POKMAS PANTAI GELAM 32) | RT 04 RW 02 PULAU JALOH | - | - | Konstruksi | - | 66.393.000 |
PENGADAAN DAN PEMASANGAN SKTM 20KV DAN PERALATAN GARDU | WARGA KAMPUNG KELEMBANG - KK KP. KELEMBAK NONGSA | - | - | Konstruksi | - | 79.889.750 |
PEMASANGAN PAGAR PENGAMAN DAN PEMELIHARAAN FISIK GD | GD BETON BANK DUTA DAN TAMAN HARAPAN INDAH | - | - | Konstruksi | - | 106.690.012 |
PEMELIHARAAN GARDU DISTRIBUSI | BATAM TERSEBAR | - | - | Konstruksi | - | 50.450.000 |
PENGGANTIAN CT TM MENJADI 150-300/5 A (PERUBAHAN DAYA) & CT TM RING MENJADI 50-100/5 A -NON KHS | PT. REZEKI PUTRA RIAU - MALL PENUIN TOP 100 & HOTEL ANGKASA PLAZA MAJESTI HOTEL JODOH RECONECTION | - | - | Konstruksi | - | 5.409.000 |
UPGRADE KUBIKEL LBS MOTORIZED | TUNAS REGENCY & TANJUNG UNCANG 1 | - | - | Konstruksi | - | 4.400.000 |
PENARIKAN DAN PENGISIAN PERALATAN GARDU DISTRIBUSI | KAVLING JUJUR BATU AMPAR | - | - | Konstruksi | - | 89.638.550 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU SKTM 20KV | PT ASSTAR RIAU DEVELOPER- SAMPING PR. ORCHARD PARK BATAM CENTRE | - | - | Konstruksi | - | 118.046.850 |
SEMENISASI JALAN LINGKUNGAN PERUM SENAWANGI BLOK A RT 02 (POKMAS SENAWANGI BERSERI) | PERUM SENAWANGI BLOK A RT 02 KEL BULIANG KECAMATAN BATU AJI | - | - | Konstruksi | - | 109.473.685 |
SEMENISASI JALAN LINGKUNGAN PERUM BUMI KENCANA BLK A RT 01 RW 28 (POKMAS BUMI KENCANA BERSATU) | PERUM BUMI KENCANA BLK A RT 01 RW 28 KEL BULIANG KEC BATU AJI | - | - | Konstruksi | - | 118.421.053 |
SEMENASI JALAN LINGKUNGAN PERUM MUKA KUNING INDAH I RT007 RW 004 (POKMAS MUKA KUNING) | PERUM MUKA KUNING INDAH I RT 007 RW 004 KEL BULIANG KEC BATU JAI | - | - | Konstruksi | - | 85.000.000 |
PEMBANGUNAN JALAN BETON RT 05 RW 01 AIR BULUH (300M??)(BULANG LINTANG 26) | RT 05 RW 01 AIR BULUH | - | - | Konstruksi | - | 103.842.105 |
PENINGKATAN/PELEBARAN JALAN DI KOTA BATAM | UNDERPASS PELITA KOTA BATAM | - | - | Konstruksi | - | 7.773.157.845 |
PEMBANGUNAN JALAN BETON RT 09 RW 02 TANJUNG KUBU(600M??) (BULANG LINTANG 27) | RT 09 RW 02 TANJUNG KUBU | - | - | Konstruksi | - | 206.578.947 |
PEMBANGUNAN JERAMBAH BETON RT 06 RW 03 PULAU LABU (38,4M??) (BATU LEGONG 34) | RT 06 RW 03 PULAU LABU | - | - | Konstruksi | - | 72.660.000 |
PEMBANGUNAN JERAMBAH BETON RT 04 RW 02 PULAU SERAYA (30M??) (BATU LEGONG35) | RT 04 RW 02 PULAU SERAYA | - | - | Konstruksi | - | 56.937.916 |
PENGALIHAN KABEL SKTM MELINTANG DILAHAN | SAMPING BANK MANDIRI CABANG BATAM, NAGOYA | - | - | Konstruksi | - | 50.781.190 |
PEKERJAAN STRUKTUR RUMAH SUSUN BLOK F KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 385.578.268 |
PEMBANGUNAN JERAMBAH BETON RT 04 RW 02 PULAUBULUH (84M??) (PULAU BULUH 23) | RT 04 RW 02 PULAU BULUH | - | - | Konstruksi | - | 155.842.105 |
PENGADAAN DAN PENGECATAN DINDING, SUPPORT PLANG, PLAFOND DAN PARAPET VOID DI PANBIL MALL KAWASAN PANBIL COMERCIAL, MUKA KUNING | PANBIL MALL KAWASAN PANBIL COMERCIAL, MUKA KUNING | - | - | Konstruksi | - | 84.026.000 |
MEMBANGUN HILL TUG BOAT 30 X 8.60 X 4.11 M (HULL 218) | KAWASAN INDUSTRI SEKUPANG KAV. 8 TG. RIAU | - | - | Konstruksi | - | 170.000.000 |
UPGRADE SUTM MENJADI SKTM & SPINDELISASI UNTUK MENINGKATKAN KEHANDALANSUPPLY TM 20 KV | PERUMAHAN SIMPANG RAYA S/D GH SIMPANG EMPAT BANDARA (FEEDER RAJA JAFAR) | - | - | Konstruksi | - | 555.958.400 |
MANUVER JTR | GD BETON SISIPAN BUKIT PERMATA TANJUNG UMA | - | - | Konstruksi | - | 13.183.519 |
PEMBANGUNAN GARDU BETON 3,5 M X 5,5 M | PR MONDE SIGNATURE BATAM | - | - | Konstruksi | - | 146.055.910 |
PENARIKAN SKTM, PENGISIAN & PEMBONGKARAN PERALATAN GARDU DISTRIBUSI | GD TAMAN PESONA INDAH | - | - | Konstruksi | - | 25.412.150 |
PENARIKAN SKTM, PENGISIAN PERALATAN GARDU DISTRIBUSI DAN MANUVER JTR | GD BETON SISIPAN BUKIT PERMATA TANJUNG UMA | - | - | Konstruksi | - | 25.574.446 |
UPGRADE PHBTR | BATAM TERSEBAR | - | - | Konstruksi | - | 12.454.000 |
UPGRADE PHBTR (NON KHS) | BATAM TERSEBAR | - | - | Konstruksi | - | 28.325.736 |
PEKERJAAN PENGECORAN DI AREA BELAKANG CHAPPEL BLOK BKAWASAN VILLA PANBIL, MUKA KUNING | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | Konstruksi | - | 31.489.200 |
PENGADAAN DAN PEMASANGAN PARTISI DOUBLE GYPSUM DI FACTORY B2 LOT 10 PHILIPS KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | Konstruksi | - | 117.612.000 |
PENGADAAN DAN PEMASANGAN PLAFOND DI VILLA PANBIL BLOK AA NO. 01 KAWASAN VILLA PANBIL, MUKA KUNING | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | Konstruksi | - | 59.758.125 |
PROYEK PEMBANGUNAN MASJID AGUNG KOTA BATAM | MASJID AGUNG KOTA BATAM | - | - | Konstruksi | - | 221.600.000 |
SEMENISASI JALAN 166.25M X 4M BALOI MAS INDAH RT.03 RW.IX (POKMAS BALOI MAS INDAHMANDIRI 3) | BALOI MAS INDAH LUBUK BAJA | - | - | Konstruksi | - | 138.631.579 |
DRAINASE U40 LINGKUNGAN PERUMAHAN PEMDA I RT 02, 04, 05 300M (POKMAS MUKA KUNINGPERMAI I) | PERUMAHAN PEMDA I RT 02, 04 KEL BULIANG KEC BATU AJI | - | - | Konstruksi | - | 69.500.000 |
JERAMBAH/ PELANTAR PERMUKIMAN (DEKAT RUMAHMATIUS) PULAU TODAK RT 02 RW 03 (50M??) (POKMAS TODAKANUGERAH) | PULAU TODAK RT 02 RW 03 | - | - | Konstruksi | - | 95.454.545 |
SEMENISASI JALAN 115M X 4M KAMPUNG DALAM RT.03,06 RW.IV (POKMAS RW IV MANDIRI) | KAMPUNG DALAM RT.03,06 RW.IV KEL BALO INDAH KEC LUBUK BAJA | - | - | Konstruksi | - | 147.473.685 |
SEMENISASI JALAN LINGKUNGAN RW 011 MELIPUTI RT 001, 002(270M??) (POKMAS TELUK LENGUNGT SEJAHTERA) | LINGKUNGAN RW 011 MELIPUTI RT 001, 002 KEL. KABIL | - | - | Konstruksi | - | 79.457.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG JABI RT.002 RW.004 (POKMAS JABI BERSATU) | JALAN LINGKUNGAN KAMPUNG JABI RT.002 RW.004 | - | - | Konstruksi | - | 107.646.315 |
SEMENISASI JALAN LINGKUNGAN RW 004 MELIPUTI RT 001 (270M??)(POKMAS BAHARI) | JALAN LINGKUNGAN RW 004 MELIPUTI RT 001 KEL KABIL KEC NONGSA | - | - | Konstruksi | - | 87.998.000 |
SEMENISASI JALAN LINGKUNGAN RW 009 MELIPUTI RT 001 (225M??)(POKMAS CAMAR LAUT) | LINGKUNGAN RW 009 MELIPUTI RT 001 KEL. KABIL | - | - | Konstruksi | - | 64.634.546 |
PARIT/DRAINASE PULAU KUBUNG RT 01 RW 03 (80M) (POKMAS POKMAS KUBUNG ANUGERAH) | PULAU KUBUNG RT 01 RW 03 (80M) KEL NGENANG KEC NONGSA | - | - | Konstruksi | - | 35.557.271 |
SEMENISASI JALAN RT 01 RW 011 MUTIARA VIEW KELURAHAN TIBAN BARU KECAMATAN SEKUPANG. VOLUME 180 M X 4 M(POKMAS BOUGENVILLE 1) | RT 01 RW 011 MUTIARA VIEW KELURAHAN TIBAN BARU | - | - | Konstruksi | - | 197.819.000 |
SEMENISASI JALAN GANG PULAU AIR MAS RT 03 RW 02 (310M??) (POKMAS AIR MAS SEJAHTERA) | JALAN GANG PULAU AIR MAS RT 03 RW 02 (310M??) | - | - | Konstruksi | - | 100.000.000 |
PEMBANGUNAN DRAINASE U 30 RT 02 RW 10 TIBAN BUKIT ASRI KELURAHAN TIBAN BARUKECAMATAN SEKUPANG (POKMAS BOUGENVILLE 11) | RT 02 RW 10 TIBAN BUKIT ASRI KELURAHAN TIBAN BARU | - | - | Konstruksi | - | 12.462.000 |
SEMENISASI JALAN PEMUKIMAN RT 03 RW 10 TIBAN BUKIT ASRI KELURAHAN TIBAN BARUKECAMATAN SEKUPANG (POKMAS BOUGEVILE 7) | JALAN PEMUKIMAN RT 03 RW 10 TIBAN BUKIT ASRI KELURAHAN TIBAN BARU KECAMATAN SEKUPANG | - | - | Konstruksi | - | 143.839.000 |
PEMBANGUNAN DRAINASE U 40 RT 01 RW 03 TAMAN SARI HIJAU KELURAHAN TIBAN BARUKECAMATAN SEKUPANG (POKMAS BOUGENVILLE 15) | RT 01 RW 03 TAMAN SARI HIJAU KELURAHAN TIBAN BARU | - | - | Konstruksi | - | 86.345.000 |
PEMBANGUNAN DRAINASE U 40 RT 01 RT 02 RW 015 TIBAN BUKIT PERMAI KELURAHAN TIBAN BARU KECAMATAN SEKUPANG (POKMASBOUGENVILE 13) | RT 01 RT 02 RW 015 TIBAN BUKIT PERMAI KELURAHAN TIBAN BARU KECAMATAN SEKUPANG | - | - | Konstruksi | - | 34.626.000 |
POKMAS MAWAR | BATAM | - | - | Konstruksi | - | 89.999.000 |
POKMAS SETOKOK 26 | KEL SETOKOK KEC BULANG | - | - | Konstruksi | - | 59.825.250 |
POKMAS PELITA MADANI DAU 1 | BATAM | - | - | Konstruksi | - | 167.894.737 |
POKMAS CITRAMAS BERSAMA | BATAM | - | - | Konstruksi | - | 107.863.158 |
POKMAS MANGGA BERSATU | KOTA BATAM | - | - | Konstruksi | - | 97.634.450 |
POKMAS NAGOYA SEJAHTERA 4 | BATAM | - | - | Konstruksi | - | 71.319.300 |
POKMAS BAROKAH | PEMDA KOTA BATAM | - | - | Konstruksi | - | 124.368.421 |
POKMAS SRIMAU INDAH | BATAM | - | - | Konstruksi | - | 83.391.666 |
POKMAS LAUT 14 | BATAM | - | - | Konstruksi | - | 42.133.000 |
POKMAS BALOI 2 | BATAM | - | - | Konstruksi | - | 104.631.579 |
POKMAS RW 14 | BATAM | - | - | Konstruksi | - | 84.090.834 |
POKMAS RW 10 | BATAM | - | - | Konstruksi | - | 172.773.685 |
POKMAS BAJA 2 | KOTA BATAM | - | - | Konstruksi | - | 113.578.947 |
POKMAS LAUT 13 | PEMDA KOTA BATAM | - | - | Konstruksi | - | 130.684.211 |
POMMAS CITRAMAS MANDIRI | KOTA BATAM | - | - | Konstruksi | - | 187.802.632 |
SEMENISASI JALAN LINGKUNGAN PERUM AIR MAS PLAZA RW 13 (POKMAS SEI LANGKAI 13) | KEL. SEI LANGKAI | - | - | Konstruksi | - | 150.635.789 |
SEMENISASI JALAN 75M X 4M SEI LADI RT.010 RW.VI (POKMAS SEILADI) | KEL. BALOI INDAH | - | - | Konstruksi | - | 97.071.000 |
SEMENISASI JALAN LINGKUNGAN RW 003 MELIPUTI RT 001 (270M??)(POKMAS SAKURA) | KEL. KABIL | - | - | Konstruksi | - | 88.283.000 |
SEMENISASI JALAN LINGKUNGAN RW 010 MELIPUTI RT 004 (270M??)(POKMAS SAGA 12) | KEL. KABIL | - | - | Konstruksi | - | 80.250.000 |
SEMENISASI JALAN LINGKUNGAN RW 013 MELIPUTI RT 002 (270M??)(POKMAS DAPUR ARANG SEJAHTERA) | KEL. KABIL | - | - | Konstruksi | - | 95.369.092 |
SEMENISASI JALAN PEMUKIMAN RT 06 RT 07 TIBAN KOPERASI KELURAHAN TIBAN BARU KECAMATAN SEKUPANG. VOLUME 230 M X 4 X (POKMAS | KEL. TIBAN BARU | - | - | Konstruksi | - | 197.819.000 |
PEMBANGUNAN DRAINASE U 40 RT 01 RW 01 TAMAN SARI KELURAHAN TIBAN BARUKECAMATAN SEKUPANG (POKMAS BOUGENVILLE 12) | KEL. TIBAN BARU | - | - | Konstruksi | - | 86.345.000 |
SEMENISASI JALAN VOLUME 440M?? GRIYA PELITA MAS RT.05 RW.02 (POKMAS PELITA MADANI 2) | KAMPUNG PELITA | - | - | Konstruksi | - | 148.736.842 |
PEMBANGUNAN JERAMBAH BETON RT 08 RW 03 PULAU BULUH (54M??) (POKMAS PULAUBULUH 24) | KEL. PULAU BULUH | - | - | Konstruksi | - | 214.263.158 |
SEMENISASI JALAN VOLUME 500M SAMPING FASUM BALOI GARDEN 2 RT.001 RW.006 (POKMAS BALOISEJAHTERA 1) | KEL BATU SELICIN | - | - | Konstruksi | - | 160.105.263 |
POKMAS SEI LANGKAI 01 | BATAM | - | - | Konstruksi | - | 151.196.842 |
POKMAS RW 11 | PEMDA BATAM | - | - | Konstruksi | - | 90.976.250 |
POKMAS RW 15 | PEMDA BATAM | - | - | Konstruksi | - | 27.021.250 |
POKMAS 09 | PEMDA BATAM | - | - | Konstruksi | - | 191.764.211 |
PEMBANGUNAN JERAMBAH (DENGAN UKURAN 80 METER X 1,5 METER) SEBELAH RUMAH KHAIRUL DAN PAK SAMAT RT.01 / RW.04 PULAU NIPAH, KELURAHAN SETOKOK, 120M?? (POKMASSETOKOK 25) | KEL SETOKOK | - | - | Konstruksi | - | 246.684.211 |
POKMAS SEJAHTERA 3 | PEMDA BATAM | - | - | Konstruksi | - | 31.107.900 |
POKMAS LAUT 11 | PEMDA BATAM | - | - | Konstruksi | - | 196.000.000 |
DRAINASE U 40 PERUM BALOI GARDEN RT 001 RW 006 VOL.150M POKMAS ALAMANDA 1 | KELURAHAN BATU SELICIN | - | - | DRAINASE U 40 PERUM BALOI GARDEN RT 001 RW 006 VOL.150M POKMAS ALAMANDA 1 | - | 48.191.000 |
DRAINASE U- 30 BALOI KUSUMA INDAH RT 002 RW 004 VOL-61M POKMAS BG | KELURAHAN BATU SELICIN | - | - | DRAINASE U- 30 BALOI KUSUMA INDAH RT 002 RW 004 VOL-61M POKMAS BG | - | 18.749.500 |
JERAMBAH BETON RT.002/RW.003 KUALA BULUH ( POKMAS SEMBULANG 20 - 135 M2 ) | KELURAHAN SEMBULANG | - | - | JERAMBAH BETON RT.002/RW.003 KUALA BULUH ( POKMAS SEMBULANG 20 - 135 M2 ) | - | 281.758.400 |
JERAMBAH BETON RT.002/RW.003 KUALA BULUH ( POKMAS SEMBULANG 19 - 135 M2 ) | KELURAHAN SEMBULANG | - | - | JERAMBAH BETON RT.002/RW.003 KUALA BULUH ( POKMAS SEMBULANG 19 - 135 M2 ) | - | 287.862.300 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 003 RW 003 (POKMAS MELATI I - 141 M2) | KELURAHAN TANJUNG RIAU | - | - | SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 003 RW 003 (POKMAS MELATI I - 141 M2) | - | 47.242.800 |
SEMENISASI JALAN LINGKUNGAN RW.015 - POKMAS KABIL RAYA 46 -VOLUME 200 M2 | KABIL | - | - | SEMENISASI JALAN LINGKUNGAN RW.015 - POKMAS KABIL RAYA 46 -VOLUME 200 M2 | - | 74.901.200 |
SEMENISASI JALAN RT 02 RW 08 VOLUME 300M2 ( POKMAS KARANG ) | KELURAHAN TANJUNG UMA | - | - | SEMENISASI JALAN RT 02 RW 08 VOLUME 300M2 ( POKMAS KARANG ) | - | 101.036.100 |
SEMENISASI JALAN RT.006 RW.006 KELURAHAN SUNGAI LEKOP ( 356 METER )(SUNGAI LEKOP 006.006-341M2) | KELURAHAN SUNGAI LEKOP | - | - | SEMENISASI JALAN RT.006 RW.006 KELURAHAN SUNGAI LEKOP ( 356 METER )(SUNGAI LEKOP 006.006-341M2) | - | 120.279.500 |
SEMENISASI SIMPANG WARSITO S/D SIMPANG MUL RT.002/RW.001 (DAU.T) (POKMAS AIR RAJA DAU 3 - 267 M2) | KELURAHAN AIR RAJA | - | - | SEMENISASI SIMPANG WARSITO S/D SIMPANG MUL RT.002/RW.001 (DAU.T) (POKMAS AIR RAJA DAU 3 - 267 M2) | - | 326.007.000 |
2019-CAPEX PROJECT-CONNECT POWER SUPPLY FROM JETTY TRANSFORMER TO DOCK 8 INCLUDING TRANSFORMER & EQUIPMENTS | JL. BRIGJEN KATAMSO (BUNDARAN), TANJUNG UNCANG | - | - | 2019-CAPEX PROJECT-CONNECT POWER SUPPLY FROM JETTY TRANSFORMER TO DOCK 8 INCLUDING TRANSFORMER & EQU | - | 2.939.300.000 |
ADDITIONAL CANOPY WITH OVERHEAD CRANE STRUCTURE | JL. HANG KESTURI I NO. 2 | - | - | ADDITIONAL CANOPY WITH OVERHEAD CRANE STRUCTURE | - | 458.398.165 |
ARCHITECTURAL WORKS IN PARTICULAR METAL ROOF SYSTEM, WALL CLADDING SYSTEM AND BELLYPAN INSTALLATION | JALAN BRIGJEN KATAMSO KM 5 TANJUNG UNCANG | - | - | ARCHITECTURAL WORKS IN PARTICULAR METAL ROOF SYSTEM, WALL CLADDING SYSTEM AND BELLYPAN INSTALLATION | - | 2.800.000.000 |
BATU MIRING KOMP. HAPPY GARDEN VOL.60M2 - POKMAS HAPPY | KELURAHAN BATU SELICIN | - | - | BATU MIRING KOMP. HAPPY GARDEN VOL.60M2 - POKMAS HAPPY | - | 76.007.800 |
BATU MIRING RT 02 RW 01 SAMPING RUMAH MUHDIFRI-RUSLI (2020) | RT 02 RW 01 | - | - | BATU MIRING RT 02 RW 01 SAMPING RUMAH MUHDIFRI-RUSLI (2020) | - | 62.492.150 |
BATU MIRING SAKURA GARDEN RT 02 RW 04 | SAKURA GARDEN RT 02 RW 04 KAMPUNG SERAYA | - | - | BATU MIRING SAKURA GARDEN RT 02 RW 04 | - | 136.720.100 |
BAUXITE COMPECTION AT YARD AREA | JLN. KASTURI I NO. 2 KAWASAN INDUSTRI TERPADU KABIL | - | - | BAUXITE COMPECTION AT YARD AREA | - | 51.429.000 |
BEKISTING BALOK DAN PLAT LANTAI | JL RE MARTADINATA NO 01 SEKUPANG | - | - | BEKISTING BALOK DAN PLAT LANTAI | - | 2.617.000.000 |
BM1 PEMBANGUNAN BATU MIRING JALAN MASJID AL-ANSHOR RW12 RT4 KEL TG SENGKUANG KEC BATU AMPAR | KEL TANJUNG SENGKUANG BATU AMPAR | - | - | BM1 PEMBANGUNAN BATU MIRING JALAN MASJID AL-ANSHOR RW12 RT4 KEL TG SENGKUANG KEC BATU AMPAR | - | 118.936.000 |
BM1 PEMBANGUNAN BRONJONG JALAN MASJID AL MUTHMAINNAH BENGKONG ABADI 1 KEL TG BUNTUNG KEC BENGKONG | KEL TG BUNTUNG KEC BENGKONG | - | - | BM1 PEMBANGUNAN BRONJONG JALAN MASJID AL MUTHMAINNAH BENGKONG ABADI 1 KEL TG BUNTUNG KEC BENGKONG | - | 1.170.000.000 |
BM1 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING TERING RAYA MELCEM ANTARA RT 2,3,4 RW.18 | KEL TANJUNG SENGKUANG KEC BATU AMPAR | - | - | BM1 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING TERING RAYA MELCEM ANTARA RT 2,3,4 RW.18 | - | 421.032.295 |
BM5 PEMBANGUNAN BATU MIRING ANTARA PURI MALAKA RT3 RW9 DAN TIBAN PALEM KEL TIBAN BARU KEC SEKUPANG | KEL TIBAN BARU KEC SEKUPANG | - | - | BM5 PEMBANGUNAN BATU MIRING ANTARA PURI MALAKA RT3 RW9 DAN TIBAN PALEM KEL TIBAN BARU KEC SEKUPANG | - | 172.500.000 |
BM5 PEMBANGUNAN BATU MIRING PUTRI FORTUNA RT.03 RW.08 KEL SEI HARAPAN KEC SEKUPANG | KEL SEI HARAPAN KEC SEKUPANG | - | - | BM5 PEMBANGUNAN BATU MIRING PUTRI FORTUNA RT.03 RW.08 KEL SEI HARAPAN KEC SEKUPANG | - | 136.850.000 |
BM5 PEMBANGUNAN BATU MIRING RT 03 RW 9 KEL TIBAN LAMA KEC SEKUPANG | KEL TIBAN LAMA KEC SEKUPANG | - | - | BM5 PEMBANGUNAN BATU MIRING RT 03 RW 9 KEL TIBAN LAMA KEC SEKUPANG | - | 43.700.000 |
BUNDLING MACHINE | PT CITRA TUBINDO KABIL | - | - | BUNDLING MACHINE | - | 1.890.000.000 |
CITRA PLAZA NAGOYA BATAM, PAKET PEKERJAAN PEMASANGAN PINTU BESI | KOMP. NAGOYA CITYWALK BLOK NORTHWALK A NO. 1 KEPULAUAN RIAU KOTA BATAM | - | - | CITRA PLAZA NAGOYA BATAM, PAKET PEKERJAAN PEMASANGAN PINTU BESI | - | 1.619.320.000 |
CLIMB UP INSPECTION TOWER TRANSMISI 150KV | AREA BATAM | - | - | CLIMB UP INSPECTION TOWER TRANSMISI 150KV | - | 61.071.934 |
CONCRATE YARD PTCT | JLN. KASTURI I NO. 2 KAWASAN INDUSTRI TERPADU KABIL | - | - | CONCRATE YARD PTCT | - | 1.501.083.000 |
D2 PEMBANGUNAN/REHABILITASI/SALURAN LINGKUNGAN PERMUKIMAN KEL BELIAN 1 KEC BATAM KOTA (RT 1 RW 6) | KEL BELIAN KEC BATAM KOTA KAMPUNG TUA BELIAN | - | - | D2 PEMBANGUNAN/REHABILITASI/SALURAN LINGKUNGAN PERMUKIMAN KEL BELIAN 1 KEC BATAM KOTA (RT 1 RW 6) | - | 110.090.845 |
D3 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN KAVLING SUNGAI PANCUR RT. 01 RW. | RT. 01 RW. 03 KEL. TANJUNG PIAYU KEC. SUNGAI BEDUK | - | - | D3 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN KAVLING SUNGAI PANCUR RT. 01 RW. | - | 199.238.334 |
D3 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN KEL.KABIL 1, KEC NONGSA | KAVLING SENJULUNG RW 11 KEC NONGSA | - | - | D3 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN KEL.KABIL 1, KEC NONGSA | - | 185.558.314 |
DP5/DP6 PROJECT EQUIPMENT, PIPELINE, ELECTRICAL APPLIANCE INSTALLATION & ENGINEERNG CONTRACT | PT. BEST ETERNITY RESOURCE TECHNOLOGY, JL. BRIGJEN KATAMSO, KEL. TANJUNG UNCANG, KEC. BATU AJI | - | - | DP5/DP6 PROJECT EQUIPMENT, PIPELINE, ELECTRICAL APPLIANCE INSTALLATION & ENGINEERNG CONTRACT | - | 11.297.000.000 |
DRAINASE RT.003 RW. 008 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 003.008-350M2) | KELURAHAN SUNGAI LEKOP | - | - | DRAINASE RT.003 RW. 008 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 003.008-350M2) | - | 90.195.600 |
DRAINASE KAMPUNG JAWA RT.001 / RW.003. KELURAHAN SEKANAK RAYA ( PIK 2020 ) (POKMAS 11 - 56 M2) | KELURAHAN SEKANAK RAYA | - | - | DRAINASE KAMPUNG JAWA RT.001 / RW.003. KELURAHAN SEKANAK RAYA ( PIK 2020 ) (POKMAS 11 - 56 M2) | - | 22.934.300 |
DRAINASE LINGKUNGAN U 40 PERUMAHAN BUANA VISTA RT. 02 RW.26 BUANA VISTA INDAH | KELURAHAN BELIAN | - | - | DRAINASE LINGKUNGAN U 40 PERUMAHAN BUANA VISTA RT. 02 RW.26 BUANA VISTA INDAH | - | 56.578.500 |
DRAINASE LINGKUNGAN U40 PERUMAHAN CEMARA GARDEN BLOK R RT.01 RW.16 (CEMARA 3- 17M) | KELURAHAN TAMAN BALOI | - | - | DRAINASE LINGKUNGAN U40 PERUMAHAN CEMARA GARDEN BLOK R RT.01 RW.16 (CEMARA 3- 17M) | - | 6.386.600 |
DRAINASE U 30 FASUM PERUM PURI RHABAYU RT 008 RW 015 POKMAS LESTARI 5 | RT 008 RW 015 KELURAHAN PATAM LESTARI | - | - | DRAINASE U 30 FASUM PERUM PURI RHABAYU RT 008 RW 015 POKMAS LESTARI 5 | - | 37.334.000 |
DRAINASE U 30 FASUM PERUM PURI RHABAYU RT 008 RW 015 POKMAS LESTARI 6 | RT 008 RW 015 KELURAHAN PATAM LESTARI | - | - | DRAINASE U 30 FASUM PERUM PURI RHABAYU RT 008 RW 015 POKMAS LESTARI 6 | - | 19.178.500 |
DRAINASE U 30 PERUM MC DERMOTT RT 002 RW 06 (POKMAS JELAWAT - 44 M) | KELURAHAN TIBAN INDAH | - | - | DRAINASE U 30 PERUM MC DERMOTT RT 002 RW 06 (POKMAS JELAWAT - 44 M) | - | 13.728.000 |
DRAINASE U 30 PERUM MC DERMOTT 1 RT 001 RW 06 (POKMAS GABUS - 32 M) | KELURAHAN TIBAN INDAH | - | - | DRAINASE U 30 PERUM MC DERMOTT 1 RT 001 RW 06 (POKMAS GABUS - 32 M) | - | 9.938.500 |
DRAINASE U 30 PERUM PONDOK PELANGI 2 RT 004 RW 09 (POKMAS TEMBANG - 170 M) | KELURAHAN TIBAN INDAH | - | - | DRAINASE U 30 PERUM PONDOK PELANGI 2 RT 004 RW 09 (POKMAS TEMBANG - 170 M) | - | 53.077.200 |
DRAINASE U 40 KAV. GRIYA SAGULUNG PERMAI RT.04 RW. 01 ( POKMAS 0104 - 300 M ) | KAV. GRIYA SAGULUNG PERMAI RT. 04 RW. 01 | - | - | DRAINASE U 40 KAV. GRIYA SAGULUNG PERMAI RT.04 RW. 01 ( POKMAS 0104 - 300 M ) | - | 80.042.600 |
DRAINASE U 40 KAV. SAGULUNG LAMA RT. 05 RW. 10 ( POKMAS 1005 - 300 M2 ) | KAV. SAGULUNG LAMA RT. 05 RW. 10 | - | - | DRAINASE U 40 KAV. SAGULUNG LAMA RT. 05 RW. 10 ( POKMAS 1005 - 300 M2 ) | - | 83.925.600 |
DRAINASE U 40 PATAM ASRI RT 006 RW 001 POKMAS LESTARI 7 | RT 006 RW 001 KELURAHAN PATAM LESTARI | - | - | DRAINASE U 40 PATAM ASRI RT 006 RW 001 POKMAS LESTARI 7 | - | 47.296.700 |
DRAINASE U 40 PERUM BUKIT TIBAN SELARAS BLOK B NO. 19-30 RT 006 RW 07 (POKMAS BLANAK - 75 M) | KELURAHAN TIBAN INDAH | - | - | DRAINASE U 40 PERUM BUKIT TIBAN SELARAS BLOK B NO. 19-30 RT 006 RW 07 (POKMAS BLANAK - 75 M) | - | 28.974.000 |
DRAINASE U 40 PERUM GPI DAHLIA BLOK K DAN G RT 003 RW 10 (POKMAS TAWES - 560 M) | KELURAHAN TIBAN INDAH | - | - | DRAINASE U 40 PERUM GPI DAHLIA BLOK K DAN G RT 003 RW 10 (POKMAS TAWES - 560 M) | - | 218.730.600 |
DRAINASE U 40 PERUM MASYEBA BLOK F RT 05 RW 07 (POKMAS TERI - 30 M) | KELURAHAN TIBAN INDAH | - | - | DRAINASE U 40 PERUM MASYEBA BLOK F RT 05 RW 07 (POKMAS TERI - 30 M) | - | 11.756.800 |
DRAINASE U 40 PERUM TIBAN ANGGREK RT 001 RW 012 (POKMAS TENGGIRI - 248 M) | KELURAHAN TIBAN INDAH | - | - | DRAINASE U 40 PERUM TIBAN ANGGREK RT 001 RW 012 (POKMAS TENGGIRI - 248 M) | - | 97.119.000 |
DRAINASE U 40 PERUM TIBAN BERLIAN RT 001 RW 013 (POKMAS MAKAREL - 100 M) | KELURAHAN TIBAN INDAH | - | - | DRAINASE U 40 PERUM TIBAN BERLIAN RT 001 RW 013 (POKMAS MAKAREL - 100 M) | - | 39.129.200 |
DRAINASE U 40 PERUM VILLA SAMPURNA 1 BLOK H 1 RT 003 RW 11 (POKMAS NILA - 40 M) | KELURAHAN TIBAN INDAH | - | - | DRAINASE U 40 PERUM VILLA SAMPURNA 1 BLOK H 1 RT 003 RW 11 (POKMAS NILA - 40 M) | - | 15.545.200 |
DRAINASE U 40 PERUMAHAN TAMAN SARI HIJAU RT 07 RW 03 (POKMAS BOUGENVILE 15 - 250 M) | KELURAHAN TIBAN BARU | - | - | DRAINASE U 40 PERUMAHAN TAMAN SARI HIJAU RT 07 RW 03 (POKMAS BOUGENVILE 15 - 250 M) | - | 71.916.900 |
DRAINASE U 40 PERUMAHAN TIBAN HOUSING RT 01 RW 16 (POKMAS BOUGENVILE 14 - 200M) | KELURAHAN TIBAN BARU | - | - | DRAINASE U 40 PERUMAHAN TIBAN HOUSING RT 01 RW 16 (POKMAS BOUGENVILE 14 - 200M) | - | 58.007.400 |
DRAINASE U 40 PERUMAHAN TIBAN HOUSING RT 06 RW 16 (POKMAS BOUGENVILE 16 - 200M) | KELURAHAN TIBAN BARU | - | - | DRAINASE U 40 PERUMAHAN TIBAN HOUSING RT 06 RW 16 (POKMAS BOUGENVILE 16 - 200M) | - | 59.865.300 |
DRAINASE U 40 TIBAN I BLOK AA RT 001 RW 013 (PATAM 11 - 388M) | KELURAHAN PATAM LESTARI | - | - | DRAINASE U 40 TIBAN I BLOK AA RT 001 RW 013 (PATAM 11 - 388M) | - | 118.505.200 |
DRAINASE U 40 VILLA DIAMOND RT 02 RW 20 (POKMAS BOUGENVILE 17 - 100M) | KELURAHAN TIBAN BARU | - | - | DRAINASE U 40 VILLA DIAMOND RT 02 RW 20 (POKMAS BOUGENVILE 17 - 100M) | - | 29.810.000 |
DRAINASE U-40 PERUM BINA UMMAH BLOK B RW 11 (POKMAS BINA MAKMUR) VOL-300M | KELURAHAN KIBING | - | - | DRAINASE U-40 PERUM BINA UMMAH BLOK B RW 11 (POKMAS BINA MAKMUR) VOL-300M | - | 91.609.100 |
DRAINASE U30 KAV.SEI TERING RT 002 RW 007 | RT 002 RW 007 | - | - | DRAINASE U30 KAV.SEI TERING RT 002 RW 007 | - | 49.157.900 |
DRAINASE U30 PERUMAHAN BANDAR SRIMAS RT.01 RT.03 RT.05 RW.12 (DAU)(BERDIKARI-400M) | KELURAHAN SUNGAI PANAS | - | - | DRAINASE U30 PERUMAHAN BANDAR SRIMAS RT.01 RT.03 RT.05 RW.12 (DAU)(BERDIKARI-400M) | - | 112.195.600 |
DRAINASE U30 PERUMAHAN PONDOK ASRI RT 01 RW 04 326 M 2020(KAMBOJA-226M) | KELURAHAN SUNGAI PANAS | - | - | DRAINASE U30 PERUMAHAN PONDOK ASRI RT 01 RW 04 326 M 2020(KAMBOJA-226M) | - | 96.527.200 |
DRAINASE U30 RT 01 RW 08 (POKMAS CEMPEDAK 2 - 200M) | KELURAHAN TIBAN LAMA | - | - | DRAINASE U30 RT 01 RW 08 (POKMAS CEMPEDAK 2 - 200M) | - | 42.883.500 |
DRAINASE U30 RT 02 RW 01 KELURAHAN TANJUNG UMA VOL. 240 M POKMAS MANGGIS | KELURAHAN TANJUNG UMA | - | - | DRAINASE U30 RT 02 RW 01 KELURAHAN TANJUNG UMA VOL. 240 M POKMAS MANGGIS | - | 73.779.200 |
DRAINASE U30 RT 03 RW 06 (POKMAS ALPUKAT 2 - 106M) | KELURAHAN TIBAN LAMA | - | - | DRAINASE U30 RT 03 RW 06 (POKMAS ALPUKAT 2 - 106M) | - | 24.691.700 |
DRAINASE U30 RT 03 RW 07 VOLUME 165 M- POKMAS SEJAHTERA | KELURAHAN TANJUNG UMA | - | - | DRAINASE U30 RT 03 RW 07 VOLUME 165 M- POKMAS SEJAHTERA | - | 50.726.500 |
DRAINASE U30 RT.04 RW.09 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 04 . 09-400M2) | KELURAHAN SUNGAI LEKOP | - | - | DRAINASE U30 RT.04 RW.09 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 04 . 09-400M2) | - | 96.880.300 |
DRAINASE U30 TANJUNG SENGKUANG RT001 RW 012 | RT 001 RW 012 TANJUNG SENGKUANG | - | - | DRAINASE U30 TANJUNG SENGKUANG RT001 RW 012 | - | 12.582.900 |
DRAINASE U40 RT 001, 002, 003, 006 RW. 01 SUNGAI LEKOP(SUNGAI LEKOP 001.01-350M2) | KELURAHAN SUNGAI LEKOP | - | - | DRAINASE U40 RT 001, 002, 003, 006 RW. 01 SUNGAI LEKOP(SUNGAI LEKOP 001.01-350M2) | - | 103.392.300 |
DRAINASE U40 RT 001, 02, 003,004 RW.002 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 001.002-358M2) | KELURAHAN SUNGAI LEKOP | - | - | DRAINASE U40 RT 001, 02, 003,004 RW.002 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 001.002-358M2) | - | 106.634.000 |
DRAINASE U40 DEPAN MASJID NURUL QU'AN RT 004 RW 005 (POKMAS PATAM 18 - 100 M) | KELURAHAN PATAM LESTARI | - | - | DRAINASE U40 DEPAN MASJID NURUL QU'AN RT 004 RW 005 (POKMAS PATAM 18 - 100 M) | - | 32.572.100 |
DRAINASE U40 PERUMAHAN KAMPUNG MELAYU BUKIT JODOH RT.05 RW.01 (222M) DAU(SENTOSA 05-200M) | KELURAHAN SUNGAI PANAS | - | - | DRAINASE U40 PERUMAHAN KAMPUNG MELAYU BUKIT JODOH RT.05 RW.01 (222M) DAU(SENTOSA 05-200M) | - | 68.553.000 |
DRAINASE U40 PERUMAHAN PONDOK ASRI INDAH RT.03 RW.04 TAHUN 2020(ANGGREK MAS-90M) | KELURAHAN SUNGAI PANAS | - | - | DRAINASE U40 PERUMAHAN PONDOK ASRI INDAH RT.03 RW.04 TAHUN 2020(ANGGREK MAS-90M) | - | 33.886.600 |
DRAINASE U40 PERUMAHAN TAMAN BUANA INDAH RT.01 RW.03 TAHUN 2020(NANAS-67M) | KELURAHAN SUNGAI PANAS | - | - | DRAINASE U40 PERUMAHAN TAMAN BUANA INDAH RT.01 RW.03 TAHUN 2020(NANAS-67M) | - | 25.268.100 |
DRAINASE U40 PERUMAHAN TAMAN BUANA INDAH RT.02 RW.03 2020(KIWI-50M) | KELURAHAN SUNGAI PANAS | - | - | DRAINASE U40 PERUMAHAN TAMAN BUANA INDAH RT.02 RW.03 2020(KIWI-50M) | - | 18.849.600 |
DRAINASE U40 RT 01 & 02 RW 07 (POKMAS STRAWBERY II - 118M) | KELURAHAN TIBAN LAMA | - | - | DRAINASE U40 RT 01 & 02 RW 07 (POKMAS STRAWBERY II - 118M) | - | 40.482.200 |
DRAINASE U40 RT 01 RW 01 POKMAS PEPAYA 1 | RT 01 RW 01 KELURAHAN TIBAN LAMA | - | - | DRAINASE U40 RT 01 RW 01 POKMAS PEPAYA 1 | - | 36.252.700 |
DRAINASE U40 RT 02 RW 10 (POKMAS SEMANGKA - 50 M) | KELURAHAN TIBAN LAMA | - | - | DRAINASE U40 RT 02 RW 10 (POKMAS SEMANGKA - 50 M) | - | 17.847.500 |
DRAINASE U40 RT 02 RW 10 VOLUME 231 M POKMAS BEROKAH | KELURAHAN TANJUNG UMA | - | - | DRAINASE U40 RT 02 RW 10 VOLUME 231 M POKMAS BEROKAH | - | 76.235.500 |
DRAINASE U40 RT 02 RW 11 POKMAS SALAK 1 | RT 02 RW 11 KELURAHAN TIBAN LAMA | - | - | DRAINASE U40 RT 02 RW 11 POKMAS SALAK 1 | - | 26.681.600 |
DRAINASE U40 RT 02 RW 15 (POKMAS SIRSAK 2 - 105 M) | KELURAHAN TIBAN LAMA | - | - | DRAINASE U40 RT 02 RW 15 (POKMAS SIRSAK 2 - 105 M) | - | 34.043.900 |
DRAINASE U40 RT 03 RW 01 VOLUME 200 M POKMAS HANG KASTURI | KELURAHAN TANJUNG UMA | - | - | DRAINASE U40 RT 03 RW 01 VOLUME 200 M POKMAS HANG KASTURI | - | 66.954.800 |
DRAINASE U40 RT 04 RW 011 POKMAS SALAK 2 | RT 04 RW 11 KELURAHAN TIBAN LAMA | - | - | DRAINASE U40 RT 04 RW 011 POKMAS SALAK 2 | - | 25.117.400 |
DRAINASE U40 RT.002 RW.003 PULAU PETONG (DAU T) ( POKMAS DAU 6 - 77 M² ) | KELURAHAN PULAU ABANG | - | - | DRAINASE U40 RT.002 RW.003 PULAU PETONG (DAU T) ( POKMAS DAU 6 - 77 M² ) | - | 37.633.000 |
DRAINASE U40 TIBAN III RT 002 RW 005 (PATAM 14 - 112M) | KELURAHAN PATAM LESTARI | - | - | DRAINASE U40 TIBAN III RT 002 RW 005 (PATAM 14 - 112M) | - | 36.851.100 |
DRAINASE U40 TIBAN RIAU BERTUAH TAHAP 2 RT 007 RW 009 (PATAM 12 - 50M) | KELURAHAN PATAM LESTARI | - | - | DRAINASE U40 TIBAN RIAU BERTUAH TAHAP 2 RT 007 RW 009 (PATAM 12 - 50M) | - | 18.219.300 |
Drainase (dari Depan Rumah Sdr. Amin - simpang Apeng RT.02/RW.05 -RT.02/RW.02) (PIK 2020) | KELURAHAN TANJUNG SARI | - | - | Drainase (dari Depan Rumah Sdr. Amin - simpang Apeng RT.02/RW.05 -RT.02/RW.02) (PIK 2020) | - | 37.681.850 |
Drainase Lingkungan U40 Perumahan Taman Marchelia RT.002 RW.009(marchelia maju-100m) | KELURAHAN TAMAN BALOI | - | - | Drainase Lingkungan U40 Perumahan Taman Marchelia RT.002 RW.009(marchelia maju-100m) | - | 37.664.000 |
ELECTRICITY POWER ENGINEERING OF LOT 11 | JL. BERINGIN LOT 11 BATAMINDO, MUKA KUNING | - | - | ELECTRICITY POWER ENGINEERING OF LOT 11 | - | 1.669.800.000 |
FINISHING DAPUR DAN TOILET PADA FACTORY IKAYU, KAWASAN PANBIL INDUSTRIAL | MUKA KUNING | - | - | FINISHING DAPUR DAN TOILET PADA FACTORY IKAYU, KAWASAN PANBIL INDUSTRIAL | - | 26.150.000 |
FINISHING DINDING DI GEDUNG VISITOR TAMAN WISATA ALAM | MUKA KUNING | - | - | FINISHING DINDING DI GEDUNG VISITOR TAMAN WISATA ALAM | - | 150.621.300 |
FINISHING DINDING DI VILLA PANBIL BLOK AA NO. 02 KAWASAN VILLA PANBIL | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | FINISHING DINDING DI VILLA PANBIL BLOK AA NO. 02 KAWASAN VILLA PANBIL | - | 201.681.375 |
FINISHING PADA PROYEK RENOVASI WISMA PANBIL | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | FINISHING PADA PROYEK RENOVASI WISMA PANBIL | - | 47.031.000 |
FIRE ALARM ENGINEERING OF LOT 2 | JL. BERINGIN LOT 2, BATAMINDO, MUKA KUNING | - | - | FIRE ALARM ENGINEERING OF LOT 2 | - | 446.200.000 |
FIRE ALARM PTB_LOT 21 PHASE 1 | LOT 21 PHASE 1 KAWASAN BIC MUKA KUNING | - | - | FIRE ALARM PTB_LOT 21 PHASE 1 | - | 195.000.000 |
GALERY DAN FOODCOURT | RT. 001/RW.003 KEL. DURIANGKANG, KEC. SUNGAI BEDUK | - | - | GALERY DAN FOODCOURT | - | 1.000.000.000 |
GORONG-GORONG AMPERA BERANGIN RT 01 RW 02 VOL.7M POKMAS PLITA MADANI 10 | RT 01 RW 02 | - | - | GORONG-GORONG AMPERA BERANGIN RT 01 RW 02 VOL.7M POKMAS PLITA MADANI 10 | - | 6.153.400 |
HULL 063 (PEKERJAAN : FABRICATION, WELDING, FIT UP, ERECTION, OUTFITTING) | PT. LAUTAN LESTARI SHIPYARD, KAVLING 20 KEL. SUNGAI LEKOP, KEC. SAGULUNG | - | - | HULL 063 (PEKERJAAN : FABRICATION, WELDING, FIT UP, ERECTION, OUTFITTING) | - | 330.000.000 |
HULL 064 (PEKERJAAN : FABRICATION, WELDING, FIT UP, ERECTION, OUTFITTING) | PT. LAUTAN LESTARI SHIPYARD, KAVLING 20 KEL. SUNGAI LEKOP, KEC. SAGULUNG | - | - | HULL 064 (PEKERJAAN : FABRICATION, WELDING, FIT UP, ERECTION, OUTFITTING) | - | 330.000.000 |
INSPECTOR TRANSMISSION LINE 150KV | AREA BATAM | - | - | INSPECTOR TRANSMISSION LINE 150KV | - | 492.237.000 |
INSPECTOR TRANSMISSION LINE 150KV | PLN BATAM | - | - | INSPECTOR TRANSMISSION LINE 150KV | - | 476.415.512 |
INSTALATION FIRE PROTECTION SYSTEM BAY 6 | JL BRIGJEN KATAMSO KM 6 TANJUNG UNCANG | - | - | INSTALATION FIRE PROTECTION SYSTEM BAY 6 | - | 2.497.000.000 |
INSTALLATION OF GAS METER AND INSTALLATION OF COMMUNICATION | KAWASAN INDUSTRI TERPADU KABIL | - | - | INSTALLATION OF GAS METER AND INSTALLATION OF COMMUNICATION | - | 44.290.804 |
JALAN LINGKAR SEMENISASI PULAU AMAT BELANDA RT.003/ RW.004.KEL.SEKANAKRAYA(PIK2020)(POKMAS 1 -180M2) | KELURAHAN SEKANAK RAYA | - | - | JALAN LINGKAR SEMENISASI PULAU AMAT BELANDA RT.003/ RW.004.KEL.SEKANAKRAYA(PIK2020)(POKMAS 1 -180M2) | - | 73.251.290 |
JALAN PERUM VILLA SEMPURNA I BLK H1 POKMAS MUJAIR | RT 003 RW 011 KELURAHAN TIBAN INDAH | - | - | JALAN PERUM VILLA SEMPURNA I BLK H1 POKMAS MUJAIR | - | 42.212.500 |
JALAN, BATU MIRING, GEDUNG PERTEMUAN | PULAU TERONG RT. 001 RW. 001 KECAMATAN BELAKANG PADANG | - | - | JALAN, BATU MIRING, GEDUNG PERTEMUAN | - | 295.000.000 |
JALAN, DRAINASE, BATU MIRING | RT. 009, RW.003 KELURAHAN KASU, KECAMATAN BELAKANG PADANG | - | - | JALAN, DRAINASE, BATU MIRING | - | 295.000.000 |
JALAN, DRAINASE, DAN MCK | RW 001-006 KAMPUNG PADANG | - | - | JALAN, DRAINASE, DAN MCK | - | 295.000.000 |
JERAMBAH BETON DI RT. 01 / RW. 02 TANJUNG KERTANG (POKMAS REMPANG 4 - 140 M²) | KELURAHAN REMPANG CATE | - | - | JERAMBAH BETON DI RT. 01 / RW. 02 TANJUNG KERTANG (POKMAS REMPANG 4 - 140 M²) | - | 282.266.600 |
JERAMBAH BETON RT 002 RW 001 KP. CATE (POKMAS REMPANG 3 - 140 M² ) | KELURAHAN REMPANG CATE | - | - | JERAMBAH BETON RT 002 RW 001 KP. CATE (POKMAS REMPANG 3 - 140 M² ) | - | 291.920.200 |
JERAMBAH BETON RT 002 RW 004 MONGGAK (POKMAS REMPANG 10 -140 M² ) | KELURAHAN REMPANG CATE | - | - | JERAMBAH BETON RT 002 RW 004 MONGGAK (POKMAS REMPANG 10 -140 M² ) | - | 292.052.000 |
JERAMBAH BETON RT. 01 RW. 01 KP. CATE (POKMAS REMPANG 2 - 140 M² ) | KELURAHAN REMPANG CATE | - | - | JERAMBAH BETON RT. 01 RW. 01 KP. CATE (POKMAS REMPANG 2 - 140 M² ) | - | 292.091.800 |
JERAMBAH BETON RT.01 RW.02 VOLUME 40 M2 POKMAS BERKAH BERSAMA | KELURAHAN TANJUNG UMA | - | - | JERAMBAH BETON RT.01 RW.02 VOLUME 40 M2 POKMAS BERKAH BERSAMA | - | 83.481.200 |
JERAMBAH BETON RT.02 RW.03 VOLUME 52 M2 POKMAS MAYA SARI | KELURAHAN TANJUNG UMA | - | - | JERAMBAH BETON RT.02 RW.03 VOLUME 52 M2 POKMAS MAYA SARI | - | 105.501.800 |
JERAMBAH BETON RT.04 RW.01 VOLUME 45 M2- POKMAS MELATI PUTIH | KELURAHAN TANJUNG UMA | - | - | JERAMBAH BETON RT.04 RW.01 VOLUME 45 M2- POKMAS MELATI PUTIH | - | 93.908.100 |
JERAMBAH BETON TG. COLEM RT.02 / RW.02 ( POKMAS REMPANG 5 - 140 M² ) | KELURAHAN REMPANG CATE | - | - | JERAMBAH BETON TG. COLEM RT.02 / RW.02 ( POKMAS REMPANG 5 - 140 M² ) | - | 292.028.000 |
JERAMBAH DARI RUMAH WAHID KERUMAH LEMPUN RT 002 RW 001 PULAU ABANG (DAU T) ( POKMAS DAU 5 - 93 M² ) | KELURAHAN PULAU ABANG | - | - | JERAMBAH DARI RUMAH WAHID KERUMAH LEMPUN RT 002 RW 001 PULAU ABANG (DAU T) ( POKMAS DAU 5 - 93 M² ) | - | 119.476.900 |
JERAMBAH PULAU NGUAN RT. 01 RW. 04 KEL. GALANG BARU (DAU T) (POKMAS GALANG BARU DAU 5 - 131,6 M²) | KELURAHAN GALANG BARU | - | - | JERAMBAH PULAU NGUAN RT. 01 RW. 04 KEL. GALANG BARU (DAU T) (POKMAS GALANG BARU DAU 5 - 131,6 M²) | - | 249.701.000 |
JERAMBAH RT 001 RW 003 ( POKMAS PULAU ABANG 25 - 60 M² ) | KELURAHAN PULAU ABANG | - | - | JERAMBAH RT 001 RW 003 ( POKMAS PULAU ABANG 25 - 60 M² ) | - | 113.425.000 |
JERAMBAH RT 004 RW 001 KELURAHAN PULAU ABANG ( POKMAS PULAU ABANG 19 - 60 M² ) | KELURAHAN PULAU ABANG | - | - | JERAMBAH RT 004 RW 001 KELURAHAN PULAU ABANG ( POKMAS PULAU ABANG 19 - 60 M² ) | - | 113.850.000 |
JERAMBAH RT. 001 RW. 002 ( POKMAS PULAU ABANG 22 - 150 M²) | KELURAHAN PULAU ABANG | - | - | JERAMBAH RT. 001 RW. 002 ( POKMAS PULAU ABANG 22 - 150 M²) | - | 284.517.000 |
JERAMBAH RT. 001 RW. 004 AIR NAGA ( POKMAS PULAU AIR NAGA SEHATI 1 - 140 M2 ) | KELURAHAN SIJANTUNG | - | - | JERAMBAH RT. 001 RW. 004 AIR NAGA ( POKMAS PULAU AIR NAGA SEHATI 1 - 140 M2 ) | - | 292.161.100 |
JERAMBAH RT. 002 RW. 002 ( POKMAS PULAU ABANG 24 - 75 M² ) | KELURAHAN PULAU ABANG | - | - | JERAMBAH RT. 002 RW. 002 ( POKMAS PULAU ABANG 24 - 75 M² ) | - | 140.906.000 |
JERAMBAH RT. 002 RW. 002 KELURAHAN PULAU ABANG ( POKMAS PULAU ABANG 23 - 60 M² ) | KELURAHAN PULAU ABANG | - | - | JERAMBAH RT. 002 RW. 002 KELURAHAN PULAU ABANG ( POKMAS PULAU ABANG 23 - 60 M² ) | - | 113.425.000 |
JERAMBAH RT. 002 RW. 002 PULAU PANJANG ( POKMAS PULAU PANJANG SEHATI 1 - 140 M2 ) | KELURAHAN SIJANTUNG | - | - | JERAMBAH RT. 002 RW. 002 PULAU PANJANG ( POKMAS PULAU PANJANG SEHATI 1 - 140 M2 ) | - | 265.631.000 |
JERAMBAH RT. 002 RW. 003 ( POKMAS PULAU ABANG 28 - 60 M² ) | KELURAHAN PULAU ABANG | - | - | JERAMBAH RT. 002 RW. 003 ( POKMAS PULAU ABANG 28 - 60 M² ) | - | 113.425.000 |
JERAMBAH RT. 002 RW. 003 PULAU ABANG ( POKMAS PULAU ABANG 29 - 60 M² ) | KELURAHAN PULAU ABANG | - | - | JERAMBAH RT. 002 RW. 003 PULAU ABANG ( POKMAS PULAU ABANG 29 - 60 M² ) | - | 113.425.000 |
JERAMBAH RT. 002 RW. 004 AIR NAGA ( POKMAS PULAU AIR NAGA SEHATI 3 - 140 M2 ) | KELURAHAN SIJANTUNG | - | - | JERAMBAH RT. 002 RW. 004 AIR NAGA ( POKMAS PULAU AIR NAGA SEHATI 3 - 140 M2 ) | - | 292.118.200 |
JERAMBAH RT. 003 RW. 001 ( POKMAS PULAU ABANG 18 - 97.5 M² ) | KELURAHAN PULAU ABANG | - | - | JERAMBAH RT. 003 RW. 001 ( POKMAS PULAU ABANG 18 - 97.5 M² ) | - | 184.845.000 |
JERAMBAH RT. 003 RW. 001 DARI RUMAH SAPARI KE RUMAH BUDIMAN ( POKMAS PULAU ABANG 16 - 75 M² ) | KELURAHAN PULAU ABANG | - | - | JERAMBAH RT. 003 RW. 001 DARI RUMAH SAPARI KE RUMAH BUDIMAN ( POKMAS PULAU ABANG 16 - 75 M² ) | - | 140.906.000 |
JERAMBAH RT. 003 RW. 003 PULAU PANJANG ( POKMAS PULAU PANJANG SEHATI 2 - 140 M2 ) | KELURAHAN SIJANTUNG | - | - | JERAMBAH RT. 003 RW. 003 PULAU PANJANG ( POKMAS PULAU PANJANG SEHATI 2 - 140 M2 ) | - | 265.645.000 |
JERAMBAH RT. 004 RW. 001 ( POKMAS PULAU ABANG 20 - 135 M² ) | KELURAHAN PULAU ABANG | - | - | JERAMBAH RT. 004 RW. 001 ( POKMAS PULAU ABANG 20 - 135 M² ) | - | 255.335.000 |
JERAMBAH RT. 004 RW. 001 PULAU ABANG ( POKMAS PULAU ABANG 21 - 60 M² ) | KELURAHAN PULAU ABANG | - | - | JERAMBAH RT. 004 RW. 001 PULAU ABANG ( POKMAS PULAU ABANG 21 - 60 M² ) | - | 113.425.000 |
JERAMBAH RT. 004 RW. 003 PULAU PANJANG ( POKMAS PULAU PANJANG SEHATI 3 - 100 M2 ) | KELURAHAN SIJANTUNG | - | - | JERAMBAH RT. 004 RW. 003 PULAU PANJANG ( POKMAS PULAU PANJANG SEHATI 3 - 100 M2 ) | - | 189.723.000 |
JERAMBAH RT. 01 RW. 05 TANJUNG BANUN ( POKMAS SEMBULANG 21 - 135 M2 ) | KELURAHAN SEMBULANG | - | - | JERAMBAH RT. 01 RW. 05 TANJUNG BANUN ( POKMAS SEMBULANG 21 - 135 M2 ) | - | 281.705.600 |
JL. 02 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. HANG TUAH RT 02 RW 06, KEL. TELUK TERING KEC | PERUM. HANG TUAH | - | - | JL. 02 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. HANG TUAH RT 02 RW 06, KEL. TELUK TERING KEC | - | 245.375.669 |
JL1 PEMBANGUNAN/REHABITILASI JALAN LINGKUNGAN KEL. SADAI 2, KEC. BENGKONG (SEI NAYON) | SEI NAYON RT 01, 02 RW 12; RT 2 RW 12 NAYON; SEI NAYON RT 02 DAN 04 RW 12 | - | - | JL1 PEMBANGUNAN/REHABITILASI JALAN LINGKUNGAN KEL. SADAI 2, KEC. BENGKONG (SEI NAYON) | - | 710.187.198 |
JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN DEPAN MASJID AL-JIHAD PERUM NUSA JAYA | KEL. SUNGAI PANAS, KEC. BATAM KOTA | - | - | JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN DEPAN MASJID AL-JIHAD PERUM NUSA JAYA | - | 141.000.390 |
JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. BATU SELICIN, KEC. LUBUK BAJA | PERUM. LUCKY ESTATE RT 02/RW007 | - | - | JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. BATU SELICIN, KEC. LUBUK BAJA | - | 157.550.889 |
JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. MANGSANG 2 | KEC. SUNGAI BEDUK (MANGSANG INDAH RT 01,02 DAN 03 RW 24) | - | - | JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. MANGSANG 2 | - | 194.025.787 |
JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL.KABIL 4 KEC NONGSA | RT 01 RW 10 KAVLING SENJULUNG;KAVLING SENJULUNG RW10; KAVLING PUNGGUR RT 04 RW 10 | - | - | JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL.KABIL 4 KEC NONGSA | - | 348.961.405 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. SAGULUNG KOTA 2, KEC. SAGULUNG (RT 03 RW 08) | KEC. SAGULUNG | - | - | JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. SAGULUNG KOTA 2, KEC. SAGULUNG (RT 03 RW 08) | - | 189.904.926 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. SUNGAI LANGKAI 1, KEC. SAGULUNG | PERUM MKP RT.03/RW.24, SAGULUNG SUMBER SARI RT.003/RW.007, KAV. SUMBER SERAYA RT.01/RW.08 | - | - | JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. SUNGAI LANGKAI 1, KEC. SAGULUNG | - | 408.823.250 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. SUNGAI LANGKAI 2, KEC. SAGULUNG (RW 20 RT01 RT04) | SUNGAI LANGKAI, SAGULUNG | - | - | JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. SUNGAI LANGKAI 2, KEC. SAGULUNG (RW 20 RT01 RT04) | - | 158.617.045 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. TEMBESI 1, KEC. SAGULUNG (RT 03, 04 RW 23 PERUM. | KEC. SAGULUNG | - | - | JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. TEMBESI 1, KEC. SAGULUNG (RT 03, 04 RW 23 PERUM. | - | 199.839.651 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL PATAM LESTARI 3, KEC SEKUPANG | PERUM BATAM NIRWANA RESIDENCE RT 03 RW 07 | - | - | JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL PATAM LESTARI 3, KEC SEKUPANG | - | 348.924.350 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. KIBING 4, KEC. BATU AJI | PERUM BUMI AGUNG RW.21 | - | - | JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. KIBING 4, KEC. BATU AJI | - | 284.271.465 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. TANJUNG UNCANG 3, KEC. BATU AJI | PERUM. PRIMA GARDEN RT.01, 02, RW.13 KEL. TANJUNG UNCANG 3, KEC. BATU AJI | - | - | JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. TANJUNG UNCANG 3, KEC. BATU AJI | - | 151.660.543 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. TIBAN BARU, KEC. SEKUPANG (PERUM. PURI MALAKA) | PERUM. PURI MALAKA RT 02,03 RW 09 KEL. TIBAN BARU, KEC. SEKUPANG | - | - | JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. TIBAN BARU, KEC. SEKUPANG (PERUM. PURI MALAKA) | - | 158.647.900 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN TIBAN PAJAK RT 02 RW 08 | KEL PATAM LESTARI 5 KEC SEKUPANG | - | - | JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN TIBAN PAJAK RT 02 RW 08 | - | 192.347.285 |
KONSTRUKSI APARTEMEN PERMATA RESIDENCE | APARTEMEN PERMATA RESIDENCE, BALOI INDAH | - | - | KONSTRUKSI APARTEMEN PERMATA RESIDENCE | - | 2.681.478.000 |
MALL & TOWER PHASE 1 MEISTERTADT BATAM | SEI PANAS | - | - | MALL & TOWER PHASE 1 MEISTERTADT BATAM | - | 999.500.000.000 |
NEW CONSTRUCTION LAND EX DORMITORY I,J,K & L - BIC - NEW CONSTRUCTION OF 4 LOTS TYPE E FACTORY FOR P | KOMPLEK KAWASAN BATAMINDO MUKA KUNING | - | - | NEW CONSTRUCTION LAND EX DORMITORY I,J,K & L - BIC - NEW CONSTRUCTION OF 4 LOTS TYPE E FACTORY FOR P | - | 53.680.000.000 |
NEW TYPE E FACTORY FOR PT SIMATELEX PROJECT BATAMINDO INDUSTRIAL PARK - ELECTRICAL RETICULATION WORK | BATAMINDO INDUSTRIAL PARK | - | - | NEW TYPE E FACTORY FOR PT SIMATELEX PROJECT BATAMINDO INDUSTRIAL PARK - ELECTRICAL RETICULATION WORK | - | 20.400.000.000 |
OKMAS BATU MERAH 10 JEMBATAN BETON RT 05 RW 02 ( 117 M² ) | BATU MERAH RT 05 RW 02 | - | - | OKMAS BATU MERAH 10 JEMBATAN BETON RT 05 RW 02 ( 117 M² ) | - | 219.096.900 |
OPTIMALISASI IPLT KABUPATEN BINTAN | KABUPATEN BINTAN | - | - | OPTIMALISASI IPLT KABUPATEN BINTAN | - | 4.841.238.182 |
OZON HOTEL INTERNATIONAL - BATAM | OZON HOTEL BATAM | - | - | OZON HOTEL INTERNATIONAL - BATAM | - | 73.260.000 |
PAVING BLOK JALAN LINGKUNGAN KP. BATU PUTIH RT.001/RW.004 (POKMAS 22 - 710 M²) | KELURAHAN KARAS | - | - | PAVING BLOK JALAN LINGKUNGAN KP. BATU PUTIH RT.001/RW.004 (POKMAS 22 - 710 M²) | - | 248.992.000 |
PAVING BLOK JALAN LINGKUNGAN KP. DARAT PULAU RT. 002 RW. 001 (POKMAS 11 - 710 M²) | KELURAHAN KARAS | - | - | PAVING BLOK JALAN LINGKUNGAN KP. DARAT PULAU RT. 002 RW. 001 (POKMAS 11 - 710 M²) | - | 248.992.000 |
PEKERJAAN ARSITEKTUR PROYEK HOTEL GRAND MERCURE BATAM CENTER | BATAM CENTER | - | - | PEKERJAAN ARSITEKTUR PROYEK HOTEL GRAND MERCURE BATAM CENTER | - | 39.863.636.364 |
PEKERJAAN ARSITEKTUR UNTUK PROYEK FORMOSA RESIDENCE | JL. PEMBANGUNAN KOMP. CITY PLAZA FORMOSA HOTEL BLOK G NO 1-2 | - | - | PEKERJAAN ARSITEKTUR UNTUK PROYEK FORMOSA RESIDENCE | - | 4.500.000.000 |
PEKERJAAN BESI FABRICATION & ERECTION DALAM PEMBANGUNAN GEDUNG INDUSTRI TYPE C 798 | KAWASAN BINTANG INDUSTRI II TYPE C 798 - TANJUNG UNCANG | - | - | PEKERJAAN BESI FABRICATION & ERECTION DALAM PEMBANGUNAN GEDUNG INDUSTRI TYPE C 798 | - | 265.195.068 |
PEKERJAAN BESI FABRICATION & ERECTION DALAM PEMBANGUNAN GEDUNG INDUSTRI TYPE C 799 | KAWASAN BINTANG INDUSTRI II TYPE C 799 - TANJUNG UNCANG | - | - | PEKERJAAN BESI FABRICATION & ERECTION DALAM PEMBANGUNAN GEDUNG INDUSTRI TYPE C 799 | - | 238.070.227 |
PEKERJAAN BESI FABRICATION & ERECTION DALAM PEMBANGUNAN GEDUNG INDUSTRI TYPE C 800 | KAWASAN BINTANG INDUSTRI II TYPE C 800 - TANJUNG UNCANG | - | - | PEKERJAAN BESI FABRICATION & ERECTION DALAM PEMBANGUNAN GEDUNG INDUSTRI TYPE C 800 | - | 266.535.750 |
PEKERJAAN BORED PILE DIA. 600 MM | NONGSA | - | - | PEKERJAAN BORED PILE DIA. 600 MM | - | 102.000.000 |
PEKERJAAN BORED PILE PLTU 2X31 MW SOMA KARIMUN, KARIMUN BESAR KEPULAUAN RIAU | KARIMUN, KARIMUN BESAR KEPULAUAN RIAU | - | - | PEKERJAAN BORED PILE PLTU 2X31 MW SOMA KARIMUN, KARIMUN BESAR KEPULAUAN RIAU | - | 1.332.064.285 |
PEKERJAAN BORED PILE PROYEK PLTMG 30 MW BALOI BATAM | BALOI | - | - | PEKERJAAN BORED PILE PROYEK PLTMG 30 MW BALOI BATAM | - | 1.180.818.000 |
PEKERJAAN BOREDPILE PROYEK PEMBANGUNAN GEDUNG REKTORAT UNIVERSITAS INTERNATIONAL BATAM | UNIVERSITAS INTERNATIONAL BATAM | - | - | PEKERJAAN BOREDPILE PROYEK PEMBANGUNAN GEDUNG REKTORAT UNIVERSITAS INTERNATIONAL BATAM | - | 7.150.924.945 |
PEKERJAAN CAPPING BEAM DAN PEMBOBOKAN TIANG | NONGSA | - | - | PEKERJAAN CAPPING BEAM DAN PEMBOBOKAN TIANG | - | 25.950.000 |
PEKERJAAN ERECTION HANGGAR REIDSTEEL | HANGGAR PT. BATAM AERO TEKNIK KAWASAN BANDAR UDARA HANG NADIM, BATU BESAR NONGSA | - | - | PEKERJAAN ERECTION HANGGAR REIDSTEEL | - | 20.380.000.000 |
PEKERJAAN FABRIKASI DAN ERECTION KONSTRUKSI BAJA, PEMASANGAN ATAP DAN RESPLANG GEDUNG WORKSHOP | KAWASAN GLOBAL MEGA TOP, BATAM CENTER DI LOT 7,8,9 DAN 10 | - | - | PEKERJAAN FABRIKASI DAN ERECTION KONSTRUKSI BAJA, PEMASANGAN ATAP DAN RESPLANG GEDUNG WORKSHOP | - | 817.451.545 |
PEKERJAAN INSTALASI ELEKTRIKAL DI FACTORY IKAYU PHASE II. KAWASAN PANBIL INDUSTRIAL | MUKA KUNING | - | - | PEKERJAAN INSTALASI ELEKTRIKAL DI FACTORY IKAYU PHASE II. KAWASAN PANBIL INDUSTRIAL | - | 90.000.000 |
PEKERJAAN JASA KONSTRUKSI PEMASANGAN PIPA DINAS DAN MRS PELANGGAN PT METROPOLITAN KENTJANA (PIM 3) | JL KARTIKA UTAMA, PONDOK PINANG, KEBAYORAN LAMA KOTA JAKARTA SELATAN, DKI JAKARTA | - | - | PEKERJAAN JASA KONSTRUKSI PEMASANGAN PIPA DINAS DAN MRS PELANGGAN PT METROPOLITAN KENTJANA (PIM 3) | - | 720.852.960 |
PEKERJAAN KONSTRUKSI BAJA 22 UNIT TANGKI PADA PROYEK OLEIC ACID PLANT, BERLOKASI DI PT MUSIM MAS | PT. MUSIM MAS BATAM, PELABUHAN KABIL | - | - | PEKERJAAN KONSTRUKSI BAJA 22 UNIT TANGKI PADA PROYEK OLEIC ACID PLANT, BERLOKASI DI PT MUSIM MAS | - | 3.350.000.000 |
PEKERJAAN KONSTRUKSI BAJA TANK FARM REPAIR MS TANK CAP 2500M WITH STEAM COIL | PT. MUSIM MAS, BELAWAN | - | - | PEKERJAAN KONSTRUKSI BAJA TANK FARM REPAIR MS TANK CAP 2500M WITH STEAM COIL | - | 2.656.800.000 |
PEKERJAAN OPTIMALISASI WTP BELAKANG PADANG | BELAKANG PADANG | - | - | PEKERJAAN OPTIMALISASI WTP BELAKANG PADANG | - | 7.078.202.254 |
PEKERJAAN OPTIMALISASI WTP BULANG LINTANG | BULANG LINTANG | - | - | PEKERJAAN OPTIMALISASI WTP BULANG LINTANG | - | 2.763.991.503 |
PEKERJAAN OPTIMALISASI WTP GERANTING | GERANTING | - | - | PEKERJAAN OPTIMALISASI WTP GERANTING | - | 2.569.495.332 |
PEKERJAAN OPTIMALISASI WTP KASU | PULAU KASU | - | - | PEKERJAAN OPTIMALISASI WTP KASU | - | 2.571.531.326 |
PEKERJAAN OPTIMALISASI WTP MECAN | PULAU MECAN | - | - | PEKERJAAN OPTIMALISASI WTP MECAN | - | 3.073.600.823 |
PEKERJAAN PANCANG PHASE 1 | BATAM CENTER | - | - | PEKERJAAN PANCANG PHASE 1 | - | 1.914.000.000 |
PEKERJAAN PEMANCANGAN | BATAM CENTRE, KOTA BATAM | - | - | PEKERJAAN PEMANCANGAN | - | 738.800.000 |
PEKERJAAN PEMANCANGAN SHEET PILE DAN RC PILE (ONSHORE) PROYEK PEMBANGUNAN JETTY | TANJUNG UNCANG | - | - | PEKERJAAN PEMANCANGAN SHEET PILE DAN RC PILE (ONSHORE) PROYEK PEMBANGUNAN JETTY | - | 2.164.755.000 |
PEKERJAAN PEMANCANGAN TIANG PANCANG MINI PILE PADA PEMBANGUNAN VILLA PANBIL BLOK DD MINI | KAWASAN VILLA PANBIL MUKA KUNING | - | - | PEKERJAAN PEMANCANGAN TIANG PANCANG MINI PILE PADA PEMBANGUNAN VILLA PANBIL BLOK DD MINI | - | 155.900.000 |
PEKERJAAN PEMANCANGAN TIANG PANCANG SPUN PILE, STEEL PILE DAN RC PILE PADA PEMBANGUNAN DERMAGA PELABUHAN DI KAWASAN COASTAL AREA | TANJUNG BALAI KARIMUN | - | - | PEKERJAAN PEMANCANGAN TIANG PANCANG SPUN PILE, STEEL PILE DAN RC PILE PADA PEMBANGUNAN DERMAGA PELAB | - | 2.331.820.000 |
PEKERJAAN PEMASANGAN BATU KALI DI SALURAN ALAM AA.21.KAWASAN VILLA PANBIL | MUKA KUNING | - | - | PEKERJAAN PEMASANGAN BATU KALI DI SALURAN ALAM AA.21.KAWASAN VILLA PANBIL | - | 59.000.000 |
PEKERJAAN PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT AREA BATAM TAHUN 2021 TAHAP 1 | MC DONALD, JL. AHMAD YANI, TELUK TERING | - | - | PEKERJAAN PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT AREA BATAM TAHUN 2021 TAHAP 1 | - | 907.272.727 |
PEKERJAAN PEMASANGAN PINTU KAYU PROYEK: CITRA PLAZA NAGOYA BATAM | KOMP. NAGOYA CITYWALK BLOK NORTHWALK A NO. 01, LUBUK BAJA | - | - | PEKERJAAN PEMASANGAN PINTU KAYU PROYEK: CITRA PLAZA NAGOYA BATAM | - | 2.311.325.030 |
PEKERJAAN PEMASANGAN PIPA DISTRIBUSI PENGEMBANGAN BATAM CENTRE-NAGOYA SECTION A | BATAM CENTRE-NAGOYA | - | - | PEKERJAAN PEMASANGAN PIPA DISTRIBUSI PENGEMBANGAN BATAM CENTRE-NAGOYA SECTION A | - | 1.449.754.966 |
PEKERJAAN PEMBANGUNAN GUDANG TYPE H LOT 20 | HORIZON INDUSTRIAL PARK | - | - | PEKERJAAN PEMBANGUNAN GUDANG TYPE H LOT 20 | - | 5.200.000.000 |
PEKERJAAN PEMBANGUNAN VILLA PANBIL TYPE UPSLOPE BLOK DD | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | PEKERJAAN PEMBANGUNAN VILLA PANBIL TYPE UPSLOPE BLOK DD | - | 12.494.134.616 |
PEKERJAAN PEMBERSIHAN, PERBAIKAN, PEMASANGAN KERAMIK, CARPORT DI RENOVASI VILLA PANBIL BLOK S NO. 17 | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | PEKERJAAN PEMBERSIHAN, PERBAIKAN, PEMASANGAN KERAMIK, CARPORT DI RENOVASI VILLA PANBIL BLOK S NO. 17 | - | 11.296.000 |
PEKERJAAN PEMBONGKARAN ATAP DAN DINDING SERTA PEKERJAAN SIPIL PEMBANGUNAN AUDITORIUM, SHAFT LIFT DAN KANTOR AREA DI PROJECT RENOVASI SHOWROOM RIWAY INDONESIA-BATAM | BATAM CENTRE JL. AHMAD, TLK KERING KEC BATAM | - | - | PEKERJAAN PEMBONGKARAN ATAP DAN DINDING SERTA PEKERJAAN SIPIL PEMBANGUNAN AUDITORIUM, SHAFT LIFT DAN | - | 3.960.000.000 |
PEKERJAAN PEMBUATAN BRONJONG, SALURAN C-7, DAN MAINHOLE AKIBAT FORCE MAYOR | BLOK DD KAWASAN VILLA PANBIL MUKA KUNING | - | - | PEKERJAAN PEMBUATAN BRONJONG, SALURAN C-7, DAN MAINHOLE AKIBAT FORCE MAYOR | - | 29.083.125 |
PEKERJAAN PEMIPAAN ISBL ISOLASI PIPA ISBL PROYEK MS94 | AREAL PELABUHAN KABIL | - | - | PEKERJAAN PEMIPAAN ISBL ISOLASI PIPA ISBL PROYEK MS94 | - | 7.700.000.000 |
PEKERJAAN PENATAAN KAWASAN TAMAN KOLAM SEKUPANG TAHAP 2 | SEKUPANG | - | - | PEKERJAAN PENATAAN KAWASAN TAMAN KOLAM SEKUPANG TAHAP 2 | - | 8.418.999.885 |
PEKERJAAN PENGECATAN DINDING DALAM DAN LUAR POS JAGA DAN PAGAR DI TAMAN WISATA ROHANI KAMPUNG VIETNAM | PULAU GALANG - BATAM | - | - | PEKERJAAN PENGECATAN DINDING DALAM DAN LUAR POS JAGA DAN PAGAR DI TAMAN WISATA ROHANI KAMPUNG VIETNA | - | 13.856.970 |
PEKERJAAN PENGECATAN DINDING DAN PLAFOND VILLA BLOK DD NO 15 & 25 KAWASAN VILLA PANBIL, MUKA KUNING | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | PEKERJAAN PENGECATAN DINDING DAN PLAFOND VILLA BLOK DD NO 15 & 25 KAWASAN VILLA PANBIL, MUKA KUNING | - | 20.719.000 |
PEKERJAAN PENGECETAN DINDING EXTERIOR HOTEL SANTIKA BATAM | HOTEL SANTIKA BATAM | - | - | PEKERJAAN PENGECETAN DINDING EXTERIOR HOTEL SANTIKA BATAM | - | 114.000.000 |
PEKERJAAN PENYELIDIKAN TANAH UNTUK PEMBANGUNAN DERMAGA PELABUHAN DI KAWASAN COASTAL AREA DI TANJUNG BALAI KARIMUN KEPULAUAN RIAU | TANJUNG BALAI KARIMUN, KEPULAUAN RIAU | - | - | PEKERJAAN PENYELIDIKAN TANAH UNTUK PEMBANGUNAN DERMAGA PELABUHAN DI KAWASAN COASTAL AREA DI TANJUNG | - | 204.600.000 |
PEKERJAAN PERBAIKAN TANAH YANG LONGSOR | TEBING DEPAN VILLA PANBIL BLOK DD 33 KAWASAN VILLA PANBIL MUKA KUNING | - | - | PEKERJAAN PERBAIKAN TANAH YANG LONGSOR | - | 18.275.000 |
PEKERJAAN PEREMAJAAN PRIMARY JUNCTION | TOWER TRANSMISI TERSEBAR DAN GI PANARAN | - | - | PEKERJAAN PEREMAJAAN PRIMARY JUNCTION | - | 494.855.061 |
PEKERJAAN PILE PKG-4 RDMP RU-V BALIKPAPAN | RDMP RU-V, KILANG PERTAMINA BALIKPAPAN-KALIMANTAN TIMUR | - | - | PEKERJAAN PILE PKG-4 RDMP RU-V BALIKPAPAN | - | 92.000.000.000 |
PEKERJAAN PONDASI BORED PILE PROYEK MARCS BOULEVARD - BATAM | BATAM CENTRE | - | - | PEKERJAAN PONDASI BORED PILE PROYEK MARCS BOULEVARD - BATAM | - | 5.628.120.000 |
PEKERJAAN PRESERVASI JALAN NONGSA-BATU AMPAR-TEMBESI-GALANG | NONGSA-BATU AMPAR-TEMBESI-GALANG | - | - | PEKERJAAN PRESERVASI JALAN NONGSA-BATU AMPAR-TEMBESI-GALANG | - | 46.884.692.420 |
PEKERJAAN RENOVASI RUKO TAMAN LAGUNA BLOK A1 NO. 08 TANJUNG RIAU | TAMAN LAGUNA TANJUNG RIAU | - | - | PEKERJAAN RENOVASI RUKO TAMAN LAGUNA BLOK A1 NO. 08 TANJUNG RIAU | - | 35.000.000 |
PEKERJAAN RETAININGWALL BRONJONG BATU KALI, SALURAN ALAM TAHAP-2 | VILLA PANBIL AA.21 KAWASAN VILLA PANBIL MUKA KUNING | - | - | PEKERJAAN RETAININGWALL BRONJONG BATU KALI, SALURAN ALAM TAHAP-2 | - | 58.300.000 |
PEKERJAAN ROMP CARPORT | VILLA PANBIL AA NO. 2 KAWASAN VILLA PANBIL MUKA KUNING | - | - | PEKERJAAN ROMP CARPORT | - | 14.000.000 |
PEKERJAAN SOIL INVESTIGASI | BATAM CENTRE | - | - | PEKERJAAN SOIL INVESTIGASI | - | 112.630.000 |
PEKERJAAN SOIL INVESTIGASI (OFFSHORE) | KABIL | - | - | PEKERJAAN SOIL INVESTIGASI (OFFSHORE) | - | 273.000.000 |
PEKERJAAN STRUKTUR ARSITEKTUR DAN PLUMBING PROYEK PT. HOTEL OZON INTERNATIONAL | PT. HOTEL OZON INTERNATIONAL | - | - | PEKERJAAN STRUKTUR ARSITEKTUR DAN PLUMBING PROYEK PT. HOTEL OZON INTERNATIONAL | - | 54.200.000.000 |
PEKERJAAN STRUKTUR BANGUNAN VILLA PANBIL BLOK J NO. 01 KAWASAN VILLA PANBIL | MUKA KUNING | - | - | PEKERJAAN STRUKTUR BANGUNAN VILLA PANBIL BLOK J NO. 01 KAWASAN VILLA PANBIL | - | 57.000.000 |
PEKERJAAN STRUKTUR BETON DAN PEMINDAHAN KANDANG ANJING PADA PROYEK RENOVASI WISMA PANBIL | WISMA PANBIL KAWASAN VILLA PANBIL MUKA KUNING | - | - | PEKERJAAN STRUKTUR BETON DAN PEMINDAHAN KANDANG ANJING PADA PROYEK RENOVASI WISMA PANBIL | - | 22.295.000 |
PEKERJAAN STRUKTUR VILLA PANBIL BLOK DD NO. 53-55 DOWNSLOPE | KAWASAN VILLA PANBIL MUKA KUNING | - | - | PEKERJAAN STRUKTUR VILLA PANBIL BLOK DD NO. 53-55 DOWNSLOPE | - | 149.793.921 |
PEKERJAAN STRUKTUR, ARSITEKTUR DAN MEP WORKSHOP DAN WAREHOUSE | JL SUDIRMAN, SUKAJADI KEC. BATAM KOTA, KOTA BATAM | - | - | PEKERJAAN STRUKTUR, ARSITEKTUR DAN MEP WORKSHOP DAN WAREHOUSE | - | 2.509.721.767 |
PEKERJAAN UJI PENYELIDIKAN TANAH | HORES BOULEXARD BATAM | - | - | PEKERJAAN UJI PENYELIDIKAN TANAH | - | 193.800.000 |
PEKERJAAN UPAH FINISHING LANTAI 1 S/D LT. 3 DI RUSUN BLOK I TAHAP II | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING - BATAM | - | - | PEKERJAAN UPAH FINISHING LANTAI 1 S/D LT. 3 DI RUSUN BLOK I TAHAP II | - | 430.000.000 |
PEKERJAAN WAREHOUSE TYPE A NO. 07 | HORIZON INDUSTRIAL PARK | - | - | PEKERJAAN WAREHOUSE TYPE A NO. 07 | - | 12.484.000.000 |
PELEBARAN JALAN MENAMBAH LAJUR JALAN DIPONEGORO | SP. SEI. HARAPAN - SP. BASECHAMP BATU AJI | - | - | PELEBARAN JALAN MENAMBAH LAJUR JALAN DIPONEGORO | - | 23.816.827.818 |
PELEBARAN JALAN MENAMBAH LAJUR JALAN TEMBESI - TANJUNG BERIKAT | TEMBESI - TANJUNG BERIKAT | - | - | PELEBARAN JALAN MENAMBAH LAJUR JALAN TEMBESI - TANJUNG BERIKAT | - | 20.198.954.100 |
PELEBARAN MENAMBAH LAJUR JALAN TEMBESI-TANJUNG BERIKAT | JL. LETJEN S. PARMAN BLOK R2 NO. 1-11 TG. PIAYU | - | - | PELEBARAN MENAMBAH LAJUR JALAN TEMBESI-TANJUNG BERIKAT | - | 9.288.350.909 |
PEMANCANGAN PROYEK PLBN TERPADU SERASAN | SERASAN | - | - | PEMANCANGAN PROYEK PLBN TERPADU SERASAN | - | 2.400.000.000 |
PEMANCANGAN TIANG SQUARE 25X25 CM | BATAM CENTRE | - | - | PEMANCANGAN TIANG SQUARE 25X25 CM | - | 255.470.000 |
PEMANGKASAN POHON DI BAWAH SUTM TAHAP II | AREA NAGOYA DAN TIBAN | - | - | PEMANGKASAN POHON DI BAWAH SUTM TAHAP II | - | 15.200.000 |
PEMANGKASAN POHON DIBAWAH SUTM | AREA BATAM CENTRE DAN NAGOYA | - | - | PEMANGKASAN POHON DIBAWAH SUTM | - | 125.105.000 |
PEMASANGAN ATAP BANGUNAN 7000 M2 | KAWASAN INDUSTRI SEKUPANG | - | - | PEMASANGAN ATAP BANGUNAN 7000 M2 | - | 255.000.000 |
PEMASANGAN BATU KALI BRONJONG DI ATAS RETAININGWALL TAHAP-II DEPAN VILLA PANBIL BLOK DD NO. 33 | VILLA PANBIL BLOK DD NO. 33, KAWASAN VILLA PANBIL, MUKA KUNING | - | - | PEMASANGAN BATU KALI BRONJONG DI ATAS RETAININGWALL TAHAP-II DEPAN VILLA PANBIL BLOK DD NO. 33 | - | 17.172.550 |
PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT AREA BATAM TAHUN 2020 TAHAP III | AREA BATAM | - | - | PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT AREA BATAM TAHUN 2020 TAHAP III | - | 271.017.937 |
PEMASANGAN PIPA DISTRIBUSI PENGEMBANGAN BATAM CENTRE - SEI PANAS | AREA BATAM | - | - | PEMASANGAN PIPA DISTRIBUSI PENGEMBANGAN BATAM CENTRE - SEI PANAS | - | 932.574.636 |
PEMASANGAN PROTEKSI PETIR INDEPENDENT GROUND WIRE SYSTEM TRASMISI 150KV | AREA BATAM | - | - | PEMASANGAN PROTEKSI PETIR INDEPENDENT GROUND WIRE SYSTEM TRASMISI 150KV | - | 1.710.000.000 |
PEMBANGUNA DRAINASE MONGKOL RT 01 RW 02 KELURAHAN PEMPING (POKMAS DAU MONGKOL 8 - 92 M2) | KELURAHAN PEMPING | - | - | PEMBANGUNA DRAINASE MONGKOL RT 01 RW 02 KELURAHAN PEMPING (POKMAS DAU MONGKOL 8 - 92 M2) | - | 30.009.010 |
PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN DI RT. 01 / RW. 01 CATE (POKMAS REMPANG 1) | KELURAHAN REMPANG CATE | - | - | PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN DI RT. 01 / RW. 01 CATE (POKMAS REMPANG 1) | - | 268.600.200 |
PEMBANGUNAN BANGUNAN INDUSTRI KAWASAN INDUSTRI TUNAS KABIL | KABIL | - | - | PEMBANGUNAN BANGUNAN INDUSTRI KAWASAN INDUSTRI TUNAS KABIL | - | 9.852.975.000 |
PEMBANGUNAN BARU SPAM JARINGAN PERPIPAAN (TAHUN JAMAK) | SOFIFI | - | - | PEMBANGUNAN BARU SPAM JARINGAN PERPIPAAN (TAHUN JAMAK) | - | 9.825.414.545 |
PEMBANGUNAN BATU MIRIN DI KAV-SAMBU | KAU SAMBAU NONGSA BATAM | - | - | PEMBANGUNAN BATU MIRIN DI KAV-SAMBU | - | 127.291.000 |
PEMBANGUNAN BATU MIRING RT 03 RW 05 BENGKONG KODIM - POKMAS LAUT 35 (140 M2) | RT 03 RW 05 BENGKONG LAUT | - | - | PEMBANGUNAN BATU MIRING RT 03 RW 05 BENGKONG KODIM - POKMAS LAUT 35 (140 M2) | - | 177.356.300 |
PEMBANGUNAN DINDING PENAHAN TANAH DI BELAKANG RSBP SEKUPANG | SEKUPANG | - | - | PEMBANGUNAN DINDING PENAHAN TANAH DI BELAKANG RSBP SEKUPANG | - | 3.596.888.706 |
PEMBANGUNAN DRAINASE KAVLING SEROJA RT.03 RW.07 | KEL. SEI PELUNGGUT, KEC. SAGULUNG | - | - | PEMBANGUNAN DRAINASE KAVLING SEROJA RT.03 RW.07 | - | 273.994.243 |
PEMBANGUNAN DRAINASE KAWASAN AVIARI | KAWASAN PERTOKOAN AVIARI BATU AJI | - | - | PEMBANGUNAN DRAINASE KAWASAN AVIARI | - | 4.059.065.374 |
PEMBANGUNAN DRAINASE PERUM MUTIARA INDAH RT 1,2 DAN 04 RW 24 | KEL. BULIANG | - | - | PEMBANGUNAN DRAINASE PERUM MUTIARA INDAH RT 1,2 DAN 04 RW 24 | - | 466.197.705 |
PEMBANGUNAN DRAINASE PERUMAHAN ASPOL BALOI RT.01, 02 RW.02 (DAU TAMBAHAN)(SUKAJADI MAJU 2-93M) | KELURAHAN SUKAJADI | - | - | PEMBANGUNAN DRAINASE PERUMAHAN ASPOL BALOI RT.01, 02 RW.02 (DAU TAMBAHAN)(SUKAJADI MAJU 2-93M) | - | 25.565.100 |
PEMBANGUNAN DRAINASE PERUMAHAN WISMA BUANA INDAH II RT. 03 RW. 03 ( POKMAS 0303- 300M ) | KECAMATAN SAGULUNG | - | - | PEMBANGUNAN DRAINASE PERUMAHAN WISMA BUANA INDAH II RT. 03 RW. 03 ( POKMAS 0303- 300M ) | - | 69.380.300 |
PEMBANGUNAN DRAINASE RT 02 RW 02 MONGKOL KELURAHAN PEMPING (POKMAS MONGKOL 6 - 78 M') | KELURAHAN PEMPING | - | - | PEMBANGUNAN DRAINASE RT 02 RW 02 MONGKOL KELURAHAN PEMPING (POKMAS MONGKOL 6 - 78 M') | - | 25.442.300 |
PEMBANGUNAN DRAINASE RT 03 RW 01 KAMPUNG TENGAH KELURAHAN PEMPING (POKMAS KAMPUNG TENGAH 3 - 74 M') | KELURAHAN PEMPING | - | - | PEMBANGUNAN DRAINASE RT 03 RW 01 KAMPUNG TENGAH KELURAHAN PEMPING (POKMAS KAMPUNG TENGAH 3 - 74 M') | - | 24.137.770 |
PEMBANGUNAN DRAINASE RT 03 RW 10 BENGKONG HARAPAN II (POKMAS INDAH 33 - 250 M) | RT 03 RW 10 BENGKONG HARAPAN II - BENGKONG INDAH | - | - | PEMBANGUNAN DRAINASE RT 03 RW 10 BENGKONG HARAPAN II (POKMAS INDAH 33 - 250 M) | - | 94.099.500 |
PEMBANGUNAN DRAINASE RT 6 RW 10 BENGKONG HARAPAN II (POKMAS INDAH 34 - 250 M) | RT 6 RW 10 BENGKONG HARAPAN II - BENGKONG INDAH | - | - | PEMBANGUNAN DRAINASE RT 6 RW 10 BENGKONG HARAPAN II (POKMAS INDAH 34 - 250 M) | - | 94.219.400 |
PEMBANGUNAN DRAINASE U 30 DI KAV. BUKIT KAMBOJA RT. 07 RW.03 (350 M) | RT 07 RW 03 KAV. BUKIT KAMBOJA KEL. SUNGAI PELUNGGUT | - | - | PEMBANGUNAN DRAINASE U 30 DI KAV. BUKIT KAMBOJA RT. 07 RW.03 (350 M) | - | 92.516.600 |
PEMBANGUNAN DRAINASE U 30 KAV. KAMBOJA RT. 01, 04 RW.04 (319 M) | RT.01, 04 RW.11 KAV. BUKIT KAMBOJA KELURAHAN SUNGAI PELUNGGUT | - | - | PEMBANGUNAN DRAINASE U 30 KAV. KAMBOJA RT. 01, 04 RW.04 (319 M) | - | 84.612.000 |
PEMBANGUNAN DRAINASE U 30 RT 1 RT 2 RW 15 TG PIAYU (PTM 16 - 440 M2) | RT 01 RT 02 RW 15 SEI DAUN KELURAHAN TGPIAYU | - | - | PEMBANGUNAN DRAINASE U 30 RT 1 RT 2 RW 15 TG PIAYU (PTM 16 - 440 M2) | - | 101.767.600 |
PEMBANGUNAN DRAINASE U 30 RT 2 RT 3 RW 5 TG PIAYU (PTM 14 - 500 M2) | RT 2 RT 3 RW 5 TGPIAYU | - | - | PEMBANGUNAN DRAINASE U 30 RT 2 RT 3 RW 5 TG PIAYU (PTM 14 - 500 M2) | - | 121.810.700 |
PEMBANGUNAN DRAINASE U 30 RT 2 RW 3 TG PIAYU (PTM 15 - 226.50 M2) | RT 02 RW 03 SEI PANCUR KELURAHAN TGPIAYU | - | - | PEMBANGUNAN DRAINASE U 30 RT 2 RW 3 TG PIAYU (PTM 15 - 226.50 M2) | - | 57.175.800 |
PEMBANGUNAN DRAINASE U 30 RT 3 RW 2 MANGSANG (TEKUKUR - 260 M2) | RT 3 RW 2 KELURAHAN MANGSANG | - | - | PEMBANGUNAN DRAINASE U 30 RT 3 RW 2 MANGSANG (TEKUKUR - 260 M2) | - | 59.233.900 |
PEMBANGUNAN DRAINASE U 40 DI KAV. SAGULUNG MANDIRI RT. 01, 02 RW.10 (272 M) | RT 01, 02 RW 10 KAV. SAGULUNG MANDIRI KEL. SUNGAI PELUNGGUT | - | - | PEMBANGUNAN DRAINASE U 40 DI KAV. SAGULUNG MANDIRI RT. 01, 02 RW.10 (272 M) | - | 85.712.000 |
PEMBANGUNAN DRAINASE U 40 RT 1 RW 2 TG PIAYU (PTM 12 - 214.5 M2) | RT 01 RW 02 KELURAHAN TANJUNGPIAYU | - | - | PEMBANGUNAN DRAINASE U 40 RT 1 RW 2 TG PIAYU (PTM 12 - 214.5 M2) | - | 73.087.300 |
PEMBANGUNAN DRAINASE U 40 RT 1 RW 24 MANGSANG (PIPIT - 500 M2) | RT 1 RW 24 KELURAHAN MANGSANG | - | - | PEMBANGUNAN DRAINASE U 40 RT 1 RW 24 MANGSANG (PIPIT - 500 M2) | - | 167.289.100 |
PEMBANGUNAN DRAINASE U 40 RT 3 RW 4 TG PIAYU (PTM 13 - 300 M2) | RT 3 RW 4 KELURAHAN TANJUNGPIAYU | - | - | PEMBANGUNAN DRAINASE U 40 RT 3 RW 4 TG PIAYU (PTM 13 - 300 M2) | - | 93.101.800 |
PEMBANGUNAN DRAINASE U 40 RT.05 RW.03 (POKMAS KARYA MANDIRI) VOLUME 150 M | KELURAHAN SAMBAU | - | - | PEMBANGUNAN DRAINASE U 40 RT.05 RW.03 (POKMAS KARYA MANDIRI) VOLUME 150 M | - | 54.528.100 |
PEMBANGUNAN DRAINASE U-40 | RT 003 RW 004 PULAU NIPAH | - | - | PEMBANGUNAN DRAINASE U-40 | - | 64.582.000 |
PEMBANGUNAN DRAINASE U-40 | RT 003 RW 001 SETOKOK | - | - | PEMBANGUNAN DRAINASE U-40 | - | 33.825.000 |
PEMBANGUNAN DRAINASE U-40 | RT 003 RW 001 SETOKOK | - | - | PEMBANGUNAN DRAINASE U-40 | - | 33.825.000 |
PEMBANGUNAN DRAINASE U30 RT.002,003,005 RW.009 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 002.009-379M2) | KELURAHAN SUNGAI LEKOP | - | - | PEMBANGUNAN DRAINASE U30 RT.002,003,005 RW.009 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 002.009-379M2) | - | 92.411.000 |
PEMBANGUNAN DRAINASE U40 DI KAMPUNG TUA BAKAU SERIP RT 01,02 RW 10 (BASSOK BERSATU) | RT 1 / RW 10 SAMBAU | - | - | PEMBANGUNAN DRAINASE U40 DI KAMPUNG TUA BAKAU SERIP RT 01,02 RW 10 (BASSOK BERSATU) | - | 64.558.000 |
PEMBANGUNAN DRAINASE U40 PERBATASAN ANTARA RT.06 DAN RT.07 RW.04 KAVLING NONGSA (BELAKANG UPT DINSOS | KELURAHAN SAMBAU | - | - | PEMBANGUNAN DRAINASE U40 PERBATASAN ANTARA RT.06 DAN RT.07 RW.04 KAVLING NONGSA (BELAKANG UPT DINSOS | - | 41.340.200 |
PEMBANGUNAN GARDU BETON 3,5 M2 X 5,5 M2 | PT MULIA REALTY BATINDO-KK PR DEVELY RESINDENCE BATAM CENTRE | - | - | PEMBANGUNAN GARDU BETON 3,5 M2 X 5,5 M2 | - | 146.055.910 |
PEMBANGUNAN GARDU BETON 3,5M2 X 5,5M2 | PT. ANUGERAH GRIYA UTAMA - KK PR CITRA RENGGALI MARINA, TANJUNG UNCANG | - | - | PEMBANGUNAN GARDU BETON 3,5M2 X 5,5M2 | - | 146.055.910 |
PEMBANGUNAN GARDU BETON 3X4 M2 | WARGA SAMBAU II - KK KAV SAMBAU II NONGSA | - | - | PEMBANGUNAN GARDU BETON 3X4 M2 | - | 116.773.609 |
PEMBANGUNAN GARDU BETON 3X4 M2 | PT SUMBER ALFARIA TRIJAYA - KK KAWASAN INDUSTRIAL KIE KABIL | - | - | PEMBANGUNAN GARDU BETON 3X4 M2 | - | 116.773.609 |
PEMBANGUNAN GARDU BETON DISTRIBUSI 3,5M X 5,5M | PT ANUGERAH SENTOSA ABADIS - KK PR & RUKO AZURE GARDENIA SAGULUNG | - | - | PEMBANGUNAN GARDU BETON DISTRIBUSI 3,5M X 5,5M | - | 146.055.910 |
PEMBANGUNAN GARDU BETON DISTRIBUSI 3,5M X 5,5M | PT JAYAWIRABUANA MEDIARAYA - KK PR CEMARA PARK RESIDANCE BATAM CENTRE | - | - | PEMBANGUNAN GARDU BETON DISTRIBUSI 3,5M X 5,5M | - | 146.055.910 |
PEMBANGUNAN GARDU BETON DISTRIBUSI 3,5M X 5,5M | PT BANGUN TATA PROPERINDO-KK PR GREEN BAY TIBAN | - | - | PEMBANGUNAN GARDU BETON DISTRIBUSI 3,5M X 5,5M | - | 146.055.910 |
PEMBANGUNAN GARDU BETON DISTRIBUSI 3X4 METER (SISIPAN) | KAVLING MANGSANG BLOK I TANJUNG PIAYU | - | - | PEMBANGUNAN GARDU BETON DISTRIBUSI 3X4 METER (SISIPAN) | - | 121.801.333 |
PEMBANGUNAN GARDU KIOS UNTUK PENINGKATAN KEHANDALAN OPERASIONAL | TANJUNG UMA | - | - | PEMBANGUNAN GARDU KIOS UNTUK PENINGKATAN KEHANDALAN OPERASIONAL | - | 189.563.580 |
PEMBANGUNAN GEDUNG LABORATORIUM TERPADU | MAN INSAN CENDEKIA HALMAHERA BARAT | - | - | PEMBANGUNAN GEDUNG LABORATORIUM TERPADU | - | 6.593.805.455 |
PEMBANGUNAN GEDUNG SERBAGUNA KANTOR KELURAHAN KAMPUNG PELITA VOL. 1 UNIT POKMAS PELITA MADANI 11 | KELURAHAN KAMPUNG PELITA | - | - | PEMBANGUNAN GEDUNG SERBAGUNA KANTOR KELURAHAN KAMPUNG PELITA VOL. 1 UNIT POKMAS PELITA MADANI 11 | - | 200.644.400 |
PEMBANGUNAN GEDUNG TECHNOPRENEUR CENTER POLITEKNIK NEGERI BATAM | JALAN AHMAD YANI BATAM CENTRE | - | - | PEMBANGUNAN GEDUNG TECHNOPRENEUR CENTER POLITEKNIK NEGERI BATAM | - | 33.401.912.000 |
PEMBANGUNAN GUDANG 23 M X 60 M DI PT. HAIKKI GREEN | KAWASAN PENGOLAHAN LIMBAH INDUSTRI B3 - KABIL | - | - | PEMBANGUNAN GUDANG 23 M X 60 M DI PT. HAIKKI GREEN | - | 855.000.000 |
PEMBANGUNAN GUDANG INDUSTRI DI TUNAS KABIL SEBANYAK 3 UNIT YAKNI TYPE 6A, 2B, 2C | TUNAS KABIL | - | - | PEMBANGUNAN GUDANG INDUSTRI DI TUNAS KABIL SEBANYAK 3 UNIT YAKNI TYPE 6A, 2B, 2C | - | 307.700.000 |
PEMBANGUNAN GUDANG TIPE 5D-1 TUNAS KABIL | JLN. PATIMURA, KAWASAN INDUSTRI TUNAS KABIL, KABIL, PUNGGUR, BATAM | - | - | PEMBANGUNAN GUDANG TIPE 5D-1 TUNAS KABIL | - | 9.952.500.000 |
PEMBANGUNAN IPAL TERMINAL PENUMPANG DOMESTIK TELAGA PUNGGUR | PELABUHAN DOMESTIK TELAGA PUNGGUR | - | - | PEMBANGUNAN IPAL TERMINAL PENUMPANG DOMESTIK TELAGA PUNGGUR | - | 2.046.636.531 |
PEMBANGUNAN JALAN DAN LENGAN SIMPANG BATU AMPAR TAHAP 1 | BATU AMPAR | - | - | PEMBANGUNAN JALAN DAN LENGAN SIMPANG BATU AMPAR TAHAP 1 | - | 22.281.135.400 |
PEMBANGUNAN JALAN KOLEKTOR BUNDARAN MADANI S.D BENGKONG SADAI | BATAM KOTA, BENGKONG | - | - | PEMBANGUNAN JALAN KOLEKTOR BUNDARAN MADANI S.D BENGKONG SADAI | - | 23.590.632.000 |
PEMBANGUNAN JALAN KOLEKTOR MENUJU KAWASAM INDUSTRI MUSIMMAS TAHAP 2 | KABIL | - | - | PEMBANGUNAN JALAN KOLEKTOR MENUJU KAWASAM INDUSTRI MUSIMMAS TAHAP 2 | - | 4.404.793.039 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PIK), 474 M², PERUMAHAN GRAHA NUSA P | KELURAHAN BELIAN | - | - | PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PIK), 474 M², PERUMAHAN GRAHA NUSA P | - | 176.990.000 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PIK), 474 M², PERUMAHAN ODESA RT.01 | KELURAHAN BELIAN | - | - | PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PIK), 474 M², PERUMAHAN ODESA RT.01 | - | 177.045.000 |
PEMBANGUNAN JALAN TELUK BUTON - SEI TEKAN | SEI TEKAN | - | - | PEMBANGUNAN JALAN TELUK BUTON - SEI TEKAN | - | 33.553.658.182 |
PEMBANGUNAN JALUR KEDUA JALAN HANG KESTURI TAHAP 1 (SIMP. KABIL - BATU BESAR) | NONGSA | - | - | PEMBANGUNAN JALUR KEDUA JALAN HANG KESTURI TAHAP 1 (SIMP. KABIL - BATU BESAR) | - | 35.455.263.000 |
PEMBANGUNAN JALUR SEPEDA JALAN RE MARTADINATA BATAM TAHAP 2 (PERUMAHAN TELKOM-SIMPANG SEI HARAPAN) | JALAN RE MARTADINATA SEKUPANG BATAM | - | - | PEMBANGUNAN JALUR SEPEDA JALAN RE MARTADINATA BATAM TAHAP 2 (PERUMAHAN TELKOM-SIMPANG SEI HARAPAN) | - | 7.330.395.118 |
PEMBANGUNAN JERAMBAH BETON | RT 005 RW 002 SELAT NENEK | - | - | PEMBANGUNAN JERAMBAH BETON | - | 265.127.000 |
PEMBANGUNAN JERAMBAH BETON | RT 001 RW 001 | - | - | PEMBANGUNAN JERAMBAH BETON | - | 71.204.000 |
PEMBANGUNAN JERAMBAH BETON | RT 009 RW 003 | - | - | PEMBANGUNAN JERAMBAH BETON | - | 249.206.000 |
PEMBANGUNAN JERAMBAH BETON | RT 001 RW 006 PULAU PANJANG TIMUR | - | - | PEMBANGUNAN JERAMBAH BETON | - | 277.101.000 |
PEMBANGUNAN JERAMBAH BETON | RT 003 RW 001 TELUK AIR | - | - | PEMBANGUNAN JERAMBAH BETON | - | 236.725.000 |
PEMBANGUNAN JERAMBAH BETON | RT 006 RW 003 SELAT NENEK | - | - | PEMBANGUNAN JERAMBAH BETON | - | 262.552.400 |
PEMBANGUNAN JERAMBAH BETON | RT 001 RW 002 SETOKOK | - | - | PEMBANGUNAN JERAMBAH BETON | - | 205.700.000 |
PEMBANGUNAN JERAMBAH BETON | RT 003 RW 002 SETOKOK | - | - | PEMBANGUNAN JERAMBAH BETON | - | 231.915.000 |
PEMBANGUNAN JERAMBAH BETON | RT 003 RW 001 TEMOYONG | - | - | PEMBANGUNAN JERAMBAH BETON | - | 265.981.500 |
PEMBANGUNAN JERAMBAH BETON | RT 007 RW 003 PULAU AWENG | - | - | PEMBANGUNAN JERAMBAH BETON | - | 268.414.500 |
PEMBANGUNAN JERAMBAH BETON BENGKONG LAUT RT.03 RW.01 | RT 03 RW 01 - BENGKONG LAUT | - | - | PEMBANGUNAN JERAMBAH BETON BENGKONG LAUT RT.03 RW.01 | - | 219.071.600 |
PEMBANGUNAN JERAMBAH LINGKUNGAN PULAU NANGA RT.001/RW.002 (POKMAS GALANG BARU 29 - 138,60 M2) | KELURAHAN GALANG BARU | - | - | PEMBANGUNAN JERAMBAH LINGKUNGAN PULAU NANGA RT.001/RW.002 (POKMAS GALANG BARU 29 - 138,60 M2) | - | 262.987.000 |
PEMBANGUNAN JERAMBAH LINGKUNGAN PULAU NGUAN RT.02 / RW.04 (POKMAS GALANG BARU 30 - 138,6 M²) | KELURAHAN GALANG BARU | - | - | PEMBANGUNAN JERAMBAH LINGKUNGAN PULAU NGUAN RT.02 / RW.04 (POKMAS GALANG BARU 30 - 138,6 M²) | - | 262.985.000 |
PEMBANGUNAN JERAMBAH PULAU SEMBUR RT.001/RW.001 (POKMAS GALANG BARU 26 - 138,60 M2) | KELURAHAN GALANG BARU | - | - | PEMBANGUNAN JERAMBAH PULAU SEMBUR RT.001/RW.001 (POKMAS GALANG BARU 26 - 138,60 M2) | - | 262.991.000 |
PEMBANGUNAN JERAMBAH RT 01 RW 09 TGPIAYU (PTM 10 - 105 M2) | RT 01 RW 09 KP BAGAN - TGPIAYU | - | - | PEMBANGUNAN JERAMBAH RT 01 RW 09 TGPIAYU (PTM 10 - 105 M2) | - | 218.252.100 |
PEMBANGUNAN JERAMBAH RT 01 RW 10 TGPIAYU (PTM 11 - 50 M2) | RT 01 RW 10 TANJUNGPIAYU LAUT - KEL. TANJUNGPIAYU | - | - | PEMBANGUNAN JERAMBAH RT 01 RW 10 TGPIAYU (PTM 11 - 50 M2) | - | 103.783.900 |
PEMBANGUNAN JERAMBAH TELUK NIPAH RT.002/RW.002 (POKMAS GALANG BARU 32 - 138,60 M2) | KELURAHAN GALANG BARU | - | - | PEMBANGUNAN JERAMBAH TELUK NIPAH RT.002/RW.002 (POKMAS GALANG BARU 32 - 138,60 M2) | - | 262.988.000 |
PEMBANGUNAN JERAMBAHPULAU SEMBUR RT.002/RW.001 (POKMAS GALANG BARU 27 - 138,60 M2) | KELURAHAN GALANG BARU | - | - | PEMBANGUNAN JERAMBAHPULAU SEMBUR RT.002/RW.001 (POKMAS GALANG BARU 27 - 138,60 M2) | - | 262.977.000 |
PEMBANGUNAN LAMPU PJU WILAYAH II (SEKUPANG, BATU AJI, SAGULUNG DAN SEI BEDUK) | AREA BATAM | - | - | PEMBANGUNAN LAMPU PJU WILAYAH II (SEKUPANG, BATU AJI, SAGULUNG DAN SEI BEDUK) | - | 1.402.632.003 |
PEMBANGUNAN LAPANGAN /FASUM PERUMAHAN TAMAN BUANA INDAH RW. 03 KEL. SEI PANAS BATAM KOTA | TAMAN BUANA INDAH SEI PANAS BATAM KOTA | - | - | PEMBANGUNAN LAPANGAN /FASUM PERUMAHAN TAMAN BUANA INDAH RW. 03 KEL. SEI PANAS BATAM KOTA | - | 127.327.000 |
PEMBANGUNAN LAPANGAN OLAHRAGA MULTI FUNGSI KAVLING BIDA KABIL DAN PEMBANGUNAN PAGAR KAWAT HARMONIKA | BIDA KABIL RW21 KEL KABIL KEC NONGSA | - | - | PEMBANGUNAN LAPANGAN OLAHRAGA MULTI FUNGSI KAVLING BIDA KABIL DAN PEMBANGUNAN PAGAR KAWAT HARMONIKA | - | 114.543.104 |
PEMBANGUNAN LAPANGAN OLAHRAGA MULTIFUNGSI PERUMAHAN PURNA YUDA DAN PEMBANGUNAN PAGAR KAWAT HARMONIKA | PERUMAHAN PURNA YUDA RW 08 KELURAHAN KABIL KEC NONGSA | - | - | PEMBANGUNAN LAPANGAN OLAHRAGA MULTIFUNGSI PERUMAHAN PURNA YUDA DAN PEMBANGUNAN PAGAR KAWAT HARMONIKA | - | 156.287.788 |
PEMBANGUNAN MASJID BANDARA HANG NADIM | BANDARA HANG NADIM | - | - | PEMBANGUNAN MASJID BANDARA HANG NADIM | - | 39.937.665.520 |
PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN BRB3 RT.04 RW.25 PERUM. AVIARI | BRB 3 RT.04 RW.25 PERUM. AVIARI GARDEN | - | - | PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN BRB3 RT.04 RW.25 PERUM. AVIARI | - | 103.459.400 |
PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN RT.01 DAN RT.02 RW.14 PERUM. PUTRI HIJAU | RT.01.RW.14 PERUM.PUTRI HIJAU KEL. SEI LANGKAI | - | - | PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN RT.01 DAN RT.02 RW.14 PERUM. PUTRI HIJAU | - | 100.584.000 |
PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN RT.01 DAN RT.02 RW.17 PERUM. GRIYA BATUAJI ASRI | RT.01 RW.17 PERUM. GRIYA BATU AJI ASRI KEL. SEI LANGKAI | - | - | PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN RT.01 DAN RT.02 RW.17 PERUM. GRIYA BATUAJI ASRI | - | 102.767.500 |
PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN RT.01 DAN RT.02 RW.22 PERUM. BATUAJI RIAU BERT | RT.01 RW.22 PERUM. GRIYA BATU AJI RIAU BERTUAH KEL. SEI LANGKAI | - | - | PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN RT.01 DAN RT.02 RW.22 PERUM. BATUAJI RIAU BERT | - | 102.066.800 |
PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN RT.01 RW.15 PERUM. HARAPAN PUTRA MORO | RT.01 RW.15 PERUM. HARAPAN PUTRA MORO KEL. SEI LANGKAI | - | - | PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN RT.01 RW.15 PERUM. HARAPAN PUTRA MORO | - | 99.405.900 |
PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN RT.01 RW.26 PERUM. PARISA INDAH | RT.01 RW.26 PERUM PARISA INDAH KEL. SEI LANGKAI | - | - | PEMBANGUNAN REHABILITASI SEMENISASI JALAN LINGKUNGAN RT.01 RW.26 PERUM. PARISA INDAH | - | 98.756.900 |
PEMBANGUNAN RUMAH SUSUN STISIPOL RAJA HAJI | JALAN HANDJOYO PUTRO KM.8 ATAS TG. PINANG | - | - | PEMBANGUNAN RUMAH SUSUN STISIPOL RAJA HAJI | - | 14.985.656.364 |
PEMBANGUNAN SEDIMENTASI TRAP DAN TRASH RACK INLET-12 WADUK DURIANGKANG | BATAM | - | - | PEMBANGUNAN SEDIMENTASI TRAP DAN TRASH RACK INLET-12 WADUK DURIANGKANG | - | 18.729.000.000 |
PEMBANGUNAN SEDIMENTASI TRAP DAN TRASH RACK WADUK SEI HARAPAN | WADUK SEI HARAPAN | - | - | PEMBANGUNAN SEDIMENTASI TRAP DAN TRASH RACK WADUK SEI HARAPAN | - | 12.175.000.000 |
PEMBANGUNAN SEMENISASI JALAN ROSTAM RT.002 RW.002 AIR RAJA (POKMAS AIR RAJA 12) | KELURAHAN AIR RAJA | - | - | PEMBANGUNAN SEMENISASI JALAN ROSTAM RT.002 RW.002 AIR RAJA (POKMAS AIR RAJA 12) | - | 158.724.000 |
PEMBANGUNAN SEMENISASI JALAN BETON PASIR PANJANG RT.001 RW.003 (DAU TAMBAHAN) (POKMAS REMPANG 13) | KELURAHAN REMPANG CATE | - | - | PEMBANGUNAN SEMENISASI JALAN BETON PASIR PANJANG RT.001 RW.003 (DAU TAMBAHAN) (POKMAS REMPANG 13) | - | 179.061.300 |
PEMBANGUNAN SEMENISASI JALAN KE PEMAKAMAN UMUM SIJANTUNG RT.001 RW.001 (POKMAS SIJANTUNG SEHATI 2) | KELURAHAN SIJANTUNG | - | - | PEMBANGUNAN SEMENISASI JALAN KE PEMAKAMAN UMUM SIJANTUNG RT.001 RW.001 (POKMAS SIJANTUNG SEHATI 2) | - | 268.600.200 |
PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT.02,04 RW. 05(SUNGAI LEKOP 02.05-300M2) | KELURAHAN SUNGAI LEKOP | - | - | PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT.02,04 RW. 05(SUNGAI LEKOP 02.05-300M2) | - | 105.222.700 |
PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN DI RT. 02 / RW. 03 PASIR PANJANG (POKMAS REMPANG 9) | KELURAHAN REMPANG CATE | - | - | PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN DI RT. 02 / RW. 03 PASIR PANJANG (POKMAS REMPANG 9) | - | 268.600.200 |
PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN DI RT.001 RW. 002 (POKMAS PULAU PANJANG SEHATI 4) | KELURAHAN SIJANTUNG | - | - | PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN DI RT.001 RW. 002 (POKMAS PULAU PANJANG SEHATI 4) | - | 122.027.000 |
PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 06 RW. 03(SUNGAILEKOP 06.03-289M2) | KELURAHAN SUNGAI LEKOP | - | - | PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 06 RW. 03(SUNGAILEKOP 06.03-289M2) | - | 106.730.800 |
PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT. 001 RW. 004 AIR NAGA (POKMAS AIR NAGA SEHATI 4) | KELURAHAN SIJANTUNG | - | - | PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT. 001 RW. 004 AIR NAGA (POKMAS AIR NAGA SEHATI 4) | - | 96.236.800 |
PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT. 004 RW. 003 (POKMAS PULAU PANJANG SEHATI 6) | KELURAHAN SIJANTUNG | - | - | PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT. 004 RW. 003 (POKMAS PULAU PANJANG SEHATI 6) | - | 97.640.000 |
PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT.003 RW. 002 TANJUNG KELENGKING (POKMAS REMPANG 7) | KELURAHAN REMPANG CATE | - | - | PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT.003 RW. 002 TANJUNG KELENGKING (POKMAS REMPANG 7) | - | 134.272.600 |
PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT.02 RW.10(SUNGAILEKOP 02.10-380M2) | KELURAHAN SUNGAI LEKOP | - | - | PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT.02 RW.10(SUNGAILEKOP 02.10-380M2) | - | 134.444.200 |
PEMBANGUNAN SEMENISASI JALAN MASUK GANG SD SEI RAYA RT. 001/RW. 004 (POKMAS SEMBULANG 18) | KELURAHAN SEMBULANG | - | - | PEMBANGUNAN SEMENISASI JALAN MASUK GANG SD SEI RAYA RT. 001/RW. 004 (POKMAS SEMBULANG 18) | - | 201.446.300 |
PEMBANGUNAN SEMENISASI JALAN MENUJU LAPANGAN BOLA KAKI SEI RAYA RT. 002/RW.004 (POKMAS SEMBULANG 16) | KELURAHAN SEMBULANG | - | - | PEMBANGUNAN SEMENISASI JALAN MENUJU LAPANGAN BOLA KAKI SEI RAYA RT. 002/RW.004 (POKMAS SEMBULANG 16) | - | 136.492.400 |
PEMBANGUNAN SEMENISASI JALAN PERMUKIMAN RT.004/RW.002 (POKMAS KAMPUNG BARU 1 DAU TAMBAHAN) | KELURAHAN SUBANG MAS | - | - | PEMBANGUNAN SEMENISASI JALAN PERMUKIMAN RT.004/RW.002 (POKMAS KAMPUNG BARU 1 DAU TAMBAHAN) | - | 183.136.000 |
PEMBANGUNAN SEMENISASI JALAN RT. 001/RW.002 (POKMAS SEMBULANG 11) | KELURAHAN SEMBULANG | - | - | PEMBANGUNAN SEMENISASI JALAN RT. 001/RW.002 (POKMAS SEMBULANG 11) | - | 134.292.400 |
PEMBANGUNAN SEMENISASI JALAN RT. 002/RW. 002 (POKMAS SEMBULANG 12) | KELURAHAN SEMBULANG | - | - | PEMBANGUNAN SEMENISASI JALAN RT. 002/RW. 002 (POKMAS SEMBULANG 12) | - | 201.446.300 |
PEMBANGUNAN SEMENISASI JALAN RT.001 / RW.002 AIR RAJA (POKMAS AIR RAJA 7) | KELURAHAN AIR RAJA | - | - | PEMBANGUNAN SEMENISASI JALAN RT.001 / RW.002 AIR RAJA (POKMAS AIR RAJA 7) | - | 292.920.000 |
PEMBANGUNAN SEMENISASI JALAN RT.002/RW.001 (POKMAS SEMBULANG 13) | KELURAHAN SEMBULANG | - | - | PEMBANGUNAN SEMENISASI JALAN RT.002/RW.001 (POKMAS SEMBULANG 13) | - | 201.446.300 |
PEMBANGUNAN SEMENISASI JALAN RT.002/RW.001 PULAU TUNJUK KELURAHAN SUBANG MAS (POKMAS PULAU TUNJUK 1) | KELURAHAN SUBANG MAS | - | - | PEMBANGUNAN SEMENISASI JALAN RT.002/RW.001 PULAU TUNJUK KELURAHAN SUBANG MAS (POKMAS PULAU TUNJUK 1) | - | 162.784.000 |
PEMBANGUNAN SEMENISASI JALAN RT.002/RW.002 AIR RAJA (POKMAS AIR RAJA 11) | KELURAHAN AIR RAJA | - | - | PEMBANGUNAN SEMENISASI JALAN RT.002/RW.002 AIR RAJA (POKMAS AIR RAJA 11) | - | 158.714.000 |
PEMBANGUNAN SEMENISASI JALAN RT.003 RW.002 AIR RAJA (POKMAS AIR RAJA 10) | KELURAHAN AIR RAJA | - | - | PEMBANGUNAN SEMENISASI JALAN RT.003 RW.002 AIR RAJA (POKMAS AIR RAJA 10) | - | 286.908.000 |
PEMBANGUNAN SEMENISASI JALAN RUMAH BUJANG-RUMAH MISNAN RT.001/RW.001 (POKMAS SEMBULANG 14) | KELURAHAN SEMBULANG | - | - | PEMBANGUNAN SEMENISASI JALAN RUMAH BUJANG-RUMAH MISNAN RT.001/RW.001 (POKMAS SEMBULANG 14) | - | 201.446.300 |
PEMBANGUNAN SEMENISASI JALAN SEI BULUH RT.002/RW.005 (POKMAS SEMBULANG 15) | KELURAHAN SEMBULANG | - | - | PEMBANGUNAN SEMENISASI JALAN SEI BULUH RT.002/RW.005 (POKMAS SEMBULANG 15) | - | 201.446.300 |
PEMBANGUNAN SEMENISASI JALAN/GANG RT.003,004,RW.007 KELURAHAN SUNGAI LEKOP(SUNGAILEKOP003.007-325M2) | KELURAHAN SUNGAI LEKOP | - | - | PEMBANGUNAN SEMENISASI JALAN/GANG RT.003,004,RW.007 KELURAHAN SUNGAI LEKOP(SUNGAILEKOP003.007-325M2) | - | 121.661.100 |
PEMBANGUNAN SEMENISASI JALAN/GANG RT.003,RW.013 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 003.013-394M2) | KELURAHAN SUNGAI LEKOP | - | - | PEMBANGUNAN SEMENISASI JALAN/GANG RT.003,RW.013 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 003.013-394M2) | - | 143.459.800 |
PEMBANGUNAN SEMENISASI JALAN/GANG RT.004,RW.011 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 001 . 011-390M2) | KELURAHAN SUNGAI LEKOP | - | - | PEMBANGUNAN SEMENISASI JALAN/GANG RT.004,RW.011 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 001 . 011-390M2) | - | 140.870.400 |
PEMBANGUNAN SEMENISASI KAVLING SAGULUNG LAMA RT. 04 RW. 10 ( 1004-580 M2 ) | KELURAHAN SAGULUNG KOTA | - | - | PEMBANGUNAN SEMENISASI KAVLING SAGULUNG LAMA RT. 04 RW. 10 ( 1004-580 M2 ) | - | 217.068.500 |
PEMBANGUNAN SEMENISASI PERUMAHAN ANGGARA GRAHA RT. 02,03 RW. 12 | KELURAHAN SAGULUNG KOTA | - | - | PEMBANGUNAN SEMENISASI PERUMAHAN ANGGARA GRAHA RT. 02,03 RW. 12 | - | 207.411.600 |
PEMBANGUNAN SEMENISASI PERUMAHAN FORTUNA RAYA I RT. 01 RW. 13 | KELURAHAN SAGULUNG KOTA | - | - | PEMBANGUNAN SEMENISASI PERUMAHAN FORTUNA RAYA I RT. 01 RW. 13 | - | 215.028.000 |
PEMBANGUNAN SEMENISASI PERUMAHAN TAMAN BATUAJI INDAH II RT. 01 RW. 07 | KELURAHAN SAGULUNG KOTA | - | - | PEMBANGUNAN SEMENISASI PERUMAHAN TAMAN BATUAJI INDAH II RT. 01 RW. 07 | - | 173.840.700 |
PEMBANGUNAN SEMENISASI PERUMAHAN VILLA NAMORA RT. 03 RW. 17(POKMAS 1703-500 M2) | PERUMAHAN VILLA NAMORA RT. 03 RW. 17 | - | - | PEMBANGUNAN SEMENISASI PERUMAHAN VILLA NAMORA RT. 03 RW. 17(POKMAS 1703-500 M2) | - | 187.273.900 |
PEMBANGUNAN SEMENISASI PERUMNAS SAGULUNG RT. 01,02 RW. 19 | KELURAHAN SAGULUNG KOTA | - | - | PEMBANGUNAN SEMENISASI PERUMNAS SAGULUNG RT. 01,02 RW. 19 | - | 119.856.000 |
PEMBANGUNAN SPAM DI PULAU PETONG KEL. PULAU ABANG KEC. GALANG | KEL. PULAU ABANG, KEC. GALANG | - | - | PEMBANGUNAN SPAM DI PULAU PETONG KEL. PULAU ABANG KEC. GALANG | - | 7.186.376.925 |
PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10 KK) | KEL. REMPANG CATE KEC. GALANG (DAK REGULER) | - | - | PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10 KK) | - | 477.500.000 |
PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10 KK) KELURAHAN BATU MERAH KE BATU AMPAR (DAK PENUGASAN) | KELURAHAN BARU MERAH KEC BATU AMPAR | - | - | PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10 KK) KELURAHAN BATU MERAH KE BATU AMPAR (DAK PENUGASAN) | - | 460.000.000 |
PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10 KK) KELURAHAN GALANG BARU KEC. GALANG (DAK PENUGASAN) | KELURAHAN GALANG BARU KECAMATAN GALANG | - | - | PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10 KK) KELURAHAN GALANG BARU KEC. GALANG (DAK PENUGASAN) | - | 980.000.000 |
PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10 KK) KELURAHAN TEMOYONG KEC BULANG (DAK PENUGASAN) | KEL TEMOYONG KEC BULANG | - | - | PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10 KK) KELURAHAN TEMOYONG KEC BULANG (DAK PENUGASAN) | - | 980.000.000 |
PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10KK) (KELOMPOK SWADAYA MASYRAKAT SEMBULANG JAYA) | KEL SEMBULANG KEC GALANG | - | - | PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5-10KK) (KELOMPOK SWADAYA MASYRAKAT SEMBULANG JAYA) | - | 250.000.000 |
PEMBANGUNAN TAXIWAY DAN APRON 04 BANDARA HANG NADIM BATAM | JL. HANG NADIM, NO. 1 | - | - | PEMBANGUNAN TAXIWAY DAN APRON 04 BANDARA HANG NADIM BATAM | - | 155.146.598.060 |
PEMBANGUNAN TPSP KEC. BELAKANG PADANG KOTA BATAM | TEMPAT PEMBUANGAN SAMPAH TERPADU BELAKANG PADANG | - | - | PEMBANGUNAN TPSP KEC. BELAKANG PADANG KOTA BATAM | - | 3.823.003.000 |
PEMBANGUNAN/ REHABILITASI JALAN LINGKUNGAN RT.03/ RW.26 ( 326 M2), POKMAS PONDOK PERMTA | RT.03/ RW. 26 PERUM.PONDOK PERMATA KEL.TEMBESI. | - | - | PEMBANGUNAN/ REHABILITASI JALAN LINGKUNGAN RT.03/ RW.26 ( 326 M2), POKMAS PONDOK PERMTA | - | 122.030.700 |
PEMBANGUNAN/REHABILITASI SEMENISASI JALAN LINGKUNGAN RT 05 RW 04 | RT 05 RW 04 DURIANGKANG | - | - | PEMBANGUNAN/REHABILITASI SEMENISASI JALAN LINGKUNGAN RT 05 RW 04 | - | 199.442.000 |
PEMBERSIHAN ISOLATOR DAN PENGENCANGAN BAUT PERALATAN TOWER TRANSMISI 150 KV | AREA BATAM | - | - | PEMBERSIHAN ISOLATOR DAN PENGENCANGAN BAUT PERALATAN TOWER TRANSMISI 150 KV | - | 445.870.406 |
PEMBONGKARAN SHOP OFFICE DAN PEMINDAHAN STORE VALLEN DAN TOOL CRIB | JL BRIGJEN KATAMSO KM.6 TANJUNG UNCANG | - | - | PEMBONGKARAN SHOP OFFICE DAN PEMINDAHAN STORE VALLEN DAN TOOL CRIB | - | 600.250.000 |
PEMBUATAN PAGAR PENGAMAN BRC GD PORTAL | PERUMNAS 2 BATU AJI, SEROJA 1 BELAKANG PASAR BATU 12, YAYASAN AN NIMAH PESANTREN BATU 12, PANTI REHAB BATU BESAR, TAMAN BATU BESAR/GRIYA AMANDA/TAMAN YOSE INDAH BATU BESAR | - | - | PEMBUATAN PAGAR PENGAMAN BRC GD PORTAL | - | 71.638.928 |
PEMELIHARAAN BERKALA JALAN PROVINSI PADA RUAS JALAN SIMP. MARINA CITY-SIMP. BASE CAMP KOTA BATAM | RUAS JALAN SIMP. MARINA CITY-SIMP. BASE CAMP KOTA BATAM | - | - | PEMELIHARAAN BERKALA JALAN PROVINSI PADA RUAS JALAN SIMP. MARINA CITY-SIMP. BASE CAMP KOTA BATAM | - | 21.044.516.364 |
PEMELIHARAAN BERKALA JL. UTAMA TIBAN KOPERASI | TIBAN KOPERASI | - | - | PEMELIHARAAN BERKALA JL. UTAMA TIBAN KOPERASI | - | 2.262.500.892 |
PEMELIHARAAN DAN PERAWATAN TAMAN JALAN ARTERI DAN ROW WILAYAH PERAWATAN PERTAMANAN BP BATAM | AREA BATAM | - | - | PEMELIHARAAN DAN PERAWATAN TAMAN JALAN ARTERI DAN ROW WILAYAH PERAWATAN PERTAMANAN BP BATAM | - | 1.229.209.088 |
PEMELIHARAAN GARDU DISTRIBUSI | AREA TIBAN | - | - | PEMELIHARAAN GARDU DISTRIBUSI | - | 44.629.000 |
PEMELIHARAAN GARDU DISTRIBUSI | AREA BATAM CENTRE | - | - | PEMELIHARAAN GARDU DISTRIBUSI | - | 68.883.000 |
PEMELIHARAAN JALAN DAN PEMELIHARAAN GEDUNG | KELURAHAN SEMBULANG, KECAMATAN GALANG, KOTA BATAM | - | - | PEMELIHARAAN JALAN DAN PEMELIHARAAN GEDUNG | - | 295.000.000 |
PEMELIHARAAN JALAN, DAN GEDUNG | GALANG BARU, KECAMATAN GALANG, KOTA BATAM | - | - | PEMELIHARAAN JALAN, DAN GEDUNG | - | 295.000.000 |
PEMELIHARAAN JALAN, DRAINASE DAN GEDUNG | KELURAHAN TANJUNG UNCANG, KECAMATAN, BATU AJI, KOTA BATAM | - | - | PEMELIHARAAN JALAN, DRAINASE DAN GEDUNG | - | 295.000.000 |
PEMELIHARAAN JALAN, DRAINASE, BATU MIRING DAN MCK | KELURAHAN PULAU ABANG, KECAMATAN GALANG, KOTA BATAM | - | - | PEMELIHARAAN JALAN, DRAINASE, BATU MIRING DAN MCK | - | 295.000.000 |
PEMELIHARAAN JALAN, DRAINASE, DAN PEMELIHARAAN POSYANDU | KELURAHAN SUNGAI BINTI, KECAMATAN SAGULUNG, KOTA BATAM | - | - | PEMELIHARAAN JALAN, DRAINASE, DAN PEMELIHARAAN POSYANDU | - | 295.000.000 |
PEMELIHARAAN PAGAR DAERAH TANGKAPAN AIR WADUK SEI HARAPAN | WADUK SEI HARAPAN | - | - | PEMELIHARAAN PAGAR DAERAH TANGKAPAN AIR WADUK SEI HARAPAN | - | 3.841.962.000 |
PEMELIHARAAN PREVENTIVE TM, TR DAN GARDU | AREA BATU AJI TERSEBAR | - | - | PEMELIHARAAN PREVENTIVE TM, TR DAN GARDU | - | 193.427.489 |
PEMELIHARAAN SISTEM PROTEKSI PETIR | BATU BESAR, SAGULUNG, NONGSA | - | - | PEMELIHARAAN SISTEM PROTEKSI PETIR | - | 172.109.532 |
PEMOTONGAN TANAH CADAS, BEBATU, BIASA & PENIMBUNAN SERTA PEMATANGAN LAHAN UNTUK PEMBANGUNAN FACTORY | PANBIL INDUSTRIAL ESTATE, MUKAKUNING | - | - | PEMOTONGAN TANAH CADAS, BEBATU, BIASA & PENIMBUNAN SERTA PEMATANGAN LAHAN UNTUK PEMBANGUNAN FACTORY | - | 52.347.128.000 |
PENAMBAHAN BATU BRONJONG AREA TANAH YANG LONGSOR DI LERENG DEPAN VILLA PANBIL BLOK DD NO. 33 | VILLA PANBIL BLOK DD NO. 33 KAWASAN VILLA PANBIL MUKA KUNING | - | - | PENAMBAHAN BATU BRONJONG AREA TANAH YANG LONGSOR DI LERENG DEPAN VILLA PANBIL BLOK DD NO. 33 | - | 18.542.000 |
PENAMBAHAN RUANG KANTOR DINAS CIPTA KARYA DAN TATA RUANG SEKUPANG | JL KARTINI 1 NO 29 SEKUPANG | - | - | PENAMBAHAN RUANG KANTOR DINAS CIPTA KARYA DAN TATA RUANG SEKUPANG | - | 1.713.178.175 |
PENATAAN FASUM PERUMAHAN BANDARA MAS BATAM | PERUMAHAN BANDARA MAS BATAM | - | - | PENATAAN FASUM PERUMAHAN BANDARA MAS BATAM | - | 99.905.000 |
PENATAAN FASUM PERUMAHAN CIPTA PERMATA BATAM | PERUMAHAN CIPTA PERMATA BATAM | - | - | PENATAAN FASUM PERUMAHAN CIPTA PERMATA BATAM | - | 119.983.000 |
PENATAAN JALAN (PELEBARAN JALAN) SIMP. KABIL - SIMP MASJID RAYA BATAM CENTRE (LANJUTAN) | SIMP. KABIL - SIMP MASJID RAYA BATAM CENTRE | - | - | PENATAAN JALAN (PELEBARAN JALAN) SIMP. KABIL - SIMP MASJID RAYA BATAM CENTRE (LANJUTAN) | - | 10.543.640.910 |
PENATAAN JALAN PERUMAHAN CIPTA PERMATA BATAM | PERUMAHAN CIPTA PERMATA BATAM | - | - | PENATAAN JALAN PERUMAHAN CIPTA PERMATA BATAM | - | 119.978.000 |
PENATAAN JARINGAN UTILITAS MILIK PT PLN BATAM | PERUMAHAN OB NONGSA DAN LIMBAH B3 KABIL RAYA | - | - | PENATAAN JARINGAN UTILITAS MILIK PT PLN BATAM | - | 19.347.600 |
PENATAAN LENGAN SIMP BASECAMP | BATAM | - | - | PENATAAN LENGAN SIMP BASECAMP | - | 9.691.060.515 |
PENATAAN LENGAN SIMP. MAN SAGULUNG | SIMPANG MAN SAGULUNG - SEI LEKOP | - | - | PENATAAN LENGAN SIMP. MAN SAGULUNG | - | 3.109.456.708 |
PENATAAN LINGKUNGAN BALOI CENTER BATAM | KAWASAN LINGKUNGAN BALOI CENTER BATAM | - | - | PENATAAN LINGKUNGAN BALOI CENTER BATAM | - | 119.978.000 |
PENATAAN LINGKUNGAN BSI RESIDENCE BATAM | BSI RESIDENCE BATAM | - | - | PENATAAN LINGKUNGAN BSI RESIDENCE BATAM | - | 119.978.000 |
PENATAAN LINGKUNGAN HANG LEKIR BATAM | PERUMAHAN HANG LEKIR BATAM | - | - | PENATAAN LINGKUNGAN HANG LEKIR BATAM | - | 119.978.000 |
PENATAAN LINGKUNGAN PERUMAHAN CIPTA REGENCY BATAM | PERUMAHAN CIPTA REGENCY BATAM | - | - | PENATAAN LINGKUNGAN PERUMAHAN CIPTA REGENCY BATAM | - | 119.935.000 |
PENATAAN LINGKUNGAN RW 08, KEL TANJUNG BUNTUNG | RW 08, KEL TANJUNG BUNTUNG | - | - | PENATAAN LINGKUNGAN RW 08, KEL TANJUNG BUNTUNG | - | 77.152.078 |
PENATAAN LINGKUNGAN RW 10 BALOI PERMAI BATAM | LINGKUNGAN RW 10 BALOI PERMAI | - | - | PENATAAN LINGKUNGAN RW 10 BALOI PERMAI BATAM | - | 119.984.000 |
PENGADAAN DAN PEMASANGAN ATAP PROYEK RENOVASI WISMA KAWASAN VILLA PANBIL | MUKA KUNING | - | - | PENGADAAN DAN PEMASANGAN ATAP PROYEK RENOVASI WISMA KAWASAN VILLA PANBIL | - | 75.000.000 |
PENGADAAN DAN PEMASANGAN GARDU & SKTM 20 KV | PT MULIA REALTY BATINDO - KK PR DEVELY RESIDANCE BATAM CENTRE | - | - | PENGADAAN DAN PEMASANGAN GARDU & SKTM 20 KV | - | 127.364.020 |
PENGADAAN DAN PEMASANGAN GARDU CANTOL | BTS XL SUM-KR-BTM-0264 - KP.AIR LINGKA GALANG BARU SEMBULANG | - | - | PENGADAAN DAN PEMASANGAN GARDU CANTOL | - | 25.375.915 |
PENGADAAN DAN PEMASANGAN GARDU CANTOL DAN SISIP PERALATAN GARDU BETON | WARGA SEMBULANG - BARELANG | - | - | PENGADAAN DAN PEMASANGAN GARDU CANTOL DAN SISIP PERALATAN GARDU BETON | - | 39.040.121 |
PENGADAAN DAN PEMASANGAN JARINGAN LISTRIK BARU | JL. BRIGJEN KATAMSO KM 7 KEL. TANJUNG UNCANG KEC. BATU AJI BATAM | - | - | PENGADAAN DAN PEMASANGAN JARINGAN LISTRIK BARU | - | 1.925.000.000 |
PENGADAAN DAN PEMASANGAN JTM DAN PERALATAN GARDU | PT BUANA CIPTA PROPERTINDO - KK PR CIPTA VILLAGE CLUSTER HALIMUN MARINA | - | - | PENGADAAN DAN PEMASANGAN JTM DAN PERALATAN GARDU | - | 32.687.616 |
PENGADAAN DAN PEMASANGAN JTM DAN PERALATAN GARDU | PT BATAM RIAU BERTUAH - KK PR GOLDEN PARK NONGSA | - | - | PENGADAAN DAN PEMASANGAN JTM DAN PERALATAN GARDU | - | 76.360.788 |
PENGADAAN DAN PEMASANGAN JTR | PT GOLDEN GATE NUSA PERSADA | - | - | PENGADAAN DAN PEMASANGAN JTR | - | 118.532.303 |
PENGADAAN DAN PEMASANGAN JTR | AREA NAGOYA TERSEBAR | - | - | PENGADAAN DAN PEMASANGAN JTR | - | 100.000.000 |
PENGADAAN DAN PEMASANGAN JTR (SKTR) | AREA BATAM CENTRE TERSEBAR | - | - | PENGADAAN DAN PEMASANGAN JTR (SKTR) | - | 364.462.393 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN JTM-SKTM 20 KV | KAWASAN PURI INDUSTRIAL PARK 2000 | - | - | PENGADAAN DAN PEMASANGAN KUBIKEL DAN JTM-SKTM 20 KV | - | 347.362.270 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | YAYASAN PANCARAN MAITRI-KK MAHA VIHARA MAITREYA BATAM | - | - | PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | - | 35.102.500 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | JALAN HANG KESTURI | - | - | PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | - | 47.863.466 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20 KV | KOMPLEK PERTOKOAN CAPITOL SUPERBLOCK IMPERIUM BLOK B1, B2A JL. JENDRAL SUDIRMAN, BALOI | - | - | PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20 KV | - | 494.359.200 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20 KV | WARGA SAMBAU II-KK KAV SAMBAU II NONGSA | - | - | PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20 KV | - | 122.701.475 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20KV | PT YILIN AGUATECH INDONESIA - HORIZON INDUSTRIAL PARK LOT H NO 01-2 | - | - | PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20KV | - | 37.092.752 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20KV | PT AFP DWILESTARI - THE NOVE KAWASAN NUVASA BAY | - | - | PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20KV | - | 62.653.938 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTABLE | PT. WISATA ANUGERAH BARELANG INDONESIA, JLN. PESISIR PANJANG REMPANG CATE BARELANG | - | - | PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTABLE | - | 435.390.452 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL DAN PENARIKAN JTM SUTM & KWH PANTAU | WARGA KAV. TAMAN BALOI BLOK D2 & B2 RT.01-02-03 WR.024 BALOI | - | - | PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL DAN PENARIKAN JTM SUTM & KWH PANTAU | - | 213.959.765 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL, JTM - SUTM | PANTAI KALAT MELAYU - REMPANG BARELANG | - | - | PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL, JTM - SUTM | - | 287.368.817 |
PENGADAAN DAN PEMASANGAN PLAFOND DI RUANG KAPEL RUMAH SUSTER RS. SANTA ELISABETH | RS. ELISABET BATAM KOTA | - | - | PENGADAAN DAN PEMASANGAN PLAFOND DI RUANG KAPEL RUMAH SUSTER RS. SANTA ELISABETH | - | 31.583.000 |
PENGADAAN DAN PEMASANGAN PLAFOND DI RUSUN TAHAP-II BLOK I KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | PENGADAAN DAN PEMASANGAN PLAFOND DI RUSUN TAHAP-II BLOK I KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | 53.898.300 |
PENGADAAN DAN PEMASANGAN RAILING BALKON UNIT DI PROYEK CITRAPLAZA NAGOYA | NAGOYA | - | - | PENGADAAN DAN PEMASANGAN RAILING BALKON UNIT DI PROYEK CITRAPLAZA NAGOYA | - | 781.343.009 |
PENGADAAN DAN PEMBANGUNAN TOWNHOUSE (90) PAPA MAMA 2 | JLN ABUYALTAMA | - | - | PENGADAAN DAN PEMBANGUNAN TOWNHOUSE (90) PAPA MAMA 2 | - | 2.430.000.000 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI FACTORY A LOT 03 | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI FACTORY A LOT 03 | - | 90.953.990 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK E | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK E | - | 172.784.136 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK F | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK F | - | 172.784.136 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK G | KAWASAN PANBIL INDUSTRIAL MUKA KUNING | - | - | PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK G | - | 172.784.136 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK H | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | - | - | PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK H | - | 172.784.136 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK J KAWASAN PANBIL INDUSTRIAL, MUKA KUNING - BATAM | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING - BATAM | - | - | PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI RUSUN TAHAP II BLOK J KAWASAN PANBIL INDUSTRIAL, | - | 172.784.136 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI VILLA PANBIL BLOK AA NO. 01 KAWASAN VILLA PANBIL, MUKA KUNING | KAWASAN VILLA PANBIL, MUKA KUNING | - | - | PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR DI VILLA PANBIL BLOK AA NO. 01 KAWASAN VILLA PANBIL, | - | 102.769.680 |
PENGAWASAN (MANAJEMEN PROYEK) TERHADAP PELAKSANAAN PEMBANGUNAN PROYEK BALOI APARTMENT TOWER A | PERMATA BALOI | - | - | PENGAWASAN (MANAJEMEN PROYEK) TERHADAP PELAKSANAAN PEMBANGUNAN PROYEK BALOI APARTMENT TOWER A | - | 102.000.000.000 |
PENGGANTIAN KWH METER AMI | AREA NAGOYA TERSEBAR | - | - | PENGGANTIAN KWH METER AMI | - | 100.000.000 |
PENGGANTIAN TANDA PHASA, PEMASANGAN KAWAT ANTI CLIMBING DAN PENGECATAN PLAT SAMBUNG BERKARAT | AREA TOWER SUTT PLN KOTA BATAM | - | - | PENGGANTIAN TANDA PHASA, PEMASANGAN KAWAT ANTI CLIMBING DAN PENGECATAN PLAT SAMBUNG BERKARAT | - | 107.010.576 |
PENINGKATAN / PENATAAN JALAN SIMP. BARELANG | SIMPANG LAMPU MERAH BARELANG | - | - | PENINGKATAN / PENATAAN JALAN SIMP. BARELANG | - | 16.047.472.438 |
PENINGKATAN JALAAN MENUJU SMPN 37 PERUM CIPTA ASRI TEMBESI | PERUM CIPTA ASRI TEMBESI | - | - | PENINGKATAN JALAAN MENUJU SMPN 37 PERUM CIPTA ASRI TEMBESI | - | 783.812.380 |
PENINGKATAN JALAN KAWASAN INDUSTRI TANJUNG UNCANG JALAN MC. CONNEL DOWELL | BATAM | - | - | PENINGKATAN JALAN KAWASAN INDUSTRI TANJUNG UNCANG JALAN MC. CONNEL DOWELL | - | 9.341.975.168 |
PENINGKATAN JALAN MESJID RAYA TANJUNG UNCANG (LANJUTAN) | MESJID RAYA TANJUNG UNCANG | - | - | PENINGKATAN JALAN MESJID RAYA TANJUNG UNCANG (LANJUTAN) | - | 10.482.178.167 |
PENINGKATAN JALAN OCARINA | OCARINA BATAM CENTRE | - | - | PENINGKATAN JALAN OCARINA | - | 1.462.066.368 |
PENINGKATAN JALAN RW.09 KAMPUNG BAGAN KELURAHAN TANJUNG PIAYU KECAMATAN SEI. BEDUK | TANJUNG PIAYU-KAMPUNG BAGAN | - | - | PENINGKATAN JALAN RW.09 KAMPUNG BAGAN KELURAHAN TANJUNG PIAYU KECAMATAN SEI. BEDUK | - | 465.487.939 |
PENINGKATAN JALAN SIMP. APARTEMENT HARMONI -SIMPANG IRINCO-SIMP. POLSEK LUBUK BAJA (LANJUTAN) | LUBUK BAJA | - | - | PENINGKATAN JALAN SIMP. APARTEMENT HARMONI -SIMPANG IRINCO-SIMP. POLSEK LUBUK BAJA (LANJUTAN) | - | 9.755.074.546 |
PENINGKATAN JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI (TAHAP 2) | AREA BATAM | - | - | PENINGKATAN JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI (TAHAP 2) | - | 13.301.217.540 |
PENINGKATAN JALAN SIMP. PATUNG KUDA-SIMP.BENGKONG SEKEN (LANJUTAN) | SIMPANG BENGKONG SEKEN KOTA BATAM | - | - | PENINGKATAN JALAN SIMP. PATUNG KUDA-SIMP.BENGKONG SEKEN (LANJUTAN) | - | 4.762.142.135 |
PENINGKATAN JALAN SIMP.COASTARINA - SIMP. JEMBATAN BENGKONG SADAI | COASTARINA - BATAM CENTRE | - | - | PENINGKATAN JALAN SIMP.COASTARINA - SIMP. JEMBATAN BENGKONG SADAI | - | 2.575.745.059 |
PENINGKATAN JALAN UTAMA TIBAN PAJAK | TIBAN KECAMATAN SEKUPANG | - | - | PENINGKATAN JALAN UTAMA TIBAN PAJAK | - | 1.074.395.146 |
PENINGKATAN JALAN WINSOR SQUARE DERETAN BLOK A 60 KEL. LUBUK BAJA KOTA | RUKO WINSOR SQUARE KEL LUBUK BAJA KOTA | - | - | PENINGKATAN JALAN WINSOR SQUARE DERETAN BLOK A 60 KEL. LUBUK BAJA KOTA | - | 592.793.785 |
PENINGKATAN KAPASITAS JALAN DUTAMAS-LEGENDA MALAKA | SIMPANG JALAN DUTAMAS-LEGENDA MALAKA | - | - | PENINGKATAN KAPASITAS JALAN DUTAMAS-LEGENDA MALAKA | - | 3.405.965.532 |
PENINGKATAN TPA SEMEMAL | KARIMUN | - | - | PENINGKATAN TPA SEMEMAL | - | 19.507.713.000 |
PERBAIKAN DERMAGA SELATAN PERLABUHAN BATU AMPAR | BATU AMPAR | - | - | PERBAIKAN DERMAGA SELATAN PERLABUHAN BATU AMPAR | - | 21.059.686.532 |
PERBAIKAN GORONG-GORONG CORRUGATED STEEL YANG MELINTASI RUNWAR DAN TAXIWAY | BANDARA HANGNADIM | - | - | PERBAIKAN GORONG-GORONG CORRUGATED STEEL YANG MELINTASI RUNWAR DAN TAXIWAY | - | 19.898.332.000 |
PIPING WORK FOR NEW PASTILLATION EOMB + PIPING WORK HYDRANT PIPE MODIFICATION DI DALAM LOKASI PABRIK PT. ECOGREEN OLEOCHEMICALS BATAM | JL. HASANUDIN, KABIL | - | - | PIPING WORK FOR NEW PASTILLATION EOMB + PIPING WORK HYDRANT PIPE MODIFICATION DI DALAM LOKASI PABRIK | - | 906.400.000 |
POKMAS BATU MERAH 11 JEMBATAN BETON RT 07 RW 02 ( 100 M² ) | BATU MERAH RT 07 RW 02 | - | - | POKMAS BATU MERAH 11 JEMBATAN BETON RT 07 RW 02 ( 100 M² ) | - | 208.692.000 |
POKMAS BATU MERAH 12 JEMBATAN BETON RT 17 RW 05 ( 100 M² ) | BATU MERAH RT 17 RW 05 | - | - | POKMAS BATU MERAH 12 JEMBATAN BETON RT 17 RW 05 ( 100 M² ) | - | 208.692.000 |
POKMAS BATU MERAH 1D PAVING BLOCK JALAN LINGKUNGAN RT 02 RW 08 (407,5 M2) | BATU MERAH RT 02 RW 08 | - | - | POKMAS BATU MERAH 1D PAVING BLOCK JALAN LINGKUNGAN RT 02 RW 08 (407,5 M2) | - | 157.347.300 |
POKMAS BATU MERAH 2 PAVING BLOCK JALAN LINGKUNGAN RT 18 RW 05 ( 90 M² ) | BATU MERAH RT 18 RW 05 | - | - | POKMAS BATU MERAH 2 PAVING BLOCK JALAN LINGKUNGAN RT 18 RW 05 ( 90 M² ) | - | 34.776.500 |
POKMAS BATU MERAH 2D SEMENISASI JALAN LINGKUNGAN RT 17 RW 05 ( 120 M² ) | BATU MERAH RT 17 RW 05 | - | - | POKMAS BATU MERAH 2D SEMENISASI JALAN LINGKUNGAN RT 17 RW 05 ( 120 M² ) | - | 44.345.400 |
POKMAS BATU MERAH 3 PAVING BLOCK JALAN LINGKUNGAN RT 30 RW 06 ( 244 M² ) | BATU MERAH RT 30 RW 06 | - | - | POKMAS BATU MERAH 3 PAVING BLOCK JALAN LINGKUNGAN RT 30 RW 06 ( 244 M² ) | - | 94.370.100 |
POKMAS BATU MERAH 3D SEMENISASI JALAN LINGKUNGAN RT 26 RW 01 ( 444 M2 ) | BATU MERAH RT 26 RW 01 | - | - | POKMAS BATU MERAH 3D SEMENISASI JALAN LINGKUNGAN RT 26 RW 01 ( 444 M2 ) | - | 156.960.100 |
POKMAS BATU MERAH 7 SEMENISASI JALAN LINGKUNGAN RT 13 RW 04 ( 136 M2) | BATU MERAH RT 13 RW 04 | - | - | POKMAS BATU MERAH 7 SEMENISASI JALAN LINGKUNGAN RT 13 RW 04 ( 136 M2) | - | 49.891.600 |
POKMAS BATU MERAH 8 SEMENISASI JALAN LINGKUNGAN RT 16 RW 05 ( 67,5 M2 ) | BATU MERAH RT 16 RW 05 | - | - | POKMAS BATU MERAH 8 SEMENISASI JALAN LINGKUNGAN RT 16 RW 05 ( 67,5 M2 ) | - | 25.254.900 |
POKMAS BATU MERAH 9 SEMENISASI JALAN LINGKUNGAN RT 18 RW 05 ( 110 M2 ) | BATU MERAH RT 18 RW 05 | - | - | POKMAS BATU MERAH 9 SEMENISASI JALAN LINGKUNGAN RT 18 RW 05 ( 110 M2 ) | - | 41.180.700 |
POKMAS BINTANG KEJORA | RT.002 RW.003 TANJUNG SENGKUANG | - | - | POKMAS BINTANG KEJORA | - | 29.508.600 |
POKMAS DAU TANJUNG SARI XV JERAMBAH BETON (MENUJU RUMAH SDRI. TUTIK KEBUN TEMPANG RT.03/RW.04) | KELURAHAN TANJUNG SARI | - | - | POKMAS DAU TANJUNG SARI XV JERAMBAH BETON (MENUJU RUMAH SDRI. TUTIK KEBUN TEMPANG RT.03/RW.04) | - | 151.897.000 |
POKMAS TANJUNG SARI V JERAMBAH BETON (DEPAN RUMAH HJ. KARTINI) RT.01/RW.04 | KELURAHAN TANJUNG SARI | - | - | POKMAS TANJUNG SARI V JERAMBAH BETON (DEPAN RUMAH HJ. KARTINI) RT.01/RW.04 | - | 175.632.800 |
POKMAS TANJUNG SARI X JERAMBAH BETON PELANTAR MASYARAKAT RT.03/RW.04 KAMPUNG TANJUNG | KELURAHAN TANJUNG SARI | - | - | POKMAS TANJUNG SARI X JERAMBAH BETON PELANTAR MASYARAKAT RT.03/RW.04 KAMPUNG TANJUNG | - | 173.262.900 |
POKMAS TANJUNG SARI XI JERAMBAH BETON (MENUJU RUMAH SDR. A KIM) RT.04/RW.04 | KELURAHAN TANJUNG SARI | - | - | POKMAS TANJUNG SARI XI JERAMBAH BETON (MENUJU RUMAH SDR. A KIM) RT.04/RW.04 | - | 175.627.100 |
POKMAS TERING JAYA III | KAV. SEI TERING RT.002,003 RW.006 TANJUNG SENGKUANG | - | - | POKMAS TERING JAYA III | - | 86.353.300 |
PONDASI DAN STOMP VIDEOTRON | BUNDARAN KABIL, BANDARA - BATAM | - | - | PONDASI DAN STOMP VIDEOTRON | - | 16.882.966 |
PRESERVASI JALAN NONGSA - BATU AMPAR - TEMBESI - GALANG (PULANG BATAM - GALANG) | AREA BATAM - GALANG | - | - | PRESERVASI JALAN NONGSA - BATU AMPAR - TEMBESI - GALANG (PULANG BATAM - GALANG) | - | 7.686.693.455 |
PRESERVASI JEMBATAN NONGSA - BATU AMPAR - TEMBESI - GALANG (PULAU BATAM - GALANG) | AREA BATAM | - | - | PRESERVASI JEMBATAN NONGSA - BATU AMPAR - TEMBESI - GALANG (PULAU BATAM - GALANG) | - | 2.679.810.000 |
PROYEK BANGUNAN GUDANG 3# DAN KANOPI TENDA HUJAN BA(2) INDONESIA | JALAN BRIGJEN KATAMSO, LOT 8 KELURAHAN TANJUNG UNCANG KECAMATAN BATU AJI | - | - | PROYEK BANGUNAN GUDANG 3# DAN KANOPI TENDA HUJAN BA(2) INDONESIA | - | 22.318.000.000 |
PROYEK PEMBANGUNAN WORKSHOP PRODUKSI TAHAP II BA (2) | JL BRIGJEN KATAMSO LOT 8 KEL TANJUNG UNCANG KEC BATU AJI | - | - | PROYEK PEMBANGUNAN WORKSHOP PRODUKSI TAHAP II BA (2) | - | 31.630.000.000 |
PTB LOT13B PLANT CONSTRUCTION PROJECT | BATAMINDO INDUSTRIAL PARK LOT.13B, JALAN BERINGIN KABIL NONGSA | - | - | PTB LOT13B PLANT CONSTRUCTION PROJECT | - | 1.254.545.455 |
RACKING INSTALLATION | PT. VOLEX INDONESIA, KAWASAN INDUSTRI SEKUPANG | - | - | RACKING INSTALLATION | - | 637.000.000 |
REHAB JALAN PERMUKIMAN RT.001/RW.001 SUBANG MAS (POKMAS SUBANG MAS 2) | KELURAHAN SUBANG MAS | - | - | REHAB JALAN PERMUKIMAN RT.001/RW.001 SUBANG MAS (POKMAS SUBANG MAS 2) | - | 162.736.000 |
REHAB JALAN PERMUKIMAN RT.006/RW.001 PENURUN KELURAHAN SUBANG MAS (POKMAS PENURUN 1) | KELURAHAN SUBANG MAS | - | - | REHAB JALAN PERMUKIMAN RT.006/RW.001 PENURUN KELURAHAN SUBANG MAS (POKMAS PENURUN 1) | - | 183.136.000 |
REHABILITASI GARDU DISTRIBUSI BETON | GD BONAVISTA BATAM CENTRE DAN GD HANG LEKIR BATAM CENTRE | - | - | REHABILITASI GARDU DISTRIBUSI BETON | - | 95.753.803 |
REHABILITASI JARINGAN PJU WILAYAH 1 (NONGSA, BATAM KOTA) | NONGSA-BATAM KOTA | - | - | REHABILITASI JARINGAN PJU WILAYAH 1 (NONGSA, BATAM KOTA) | - | 1.189.822.306 |
REHABILITASI JARINGAN PJU WILAYAH II (SEKUPANG, BATU AJI, SAGULUNG DAN SEI BEDUK) | AREA BATAM | - | - | REHABILITASI JARINGAN PJU WILAYAH II (SEKUPANG, BATU AJI, SAGULUNG DAN SEI BEDUK) | - | 1.068.618.475 |
REHABILITASI PAGAR DAN PARKIRAN MOTOR | JL. SUDIRMAN, SUKAJADI | - | - | REHABILITASI PAGAR DAN PARKIRAN MOTOR | - | 173.140.214 |
REHABILITASI RUANG LABORATORIUM IPA SMPN 47 BATAM | SMPN 47 BATAM KECAMATAN SEKUPANG | - | - | REHABILITASI RUANG LABORATORIUM IPA SMPN 47 BATAM | - | 294.417.000 |
REHABILITASI/PEMBANGUNAN SEMENISASI JALAN LINGK PERUM GALAXY PARK RT 002 RW 014 (GALAXY 2 - 530M2) | KELURAHAN TANJUNG RIAU | - | - | REHABILITASI/PEMBANGUNAN SEMENISASI JALAN LINGK PERUM GALAXY PARK RT 002 RW 014 (GALAXY 2 - 530M2) | - | 181.912.500 |
REHABILITASI/PEMBANGUNAN SEMENISASI JALAN LINGK PERUM GALAXY PARK RT 003 RW 014 (GALAXY 3 - 530M2) | KELURAHAN TANJUNG RIAU | - | - | REHABILITASI/PEMBANGUNAN SEMENISASI JALAN LINGK PERUM GALAXY PARK RT 003 RW 014 (GALAXY 3 - 530M2) | - | 181.912.500 |
REHABILITASI/PEMBANGUNAN SEMENISASI JALAN LINGK PERUM GALAXY PARK RT 004 RW 014 (GALAXY 4 - 530M2) | KELURAHAN TANJUNG RIAU | - | - | REHABILITASI/PEMBANGUNAN SEMENISASI JALAN LINGK PERUM GALAXY PARK RT 004 RW 014 (GALAXY 4 - 530M2) | - | 181.912.500 |
REHABILITASI/PEMBANGUNAN SEMENISASI JALAN LINGK. PERUM GALAXY PARK RT 001 RW 014 (GALAXY 1 - 530M2) | KELURAHAN TANJUNG RIAU | - | - | REHABILITASI/PEMBANGUNAN SEMENISASI JALAN LINGK. PERUM GALAXY PARK RT 001 RW 014 (GALAXY 1 - 530M2) | - | 181.912.500 |
REINSTATE BUILDING FOR CIVIL, MECHANICAL & ELECTRICAL WORK | BATAMINDO INDUSTRIAL PARK, MUKA KUNING | - | - | REINSTATE BUILDING FOR CIVIL, MECHANICAL & ELECTRICAL WORK | - | 2.691.810.000 |
RELOKASI GARDU PORTAL DAN PERUBAHAN MENJADI GARDU PAKET | RUKO GENTA 2 | - | - | RELOKASI GARDU PORTAL DAN PERUBAHAN MENJADI GARDU PAKET | - | 96.447.858 |
RENOVASI GARASI, REPAIR DINDING DAN PIPA AIR HUJAN DI VILLA PANBIL BLOK S.15 KAWASAN VILLA PANBIL | MUKA KUNING | - | - | RENOVASI GARASI, REPAIR DINDING DAN PIPA AIR HUJAN DI VILLA PANBIL BLOK S.15 KAWASAN VILLA PANBIL | - | 19.500.000 |
RENOVASI MASJID NADIM RAYA | KAWASAN MASJID NADIM RAYA BATAM | - | - | RENOVASI MASJID NADIM RAYA | - | 170.000.000 |
RENOVASI MASJID PERUMAHAN GRIYA PANORAMA PERMAI | PERUMAHAN GRIYA PANORAMA PERMAI | - | - | RENOVASI MASJID PERUMAHAN GRIYA PANORAMA PERMAI | - | 171.766.000 |
RENOVASI MASJID TAMAN RAYA BATAM CENTRE | KAWASAN MASJID TAMAN RAYA BATAM CENTRE | - | - | RENOVASI MASJID TAMAN RAYA BATAM CENTRE | - | 169.893.000 |
RENOVASI RUMAH TINGGAL BPK. HERRY JL. KILIMANJARO NO. 11 GRAND SUMMIT | JL. KILIMANJARO NO. 11 GRAND SUMMIT SOUTHLINK | - | - | RENOVASI RUMAH TINGGAL BPK. HERRY JL. KILIMANJARO NO. 11 GRAND SUMMIT | - | 3.200.000.000 |
REVITALISASI JARINGAN LISTRIK TERMINAL 1 | JL HANG NADIM NOMOR 1 , BATU BESAR | - | - | REVITALISASI JARINGAN LISTRIK TERMINAL 1 | - | 52.848.671.000 |
SEMENISASI BELAKANG POS KAMLING MENUJU TIBAN GLOBAL POKMAS LELE | RT 01 RW 03 KELURAHAN TIBAN INDAH | - | - | SEMENISASI BELAKANG POS KAMLING MENUJU TIBAN GLOBAL POKMAS LELE | - | 52.204.900 |
SEMENISASI BLOK I KSB MENTARAU RT 004 RW 010 (POKMAS PATAM 15 - 375M2) | KELURAHAN PATAM LESTARI | - | - | SEMENISASI BLOK I KSB MENTARAU RT 004 RW 010 (POKMAS PATAM 15 - 375M2) | - | 128.813.300 |
SEMENISASI GANG BLOK J 125 KSB MENTARAU RT 007 RW 010 POKMAS LESTARI 1 | RT 007 RW 010 KELURAHAN PATAM LESTARI | - | - | SEMENISASI GANG BLOK J 125 KSB MENTARAU RT 007 RW 010 POKMAS LESTARI 1 | - | 144.971.200 |
SEMENISASI GRIYA SAGULUNG PERMAI RT. 06 RW. 01 ( POKMAS 0106 - 320 M2 ) | KELURAHAN SAGULUNG KOTA | - | - | SEMENISASI GRIYA SAGULUNG PERMAI RT. 06 RW. 01 ( POKMAS 0106 - 320 M2 ) | - | 119.779.000 |
SEMENISASI JALAN | SEMENISASI JALAN LINGKUNGAN RT 01 RT 02 RT 03 RW 28 PERUM.BUMI KENCANA KELURAHAN BULIANG (POKMAS BUMI KENCANA BERSATU) VOLUME 640M2 | - | - | SEMENISASI JALAN | - | 195.593.000 |
SEMENISASI JALAN MASJID DARUL HIKMAH AKSES KE RADEN PATAH VOLUME 560 M2 ( POKMAS PELITA MADANI 4 ) | KELURAHAN KAMPUNG PELITA | - | - | SEMENISASI JALAN MASJID DARUL HIKMAH AKSES KE RADEN PATAH VOLUME 560 M2 ( POKMAS PELITA MADANI 4 ) | - | 208.577.600 |
SEMENISASI JALAN ( PAK SARANG ) KAMPUNG MELAYU RT.004/RW.004 SEKANAK RAYA 2021 (POKMAS DAU 1 -92 M2) | KELURAHAN SEKANAK RAYA | - | - | SEMENISASI JALAN ( PAK SARANG ) KAMPUNG MELAYU RT.004/RW.004 SEKANAK RAYA 2021 (POKMAS DAU 1 -92 M2) | - | 37.440.600 |
SEMENISASI JALAN (GANG BAITUL MAKMUR) KAMPUNG JAWA RT.003/RW.002 SEKANAK RAYA 2021(POKMASDAU3-173M2) | KELURAHAN SEKANAK RAYA | - | - | SEMENISASI JALAN (GANG BAITUL MAKMUR) KAMPUNG JAWA RT.003/RW.002 SEKANAK RAYA 2021(POKMASDAU3-173M2) | - | 70.406.130 |
SEMENISASI JALAN (JALAN BUKIT DEPAN KUA - DEPAN RUMAH IBU ATUN) RT.02/RW.05 (PIK 2020) | KELURAHAN TANJUNG SARI | - | - | SEMENISASI JALAN (JALAN BUKIT DEPAN KUA - DEPAN RUMAH IBU ATUN) RT.02/RW.05 (PIK 2020) | - | 77.313.320 |
SEMENISASI JALAN (JALAN UTAMA) KAMPUNG JAWA RT.002/RW.002.KEL.SEKANAK RAYA(PIK2020 )(POKMAS3 -300M2) | KELURAHAN SEKANAK RAYA | - | - | SEMENISASI JALAN (JALAN UTAMA) KAMPUNG JAWA RT.002/RW.002.KEL.SEKANAK RAYA(PIK2020 )(POKMAS3 -300M2) | - | 122.096.580 |
SEMENISASI JALAN (MENUJU RUMAH SDR. M. GADUH) RT.03/RW.03 (PIK 2020) (POKMAS TG SARI IV - 68 M2) | KELURAHAN TANJUNG SARI | - | - | SEMENISASI JALAN (MENUJU RUMAH SDR. M. GADUH) RT.03/RW.03 (PIK 2020) (POKMAS TG SARI IV - 68 M2) | - | 27.674.310 |
SEMENISASI JALAN (SIMPANG APEK ROTI SAMPAI PAK AYUB RT.02/RW.02 DAN RT.02/RW.05) | KELURAHAN TANJUNG SARI | - | - | SEMENISASI JALAN (SIMPANG APEK ROTI SAMPAI PAK AYUB RT.02/RW.02 DAN RT.02/RW.05) | - | 39.070.950 |
SEMENISASI JALAN 2 TITIK. KAMPUNG JAWA WAHDINAH RT.02/ RW.03 SEKANAK RAYA (2021)(POKMASDAU4 -189 M2) | KELURAHAN SEKANAK RAYA | - | - | SEMENISASI JALAN 2 TITIK. KAMPUNG JAWA WAHDINAH RT.02/ RW.03 SEKANAK RAYA (2021)(POKMASDAU4 -189 M2) | - | 76.919.510 |
SEMENISASI JALAN BALOI CENTRE RT.08 RW.03 ( POKMAS 5 BALOI INDAH ) | KELURAHAN BALOI INDAH | - | - | SEMENISASI JALAN BALOI CENTRE RT.08 RW.03 ( POKMAS 5 BALOI INDAH ) | - | 110.389.500 |
SEMENISASI JALAN BAYAM RT.002 RW.011 VOL.508 M2-POKMAS BAYAM PERMAI | KELURAHAN LUBUK BAJA KOTA | - | - | SEMENISASI JALAN BAYAM RT.002 RW.011 VOL.508 M2-POKMAS BAYAM PERMAI | - | 189.465.100 |
SEMENISASI JALAN BETON | RT 003 RW 003 PULAU AKAR | - | - | SEMENISASI JALAN BETON | - | 96.752.000 |
SEMENISASI JALAN BETON | RT 002 RW 005 PULAU PANJANG BARAT | - | - | SEMENISASI JALAN BETON | - | 98.290.000 |
SEMENISASI JALAN BETON | RT 002 RW 006 PULAU PANJANG TIMUR | - | - | SEMENISASI JALAN BETON | - | 60.938.000 |
SEMENISASI JALAN BETON PERUM LEGENDA MALAKA RT.001 RT.002 RW.003 , 580 M2 (SEROJA III) | KELURAHAN BALOI PERMAI | - | - | SEMENISASI JALAN BETON PERUM LEGENDA MALAKA RT.001 RT.002 RW.003 , 580 M2 (SEROJA III) | - | 217.229.100 |
SEMENISASI JALAN BETON PERUM LEGENDA MALAKA RT.001 RW.003 (POKMAS POKOK BAMBU CERIA) | KELURAHAN BALOI PERMAI | - | - | SEMENISASI JALAN BETON PERUM LEGENDA MALAKA RT.001 RW.003 (POKMAS POKOK BAMBU CERIA) | - | 119.830.700 |
SEMENISASI JALAN BETON PERUM LEGENDA MALAKA RT.008 RW.004 (POKMAS HANG KASTURI 08) | KELURAHAN BALOI PERMAI | - | - | SEMENISASI JALAN BETON PERUM LEGENDA MALAKA RT.008 RW.004 (POKMAS HANG KASTURI 08) | - | 149.820.000 |
SEMENISASI JALAN BETON PERUM OMA BATAM CENTRE RT.001 RW.012 (POKMAS OBC KU) | KELURAHAN BALOI PERMAI | - | - | SEMENISASI JALAN BETON PERUM OMA BATAM CENTRE RT.001 RW.012 (POKMAS OBC KU) | - | 224.693.700 |
SEMENISASI JALAN BETON PERUM OMA BATAM CENTRE RT.001 RW.012 (POKMAS OMA JAYA) | KELURAHAN BALOI PERMAI | - | - | SEMENISASI JALAN BETON PERUM OMA BATAM CENTRE RT.001 RW.012 (POKMAS OMA JAYA) | - | 119.792.200 |
SEMENISASI JALAN BETON PERUM TAMAN HANG TUAH RT.002 RW.006 (POKMAS TUAH BERSAMA) | KELURAHAN BALOI PERMAI | - | - | SEMENISASI JALAN BETON PERUM TAMAN HANG TUAH RT.002 RW.006 (POKMAS TUAH BERSAMA) | - | 119.763.600 |
SEMENISASI JALAN BETON PERUM TAMAN HANG TUAH RT.004 RW.006 (POKMAS SEJAHTERA BERSAMA) | KELURAHAN BALOI PERMAI | - | - | SEMENISASI JALAN BETON PERUM TAMAN HANG TUAH RT.004 RW.006 (POKMAS SEJAHTERA BERSAMA) | - | 217.231.300 |
SEMENISASI JALAN BETON PERUM TAMAN MEDITERANIA RT.008 RW.008 (POKMAS BEJO) | KELURAHAN BALOI PERMAI | - | - | SEMENISASI JALAN BETON PERUM TAMAN MEDITERANIA RT.008 RW.008 (POKMAS BEJO) | - | 217.230.200 |
SEMENISASI JALAN BETON PERUM VILLA HANG LEKIR RT.004 RW.005 (POKMAS GARUDA) | KELURAHAN BALOI PERMAI | - | - | SEMENISASI JALAN BETON PERUM VILLA HANG LEKIR RT.004 RW.005 (POKMAS GARUDA) | - | 143.608.300 |
SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT 001 RT 002 RW 007 ( POKMAS PURI JAYA ) | KELURAHAN BALOI PERMAI | - | - | SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT 001 RT 002 RW 007 ( POKMAS PURI JAYA ) | - | 217.236.800 |
SEMENISASI JALAN BETON RT 001 RW 001 (POKMAS BULANG LINTANG 35 - 660 M2) | RT 001 RW 001 BULANG LINTANG | - | - | SEMENISASI JALAN BETON RT 001 RW 001 (POKMAS BULANG LINTANG 35 - 660 M2) | - | 268.342.000 |
SEMENISASI JALAN BETON RT 002 RW 001 (POKMAS BULANG LINTANG 36 - 602 M2) | RT 002 RW 001 BULANG LINTANG | - | - | SEMENISASI JALAN BETON RT 002 RW 001 (POKMAS BULANG LINTANG 36 - 602 M2) | - | 244.809.000 |
SEMENISASI JALAN BETON RT 003 RW 001 (POKMAS BULANG LINTANG 34 - 430 M2) | RT 003 RW 001 BULANG LINTANG | - | - | SEMENISASI JALAN BETON RT 003 RW 001 (POKMAS BULANG LINTANG 34 - 430 M2) | - | 174.934.000 |
SEMENISASI JALAN BETON RT 004 RW 001 (POKMAS BULANG LINTANG 37 - 430 M2) | RT 004 RW 001 BULANG LINTANG | - | - | SEMENISASI JALAN BETON RT 004 RW 001 (POKMAS BULANG LINTANG 37 - 430 M2) | - | 174.934.000 |
SEMENISASI JALAN BETON RT 005 RW 002 (POKMAS BATU LEGONG 43 - 160 M2) | RT 005 RW 002 PULAU SERAYA | - | - | SEMENISASI JALAN BETON RT 005 RW 002 (POKMAS BATU LEGONG 43 - 160 M2) | - | 65.055.000 |
SEMENISASI JALAN BETON RT 006 RW 002 (POKMAS BULANG LINTANG 38 - 430 M2) | RT 006 RW 002 BULANG KEBAM | - | - | SEMENISASI JALAN BETON RT 006 RW 002 (POKMAS BULANG LINTANG 38 - 430 M2) | - | 174.934.000 |
SEMENISASI JALAN BETON RT 006 RW 003 (POKMAS BATU LEGONG 41 - 137 M2) | RT 006 RW 003 PULAU LABU | - | - | SEMENISASI JALAN BETON RT 006 RW 003 (POKMAS BATU LEGONG 41 - 137 M2) | - | 55.745.000 |
SEMENISASI JALAN BETON RT 007 RW 002 (POKMAS BULANG LINTANG 39 - 396 M2) | RT 007 RW 002 BULANG KEBAM | - | - | SEMENISASI JALAN BETON RT 007 RW 002 (POKMAS BULANG LINTANG 39 - 396 M2) | - | 160.916.000 |
SEMENISASI JALAN BETON RT 007 RW 003 (POKMAS BATU LEGONG 42 - 181 M2) | RT 007 RW 003 PULAU LABU | - | - | SEMENISASI JALAN BETON RT 007 RW 003 (POKMAS BATU LEGONG 42 - 181 M2) | - | 73.662.000 |
SEMENISASI JALAN BETON RT 007 RW 003 (POKMAS BATU LEGONG 44 - 70 M) | RT 006 RW 003 PULAU LABU | - | - | SEMENISASI JALAN BETON RT 007 RW 003 (POKMAS BATU LEGONG 44 - 70 M) | - | 28.480.000 |
SEMENISASI JALAN BETON RT 007 RW 003 (POKMAS BATU LEGONG 45 - 225 M) | RT 007 RW 003 PULAU LABU | - | - | SEMENISASI JALAN BETON RT 007 RW 003 (POKMAS BATU LEGONG 45 - 225 M) | - | 91.566.000 |
SEMENISASI JALAN BETON RT 007 RW 003 (POKMAS BATU LEGONG 46 - 31.50 M) | RT 007 RW 003 PULAU LABU | - | - | SEMENISASI JALAN BETON RT 007 RW 003 (POKMAS BATU LEGONG 46 - 31.50 M) | - | 12.810.000 |
SEMENISASI JALAN BLOK A-B JALAN PASAR RT 01 RW 01 ( POKMAS PELITA MADANI 1 ) | KELURAHAN KAMPUNG PELITA | - | - | SEMENISASI JALAN BLOK A-B JALAN PASAR RT 01 RW 01 ( POKMAS PELITA MADANI 1 ) | - | 37.385.700 |
SEMENISASI JALAN DR SIMPANG SIKIN S/D MULYONO RT.003 RW.001 AIR RAJA (POKMAS AIR RAJA 13 - 195 M²) | KELURAHAN AIR RAJA | - | - | SEMENISASI JALAN DR SIMPANG SIKIN S/D MULYONO RT.003 RW.001 AIR RAJA (POKMAS AIR RAJA 13 - 195 M²) | - | 79.365.000 |
SEMENISASI JALAN DR WAGIMAN SAMPAI KASPAN RT.001 / RW.002 AIR RAJA (POKMAS AIR RAJA 8 - 705 M²) | KELURAHAN AIR RAJA | - | - | SEMENISASI JALAN DR WAGIMAN SAMPAI KASPAN RT.001 / RW.002 AIR RAJA (POKMAS AIR RAJA 8 - 705 M²) | - | 286.935.000 |
SEMENISASI JALAN GANG BLOK J 107A KSB MENTARAU RT 007 RW 10 (POKMAS PATAM 16 - 469M2) | KELURAHAN PATAM LESTARI | - | - | SEMENISASI JALAN GANG BLOK J 107A KSB MENTARAU RT 007 RW 10 (POKMAS PATAM 16 - 469M2) | - | 160.754.000 |
SEMENISASI JALAN GANG GANG 5 TITIK PULAU NGENANG RT 02 RW 01 - POKMAS KUDA LAUT - 450 M2 | NGENANG | - | - | SEMENISASI JALAN GANG GANG 5 TITIK PULAU NGENANG RT 02 RW 01 - POKMAS KUDA LAUT - 450 M2 | - | 183.133.000 |
SEMENISASI JALAN GANG KP. TANJUNG RT 03 RW 01 PULAU NGENANG - POKMAS TANJUNG HARAPAN - 482 M2 | NGENANG | - | - | SEMENISASI JALAN GANG KP. TANJUNG RT 03 RW 01 PULAU NGENANG - POKMAS TANJUNG HARAPAN - 482 M2 | - | 196.168.000 |
SEMENISASI JALAN GANG PULAU NGENANG RT 03 RW 01 DEKAT RUMAH R. SULAIMAN - POKMAS DIRAJA - 256 M2 | NGENANG | - | - | SEMENISASI JALAN GANG PULAU NGENANG RT 03 RW 01 DEKAT RUMAH R. SULAIMAN - POKMAS DIRAJA - 256 M2 | - | 104.188.000 |
SEMENISASI JALAN GN. KERINCI ( POKMAS PELITA MADANI 2 ) | KELURAHAN KAMPUNG PELITA | - | - | SEMENISASI JALAN GN. KERINCI ( POKMAS PELITA MADANI 2 ) | - | 48.156.900 |
SEMENISASI JALAN KAMPUNG TERIH RT.02 RW.05 (POKMAS RANJUNGAN) 411 M2 | KELURAHAN SAMBAU | - | - | SEMENISASI JALAN KAMPUNG TERIH RT.02 RW.05 (POKMAS RANJUNGAN) 411 M2 | - | 153.869.100 |
SEMENISASI JALAN KAMPUNG UTAMA BAWAH BLOK F RT.003 RW.007 VOL.404 M2-POKMAS UTAMA PERMAI II | KELURAHAN LUBUK BAJA KOTA | - | - | SEMENISASI JALAN KAMPUNG UTAMA BAWAH BLOK F RT.003 RW.007 VOL.404 M2-POKMAS UTAMA PERMAI II | - | 151.240.100 |
SEMENISASI JALAN KAMPUNG UTAMA BAWAH RT.001 RW.007 VOL. 152 M2 POKMAS UTAMA PERMAI I | KELURAHAN LUBUK BAJA KOTA | - | - | SEMENISASI JALAN KAMPUNG UTAMA BAWAH RT.001 RW.007 VOL. 152 M2 POKMAS UTAMA PERMAI I | - | 56.906.300 |
SEMENISASI JALAN KAMPUNG UTAMA BAWAH RT.003 RW.007 VOL. 560 M2 POKMAS UTAMA PERMAI III | KELURAHAN LUBUK BAJA KOTA | - | - | SEMENISASI JALAN KAMPUNG UTAMA BAWAH RT.003 RW.007 VOL. 560 M2 POKMAS UTAMA PERMAI III | - | 208.577.600 |
SEMENISASI JALAN KAMPUNG UTAMA BAWAH RT.004 RW.007 VOL. 527 M2 POKMAS UTAMA PERMAI IV | KELURAHAN LUBUK BAJA KOTA | - | - | SEMENISASI JALAN KAMPUNG UTAMA BAWAH RT.004 RW.007 VOL. 527 M2 POKMAS UTAMA PERMAI IV | - | 196.449.000 |
SEMENISASI JALAN KAV. BUKIT MAKMUR RT 002 RW 013 ( 360 M² ) POKMAS MAKMUR JAYA ABADI | KAV.BUKIT MAKMUR RT 002 RW 013 TANJUNG SENGKUANG | - | - | SEMENISASI JALAN KAV. BUKIT MAKMUR RT 002 RW 013 ( 360 M² ) POKMAS MAKMUR JAYA ABADI | - | 134.321.000 |
SEMENISASI JALAN KAV.PATAM LESTARI RT 001 RW 001 (POKMAS PATAM 8 - 580M2) | KELURAHAN PATAM LESTARI | - | - | SEMENISASI JALAN KAV.PATAM LESTARI RT 001 RW 001 (POKMAS PATAM 8 - 580M2) | - | 198.339.900 |
SEMENISASI JALAN KAVLING BIDA KABIL RT. 001 RW. 017 (POKMAS KABIL RAYA 15) - 140 M2 | KELURAHAN KABIL | - | - | SEMENISASI JALAN KAVLING BIDA KABIL RT. 001 RW. 017 (POKMAS KABIL RAYA 15) - 140 M2 | - | 52.433.700 |
SEMENISASI JALAN KAVLING BIDA KABIL RT. 003 RW. 016 (POKMAS KABIL RAYA 43) 140 M2 | KELURAHAN KABIL | - | - | SEMENISASI JALAN KAVLING BIDA KABIL RT. 003 RW. 016 (POKMAS KABIL RAYA 43) 140 M2 | - | 52.417.200 |
SEMENISASI JALAN KAVLING BIDA KABIL RT. 003 RW. 017 (POKMAS KABIL RAYA 1) 140 M2 | KELURAHAN KABIL | - | - | SEMENISASI JALAN KAVLING BIDA KABIL RT. 003 RW. 017 (POKMAS KABIL RAYA 1) 140 M2 | - | 52.433.700 |
SEMENISASI JALAN KAVLING BIDA KABIL RT. 003 RW. 018 (POKMAS KABIL RAYA 17) - 200 M2 | KELURAHAN KABIL | - | - | SEMENISASI JALAN KAVLING BIDA KABIL RT. 003 RW. 018 (POKMAS KABIL RAYA 17) - 200 M2 | - | 74.902.300 |
SEMENISASI JALAN KAVLING BUKIT INDAH RT 001 RW 005 - POKMAS KABIL RAYA 08 - 140 M2 | KABIL | - | - | SEMENISASI JALAN KAVLING BUKIT INDAH RT 001 RW 005 - POKMAS KABIL RAYA 08 - 140 M2 | - | 52.432.600 |
SEMENISASI JALAN KAVLING BUKIT INDAH RT 002 RW 005 - POKMAS KABIL RAYA 36 - 140 M2 | KABIL | - | - | SEMENISASI JALAN KAVLING BUKIT INDAH RT 002 RW 005 - POKMAS KABIL RAYA 36 - 140 M2 | - | 52.434.800 |
SEMENISASI JALAN KAVLING BUKIT PELITA INDAH RT. 006 RW 020 - POKMAS KABIL RAYA 20 = 140 M2 | KABIL | - | - | SEMENISASI JALAN KAVLING BUKIT PELITA INDAH RT. 006 RW 020 - POKMAS KABIL RAYA 20 = 140 M2 | - | 52.430.400 |
SEMENISASI JALAN KAVLING KABIL INDAH RT. 003 RW. 003 - POKMAS KABIL RAYA 3 - 140M2 | KABIL | - | - | SEMENISASI JALAN KAVLING KABIL INDAH RT. 003 RW. 003 - POKMAS KABIL RAYA 3 - 140M2 | - | 52.432.600 |
SEMENISASI JALAN KAVLING SENJULUNG BARU RT. 003 RW. 019 - POKMAS KABIL RAYA 16 - 140 M2 | KABIL | - | - | SEMENISASI JALAN KAVLING SENJULUNG BARU RT. 003 RW. 019 - POKMAS KABIL RAYA 16 - 140 M2 | - | 52.428.200 |
SEMENISASI JALAN KAVLING SENJULUNG RT. 002 RW. 010 - POKMAS KABIL RAYA 23 - 140 M2 | KABIL | - | - | SEMENISASI JALAN KAVLING SENJULUNG RT. 002 RW. 010 - POKMAS KABIL RAYA 23 - 140 M2 | - | 52.397.400 |
SEMENISASI JALAN KAVLING SENJULUNG RT. 002 RW. 011 - POKMAS KABIL RAYA 38 - 140 M2 | KABIL | - | - | SEMENISASI JALAN KAVLING SENJULUNG RT. 002 RW. 011 - POKMAS KABIL RAYA 38 - 140 M2 | - | 52.428.200 |
SEMENISASI JALAN KAVLING SENJULUNG RT. 003 RW. 011 - POKMAS KABIL RAYA 31 - 100 M2 | KABIL | - | - | SEMENISASI JALAN KAVLING SENJULUNG RT. 003 RW. 011 - POKMAS KABIL RAYA 31 - 100 M2 | - | 37.438.500 |
SEMENISASI JALAN KAVLING SENJULUNG RT. 004 RW. 010 - POKMAS KABIL RAYA 32 - 140M2 | KABIL | - | - | SEMENISASI JALAN KAVLING SENJULUNG RT. 004 RW. 010 - POKMAS KABIL RAYA 32 - 140M2 | - | 52.397.400 |
SEMENISASI JALAN KAVLING SENJULUNG RT. 004 RW. 011 - POKMAS KABIL RAYA 42 - 144 M2 | KABIL | - | - | SEMENISASI JALAN KAVLING SENJULUNG RT. 004 RW. 011 - POKMAS KABIL RAYA 42 - 144 M2 | - | 53.933.000 |
SEMENISASI JALAN KAVLING SENJULUNG RT. 004 RW. 012 (POKMAS KABIL RAYA 28) VOLUME 204 M2 | KELURAHAN KABIL | - | - | SEMENISASI JALAN KAVLING SENJULUNG RT. 004 RW. 012 (POKMAS KABIL RAYA 28) VOLUME 204 M2 | - | 76.400.500 |
SEMENISASI JALAN KEDELAI RT.001 RW.011 ( POKMAS KEDELAI 1 ) | LUBUK BAJA KOTA | - | - | SEMENISASI JALAN KEDELAI RT.001 RW.011 ( POKMAS KEDELAI 1 ) | - | 57.682.900 |
SEMENISASI JALAN KOMPLEK BATAM PARK RT.002 RW.005 VOL.312 M2-POKMAS BATAM PERMAI | KELURAHAN LUBUK BAJA KOTA | - | - | SEMENISASI JALAN KOMPLEK BATAM PARK RT.002 RW.005 VOL.312 M2-POKMAS BATAM PERMAI | - | 116.172.100 |
SEMENISASI JALAN KOMPLEK BUKIT MAS BLOK MELATI/LOTUS RT.002 RW.004 VOL.560 M2-POKMAS MELATI PERMAI | KELURAHAN LUBUK BAJA KOTA | - | - | SEMENISASI JALAN KOMPLEK BUKIT MAS BLOK MELATI/LOTUS RT.002 RW.004 VOL.560 M2-POKMAS MELATI PERMAI | - | 208.577.600 |
SEMENISASI JALAN KOMPLEK NAGOYA PERMAI BLOK A RT.001 RW.005 ( POKMAS NAGOYA PERMAI ) | LUBUK BAJA KOTA | - | - | SEMENISASI JALAN KOMPLEK NAGOYA PERMAI BLOK A RT.001 RW.005 ( POKMAS NAGOYA PERMAI ) | - | 179.173.500 |
SEMENISASI JALAN LABUN RT 01 RW 01 KELURAHAN PEMPING ( POKMAS DAU LABUN 2 - 787 M2 ) | KELURAHAN PEMPING | - | - | SEMENISASI JALAN LABUN RT 01 RW 01 KELURAHAN PEMPING ( POKMAS DAU LABUN 2 - 787 M2 ) | - | 320.303.420 |
SEMENISASI JALAN LINGKAR PULAU LENGKANG RT.001/RW.005. KEL. SEKANAK RAYA (PIK 2020)(POKMAS 4 -270M2) | KELURAHAN SEKANAK RAYA | - | - | SEMENISASI JALAN LINGKAR PULAU LENGKANG RT.001/RW.005. KEL. SEKANAK RAYA (PIK 2020)(POKMAS 4 -270M2) | - | 109.886.710 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK MAS 1 BLOK I RT.02 RW.06(SAPU LIDI 2-580M2) | KELURAHAN TAMAN BALOI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK MAS 1 BLOK I RT.02 RW.06(SAPU LIDI 2-580M2) | - | 217.175.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK C RT.03 RW.15(CENDANA 3-530M2) | KELURAHAN TAMAN BALOI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK C RT.03 RW.15(CENDANA 3-530M2) | - | 198.475.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK DAHLIA RT.02 RW.15(DAHLIA-530M2) | KELURAHAN TAMAN BALOI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK DAHLIA RT.02 RW.15(DAHLIA-530M2) | - | 198.500.500 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BANDAR SRIMAS RT.01 RW.12 TAHUN 2020(EMEN-132M2) | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN BANDAR SRIMAS RT.01 RW.12 TAHUN 2020(EMEN-132M2) | - | 49.435.100 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BANDAR SRIMAS RT.03 RW.12 TAHUN 2020(BERKAH-144M2) | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN BANDAR SRIMAS RT.03 RW.12 TAHUN 2020(BERKAH-144M2) | - | 53.874.700 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BUKIT JODOH KAMPUNG MELAYU RT.01 RW.01 TAHUN 2020(DUA SAUDARA | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN BUKIT JODOH KAMPUNG MELAYU RT.01 RW.01 TAHUN 2020(DUA SAUDARA | - | 26.193.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GOLDEN LAND BLOK C RT.01 RW.13 (GOLDEN LAND 01-530M2) | KELURAHAN TAMAN BALOI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN GOLDEN LAND BLOK C RT.01 RW.13 (GOLDEN LAND 01-530M2) | - | 198.471.900 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GOLDEN LAND BLOK E RT.02 RW.13(GOLDEN MAJU-348M2) | KELURAHAN TAMAN BALOI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN GOLDEN LAND BLOK E RT.02 RW.13(GOLDEN MAJU-348M2) | - | 130.313.700 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN NUSA JAYA RT.03 RW.06 TAHUN 2020(NURLELA-400M2) | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN NUSA JAYA RT.03 RW.06 TAHUN 2020(NURLELA-400M2) | - | 149.813.400 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN NUSA JAYA RT.04 RW.06 2020(NUSA INDAH-320M2) | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN NUSA JAYA RT.04 RW.06 2020(NUSA INDAH-320M2) | - | 119.851.600 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN PALM REGENCY TAHAP 1 BLOK A RT.01 RW.08(PALM REGENCY SEJAHTER | KELURAHAN TAMAN BALOI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN PALM REGENCY TAHAP 1 BLOK A RT.01 RW.08(PALM REGENCY SEJAHTER | - | 116.080.800 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN PALM REGENCY TAHAP 1 BLOK B RT.01 RW.08(KEJORA-335M2) | KELURAHAN TAMAN BALOI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN PALM REGENCY TAHAP 1 BLOK B RT.01 RW.08(KEJORA-335M2) | - | 125.466.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.003 RW.004 TAHUN 2020(MAWAR-275M2) | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.003 RW.004 TAHUN 2020(MAWAR-275M2) | - | 92.502.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.006 RW.008 TAHUN 2020(PONDOK ASRI 06-506.48M2) | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.006 RW.008 TAHUN 2020(PONDOK ASRI 06-506.48M2) | - | 189.671.900 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.01 RW.04 TAHUN 2020 (DAU)(MELATI-357M2) | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.01 RW.04 TAHUN 2020 (DAU)(MELATI-357M2) | - | 133.706.100 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.02 RW.08 TAHUN 2020 (PONDOK ASRI 2-400M2) | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.02 RW.08 TAHUN 2020 (PONDOK ASRI 2-400M2) | - | 149.789.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.04/RW.08 TAHUN 2020 (PONDOK ASRI 04-360M2) | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.04/RW.08 TAHUN 2020 (PONDOK ASRI 04-360M2) | - | 134.835.800 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.05 RW.08 TAHUN 2020 (POKMAS PONDOK ASRI 05-180 | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK ASRI RT.05 RW.08 TAHUN 2020 (POKMAS PONDOK ASRI 05-180 | - | 67.376.100 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK INDAH BLOK B DAN D RT.01 RW.07 (PONDOK INDAH 5-557 M2) | KELURAHAN TAMAN BALOI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN PONDOK INDAH BLOK B DAN D RT.01 RW.07 (PONDOK INDAH 5-557 M2) | - | 208.538.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN MARCHELIA BLOK D RT.04 RW.09 (KELENGKENG-530M2) | KELURAHAN TAMAN BALOI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN MARCHELIA BLOK D RT.04 RW.09 (KELENGKENG-530M2) | - | 198.485.100 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN PUTRI INDAH BLOK B RT.01 RW.05 (DAU TAMBAHAN)(MERPATI P | KELURAHAN TAMAN BALOI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN PUTRI INDAH BLOK B RT.01 RW.05 (DAU TAMBAHAN)(MERPATI P | - | 149.781.500 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN PUTRI INDAH BLOK B RT.01 RW.05(TAMAN PUTRI-566,24M2) | KELURAHAN TAMAN BALOI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN PUTRI INDAH BLOK B RT.01 RW.05(TAMAN PUTRI-566,24M2) | - | 211.987.600 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN VILLA MAS RT.02 RW.09 TAHUN 2020 (MAKIN ASIK SAJA-568M2) | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN VILLA MAS RT.02 RW.09 TAHUN 2020 (MAKIN ASIK SAJA-568M2) | - | 212.727.900 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN VILLA MAS RT.04 RW.09 TAHUN 2020 (GUYUB RUKUN-424M2) | KELURAHAN SUNGAI PANAS | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN VILLA MAS RT.04 RW.09 TAHUN 2020 (GUYUB RUKUN-424M2) | - | 158.791.600 |
SEMENISASI JALAN LINGKUNGAN (POKMAS TAMAN ANUGERAH 3) | RT. 03 RW. 15 PERUM TAMAN ANUGRAH | - | - | SEMENISASI JALAN LINGKUNGAN (POKMAS TAMAN ANUGERAH 3) | - | 131.811.900 |
SEMENISASI JALAN LINGKUNGAN 440 M2 (PSPK), POKMAS CIPTA ASRI RT.3 RW.12 | RT.03 RW.12 PEEUM. TAMAN CIPTA ASRI I | - | - | SEMENISASI JALAN LINGKUNGAN 440 M2 (PSPK), POKMAS CIPTA ASRI RT.3 RW.12 | - | 164.800.900 |
SEMENISASI JALAN LINGKUNGAN AIR RAJA TANJUNG SENGKUANG RT 002 RW 009 | AIR RAJA TANJUNG SENGKUANG RT 002 RW 009 KELURAHAN TANJUNG SENGKUANG KECAMATAN BATU AMPAR | - | - | SEMENISASI JALAN LINGKUNGAN AIR RAJA TANJUNG SENGKUANG RT 002 RW 009 | - | 9.338.890 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN II RT.04 RW.09 | RT 04 RW 09 BENGKONG HARAPAN II - BENGKONG LAUT | - | - | SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN II RT.04 RW.09 | - | 104.038.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG INDAH II RW 01 , RT 06 DAN RT 08 TANJAK SADAI 9 - 2021 | RW 01 RT 06 DAN RT 08 | - | - | SEMENISASI JALAN LINGKUNGAN BENGKONG INDAH II RW 01 , RT 06 DAN RT 08 TANJAK SADAI 9 - 2021 | - | 209.740.300 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RW 03 RT 02 TANJAK SADAI 7 - 2021 | RW 03 RT 02 | - | - | SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RW 03 RT 02 TANJAK SADAI 7 - 2021 | - | 219.836.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RW 03 RT 03 TANJAK SADAI 1 - 2021 | RT 03 RW 03 | - | - | SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RW 03 RT 03 TANJAK SADAI 1 - 2021 | - | 209.638.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG LAUT RT.01 RW.01 | RT 01 RW 01 BENGKONG LAUT | - | - | SEMENISASI JALAN LINGKUNGAN BENGKONG LAUT RT.01 RW.01 | - | 215.272.200 |
SEMENISASI JALAN LINGKUNGAN BENGKONG LAUT RT.02 RW.01 | RT 02 RW 01 - BENGKONG LAUT | - | - | SEMENISASI JALAN LINGKUNGAN BENGKONG LAUT RT.02 RW.01 | - | 217.302.800 |
SEMENISASI JALAN LINGKUNGAN BENGKONG PERMAI RT.03 RW.02 (JALAN MENUJU PUSTU) | RT 03 RW 02 JL BENGKONG PERMAI - BENGKONG LAUT | - | - | SEMENISASI JALAN LINGKUNGAN BENGKONG PERMAI RT.03 RW.02 (JALAN MENUJU PUSTU) | - | 28.054.400 |
SEMENISASI JALAN LINGKUNGAN BENGKONG PERMAI RT.04 RW.02 | RT 04 RW 02 BENGKONG PERMAI - BENGKONG LAUT | - | - | SEMENISASI JALAN LINGKUNGAN BENGKONG PERMAI RT.04 RW.02 | - | 206.099.300 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RW 10 RT 01 TANJAK SADAI 2 - 2021 | RW 10 RT 01 | - | - | SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RW 10 RT 01 TANJAK SADAI 2 - 2021 | - | 209.667.700 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RW 10 RT 03 TANJAK SADAI 3 - 2021 | RW 10 RT 03 | - | - | SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RW 10 RT 03 TANJAK SADAI 3 - 2021 | - | 209.576.400 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RW 18 RT 01 TANJAK SADAI 4 - 2021 | RW 18 RT 01 | - | - | SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RW 18 RT 01 TANJAK SADAI 4 - 2021 | - | 209.721.600 |
SEMENISASI JALAN LINGKUNGAN BIDADARI RW 17 MANGSANG (POKMAS BELIBIS - 500 M2) | KAVLING BIDADARI RW 17 MANGSANG | - | - | SEMENISASI JALAN LINGKUNGAN BIDADARI RW 17 MANGSANG (POKMAS BELIBIS - 500 M2) | - | 169.921.000 |
SEMENISASI JALAN LINGKUNGAN BLOK IV GANG 1 RT 003 RW 002 ( BALAM ) | BATU SELICIN | - | - | SEMENISASI JALAN LINGKUNGAN BLOK IV GANG 1 RT 003 RW 002 ( BALAM ) | - | 198.287.100 |
SEMENISASI JALAN LINGKUNGAN BLOK S RW 15 MANGSANG (POKMAS CAMAR - 580 M2) | BLOK S RW 15 MANGSANG | - | - | SEMENISASI JALAN LINGKUNGAN BLOK S RW 15 MANGSANG (POKMAS CAMAR - 580 M2) | - | 173.664.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 002 RW 004 (POKMAS MELATI II - 250 M2) | KELURAHAN TANJUNG RIAU | - | - | SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 002 RW 004 (POKMAS MELATI II - 250 M2) | - | 85.009.100 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 003 RW 004 (POKMAS MELATI III - 150 M2) | KELURAHAN TANJUNG RIAU | - | - | SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 003 RW 004 (POKMAS MELATI III - 150 M2) | - | 51.505.300 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BELIAN TUA RT.01 RW.06 (KAMPUNG BELIAN TUA KSB-400M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN KAMPUNG BELIAN TUA RT.01 RW.06 (KAMPUNG BELIAN TUA KSB-400M2) | - | 149.760.600 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BELIAN TUA RT.01, RT. 02 DAN RT.03 RW.02(BELIAN MAJU-580M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN KAMPUNG BELIAN TUA RT.01, RT. 02 DAN RT.03 RW.02(BELIAN MAJU-580M2) | - | 149.779.300 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG TUA CUNTING (POKMAS CUNTING MAJU) VOL-375M2 | KELURAHAN TANJUNG UNCANG | - | - | SEMENISASI JALAN LINGKUNGAN KAMPUNG TUA CUNTING (POKMAS CUNTING MAJU) VOL-375M2 | - | 128.027.900 |
SEMENISASI JALAN LINGKUNGAN KAV. FLAMBOYAN RT.07 RW.02 ( 467 M² ) | RT 07 RW 02 KAV. FLAMBOYAN KEL. SUNGAI PELUNGGUT | - | - | SEMENISASI JALAN LINGKUNGAN KAV. FLAMBOYAN RT.07 RW.02 ( 467 M² ) | - | 168.785.100 |
SEMENISASI JALAN LINGKUNGAN KAV. SEI TERING I RT 003 RW 006 | KAV. SEI TERING I RT 003 RW 006 KELURAHAN TANJUNG SENGKUANG, KECAMATAN BATU AMPAR | - | - | SEMENISASI JALAN LINGKUNGAN KAV. SEI TERING I RT 003 RW 006 | - | 78.499.300 |
SEMENISASI JALAN LINGKUNGAN KAVLING SAGULUNG BARU (POKMAS SEI BINTI RT.06 RW.05-450M2) | KELURAHAN SUNGAI BINTI | - | - | SEMENISASI JALAN LINGKUNGAN KAVLING SAGULUNG BARU (POKMAS SEI BINTI RT.06 RW.05-450M2) | - | 153.536.900 |
SEMENISASI JALAN LINGKUNGAN KAVLING SAGULUNG BARU RT. 01 RW. 08 (POKMAS SEI BINTI RT.01 RW.08-380M2) | KELURAHAN SUNGAI BINTI | - | - | SEMENISASI JALAN LINGKUNGAN KAVLING SAGULUNG BARU RT. 01 RW. 08 (POKMAS SEI BINTI RT.01 RW.08-380M2) | - | 130.345.600 |
SEMENISASI JALAN LINGKUNGAN KAVLING SAGULUNG BARU RT. 01 RW. 17 (POKMAS SEI BINTI RT.01 RW.17-352M2) | KELURAHAN SUNGAI BINTI | - | - | SEMENISASI JALAN LINGKUNGAN KAVLING SAGULUNG BARU RT. 01 RW. 17 (POKMAS SEI BINTI RT.01 RW.17-352M2) | - | 127.084.100 |
SEMENISASI JALAN LINGKUNGAN KAVLING SAGULUNG BARU RT. 04 RW. 05 (POKMAS SEI BINTI RT.04 RW.05-470M2) | KELURAHAN SUNGAI BINTI | - | - | SEMENISASI JALAN LINGKUNGAN KAVLING SAGULUNG BARU RT. 04 RW. 05 (POKMAS SEI BINTI RT.04 RW.05-470M2) | - | 129.984.800 |
SEMENISASI JALAN LINGKUNGAN KAVLING SAGULUNG BARU RT03 RW09 (POKMAS SEI BINTI RT.03 RW.09-450M2) | KELURAHAN SUNGAI BINTI | - | - | SEMENISASI JALAN LINGKUNGAN KAVLING SAGULUNG BARU RT03 RW09 (POKMAS SEI BINTI RT.03 RW.09-450M2) | - | 151.725.200 |
SEMENISASI JALAN LINGKUNGAN KAVLING TUNAS REGENCY RT. 01 RW. 14 (POKMAS SEI BINTI RT.01 RW.14-484M2) | KELURAHAN SUNGAI BINTI | - | - | SEMENISASI JALAN LINGKUNGAN KAVLING TUNAS REGENCY RT. 01 RW. 14 (POKMAS SEI BINTI RT.01 RW.14-484M2) | - | 167.673.000 |
SEMENISASI JALAN LINGKUNGAN KP. AIR MAS RT.002 / RW. 002 (POKMAS 13 KP.AIR MAS - 600 M²) | KELURAHAN KARAS | - | - | SEMENISASI JALAN LINGKUNGAN KP. AIR MAS RT.002 / RW. 002 (POKMAS 13 KP.AIR MAS - 600 M²) | - | 243.838.000 |
SEMENISASI JALAN LINGKUNGAN KP. PADANG RT.001 RW. 003 ( POKMAS 14 KP.PADANG 300 M²) | KELURAHAN KARAS | - | - | SEMENISASI JALAN LINGKUNGAN KP. PADANG RT.001 RW. 003 ( POKMAS 14 KP.PADANG 300 M²) | - | 122.065.000 |
SEMENISASI JALAN LINGKUNGAN KP.BATU PUTIH RT.003 RW.004 (POKMAS 24 KP.BATU PUTIH - 606 M²) | KELURAHAN KARAS | - | - | SEMENISASI JALAN LINGKUNGAN KP.BATU PUTIH RT.003 RW.004 (POKMAS 24 KP.BATU PUTIH - 606 M²) | - | 244.144.000 |
SEMENISASI JALAN LINGKUNGAN KP.KETAPANG RT.002/RW.006 (POKMAS 18 KP.KETAPANG - 714 M²) | KELURAHAN KARAS | - | - | SEMENISASI JALAN LINGKUNGAN KP.KETAPANG RT.002/RW.006 (POKMAS 18 KP.KETAPANG - 714 M²) | - | 290.514.000 |
SEMENISASI JALAN LINGKUNGAN KP.LANGKANG RT.001/RW.002 (POKMAS 12 KP.LANGKANG - 302 M²) | KELURAHAN KARAS | - | - | SEMENISASI JALAN LINGKUNGAN KP.LANGKANG RT.001/RW.002 (POKMAS 12 KP.LANGKANG - 302 M²) | - | 122.875.000 |
SEMENISASI JALAN LINGKUNGAN PERMUKIMAN RT. 003 RW. 004 KAVLING NONGSA JALAN KE MASJID (POKMAS MAWAR) | KELURAHAN SAMBAU | - | - | SEMENISASI JALAN LINGKUNGAN PERMUKIMAN RT. 003 RW. 004 KAVLING NONGSA JALAN KE MASJID (POKMAS MAWAR) | - | 112.277.000 |
SEMENISASI JALAN LINGKUNGAN PERUM BARELANG RT01 RW 08 (POKMAS BARELANG JAYA) VOL-620M2 | KELURAHAN TANJUNG UNCANG | - | - | SEMENISASI JALAN LINGKUNGAN PERUM BARELANG RT01 RW 08 (POKMAS BARELANG JAYA) VOL-620M2 | - | 227.768.200 |
SEMENISASI JALAN LINGKUNGAN PERUM CITRA PENDAWA ASRI RT 04 RW 02 (POKMAS PANDAWA JAYA) VOL-400M2 | KELURAHAN BULIANG | - | - | SEMENISASI JALAN LINGKUNGAN PERUM CITRA PENDAWA ASRI RT 04 RW 02 (POKMAS PANDAWA JAYA) VOL-400M2 | - | 122.047.000 |
SEMENISASI JALAN LINGKUNGAN PERUM GMP THP.II RT 001 RW 004 | PERUM GMP THP.II RT 001 RW 004 KELURAHAN TANJUNG SENGKUANG KECAMATAN BATU AMPAR | - | - | SEMENISASI JALAN LINGKUNGAN PERUM GMP THP.II RT 001 RW 004 | - | 17.364.820 |
SEMENISASI JALAN LINGKUNGAN PERUM GMP THP.II RT 002 RW 004 | PERUM GMP THP.II RT 002 RW 004 KELURAHAN TANJUNG SENGKUANG KECAMATAN BATU AMPAR | - | - | SEMENISASI JALAN LINGKUNGAN PERUM GMP THP.II RT 002 RW 004 | - | 6.044.940 |
SEMENISASI JALAN LINGKUNGAN PERUM GMP. RT 004 RW 003 | PERUM GMP RT 004 RW 003 KELURAHAN TANJUNG SENGKUANG, KECAMATAN BATU AMPAR | - | - | SEMENISASI JALAN LINGKUNGAN PERUM GMP. RT 004 RW 003 | - | 145.240.700 |
SEMENISASI JALAN LINGKUNGAN PERUM GRAHA MAS RT 001 RW 013 (POKMAS GRAHA MAS - 509 M2) | KELURAHAN TANJUNG RIAU | - | - | SEMENISASI JALAN LINGKUNGAN PERUM GRAHA MAS RT 001 RW 013 (POKMAS GRAHA MAS - 509 M2) | - | 175.389.500 |
SEMENISASI JALAN LINGKUNGAN PERUM GRIYA PERMAI RT. 05 RW. 01 (POKMAS SEIBINTI RT. 05 RW. 01- 584 M2) | KELURAHAN SUNGAI BINTI | - | - | SEMENISASI JALAN LINGKUNGAN PERUM GRIYA PERMAI RT. 05 RW. 01 (POKMAS SEIBINTI RT. 05 RW. 01- 584 M2) | - | 195.053.100 |
SEMENISASI JALAN LINGKUNGAN PERUM GRIYA PRIMA (POKMAS GRIYA PRIMA MANDIRI) | RT 06 RW 014 KEL BULIANG | - | - | SEMENISASI JALAN LINGKUNGAN PERUM GRIYA PRIMA (POKMAS GRIYA PRIMA MANDIRI) | - | 182.637.895 |
SEMENISASI JALAN LINGKUNGAN PERUM MARINA GARDEN RW 12 (POKMAS RAJAWALI) VOL-600M2 | KELURAHAN TANJUNG UNCANG | - | - | SEMENISASI JALAN LINGKUNGAN PERUM MARINA GARDEN RW 12 (POKMAS RAJAWALI) VOL-600M2 | - | 214.391.100 |
SEMENISASI JALAN LINGKUNGAN PERUM MUKA KUNING PARADISE BLOK B1/36-B1/48 RT.02 RW.13 | KELURAHAN BUKIT TEMPAYAN (POKMAS PARADISE DAU I) VOL-580M2 | - | - | SEMENISASI JALAN LINGKUNGAN PERUM MUKA KUNING PARADISE BLOK B1/36-B1/48 RT.02 RW.13 | - | 211.163.700 |
SEMENISASI JALAN LINGKUNGAN PERUM PGRI (POKMAS SEI BINTI RT.02 RW.02-584M2) | PERUM PGRI RT. 02 RW. 02 | - | - | SEMENISASI JALAN LINGKUNGAN PERUM PGRI (POKMAS SEI BINTI RT.02 RW.02-584M2) | - | 196.170.700 |
SEMENISASI JALAN LINGKUNGAN PERUM PLUTO RW 5 (POKMAS PLUTO) VOL-600M2 | KELURAHAN TANJUNG UNCANG | - | - | SEMENISASI JALAN LINGKUNGAN PERUM PLUTO RW 5 (POKMAS PLUTO) VOL-600M2 | - | 221.665.400 |
SEMENISASI JALAN LINGKUNGAN PERUM PRIMA GARDEN RW 13 (POKMAS PRIMA GARDEN MAKMUR) VOL-630M2 | KELURAHAN TANJUNG UNCANG | - | - | SEMENISASI JALAN LINGKUNGAN PERUM PRIMA GARDEN RW 13 (POKMAS PRIMA GARDEN MAKMUR) VOL-630M2 | - | 234.864.300 |
SEMENISASI JALAN LINGKUNGAN PERUM RHABAYU REGENCY RT 001 RW 019 (POKMAS RHABAYU REGENCY 1 - 500 M2) | KELURAHAN TANJUNG RIAU | - | - | SEMENISASI JALAN LINGKUNGAN PERUM RHABAYU REGENCY RT 001 RW 019 (POKMAS RHABAYU REGENCY 1 - 500 M2) | - | 171.898.100 |
SEMENISASI JALAN LINGKUNGAN PERUM TAMAN LAGUNA INDAH RT 003 RW 011 (POKMAS LAGUNA INDAH 3 - 360 M2) | KELURAHAN TANJUNG RIAU | - | - | SEMENISASI JALAN LINGKUNGAN PERUM TAMAN LAGUNA INDAH RT 003 RW 011 (POKMAS LAGUNA INDAH 3 - 360 M2) | - | 121.336.600 |
SEMENISASI JALAN LINGKUNGAN PERUM TAMAN LAGUNA INDAH RT 004 RW 011 (POKMAS LAGUNA INDAH 4 - 550 M)2) | KELURAHAN TANJUNG RIAU | - | - | SEMENISASI JALAN LINGKUNGAN PERUM TAMAN LAGUNA INDAH RT 004 RW 011 (POKMAS LAGUNA INDAH 4 - 550 M)2) | - | 183.477.800 |
SEMENISASI JALAN LINGKUNGAN PERUM TAMAN LAGUNA INDAH RT 005 RW 011 (POKMAS LAGUNA INDAH 5 - 550 M2) | KELURAHAN TANJUNG RIAU | - | - | SEMENISASI JALAN LINGKUNGAN PERUM TAMAN LAGUNA INDAH RT 005 RW 011 (POKMAS LAGUNA INDAH 5 - 550 M2) | - | 189.315.500 |
SEMENISASI JALAN LINGKUNGAN PERUM. GRIYA PRATAMA RT09 RW18 (POKMAS GRIYA PRATAMA 2020-VOLUME 620M2) | KELURAHAN BULIANG | - | - | SEMENISASI JALAN LINGKUNGAN PERUM. GRIYA PRATAMA RT09 RW18 (POKMAS GRIYA PRATAMA 2020-VOLUME 620M2) | - | 187.108.000 |
SEMENISASI JALAN LINGKUNGAN PERUM.NAGA JAYA RT02 RW 15 (POKMAS TAMAN JAYA ASRI)-VOLUME 538M2 | KELURAHAN BULIANG | - | - | SEMENISASI JALAN LINGKUNGAN PERUM.NAGA JAYA RT02 RW 15 (POKMAS TAMAN JAYA ASRI)-VOLUME 538M2 | - | 184.363.300 |
SEMENISASI JALAN LINGKUNGAN PERUM.SIERRA RT.02 RW.10 (POKMAS SIERRA INDAH) VOL - 542M2 | KELURAHAN BUKIT TEMPAYAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUM.SIERRA RT.02 RW.10 (POKMAS SIERRA INDAH) VOL - 542M2 | - | 198.418.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ASPOL BALOI RT.001 RW.002 (DAU)(SUKAJADI MAJU 1-280M2) | KELURAHAN SUKAJADI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN ASPOL BALOI RT.001 RW.002 (DAU)(SUKAJADI MAJU 1-280M2) | - | 104.794.800 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BALOI RANTAU RT.001 RW.004 (DAU TAMBAHAN)(SUKAJADI SENTOSA 4 | KELURAHAN SUKAJADI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN BALOI RANTAU RT.001 RW.004 (DAU TAMBAHAN)(SUKAJADI SENTOSA 4 | - | 216.823.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BALOI RANTAU RT.01 RW.04(SUKAJADI SENTOSA 3-340M2) | KELURAHAN SUKAJADI | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN BALOI RANTAU RT.01 RW.04(SUKAJADI SENTOSA 3-340M2) | - | 127.163.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BANDARA MAS RT.01 DAN RT.02 RW.20(BANDARA MAS MAKMUR-400M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN BANDARA MAS RT.01 DAN RT.02 RW.20(BANDARA MAS MAKMUR-400M2) | - | 149.559.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BATARA RAYA RT.02 RW.03(BATARA MAKMUR-400M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN BATARA RAYA RT.02 RW.03(BATARA MAKMUR-400M2) | - | 149.779.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BOTANIA GARDEN RT.01 RW.43 (POKMAS BOTANIA-400M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN BOTANIA GARDEN RT.01 RW.43 (POKMAS BOTANIA-400M2) | - | 149.806.800 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BOTANIA GARDEN RT.02 DAN RT.03 RW.29 (POKMAS BOTANIA RAYA-400M | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN BOTANIA GARDEN RT.02 DAN RT.03 RW.29 (POKMAS BOTANIA RAYA-400M | - | 149.806.800 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN BUKIT RAYA RT.01 DAN RT.02 RW.38(BUKIT RAYA MAJU-400M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN BUKIT RAYA RT.01 DAN RT.02 RW.38(BUKIT RAYA MAJU-400M2) | - | 149.806.800 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CACTUS GARDEN RT 03 RW 13 160M2 (TELUK TERING 37) | KELURAHAN TELUK TERING | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN CACTUS GARDEN RT 03 RW 13 160M2 (TELUK TERING 37) | - | 59.330.700 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENDANA RT.01 RW.09(KARYA NYATA CENDANA TAHAP 2-78M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENDANA RT.01 RW.09(KARYA NYATA CENDANA TAHAP 2-78M2) | - | 28.744.100 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENDANA RT.01, RT.02, RT.03 DAN RT.04 RW.23CENDANA 234-400M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENDANA RT.01, RT.02, RT.03 DAN RT.04 RW.23CENDANA 234-400M2) | - | 149.559.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENDANA RT.02 DAN RT.03 RW.36 (POKMAS CENDANA SERASI-400M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENDANA RT.02 DAN RT.03 RW.36 (POKMAS CENDANA SERASI-400M2) | - | 149.559.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENTRA MELATI DAN PERUMAHAN SAKINAH RT.01 DAN RT.02 RW.08 (POK | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENTRA MELATI DAN PERUMAHAN SAKINAH RT.01 DAN RT.02 RW.08 (POK | - | 149.559.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA BATAM RT 01 RW 01 400M2 (TELUK TERING 39) | KELURAHAN TELUK TERING | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA BATAM RT 01 RW 01 400M2 (TELUK TERING 39) | - | 130.456.700 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA BATAM RT 02 RW 01 400M2 (TELUK TERING 40) | KELURAHAN TELUK TERING | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA BATAM RT 02 RW 01 400M2 (TELUK TERING 40) | - | 149.779.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA BATAM RT 03 RW 01 400M2 (TELUK TERING 41) | KELURAHAN TELUK TERING | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA BATAM RT 03 RW 01 400M2 (TELUK TERING 41) | - | 131.279.500 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA BATAM RT 05 RW 01 400M2 (TELUK TERING 42) | KELURAHAN TELUK TERING | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA BATAM RT 05 RW 01 400M2 (TELUK TERING 42) | - | 143.293.700 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA KOTA MAS RT 01 RW 015 463.5 M2 (TELUK TERING 38) | KELURAHAN TELUK TERING | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA KOTA MAS RT 01 RW 015 463.5 M2 (TELUK TERING 38) | - | 173.443.600 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA KOTA MAS RT 02 RW 015 400 M2 (TELUK TERING 44) | KELURAHAN TELUK TERING | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN CITRA KOTA MAS RT 02 RW 015 400 M2 (TELUK TERING 44) | - | 149.779.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GRIYA KPN RT.01 DAN RT.05 RW.41(BANGUN RW.41-400M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN GRIYA KPN RT.01 DAN RT.05 RW.41(BANGUN RW.41-400M2) | - | 149.806.800 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN KINTAMANI RT 01 RW 07 492M2 (TELUK TERING 43) | KELURAHAN TELUK TERING | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN KINTAMANI RT 01 RW 07 492M2 (TELUK TERING 43) | - | 183.597.700 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN KINTAMANI RT 03 RW 07 550 M2 (TELUK TERING 45) | KELURAHAN TELUK TERING | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN KINTAMANI RT 03 RW 07 550 M2 (TELUK TERING 45) | - | 204.928.900 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN MARBELLA RESIDENCE RT.01 DAN RT.02 RW.39(MARBELLA BERSATU-400 | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN MARBELLA RESIDENCE RT.01 DAN RT.02 RW.39(MARBELLA BERSATU-400 | - | 149.779.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN NADIM RAYA RT.01 RW.51 (NADIM BERSATU-400M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN NADIM RAYA RT.01 RW.51 (NADIM BERSATU-400M2) | - | 149.779.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN NONGSA ASRI RW 12 - NONGSA ASRI KOMPAK - 550M2 | BATU BESAR | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN NONGSA ASRI RW 12 - NONGSA ASRI KOMPAK - 550M2 | - | 200.856.700 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN ANUGRAH IDEAL RT.01 DAN RT.02 RW.19(ANUGERAH IDEAL-400M | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN ANUGRAH IDEAL RT.01 DAN RT.02 RW.19(ANUGERAH IDEAL-400M | - | 149.559.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN BEPEDE INDAH RT.01 RW.14 (BEPEDE INDAH-40M2) | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN BEPEDE INDAH RT.01 RW.14 (BEPEDE INDAH-40M2) | - | 149.806.800 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN RAYA TAHAP 2A RT.03 RW.35 REALITA PEMBANGUNAN KITA | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN RAYA TAHAP 2A RT.03 RW.35 REALITA PEMBANGUNAN KITA | - | 71.886.100 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN RAYA TAHAP I DAN II RT.02 DAN RT. 03 RW.07 POKMAS TAMAN | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN RAYA TAHAP I DAN II RT.02 DAN RT. 03 RW.07 POKMAS TAMAN | - | 146.806.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN RAYA TAHAP III RT. 03 RW.18 SUKA DAMAI | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN RAYA TAHAP III RT. 03 RW.18 SUKA DAMAI | - | 149.806.800 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN RAYA TAHAP III RT.01 DAN RT. 02 RW.24 KITA KITA | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN RAYA TAHAP III RT.01 DAN RT. 02 RW.24 KITA KITA | - | 150.779.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN RAYA TAHAP IV RT.02 DAN RT.03 RW.42 TARA IV | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN TAMAN RAYA TAHAP IV RT.02 DAN RT.03 RW.42 TARA IV | - | 149.806.800 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN VALENCIA RT.04 RW.25 VALENCIA MAJU | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN VALENCIA RT.04 RW.25 VALENCIA MAJU | - | 193.789.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN VILLA PESONA ASRI RT.04 DAN RT.05 RW.10 PESONA MANDIRI | KELURAHAN BELIAN | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN VILLA PESONA ASRI RT.04 DAN RT.05 RW.10 PESONA MANDIRI | - | 179.566.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN WINNER RW 17 RT 03 TANJAK SADAI 5 - 2021 | RW 17 RT 03 | - | - | SEMENISASI JALAN LINGKUNGAN PERUMAHAN WINNER RW 17 RT 03 TANJAK SADAI 5 - 2021 | - | 202.189.900 |
SEMENISASI JALAN LINGKUNGAN PL. MUBUT RT. 001 RW. 005 (POKMAS 23 PL.MUBUT - 690 M²) | KELURAHAN KARAS | - | - | SEMENISASI JALAN LINGKUNGAN PL. MUBUT RT. 001 RW. 005 (POKMAS 23 PL.MUBUT - 690 M²) | - | 280.084.000 |
SEMENISASI JALAN LINGKUNGAN PONDOK PRATIWI 2 ANTARA BLOK E/1 S/D BLOK E/8 DAN BLOK N/1-8 RT 04 RW 10 | KELURAHAN SUNGAI HARAPAN | - | - | SEMENISASI JALAN LINGKUNGAN PONDOK PRATIWI 2 ANTARA BLOK E/1 S/D BLOK E/8 DAN BLOK N/1-8 RT 04 RW 10 | - | 170.951.000 |
SEMENISASI JALAN LINGKUNGAN RT 003 RW 014 | TANJUNG SENGKUANG RT 003 RW 014, KELURAHAN TANJUNG SENGKUANG , KECAMATAN BATU AMPAR | - | - | SEMENISASI JALAN LINGKUNGAN RT 003 RW 014 | - | 116.833.200 |
SEMENISASI JALAN LINGKUNGAN RT 01 RT 02 RT 3 RW 15 DURIANGKANG (DURIANGKANG 2 - 587 M2) | RT 01 RT 02 RT 3 RW 15 DURIANGKANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RT 02 RT 3 RW 15 DURIANGKANG (DURIANGKANG 2 - 587 M2) | - | 199.432.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RT 02 RW 05 DURIANGKANG DURIANGKANG 4 587 M2 | RT 01 RT 02 RW 05 DURIANGKANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RT 02 RW 05 DURIANGKANG DURIANGKANG 4 587 M2 | - | 185.242.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RT 02 RW 06 DURIANGKANG (DURIANGKANG 3 - 587 M2) | RT 01 RT 02 RW 06 DURIANGKANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RT 02 RW 06 DURIANGKANG (DURIANGKANG 3 - 587 M2) | - | 198.679.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 01 TANJUNGPIAYU (PTM 1 - 582 M2) | RT 01 RW 01 TANJUNGPIAYU | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 01 TANJUNGPIAYU (PTM 1 - 582 M2) | - | 217.853.900 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 02 PERUM BAMBU KUNING (POKMAS BAMBU KUNING 1) VOL - 402.5M2 | KELURAHAN BUKIT TEMPAYAN | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 02 PERUM BAMBU KUNING (POKMAS BAMBU KUNING 1) VOL - 402.5M2 | - | 149.167.700 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 02 POKMAS ANGGUR 1 | RT 01 RW 02 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 02 POKMAS ANGGUR 1 | - | 97.906.600 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 02 TANJUNG BUNTUNG POKMAS ANGGREK 1 | RT 01 RW 02 KAMPUNG TUA TANJUNG BUNTUNG | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 02 TANJUNG BUNTUNG POKMAS ANGGREK 1 | - | 217.151.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 03 MANGSANG (MERPATI - 580 M2) | RT 01 RW 03 MANGSANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 03 MANGSANG (MERPATI - 580 M2) | - | 197.293.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 03 POKMAS BELIMBING III | RT 01 RW 03 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 03 POKMAS BELIMBING III | - | 46.156.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 SAKURA GARDEN (BLOK D1 NO.1 S/D D2 NO.9) KAMPUNG SERAYA I | SAKURA GARDEN RT 01 RW 04 KAMPUNG SERAYA | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 SAKURA GARDEN (BLOK D1 NO.1 S/D D2 NO.9) KAMPUNG SERAYA I | - | 74.813.200 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 TGPIAYU (PTM 5 - 564 M2) | RT 01 RW 04 PANCUR SWADAYA - TGPIAYU | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 TGPIAYU (PTM 5 - 564 M2) | - | 210.844.700 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 11 TANJUNGPIAYU (PTM 4 - 564 M2) | RT 1 RW 11 TANJUNGPIAYU | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 11 TANJUNGPIAYU (PTM 4 - 564 M2) | - | 210.624.700 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 12 DURIANGKANG (DURIANGKANG 5 - 385 M2) | RT 01 RW 12 DURIANGKANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 12 DURIANGKANG (DURIANGKANG 5 - 385 M2) | - | 119.620.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 12 PERUM BAMBU KUNING (POKMAS BAMBU KUNING 2) VOL-400M2 | KELURAHAN BUKIT TEMPAYAN | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 12 PERUM BAMBU KUNING (POKMAS BAMBU KUNING 2) VOL-400M2 | - | 146.676.200 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 12 PERUM BAMBU KUNING DAU(POKMAS BAMBU KUNING DAU 2) VOL-388M2 | KELURAHAN BUKIT TEMPAYAN | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 12 PERUM BAMBU KUNING DAU(POKMAS BAMBU KUNING DAU 2) VOL-388M2 | - | 142.748.100 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 15 DURIANGKANG (DURIANGKANG 6 - 450 M2) | RT 01 RW 15 KELURAHAN DURIANGKANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 15 DURIANGKANG (DURIANGKANG 6 - 450 M2) | - | 152.935.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 16 BUKIT KEMUNING (BANGAU - 350 M2) | RT 01 RW 016 BUKIT KEMUNING MANGSANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 16 BUKIT KEMUNING (BANGAU - 350 M2) | - | 109.820.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 24 MANGSANG (CENDRAWASIH - 133 M2) | RT 01 RW 024 MANGSANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 01 RW 24 MANGSANG (CENDRAWASIH - 133 M2) | - | 44.275.000 |
SEMENISASI JALAN LINGKUNGAN RT 01, 02 RW 03 TGPIAYU (PTM 6 - 318 M2) | RT 01, 02 RW 03 SEI PANCUR - TGPIAYU | - | - | SEMENISASI JALAN LINGKUNGAN RT 01, 02 RW 03 TGPIAYU (PTM 6 - 318 M2) | - | 114.732.200 |
SEMENISASI JALAN LINGKUNGAN RT 02 RT 03 RW 06 DURIANGKANG (DURIANGKANG 7 - 587 M2) | RT 02 RT 03 RW 06 DURIANGKANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 02 RT 03 RW 06 DURIANGKANG (DURIANGKANG 7 - 587 M2) | - | 199.328.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 01 KAMPUNG TUA TANJUNG BUNTUNG ANGGREK 2 | RT 02 RW 01 TANJUNG BUNTUNG | - | - | SEMENISASI JALAN LINGKUNGAN RT 02 RW 01 KAMPUNG TUA TANJUNG BUNTUNG ANGGREK 2 | - | 202.189.900 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 01 MANGSANG (MERAK - 400 M2) | RT 02 RW 01 MANGSANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 02 RW 01 MANGSANG (MERAK - 400 M2) | - | 126.248.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 04 SAKURA GARDEN (BLOK F2 NO.10 S/D D2 NO.10) KAMPUNG SERAYA II | SAKURA GARDEN RT 02 RW 04 KAMPUNG SERAYA | - | - | SEMENISASI JALAN LINGKUNGAN RT 02 RW 04 SAKURA GARDEN (BLOK F2 NO.10 S/D D2 NO.10) KAMPUNG SERAYA II | - | 100.701.700 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 09 TGPIAYU (PTM 2 - 582 M2)() | RT 02 RW 09 KP BAGAN - TGPIAYU | - | - | SEMENISASI JALAN LINGKUNGAN RT 02 RW 09 TGPIAYU (PTM 2 - 582 M2)() | - | 212.254.900 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 01 ( 460 M² ) POKMAS BATU MERAH 4 | BATU MERAH RT 03 RW 01 | - | - | SEMENISASI JALAN LINGKUNGAN RT 03 RW 01 ( 460 M² ) POKMAS BATU MERAH 4 | - | 162.643.800 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 04 RW 15 DURIANGKANG (DURIANGKANG 1 - 587 M2) | RT 3 RT 4 RW 15 DURIANGKANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 03 RW 04 RW 15 DURIANGKANG (DURIANGKANG 1 - 587 M2) | - | 219.774.500 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 04 SAKURA PERMAI (KAMPUNG SERAYA III) | SAKURA PERMAI RT 03 RW 04 KAMPUNG SERAYA | - | - | SEMENISASI JALAN LINGKUNGAN RT 03 RW 04 SAKURA PERMAI (KAMPUNG SERAYA III) | - | 59.915.900 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 06 MANGSANG (POKMAS KUTILANG - 580 M2) | RT 03 RW 06 MANGSANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 03 RW 06 MANGSANG (POKMAS KUTILANG - 580 M2) | - | 194.706.000 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 07 MANGSANG (POKMAS JALAK - 250 M2) | RT 03 RW 07 MANGSANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 03 RW 07 MANGSANG (POKMAS JALAK - 250 M2) | - | 78.906.000 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 07 PERUM. MUKA KUNINGINDAH I (POKMAS GENTA BERSERI) VOL-207.45M | KELURAHAN BULIANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 03 RW 07 PERUM. MUKA KUNINGINDAH I (POKMAS GENTA BERSERI) VOL-207.45M | - | 65.177.000 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 07 TANJUNGPIAYU (PTM 7 - 574 M2) | RT 3 RW 7 KAV. SEI DAUN - TANJUNGPIAYU | - | - | SEMENISASI JALAN LINGKUNGAN RT 03 RW 07 TANJUNGPIAYU (PTM 7 - 574 M2) | - | 211.722.500 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 12 DURIANGKANG (DURIANGKANG 10 - 385 M2) | RT 3 RW 12 DURIANGKANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 03 RW 12 DURIANGKANG (DURIANGKANG 10 - 385 M2) | - | 134.484.900 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 15 PESONA MANTANG ANGGREK 4 | RT 03 RW 15 PESONA MANTANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 03 RW 15 PESONA MANTANG ANGGREK 4 | - | 217.151.000 |
SEMENISASI JALAN LINGKUNGAN RT 03,05 DAN 06 RW 02 DURIANGKANG (DURIANGKANG 9 - 587M2) | KELURAHAN DURIANGKANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 03,05 DAN 06 RW 02 DURIANGKANG (DURIANGKANG 9 - 587M2) | - | 199.337.000 |
SEMENISASI JALAN LINGKUNGAN RT 04 RW 01 PERUM BAMBU KUNING (POKMAS BAMBU KUNING 4) VOL-400M2 | KELURAHAN BUKIT TEMPAYAN | - | - | SEMENISASI JALAN LINGKUNGAN RT 04 RW 01 PERUM BAMBU KUNING (POKMAS BAMBU KUNING 4) VOL-400M2 | - | 149.649.500 |
SEMENISASI JALAN LINGKUNGAN RT 04 RW 07 MANGSANG (POKMAS KEPODANG - 250 M2) | RT 04 RW 07 MANGSANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 04 RW 07 MANGSANG (POKMAS KEPODANG - 250 M2) | - | 79.723.000 |
SEMENISASI JALAN LINGKUNGAN RT 04 RW 10 JALAN UTAMA MESJID MELUR 4 | RT 04 RW 10 | - | - | SEMENISASI JALAN LINGKUNGAN RT 04 RW 10 JALAN UTAMA MESJID MELUR 4 | - | 205.515.200 |
SEMENISASI JALAN LINGKUNGAN RT 04 RW 11 KP. PANGLONG KEL BATU BESAR LANJUTAN - PANGLONG 04 - 422M2 | BATU BESAR | - | - | SEMENISASI JALAN LINGKUNGAN RT 04 RW 11 KP. PANGLONG KEL BATU BESAR LANJUTAN - PANGLONG 04 - 422M2 | - | 150.426.100 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 02 DEKAT MASJID MELUR 5 | RT 05 RW 02 | - | - | SEMENISASI JALAN LINGKUNGAN RT 05 RW 02 DEKAT MASJID MELUR 5 | - | 167.533.300 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 06 DURIANGKANG (DURIANGKANG 12 - 587 M2) | RT 05 RW 06 DURIANGKANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 05 RW 06 DURIANGKANG (DURIANGKANG 12 - 587 M2) | - | 181.566.000 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 07 TGPIAYU (PTM 8 - 585 M2) | RT 05 RW 07 SEI DAUN - TGPIAYU | - | - | SEMENISASI JALAN LINGKUNGAN RT 05 RW 07 TGPIAYU (PTM 8 - 585 M2) | - | 202.064.500 |
SEMENISASI JALAN LINGKUNGAN RT 06 RW 02 ( 170 M² ) POKMAS BATU MERAH 5 | BATU MERAH RT 06 RW 02 | - | - | SEMENISASI JALAN LINGKUNGAN RT 06 RW 02 ( 170 M² ) POKMAS BATU MERAH 5 | - | 61.678.100 |
SEMENISASI JALAN LINGKUNGAN RT 06 RW 04 BENGKONG BARU (POKMAS INDAH 28 - 90 M2) | RT.06 RW.04 BENGKONG BARU | - | - | SEMENISASI JALAN LINGKUNGAN RT 06 RW 04 BENGKONG BARU (POKMAS INDAH 28 - 90 M2) | - | 33.645.700 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 02 DURIANGKANG (DURIANGKANG 13 - 587 M2) | RT 07 RW 02 KELURAHAN DURIANGKANG | - | - | SEMENISASI JALAN LINGKUNGAN RT 07 RW 02 DURIANGKANG (DURIANGKANG 13 - 587 M2) | - | 182.823.000 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 02 GG HIDAYAH DAN GG. SENTOSA MELUR 7 | RT 07 RW 02 | - | - | SEMENISASI JALAN LINGKUNGAN RT 07 RW 02 GG HIDAYAH DAN GG. SENTOSA MELUR 7 | - | 144.101.100 |
SEMENISASI JALAN LINGKUNGAN RT 08 RW 02 ( 106 M² ) POKMAS BATU MERAH 6 | BATU MERAH RT 08 RW 02 | - | - | SEMENISASI JALAN LINGKUNGAN RT 08 RW 02 ( 106 M² ) POKMAS BATU MERAH 6 | - | 39.674.800 |
SEMENISASI JALAN LINGKUNGAN RT 08 RW 02 TANJUNG BUNTUNG MELUR 6 | RT 08 RW 02 | - | - | SEMENISASI JALAN LINGKUNGAN RT 08 RW 02 TANJUNG BUNTUNG MELUR 6 | - | 217.151.000 |
SEMENISASI JALAN LINGKUNGAN RT 4 RW 10 JL. UTAMA BENGKONG HARAPAN II (POKMAS INDAH 29 - 564 M2) | RT.04 RW.10 JL. UTAMA BENGKONG - BENGKONG INDAH | - | - | SEMENISASI JALAN LINGKUNGAN RT 4 RW 10 JL. UTAMA BENGKONG HARAPAN II (POKMAS INDAH 29 - 564 M2) | - | 211.131.800 |
SEMENISASI JALAN LINGKUNGAN RT 5 RW 09 JL. POLEWALI 1 BENGKONG HARAPAN II (POKMAS INDAH 30 - 560 M2) | RT 5 RW 9 JL POLEWALI 1 BENGKONG HARAPAN II - BENGKONG INDAH | - | - | SEMENISASI JALAN LINGKUNGAN RT 5 RW 09 JL. POLEWALI 1 BENGKONG HARAPAN II (POKMAS INDAH 30 - 560 M2) | - | 207.642.600 |
SEMENISASI JALAN LINGKUNGAN RT 5 RW 10 JL. BERINGIN BENGKONG HARAPAN II (POKMA INDAH 31 - 560 M2) | RT 5 RW 10 JL. BERINGIN BENGKONG HARAPAN II - BENGKONG INDAH | - | - | SEMENISASI JALAN LINGKUNGAN RT 5 RW 10 JL. BERINGIN BENGKONG HARAPAN II (POKMA INDAH 31 - 560 M2) | - | 205.711.000 |
SEMENISASI JALAN LINGKUNGAN RT 5 RW 10 JL. MAWAR BENGKONG HARAPAN I (POKMAS INDAH 32 - 560M2) | RT 5 RW 10 JL. MAWAR BENGKONG HARAPAN II - BENGKONG INDAH | - | - | SEMENISASI JALAN LINGKUNGAN RT 5 RW 10 JL. MAWAR BENGKONG HARAPAN I (POKMAS INDAH 32 - 560M2) | - | 209.654.500 |
SEMENISASI JALAN LINGKUNGAN RT. 001 RW. 004 KAMPUNG PANAU (POKMAS KABIL RAYA 2) VOLUME 155 M2 | KELURAHAN KABIL | - | - | SEMENISASI JALAN LINGKUNGAN RT. 001 RW. 004 KAMPUNG PANAU (POKMAS KABIL RAYA 2) VOLUME 155 M2 | - | 58.053.600 |
SEMENISASI JALAN LINGKUNGAN RT. 003 RW. 003 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 5) | KELURAHAN SIJANTUNG | - | - | SEMENISASI JALAN LINGKUNGAN RT. 003 RW. 003 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 5) | - | 97.640.000 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 24 (POKMAS MEDIO RAYA BERSATU) | PERUM. MEDIO RAYA RT. 01 RW. 24 TEMBESI | - | - | SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 24 (POKMAS MEDIO RAYA BERSATU) | - | 112.205.500 |
SEMENISASI JALAN LINGKUNGAN RT. 02 RW. 06 BENGKONG HARAPAN I (POKMAS INDAH 26 - 125 M2) | RT.02 RW.06 BENGKONG HARAPAN I | - | - | SEMENISASI JALAN LINGKUNGAN RT. 02 RW. 06 BENGKONG HARAPAN I (POKMAS INDAH 26 - 125 M2) | - | 46.784.100 |
SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 14 (POKMAS SEI BINTI RT.03 RW.14-483M2) | KELURAHAN SUNGAI BINTI | - | - | SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 14 (POKMAS SEI BINTI RT.03 RW.14-483M2) | - | 163.209.200 |
SEMENISASI JALAN LINGKUNGAN RT. 03, 05 RW. 03(SUNGAI LEKOP 03.03-300M2) | KELURAHAN SUNGAI LEKOP | - | - | SEMENISASI JALAN LINGKUNGAN RT. 03, 05 RW. 03(SUNGAI LEKOP 03.03-300M2) | - | 109.562.200 |
SEMENISASI JALAN LINGKUNGAN RT. 04 RW. 17 (POKMAS SEI BINTI RT.04 RW.17-470M2) | KELURAHAN SUNGAI BINTI | - | - | SEMENISASI JALAN LINGKUNGAN RT. 04 RW. 17 (POKMAS SEI BINTI RT.04 RW.17-470M2) | - | 161.286.400 |
SEMENISASI JALAN LINGKUNGAN RT. 05 RW. 04 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 05.04-350M2) | KELURAHAN SUNGAI LEKOP | - | - | SEMENISASI JALAN LINGKUNGAN RT. 05 RW. 04 KELURAHAN SUNGAI LEKOP(SUNGAI LEKOP 05.04-350M2) | - | 123.721.400 |
SEMENISASI JALAN LINGKUNGAN RT. 05 RW. 06 BENGKONG HARAPAN I (POKMAS INDAH 27 - 75 M2) | RT 05 RW 06 BENGKONG HARAPAN I | - | - | SEMENISASI JALAN LINGKUNGAN RT. 05 RW. 06 BENGKONG HARAPAN I (POKMAS INDAH 27 - 75 M2) | - | 28.019.200 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW.03 PERUM BAMBU KUNING (POKMAS BAMBU KUNING 3) VOL-455M2 | KELURAHAN BUKIT TEMPAYAN | - | - | SEMENISASI JALAN LINGKUNGAN RT.01 RW.03 PERUM BAMBU KUNING (POKMAS BAMBU KUNING 3) VOL-455M2 | - | 170.404.300 |
SEMENISASI JALAN LINGKUNGAN RT.01/RW.23 PERUM.CITRA LAGUNA TEMBESI (POKMAS KARYA LAGUNA) | RT.01/RW.23 PERUM.CITRA LAGUNA KELURAHAN TEMBESI | - | - | SEMENISASI JALAN LINGKUNGAN RT.01/RW.23 PERUM.CITRA LAGUNA TEMBESI (POKMAS KARYA LAGUNA) | - | 101.983.200 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW.04 KAVLING SUMBER MULIA VOLUME 300 M2 POKMAS SEI LANGKAI 04 | RT.02 RW.04 KAVLING SUMBER MULIA KEL. SUNGAI LANGKAI | - | - | SEMENISASI JALAN LINGKUNGAN RT.02 RW.04 KAVLING SUMBER MULIA VOLUME 300 M2 POKMAS SEI LANGKAI 04 | - | 103.831.200 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW.05 KAVLING SUMBER JAYA 2 VOLUME 290 M2 POKMAS SEI LANGKAI 05 | RT.02 RW.05 KAVLING SUMBER JAYA 2 | - | - | SEMENISASI JALAN LINGKUNGAN RT.02 RW.05 KAVLING SUMBER JAYA 2 VOLUME 290 M2 POKMAS SEI LANGKAI 05 | - | 99.974.600 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW.06 KAVLING SUMBER JAYA 1 VOLUME 300 M2 POKMAS SEI LANGKAI 06 | RT.02 RW.06 KEL. SUNGAI LANGKAI | - | - | SEMENISASI JALAN LINGKUNGAN RT.02 RW.06 KAVLING SUMBER JAYA 1 VOLUME 300 M2 POKMAS SEI LANGKAI 06 | - | 102.918.200 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW.08 PERMATA BALOI ( POKMAS 1 BALOI INDAH ) | BALOI INDAH | - | - | SEMENISASI JALAN LINGKUNGAN RT.02 RW.08 PERMATA BALOI ( POKMAS 1 BALOI INDAH ) | - | 211.886.400 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW.11 PERUM. CLASSIK INDAH VOLUME 300 M2 POKMAS SEI LANGKAI 11 | RT.02 RW.11 PERUM. CLASSIK INDAH | - | - | SEMENISASI JALAN LINGKUNGAN RT.02 RW.11 PERUM. CLASSIK INDAH VOLUME 300 M2 POKMAS SEI LANGKAI 11 | - | 103.701.400 |
SEMENISASI JALAN LINGKUNGAN RT.03 RW.01 KAMPUNG TUA ANGGREK 3 | RT 03 RW 01 KAMPUNG TUA | - | - | SEMENISASI JALAN LINGKUNGAN RT.03 RW.01 KAMPUNG TUA ANGGREK 3 | - | 168.512.300 |
SEMENISASI JALAN LINGKUNGAN RT.03 RW.10 VOL.50 M2 POKMAS ANGGREK TRITIP | KELURAHAN TANJUNG UMA | - | - | SEMENISASI JALAN LINGKUNGAN RT.03 RW.10 VOL.50 M2 POKMAS ANGGREK TRITIP | - | 18.701.100 |
SEMENISASI JALAN LINGKUNGAN RT.03 RW.11 KAV. BUKIT KAMBOJA ( 580 M² ) | RT 03 RW 11 KAV. BUKIT KAMBOJA | - | - | SEMENISASI JALAN LINGKUNGAN RT.03 RW.11 KAV. BUKIT KAMBOJA ( 580 M² ) | - | 202.112.900 |
SEMENISASI JALAN LINGKUNGAN RT.03 RW.14 PERUM. PUTRI HIJAU VOLUME 423.5 M2 POKMAS PUTRI HIJAU | RT.03 RW.14 PERUM. PUTRI HIJAU KEL. SEI LANGKAI KEC. SAGULUNG | - | - | SEMENISASI JALAN LINGKUNGAN RT.03 RW.14 PERUM. PUTRI HIJAU VOLUME 423.5 M2 POKMAS PUTRI HIJAU | - | 145.338.600 |
SEMENISASI JALAN LINGKUNGAN RT.03 RW.28 PERUM. GRAHA NUSA BATAM VOLUME 290 M2 POKMAS SEI LANGKAI 28 | RT.03 RW.28 PERUM. GRAHA NUSA BATAM | - | - | SEMENISASI JALAN LINGKUNGAN RT.03 RW.28 PERUM. GRAHA NUSA BATAM VOLUME 290 M2 POKMAS SEI LANGKAI 28 | - | 98.756.900 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW.16 PERUM. GRYA BATUAJI ASRI VOLUME 290 M2 POKMAS SEI LANGKAI 16 | RT.04 RW.16 PERUM. GRIYA BATUAJI ASRI | - | - | SEMENISASI JALAN LINGKUNGAN RT.04 RW.16 PERUM. GRYA BATUAJI ASRI VOLUME 290 M2 POKMAS SEI LANGKAI 16 | - | 100.508.100 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW.03 ( POKMAS 2 BALOI INDAH ) | BALOI INDAH | - | - | SEMENISASI JALAN LINGKUNGAN RT.05 RW.03 ( POKMAS 2 BALOI INDAH ) | - | 147.227.300 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW.09 ( POKMAS 3 BALOI INDAH ) | BALOI INDAH | - | - | SEMENISASI JALAN LINGKUNGAN RT.05 RW.09 ( POKMAS 3 BALOI INDAH ) | - | 85.393.000 |
SEMENISASI JALAN LINGKUNGAN RT01 RT02 RT03 DAN RT04 RW06 PERUM PERMATA HIJAU | KELURAHAN BUKIT TEMPAYAN (POKMAS PERMATA HIJAU) VOL - 541M2 | - | - | SEMENISASI JALAN LINGKUNGAN RT01 RT02 RT03 DAN RT04 RW06 PERUM PERMATA HIJAU | - | 201.561.800 |
SEMENISASI JALAN LINGKUNGAN RT01 RW23 PERUM.RINDANG GARDEN (POKMAS RINDANG SATU-VOLUME 500M2) | KELURAHAN BULIANG | - | - | SEMENISASI JALAN LINGKUNGAN RT01 RW23 PERUM.RINDANG GARDEN (POKMAS RINDANG SATU-VOLUME 500M2) | - | 153.245.000 |
SEMENISASI JALAN LINGKUNGAN RT08 RW10 PEMDA I (POKMAS MUKA KUNING PERMAI I) VOL-580M2 | KELURAHAN BULIANG | - | - | SEMENISASI JALAN LINGKUNGAN RT08 RW10 PEMDA I (POKMAS MUKA KUNING PERMAI I) VOL-580M2 | - | 194.102.700 |
SEMENISASI JALAN LINGKUNGAN RW 23 PURI AGUNG 3 (WALET - 580 M2) | RW 23 PURI AGUNG 3 MANGSANG | - | - | SEMENISASI JALAN LINGKUNGAN RW 23 PURI AGUNG 3 (WALET - 580 M2) | - | 197.417.000 |
SEMENISASI JALAN LINGKUNGAN RW. 11 PERUM. CLASIK INDAH VOLUME 484 M2 POKMAS CLASIK INDAH | RW. 11 PERUM. CLASIK INDAH KEL. SEI LANGKAI KEC. SAGULUNG | - | - | SEMENISASI JALAN LINGKUNGAN RW. 11 PERUM. CLASIK INDAH VOLUME 484 M2 POKMAS CLASIK INDAH | - | 164.914.200 |
SEMENISASI JALAN LINGKUNGAN RW.12 RT.08, 440 M2 (PSPK) | RT.08 RW.12 PERUM TAMAN CIPTA ASRI I | - | - | SEMENISASI JALAN LINGKUNGAN RW.12 RT.08, 440 M2 (PSPK) | - | 164.789.900 |
SEMENISASI JALAN LINGKUNGAN SEI.NAYON RT 01 RW 12 TANJAK SADAI 6 - 2021 | RT 01 RW 12 | - | - | SEMENISASI JALAN LINGKUNGAN SEI.NAYON RT 01 RW 12 TANJAK SADAI 6 - 2021 | - | 202.196.500 |
SEMENISASI JALAN LINGKUNGAN SEI.NAYON RW 12 RT 02 TANJAK SADAI 8 - 2021 | RW 12 RT 02 | - | - | SEMENISASI JALAN LINGKUNGAN SEI.NAYON RW 12 RT 02 TANJAK SADAI 8 - 2021 | - | 149.769.400 |
SEMENISASI JALAN LINGKUNGAN TANJUNG SENGKUANG BLOK E RT 002 RW 011 ( 105 M² ) POKMAS SUKUN 2 | TANJUNG SENGKUANG BLOK E RT 002 RW 011 | - | - | SEMENISASI JALAN LINGKUNGAN TANJUNG SENGKUANG BLOK E RT 002 RW 011 ( 105 M² ) POKMAS SUKUN 2 | - | 39.320.600 |
SEMENISASI JALAN LINGKUNGAN TANJUNG SENGKUANG RT 001 RW 001 (POKMAS GANG JAMBU) | RT 001 RW 001 | - | - | SEMENISASI JALAN LINGKUNGAN TANJUNG SENGKUANG RT 001 RW 001 (POKMAS GANG JAMBU) | - | 70.884.000 |
SEMENISASI JALAN LINGKUNGAN TANJUNG SENGKUANG RT 005 RW 001 | TANJUNG SENGKUANG RT 005 RW 001 KELURAHAN TANJUNG SENGKUANG, KECAMATAN BATU AMPAR | - | - | SEMENISASI JALAN LINGKUNGAN TANJUNG SENGKUANG RT 005 RW 001 | - | 78.263.900 |
SEMENISASI JALAN LINGKUNGAN TIBAN MADANI RT 004 RW 004 (PATAM 9 - 150M2) | KELURAHAN PATAM LESTARI | - | - | SEMENISASI JALAN LINGKUNGAN TIBAN MADANI RT 004 RW 004 (PATAM 9 - 150M2) | - | 53.358.800 |
SEMENISASI JALAN MENUJU SD 010 RT 06 RW 12 POKMAS KEDONDONG 3 | RT 06 RW 12 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN MENUJU SD 010 RT 06 RW 12 POKMAS KEDONDONG 3 | - | 27.871.800 |
SEMENISASI JALAN MUTIARA POINT RT 02 RW 05 (POKMAS BOUGENVILE 7 - 300M2) | KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN MUTIARA POINT RT 02 RW 05 (POKMAS BOUGENVILE 7 - 300M2) | - | 107.255.500 |
SEMENISASI JALAN NONGSA PANTAI RW.06 (POKMAS PULAU PUTRI) VOLUME 410 M2 | KELURAHAN SAMBAU | - | - | SEMENISASI JALAN NONGSA PANTAI RW.06 (POKMAS PULAU PUTRI) VOLUME 410 M2 | - | 153.453.300 |
SEMENISASI JALAN PELITA 1 RT 03 RW 03 ( POKMAS PELITA MADANI 3 ) | KELURAHAN KAMPUNG PELITA | - | - | SEMENISASI JALAN PELITA 1 RT 03 RW 03 ( POKMAS PELITA MADANI 3 ) | - | 66.875.600 |
SEMENISASI JALAN PELITA 7, SAMPING SKY GARDEN, RT.01 RW.02 KELURAHAN KAMPUNG PELITA VOL. 160 M2 PPM7 | KELURAHAN KAMPUNG PELITA | - | - | SEMENISASI JALAN PELITA 7, SAMPING SKY GARDEN, RT.01 RW.02 KELURAHAN KAMPUNG PELITA VOL. 160 M2 PPM7 | - | 54.451.100 |
SEMENISASI JALAN PEMUKIMAN PERUM. PESONA MATANG KEL. TANJUNG BUNTUNG KEC. BENGKONG | PERUM PESONA MANTANG KEL. TG. BUNTUNG KEC. BENGKONG | - | - | SEMENISASI JALAN PEMUKIMAN PERUM. PESONA MATANG KEL. TANJUNG BUNTUNG KEC. BENGKONG | - | 127.476.000 |
SEMENISASI JALAN PEPAYA II RT.001 RW.011 ( POKMAS PEPEYA PERMAI ) | LUBUK BAJA KOTA | - | - | SEMENISASI JALAN PEPAYA II RT.001 RW.011 ( POKMAS PEPEYA PERMAI ) | - | 122.351.900 |
SEMENISASI JALAN PERMUKIMAN BLOK F RT. 003 RW. 002 KAVLING BAKAU SERIP (POKMAS CERIA) VOLUME 300 M2 | KELURAHAN SAMBAU | - | - | SEMENISASI JALAN PERMUKIMAN BLOK F RT. 003 RW. 002 KAVLING BAKAU SERIP (POKMAS CERIA) VOLUME 300 M2 | - | 103.486.900 |
SEMENISASI JALAN PERMUKIMAN KAVLING SERAYA INDAH SAMBAU III RT. 006 RW. 001 (SERAYA INDAH) VOL 400M2 | KELURAHAN SAMBAU | - | - | SEMENISASI JALAN PERMUKIMAN KAVLING SERAYA INDAH SAMBAU III RT. 006 RW. 001 (SERAYA INDAH) VOL 400M2 | - | 144.450.900 |
SEMENISASI JALAN PERMUKIMAN MASYARAKAT RT. 004 RW. 007 TELUK MATA IKAN (GITA BUANA INDAH) VOL 332M2 | KELURAHAN SAMBAU | - | - | SEMENISASI JALAN PERMUKIMAN MASYARAKAT RT. 004 RW. 007 TELUK MATA IKAN (GITA BUANA INDAH) VOL 332M2 | - | 109.263.000 |
SEMENISASI JALAN PERMUKIMAN RT. 001 RW. 001 KAVLING SAMBKAU (POKMAS SENGGUNUNG) VOLUME 300 M2 | KELURAHAN SAMBAU | - | - | SEMENISASI JALAN PERMUKIMAN RT. 001 RW. 001 KAVLING SAMBKAU (POKMAS SENGGUNUNG) VOLUME 300 M2 | - | 112.299.000 |
SEMENISASI JALAN PERMUKIMAN RT. 005 RW. 004 KAVLING NONGSA (POKMAS SEROJA 4) VOLUME 400 M2 | KELURAHAN SAMBAU | - | - | SEMENISASI JALAN PERMUKIMAN RT. 005 RW. 004 KAVLING NONGSA (POKMAS SEROJA 4) VOLUME 400 M2 | - | 149.712.200 |
SEMENISASI JALAN PERMUKIMAN WARGA KAVLING BARU DI BLOK E2 RT.06 RW.03 (POKMAS CIPTA KARYA) 400 M2 | KELURAHAN SAMBAU | - | - | SEMENISASI JALAN PERMUKIMAN WARGA KAVLING BARU DI BLOK E2 RT.06 RW.03 (POKMAS CIPTA KARYA) 400 M2 | - | 149.779.300 |
SEMENISASI JALAN PERUM BLOK IV GANG 2 RT 003 RW 002 VOL. 532 M2-POKMAS NURI | KELURAHAN BATU SELICIN | - | - | SEMENISASI JALAN PERUM BLOK IV GANG 2 RT 003 RW 002 VOL. 532 M2-POKMAS NURI | - | 198.287.100 |
SEMENISASI JALAN PERUM BUKIT INDAH BATU AJI TAHAP II RW18 (POKMAS BUKIT INDAH MAJU) VOLUME 420M2 | KELURAHAN KIBING | - | - | SEMENISASI JALAN PERUM BUKIT INDAH BATU AJI TAHAP II RW18 (POKMAS BUKIT INDAH MAJU) VOLUME 420M2 | - | 129.346.000 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.02 RW.08 POKMAS MERPATI 1 | RT 02 RW 08 KELURAHAN SUNGAI HARAPAN | - | - | SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.02 RW.08 POKMAS MERPATI 1 | - | 69.813.700 |
SEMENISASI JALAN PERUM PONDOK PRATIWI I RT 02 RW 10 POKMAS GARUDA 2 | RT 02 RW 10 KELURAHAN SUNGAI HARAPAN | - | - | SEMENISASI JALAN PERUM PONDOK PRATIWI I RT 02 RW 10 POKMAS GARUDA 2 | - | 134.476.100 |
SEMENISASI JALAN PERUM RHABAYU RT 001 RW 012 (POKMAS PATAM 17 - 20 M2) | KELURAHAN PATAM LESTARI | - | - | SEMENISASI JALAN PERUM RHABAYU RT 001 RW 012 (POKMAS PATAM 17 - 20 M2) | - | 7.460.200 |
SEMENISASI JALAN PERUM SIRIAON REGENCY BLOK C,D,E RT 002 RW 011 POKMAS BANDENG | RT 002 RW 011 KELURAHAN TIBAN INDAH | - | - | SEMENISASI JALAN PERUM SIRIAON REGENCY BLOK C,D,E RT 002 RW 011 POKMAS BANDENG | - | 194.337.000 |
SEMENISASI JALAN PERUM TAMAN LESTARI RW. 13 ( POKMAS LESTARI MAJU ) - VOLUME 520.8M2 | KELURAHAN KIBING | - | - | SEMENISASI JALAN PERUM TAMAN LESTARI RW. 13 ( POKMAS LESTARI MAJU ) - VOLUME 520.8M2 | - | 159.065.000 |
SEMENISASI JALAN PERUM TAMAN PUTRI FORTUNA BLOK A S/D D RT.3 RW.8 MERPATI 4 | RT 03 RW 08 KELURAHAN SUNGAI HARAPAN | - | - | SEMENISASI JALAN PERUM TAMAN PUTRI FORTUNA BLOK A S/D D RT.3 RW.8 MERPATI 4 | - | 137.112.800 |
SEMENISASI JALAN PERUM TEMBESI RAYA RW 20 (POKMAS TEMBESI RAYA) VOL-314M2 | KELURAHAN KIBING | - | - | SEMENISASI JALAN PERUM TEMBESI RAYA RW 20 (POKMAS TEMBESI RAYA) VOL-314M2 | - | 106.064.200 |
SEMENISASI JALAN PERUM TIBAN ANGGREK RT 01 RW 12 POKMAS PATEN | RT 01 RW 12 KELURAHAN TIBAN INDAH | - | - | SEMENISASI JALAN PERUM TIBAN ANGGREK RT 01 RW 12 POKMAS PATEN | - | 74.736.200 |
SEMENISASI JALAN PERUM. ALAMANDA RT.003 RW.006 VOL. 488 M2-POKMAS ALAMANDA | KELURAHAN BATU SELICIN | - | - | SEMENISASI JALAN PERUM. ALAMANDA RT.003 RW.006 VOL. 488 M2-POKMAS ALAMANDA | - | 182.114.900 |
SEMENISASI JALAN PERUM. BLOK VI RT. 001 RW.003 VOL. 352 M2-POKMAS FLAMBOYAN | KELURAHAN BATU SELICIN | - | - | SEMENISASI JALAN PERUM. BLOK VI RT. 001 RW.003 VOL. 352 M2-POKMAS FLAMBOYAN | - | 130.714.100 |
SEMENISASI JALAN PERUM. BLOK VI RT. 002 RW.003 VOL. 464 M2 POKMAS MELATI | KELURAHAN BATU SELICIN | - | - | SEMENISASI JALAN PERUM. BLOK VI RT. 002 RW.003 VOL. 464 M2 POKMAS MELATI | - | 173.292.900 |
SEMENISASI JALAN PERUM. BLOK VI RT.003 RW.003 VOL.432 M2 POKMAS MAWAR | KELURAHAN BATU SELICIN | - | - | SEMENISASI JALAN PERUM. BLOK VI RT.003 RW.003 VOL.432 M2 POKMAS MAWAR | - | 161.531.700 |
SEMENISASI JALAN PERUM. PURIMAS RT02,03 RW 022 (POKMAS PURIMAS) VOLUME 633M2 | KELURAHAN BULIANG | - | - | SEMENISASI JALAN PERUM. PURIMAS RT02,03 RW 022 (POKMAS PURIMAS) VOLUME 633M2 | - | 210.024.100 |
SEMENISASI JALAN PERUM. TAMAN LESTARI BLOK A5 RT 02 RW 15 ( POKMAS LESTARI JAYA ) - VOLUME 493M2 | KELURAHAN KIBING | - | - | SEMENISASI JALAN PERUM. TAMAN LESTARI BLOK A5 RT 02 RW 15 ( POKMAS LESTARI JAYA ) - VOLUME 493M2 | - | 163.759.200 |
SEMENISASI JALAN PERUM.BALOI MAS INDAH RT.03 RW.09 VOL.316 M2 POKMAS 4 BALOI INDAH | KELURAHAN BALOI INDAH | - | - | SEMENISASI JALAN PERUM.BALOI MAS INDAH RT.03 RW.09 VOL.316 M2 POKMAS 4 BALOI INDAH | - | 117.626.300 |
SEMENISASI JALAN PERUMAHAN BAITUL HASANAH RT 02 RW 19 (POKMAS BOUGENVILE 9 - 300M2) | KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN PERUMAHAN BAITUL HASANAH RT 02 RW 19 (POKMAS BOUGENVILE 9 - 300M2) | - | 107.255.500 |
SEMENISASI JALAN PERUMAHAN BUKIT TIBAN PERMAI RT 01 RW 15 POKMAS BOUGENVILE 10 | RT 01 RW 15 KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN PERUMAHAN BUKIT TIBAN PERMAI RT 01 RW 15 POKMAS BOUGENVILE 10 | - | 91.798.300 |
SEMENISASI JALAN PERUMAHAN MUTIARA VIEW RT 02 RW 11 (POKMAS BOUGENVILE 2 - 300 M2) | KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN PERUMAHAN MUTIARA VIEW RT 02 RW 11 (POKMAS BOUGENVILE 2 - 300 M2) | - | 107.699.900 |
SEMENISASI JALAN PERUMAHAN TAMAN ASRI RT 01 RW 019 (POKMAS BOUGENVILE 5 - 300M2) | KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN PERUMAHAN TAMAN ASRI RT 01 RW 019 (POKMAS BOUGENVILE 5 - 300M2) | - | 110.909.700 |
SEMENISASI JALAN PERUMAHAN TAMAN LESTARI RT02,RT03 RW 25 ( POKMAS LESTARI MANDIRI )-VOLUME 630M2 | KELURAHAN KIBING | - | - | SEMENISASI JALAN PERUMAHAN TAMAN LESTARI RT02,RT03 RW 25 ( POKMAS LESTARI MANDIRI )-VOLUME 630M2 | - | 189.621.000 |
SEMENISASI JALAN PERUMAHAN TIBAN BUKIT ASRI RT 01 RW 10 POKMAS BOUGENVILE 3 | RT 01 RW 10 KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN PERUMAHAN TIBAN BUKIT ASRI RT 01 RW 10 POKMAS BOUGENVILE 3 | - | 114.283.400 |
SEMENISASI JALAN PERUMAHAN TIBAN IMPIAN RT 02 RW 17 POKMAS BOUGENVILE 12 | RT 02 RW 17 KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN PERUMAHAN TIBAN IMPIAN RT 02 RW 17 POKMAS BOUGENVILE 12 | - | 103.601.300 |
SEMENISASI JALAN PERUMAHAN TIBAN KOPERASI RT 02 RW 07 POKMAS BOUGENVILE 1 | RT 02 RW 07 KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN PERUMAHAN TIBAN KOPERASI RT 02 RW 07 POKMAS BOUGENVILE 1 | - | 102.262.200 |
SEMENISASI JALAN PERUMAHAN TIBAN KOPERASI RT 03 RW 07 POKMAS BOUGENVILE 4 | RT 03 RW 07 KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN PERUMAHAN TIBAN KOPERASI RT 03 RW 07 POKMAS BOUGENVILE 4 | - | 104.149.100 |
SEMENISASI JALAN PERUMAHAN VILLA ALAM LESTARI II RT 02 RW 12 POKMAS BOUGENVILE 13 | RT 02 RW 12 KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN PERUMAHAN VILLA ALAM LESTARI II RT 02 RW 12 POKMAS BOUGENVILE 13 | - | 107.255.500 |
SEMENISASI JALAN RT 002 RW 004 POKMAS LESTARI 4 | RT 002 RW 004 KELURAHAN PATAM LESTARI | - | - | SEMENISASI JALAN RT 002 RW 004 POKMAS LESTARI 4 | - | 62.181.900 |
SEMENISASI JALAN RT 01 RW 02 VOL.580M2 POKMAS PELITA MADANI 07 | RT 01 RW 02 | - | - | SEMENISASI JALAN RT 01 RW 02 VOL.580M2 POKMAS PELITA MADANI 07 | - | 215.928.900 |
SEMENISASI JALAN RT 01 RW 03 POKMAS BELIMBING I | RT 01 RW 03 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 01 RW 03 POKMAS BELIMBING I | - | 37.670.600 |
SEMENISASI JALAN RT 01 RW 07 POKMAS STRAWBERY I | RT 01 RW 07 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 01 RW 07 POKMAS STRAWBERY I | - | 85.726.300 |
SEMENISASI JALAN RT 01 RW 08 CEMPEDAK 1 | RT 01 RW 08 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 01 RW 08 CEMPEDAK 1 | - | 103.965.400 |
SEMENISASI JALAN RT 01 RW 12 POKMAS KEDONDONG 1 | RT 01 RW 12 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 01 RW 12 POKMAS KEDONDONG 1 | - | 165.974.600 |
SEMENISASI JALAN RT 01 RW 15 POKMAS SIRSAK 1 | RT 01 RW 15 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 01 RW 15 POKMAS SIRSAK 1 | - | 91.678.400 |
SEMENISASI JALAN RT 01/RW 06, HKBP BATAM CENTER, KELURAHAN BALOI PERMAI, BATAM KOTA | KOMPLEK GEREJA HKBP BATAM CENTER RT 01/RW 06, HKBP BATAM CENTER, KELURAHAN BALOI PERMAI, BATAM KOTA | - | - | SEMENISASI JALAN RT 01/RW 06, HKBP BATAM CENTER, KELURAHAN BALOI PERMAI, BATAM KOTA | - | 169.313.989 |
SEMENISASI JALAN RT 02 RW 01 TANJUNG PANA KELURAHAN PEMPING (POKMAS TANJUNG PANA 1 - 270 M2) | KELURAHAN PEMPING | - | - | SEMENISASI JALAN RT 02 RW 01 TANJUNG PANA KELURAHAN PEMPING (POKMAS TANJUNG PANA 1 - 270 M2) | - | 109.886.730 |
SEMENISASI JALAN RT 02 RW 02 MONGKOL KELURAHAN PEMPING ARAH KE SUMUR (POKMAS MONGKOL 2 - 248M2) | KELURAHAN PEMPING | - | - | SEMENISASI JALAN RT 02 RW 02 MONGKOL KELURAHAN PEMPING ARAH KE SUMUR (POKMAS MONGKOL 2 - 248M2) | - | 100.935.660 |
SEMENISASI JALAN RT 02 RW 02 MONGKOL KELURAHAN PEMPING SAMPING RUMAH PAK RUSLI(POKMASMONGKOL1-275M2) | KELURAHAN PEMPING | - | - | SEMENISASI JALAN RT 02 RW 02 MONGKOL KELURAHAN PEMPING SAMPING RUMAH PAK RUSLI(POKMASMONGKOL1-275M2) | - | 111.924.620 |
SEMENISASI JALAN RT 02 RW 02 POKMAS ANGGUR 2 | RT 02 RW 02 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 02 RW 02 POKMAS ANGGUR 2 | - | 84.165.400 |
SEMENISASI JALAN RT 02 RW 06 VOLUME 350 M2 POKMAS TARUNA | KELURAHAN TANJUNG UMA | - | - | SEMENISASI JALAN RT 02 RW 06 VOLUME 350 M2 POKMAS TARUNA | - | 127.862.900 |
SEMENISASI JALAN RT 02 RW 09 PERUM VILLA PARADISE (POKMAS PARADISE MAJU) VOL-525M2 | KELURAHAN BUKIT TEMPAYAN | - | - | SEMENISASI JALAN RT 02 RW 09 PERUM VILLA PARADISE (POKMAS PARADISE MAJU) VOL-525M2 | - | 193.855.200 |
SEMENISASI JALAN RT 02 RW 09 POKMAS KUINI II | RT 02 RW 09 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 02 RW 09 POKMAS KUINI II | - | 40.516.300 |
SEMENISASI JALAN RT 02 RW 10 VOLUME 300 M2 POKMAS ISTIQOMAH | KELURAHAN TANJUNG UMA | - | - | SEMENISASI JALAN RT 02 RW 10 VOLUME 300 M2 POKMAS ISTIQOMAH | - | 71.156.800 |
SEMENISASI JALAN RT 02/38, BUKIT RAYA, KOTA BATAM | RT 02/38, BUKIT RAYA, KOTA BATAM | - | - | SEMENISASI JALAN RT 02/38, BUKIT RAYA, KOTA BATAM | - | 154.492.786 |
SEMENISASI JALAN RT 03 RW 01 KAMPUNG TENGAH KELURAHAN PEMPING (POKMAS KAMPUNG TENGAH 1 - 281 M2) | KELURAHAN PEMPING | - | - | SEMENISASI JALAN RT 03 RW 01 KAMPUNG TENGAH KELURAHAN PEMPING (POKMAS KAMPUNG TENGAH 1 - 281 M2) | - | 114.361.320 |
SEMENISASI JALAN RT 03 RW 01 PANGKALAN PELAM KELURAHAN PEMPING (POKMAS KAMPUNG TENGAH 2 - 259 M2) | KELURAHAN PEMPING | - | - | SEMENISASI JALAN RT 03 RW 01 PANGKALAN PELAM KELURAHAN PEMPING (POKMAS KAMPUNG TENGAH 2 - 259 M2) | - | 105.412.100 |
SEMENISASI JALAN RT 03 RW 03 POKMAS BELIMBING II | RT 03 RW 03 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 03 RW 03 POKMAS BELIMBING II | - | 67.069.200 |
SEMENISASI JALAN RT 03 RW 04 POKMAS PEAR | RT 03 RW 04 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 03 RW 04 POKMAS PEAR | - | 132.557.700 |
SEMENISASI JALAN RT 03 RW 08 POKMAS CEMPEDAK 3 | RT 03 RW 08 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 03 RW 08 POKMAS CEMPEDAK 3 | - | 36.988.600 |
SEMENISASI JALAN RT 03 RW 11 KELURAHAN TANJUNG UMA VOL.60 M2 POKMAS KAMBOJA | KELURAHAN TANJUNG UMA | - | - | SEMENISASI JALAN RT 03 RW 11 KELURAHAN TANJUNG UMA VOL.60 M2 POKMAS KAMBOJA | - | 22.446.600 |
SEMENISASI JALAN RT 04 RW 05 POKMAS MELON | RT 04 RW 05 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 04 RW 05 POKMAS MELON | - | 138.435.000 |
SEMENISASI JALAN RT 04 RW 06 (POKMAS ALPUKAT 3 - 204 M2) | KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 04 RW 06 (POKMAS ALPUKAT 3 - 204 M2) | - | 71.500.000 |
SEMENISASI JALAN RT 04 RW 10 TANJUNG TERITIP VOLUME 300M2 ( POKMAS MAWAR ) | KELURAHAN TANJUNG UMA | - | - | SEMENISASI JALAN RT 04 RW 10 TANJUNG TERITIP VOLUME 300M2 ( POKMAS MAWAR ) | - | 102.803.800 |
SEMENISASI JALAN RT 04 RW 11 POKMAS SALAK 3 | RT 04 RW 11 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 04 RW 11 POKMAS SALAK 3 | - | 151.108.100 |
SEMENISASI JALAN RT 04 RW 13 (POKMAS NANAS - 371 M2) | KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 04 RW 13 (POKMAS NANAS - 371 M2) | - | 129.045.400 |
SEMENISASI JALAN RT 05 RW 01 (POKMAS PEPAYA 2 - 150 M2) | KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 05 RW 01 (POKMAS PEPAYA 2 - 150 M2) | - | 52.291.800 |
SEMENISASI JALAN RT 05 RW 02 VOL.560M2 POKMAS PELITA MADANI 08 | RT 05 RW 02 | - | - | SEMENISASI JALAN RT 05 RW 02 VOL.560M2 POKMAS PELITA MADANI 08 | - | 208.577.600 |
SEMENISASI JALAN RT 05 RW 12 POKMAS KEDONDONG 2 | RT 05 RW 12 KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 05 RW 12 POKMAS KEDONDONG 2 | - | 43.099.100 |
SEMENISASI JALAN RT 06 RW 01 (POKMAS PEPAYA 3 - 105 M2) | KELURAHAN TIBAN LAMA | - | - | SEMENISASI JALAN RT 06 RW 01 (POKMAS PEPAYA 3 - 105 M2) | - | 36.581.600 |
SEMENISASI JALAN RT 3 RW 3 KELURAHAN KAMPUNG PELITA VOL. 560M2 POKMAS PELITA MADANI 03 | RT 03 RW 03 | - | - | SEMENISASI JALAN RT 3 RW 3 KELURAHAN KAMPUNG PELITA VOL. 560M2 POKMAS PELITA MADANI 03 | - | 208.577.600 |
SEMENISASI JALAN RT. 003 RW. 001 KEL. BATU BESAR (TA. 2020) (POKMAS SRIKANDI - VOLUME 150 M2) | KELURAHAN BATU BESAR | - | - | SEMENISASI JALAN RT. 003 RW. 001 KEL. BATU BESAR (TA. 2020) (POKMAS SRIKANDI - VOLUME 150 M2) | - | 56.075.800 |
SEMENISASI JALAN RT. 02 RW 01. KEL TANJUNG UMA (POKMAS MANGGA) | KELURAHAN TANJUNG UMA | - | - | SEMENISASI JALAN RT. 02 RW 01. KEL TANJUNG UMA (POKMAS MANGGA) | - | 20.502.900 |
SEMENISASI JALAN RT. 04 / RW. 08 KEL. TANJUNG BUNTUNG-BENGKONG BATAM | RT. 04 / RW. 08 KEL. TANJUNG BUNTUNG-BENGKONG BATAM | - | - | SEMENISASI JALAN RT. 04 / RW. 08 KEL. TANJUNG BUNTUNG-BENGKONG BATAM | - | 154.432.610 |
SEMENISASI JALAN RT.001 RW.002 KELURAHAN BATU BESAR (TA.2020) (POKMAS MELATI 1 VOLUME 350 M2) | KELURAHAN BATU BESAR | - | - | SEMENISASI JALAN RT.001 RW.002 KELURAHAN BATU BESAR (TA.2020) (POKMAS MELATI 1 VOLUME 350 M2) | - | 122.413.500 |
SEMENISASI JALAN RT.001 RW.010 KELURAHAN BATU BESAR (POKMAS KAMPUNG TENGAH 3) 416M2 | KELURAHAN BATU BESAR | - | - | SEMENISASI JALAN RT.001 RW.010 KELURAHAN BATU BESAR (POKMAS KAMPUNG TENGAH 3) 416M2 | - | 150.085.100 |
SEMENISASI JALAN RT.002 RW.010 KEL. BATU BESAR (POKMAS KP TENGAH JAYA SATU) - 340 M2 | KELURAHAN BATU BESAR | - | - | SEMENISASI JALAN RT.002 RW.010 KEL. BATU BESAR (POKMAS KP TENGAH JAYA SATU) - 340 M2 | - | 121.246.400 |
SEMENISASI JALAN RT.004 RW.001 KELURAHAN BATU BESAR (TA.2020) (POKMAS BATU BESAR 04 - VOLUME 300 M2) | KELURAHAN BATU BESAR | - | - | SEMENISASI JALAN RT.004 RW.001 KELURAHAN BATU BESAR (TA.2020) (POKMAS BATU BESAR 04 - VOLUME 300 M2) | - | 107.520.600 |
SEMENISASI JALAN RT.006 RW.010 KELURAHAN BATU BESAR (POKMAS SIRATUL JANNAH) - 350 M2 | KELURAHAN BATU BESAR | - | - | SEMENISASI JALAN RT.006 RW.010 KELURAHAN BATU BESAR (POKMAS SIRATUL JANNAH) - 350 M2 | - | 123.442.000 |
SEMENISASI JALAN RT.01 RW.01 (POKMAS RAMBUTAN) | KELURAHAN TANJUNG UMA | - | - | SEMENISASI JALAN RT.01 RW.01 (POKMAS RAMBUTAN) | - | 22.368.500 |
SEMENISASI JALAN RT.01 RW.01 BALOI PERSERO VOL.400 M2 POKMAS 9 BALOI INDAH | KELURAHAN BALOI INDAH | - | - | SEMENISASI JALAN RT.01 RW.01 BALOI PERSERO VOL.400 M2 POKMAS 9 BALOI INDAH | - | 149.769.400 |
SEMENISASI JALAN RT.01 RW.09 (POKMAS KPN) | KELURAHAN TANJUNG UMA | - | - | SEMENISASI JALAN RT.01 RW.09 (POKMAS KPN) | - | 138.206.200 |
SEMENISASI JALAN RT.01 RW.11 BLOK E. KAVLING SENJULUNG | KEL. KABIL, KEC. NONGSA | - | - | SEMENISASI JALAN RT.01 RW.11 BLOK E. KAVLING SENJULUNG | - | 131.272.000 |
SEMENISASI JALAN RT.02 RW.06 KOMPLEK ANGGREK PERMAI BLOK H VOL.500 M2 POKMAS 8 BALOI INDAH | KELURAHAN BALOI INDAH | - | - | SEMENISASI JALAN RT.02 RW.06 KOMPLEK ANGGREK PERMAI BLOK H VOL.500 M2 POKMAS 8 BALOI INDAH | - | 186.524.800 |
SEMENISASI JALAN RT.05 RW.05 BATU BATAM VOL.514 M2 POKMAS 6 BALOI INDAH | KELURAHAN BALOI INDAH | - | - | SEMENISASI JALAN RT.05 RW.05 BATU BATAM VOL.514 M2 POKMAS 6 BALOI INDAH | - | 187.930.600 |
SEMENISASI JALAN RT05 RT07 RW01 PERUM. MUKAKUNING INDAH 2 (POKMAS GENTA 2 TERPADU) VOL-388M2 | KELURAHAN BULIANG | - | - | SEMENISASI JALAN RT05 RT07 RW01 PERUM. MUKAKUNING INDAH 2 (POKMAS GENTA 2 TERPADU) VOL-388M2 | - | 130.072.800 |
SEMENISASI JALAN SAMPING LAPANGAN VOLLY BLOK IV RT 002 RW 002 ( MERPATI ) | BATU SELICIN | - | - | SEMENISASI JALAN SAMPING LAPANGAN VOLLY BLOK IV RT 002 RW 002 ( MERPATI ) | - | 208.577.600 |
SEMENISASI JALAN SIMPANG SUPA'AT S/D MASJID AL-HIJRAH RT.003/RW.001 (POKMAS AIR RAJA 14 - 118 M²) | KELURAHAN AIR RAJA | - | - | SEMENISASI JALAN SIMPANG SUPA'AT S/D MASJID AL-HIJRAH RT.003/RW.001 (POKMAS AIR RAJA 14 - 118 M²) | - | 144.078.000 |
SEMENISASI JALAN TAHAP 1. PULAU MELAWA RT.001 / RW.004 SEKANAK RAYA 2021 (POKMASDAU2 - 211 M2) | KELURAHAN SEKANAK RAYA | - | - | SEMENISASI JALAN TAHAP 1. PULAU MELAWA RT.001 / RW.004 SEKANAK RAYA 2021 (POKMASDAU2 - 211 M2) | - | 85.875.350 |
SEMENISASI JALAN TAMAN EIRENE RT 02 RW 14 (POKMAS BOUGENVILE 18 - 355M2) | KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN TAMAN EIRENE RT 02 RW 14 (POKMAS BOUGENVILE 18 - 355M2) | - | 129.829.700 |
SEMENISASI JALAN TELUK NIPAH RT. 002 RW. 002 - POKMAS KABIL RAYA 44 - VOLUME 225 M2 | KABIL | - | - | SEMENISASI JALAN TELUK NIPAH RT. 002 RW. 002 - POKMAS KABIL RAYA 44 - VOLUME 225 M2 | - | 84.271.000 |
SEMENISASI JALAN TIBAN BUKIT ASRI RT 04 RW 10 (POKMAS BOUGENVILE 19 - 340 M2) | KELURAHAN TIBAN BARU | - | - | SEMENISASI JALAN TIBAN BUKIT ASRI RT 04 RW 10 (POKMAS BOUGENVILE 19 - 340 M2) | - | 119.906.600 |
SEMENISASI JALAN UTAMA JL.KARTINI 1 GG MULIA RT.04 RW.02 POKMAS KEPUDANG 5 | RT 04 RW 02 KELURAHAN SUNGAI HARAPAN | - | - | SEMENISASI JALAN UTAMA JL.KARTINI 1 GG MULIA RT.04 RW.02 POKMAS KEPUDANG 5 | - | 111.753.400 |
SEMENISASI JALAN UTAMA JL.KARTINI 4 GG MULIA RT 04 RW 02 POKMAS KEPUDANG 4 | RT 04 RW 02 KELURAHAN SUNGAI HARAPAN | - | - | SEMENISASI JALAN UTAMA JL.KARTINI 4 GG MULIA RT 04 RW 02 POKMAS KEPUDANG 4 | - | 133.739.100 |
SEMENISASI JALAN UTAMA PERMUKIMAN RT.007 RW.004 KAVLING NONGSA BELAKANG SD THABITA(KUDA HITAM) 400M2 | KELURAHAN SAMBAU | - | - | SEMENISASI JALAN UTAMA PERMUKIMAN RT.007 RW.004 KAVLING NONGSA BELAKANG SD THABITA(KUDA HITAM) 400M2 | - | 149.785.900 |
SEMENISASI JALAN UTAMA PERMUKIMAN RT.06 RW.04 KAV NONGSA BELAKANG UPT DINSOS (SAMBAU 4 BERSATU)440M2 | KELURAHAN SAMBAU | - | - | SEMENISASI JALAN UTAMA PERMUKIMAN RT.06 RW.04 KAV NONGSA BELAKANG UPT DINSOS (SAMBAU 4 BERSATU)440M2 | - | 164.795.400 |
SEMENISASI JL. TIBAN KENCANA RW 04 POKMAS SELAR | RT 003 RW 04 KELURAHAN TIBAN INDAH | - | - | SEMENISASI JL. TIBAN KENCANA RW 04 POKMAS SELAR | - | 149.273.300 |
SEMENISASI JLAN LINGKUNGAN TANJUNG SENGKUANG BLOK E RT 001 RW 011 | TANJUNG SENGKUANG BLOK E RT 001 RW 011, KELURAHAN TANJUNG SENGKUANG, KECAMATAN BATU AMPAR | - | - | SEMENISASI JLAN LINGKUNGAN TANJUNG SENGKUANG BLOK E RT 001 RW 011 | - | 44.942.700 |
SEMENISASI KAVLING SAGULUNG LAMA RT. 01 RW. 10 | KELURAHAN SAGULUNG KOTA | - | - | SEMENISASI KAVLING SAGULUNG LAMA RT. 01 RW. 10 | - | 187.117.700 |
SEMENISASI LANJUTAN SUNGAI BUAYA RT.002/ RW.004. KEL. SEKANAK RAYA ( PIK 2020 ) (POKMAS 2 - 139 M2) | KELURAHAN SEKANAK RAYA | - | - | SEMENISASI LANJUTAN SUNGAI BUAYA RT.002/ RW.004. KEL. SEKANAK RAYA ( PIK 2020 ) (POKMAS 2 - 139 M2) | - | 56.570.470 |
SEMENISASI MASYEBA PERMAI RT 001 RW 011 POKMAS LESTARI 2 | RT 001 RW 011 KELURAHAN PATAM LESTARI | - | - | SEMENISASI MASYEBA PERMAI RT 001 RW 011 POKMAS LESTARI 2 | - | 116.196.300 |
SEMENISASI PATAM ASRI RT 006 RW 001 POKMAS LESTARI 3 | RT 006 RW 001 KELURAHAN PATAM LESTARI | - | - | SEMENISASI PATAM ASRI RT 006 RW 001 POKMAS LESTARI 3 | - | 124.481.500 |
SEMENISASI PERUM PONDOK PELANGI 2 BLOK F RT 004 RW 09 POKMAS TONGKOL | RT 004 RW 09 KELURAHAN TIBAN INDAH | - | - | SEMENISASI PERUM PONDOK PELANGI 2 BLOK F RT 004 RW 09 POKMAS TONGKOL | - | 219.351.000 |
SEMENISASI PERUM SIRIAON REGENCY BLOK J POKMAS KEMBUNG | RT 002 RW 011 KELURAHAN TIBAN INDAH | - | - | SEMENISASI PERUM SIRIAON REGENCY BLOK J POKMAS KEMBUNG | - | 24.643.300 |
SEMENISASI PERUM TIBAN BERLIAN BLOK A-B RT. 001 RW 13 POKMAS TUNA | RT 001 RW 013 KELURAHAN TIBAN INDAH | - | - | SEMENISASI PERUM TIBAN BERLIAN BLOK A-B RT. 001 RW 13 POKMAS TUNA | - | 74.736.200 |
SEMENISASI PERUM TIBAN BERLIAN RT 004 RW 13 POKMAS BENGGOL | RT 004 RW 013 KELURAHAN TIBAN INDAH | - | - | SEMENISASI PERUM TIBAN BERLIAN RT 004 RW 13 POKMAS BENGGOL | - | 94.788.100 |
SEMENISASI PERUM TIBAN BTN BLOK L 22- L35 POKMAS GURAME | RT 004 RW 013 KELURAHAN TIBAN INDAH | - | - | SEMENISASI PERUM TIBAN BTN BLOK L 22- L35 POKMAS GURAME | - | 97.268.600 |
SEMENISASI PERUM TIBAN INDAH PERMAI BLOK D2 50 M RT 005 P RW 05 POKMAS BAWAL | RT 005 RW 005 KELURAHAN TIBAN INDAH | - | - | SEMENISASI PERUM TIBAN INDAH PERMAI BLOK D2 50 M RT 005 P RW 05 POKMAS BAWAL | - | 74.736.200 |
SEMENISASI PERUM. FORTUNA RAYA I RT. 04 RW. 13 | KELURAHAN SAGULUNG KOTA | - | - | SEMENISASI PERUM. FORTUNA RAYA I RT. 04 RW. 13 | - | 171.458.100 |
SEMENISASI RT.02 RW.02 BALOI TOTAL VOL.150 M2 POKMAS 10 BALOI INDAH | KELURAHAN BALOI INDAH | - | - | SEMENISASI RT.02 RW.02 BALOI TOTAL VOL.150 M2 POKMAS 10 BALOI INDAH | - | 56.150.600 |
SEMENISASI TAMAN LESTARI BLOK A RW.15 | KECAMATAN BATU AJI | - | - | SEMENISASI TAMAN LESTARI BLOK A RW.15 | - | 169.339.000 |
SEMENISASI TIBAN BERLIAN RT 004 RW013 POKMAS KAKAP | RT 004 RW 013 KELURAHAN TIBAN INDAH | - | - | SEMENISASI TIBAN BERLIAN RT 004 RW013 POKMAS KAKAP | - | 93.513.200 |
SEMENISASI TIBAN DAMAI JALAN UTAMA POKMAS BARONANG | RT 004 RW 07 KELURAHAN TIBAN INDAH | - | - | SEMENISASI TIBAN DAMAI JALAN UTAMA POKMAS BARONANG | - | 74.736.200 |
SEMENISASI TIBAN DAMAI RT 004 RW 07 POKMAS CAKALANG | RT 004 RW 07 KELURAHAN TIBAN INDAH | - | - | SEMENISASI TIBAN DAMAI RT 004 RW 07 POKMAS CAKALANG | - | 74.736.200 |
SEMENISASI TIBAN I BLOK C RT 001 RW 004 (PATAM 10 - 585M2) | KELURAHAN PATAM LESTARI | - | - | SEMENISASI TIBAN I BLOK C RT 001 RW 004 (PATAM 10 - 585M2) | - | 200.027.300 |
SEMENISASIJALAN(MASJIDRUMAISYAH)KAMPUNGBUGISBATUGAJAH RT.002/RW.001SEKANAKRAYA2021(POKMASDAU5-189M2) | KELURAHAN SEKANAK RAYA | - | - | SEMENISASIJALAN(MASJIDRUMAISYAH)KAMPUNGBUGISBATUGAJAH RT.002/RW.001SEKANAKRAYA2021(POKMASDAU5-189M2) | - | 76.921.600 |
SEMENISASIJALANMENUJUSMPN2BELAKANGPADANG(KAMPUNGBARURT.02/RW.05)(POKMASDAUTAMBAHANTGSARI XIII-385M2) | KELURAHAN TANJUNG SARI | - | - | SEMENISASIJALANMENUJUSMPN2BELAKANGPADANG(KAMPUNGBARURT.02/RW.05)(POKMASDAUTAMBAHANTGSARI XIII-385M2) | - | 156.690.500 |
SEMINISASI JALAN LINGKUNGAN PERUM MASYEBA BLOK K/E/CC/OR RT 1, 2, 3 ,4 ,6 RW 04 | KELURAHAN BUKIT TEMPAYAN (POKMAS MASYEBA INDAH) VOL-300M2 | - | - | SEMINISASI JALAN LINGKUNGAN PERUM MASYEBA BLOK K/E/CC/OR RT 1, 2, 3 ,4 ,6 RW 04 | - | 111.691.800 |
SEMINISASI JALAN LINGKUNGAN RT.05 RW.010 KAVLING SENJULUNG POKMAS KABIL RAYA 19 VOLUME 547 M2 | KABIL | - | - | SEMINISASI JALAN LINGKUNGAN RT.05 RW.010 KAVLING SENJULUNG POKMAS KABIL RAYA 19 VOLUME 547 M2 | - | 204.870.600 |
SERVICES, ADDITIONAL ELECTRICK ROLLING DOOR FOR PROJECT STRUCTURE OVER HEAD CRANE | KAWASAN INDUSTRI TERPADU KABIL | - | - | SERVICES, ADDITIONAL ELECTRICK ROLLING DOOR FOR PROJECT STRUCTURE OVER HEAD CRANE | - | 91.000.000 |
SMENISASI JALAN KAV. BUKIT MAKMUR RT 001 RW 013 ( 360 M² ) POKMAS MAKMUR JAYA | RT 001 RW 013 TANJUNG SENGKUANG | - | - | SMENISASI JALAN KAV. BUKIT MAKMUR RT 001 RW 013 ( 360 M² ) POKMAS MAKMUR JAYA | - | 134.787.620 |
SMENISASI JALAN LINGKUNGAN PERUM GMP THP II RT 002.004 RW 004 ( 350 M² ) POKMAS RAJAWALI 4 | PERUM GMP THP.II RT 002.004 RW 004 TANJUNG SENGKUANG | - | - | SMENISASI JALAN LINGKUNGAN PERUM GMP THP II RT 002.004 RW 004 ( 350 M² ) POKMAS RAJAWALI 4 | - | 130.596.400 |
SMENISASI JALAN LINGKUNGAN TANJUNG SENGKUANG RT 003 RW 002 ( 148 M² ) POKMAS PINANG | RT 003 RW 002 TANJUNG SENGKUANG | - | - | SMENISASI JALAN LINGKUNGAN TANJUNG SENGKUANG RT 003 RW 002 ( 148 M² ) POKMAS PINANG | - | 47.129.500 |
SOIL INVESTIGATION WORK | BATAM CENTRE | - | - | SOIL INVESTIGATION WORK | - | 241.600.000 |
SOLDIER PILE WORK AND SETTLEMENT MARKER FOR SLOPE STABILITY PROJECT | MONTIGO RESORT, NONGSA | - | - | SOLDIER PILE WORK AND SETTLEMENT MARKER FOR SLOPE STABILITY PROJECT | - | 804.693.000 |
STRUKTUR ARSITEK PLUMBING DI PROYEK CITRA PLAZA NAGOYA BATAM | NAGOYA BATAM | - | - | STRUKTUR ARSITEK PLUMBING DI PROYEK CITRA PLAZA NAGOYA BATAM | - | 382.157.008.605 |
SUPPLY LABOUR, MATERIAL, TOOLS AND EQUIPMENT FOR PROPOSED DESIGN AND BUILT ROAD, PAVING, FOOTPATH AND DRAINAGE WORKS, COMPLETE WITH BOX CULVERT AT PLOT B2, | MARINA CITY | - | - | SUPPLY LABOUR, MATERIAL, TOOLS AND EQUIPMENT FOR PROPOSED DESIGN AND BUILT ROAD, PAVING, FOOTPATH AN | - | 3.737.600.000 |
Semenisasi Jalan Balok D Perum.Kanaan RT.07 RW.05 ( POKMAS 7 BALOI INDAH ) | KELURAHAN BALOI INDAH | - | - | Semenisasi Jalan Balok D Perum.Kanaan RT.07 RW.05 ( POKMAS 7 BALOI INDAH ) | - | 193.408.320 |
Semenisasi Jalan Lingkungan Perumahan Pondok Asri RT.01 RW.08 Tahun 2020 (PONDOK ASRI 01-480M2) | KELURAHAN SUNGAI PANAS | - | - | Semenisasi Jalan Lingkungan Perumahan Pondok Asri RT.01 RW.08 Tahun 2020 (PONDOK ASRI 01-480M2) | - | 179.755.400 |
Semenisasi Jalan Lingkungan di Kampung Tua Dapur 12 Pantai RW. 09 ( 300 m² ) | RT 02 RW 09 DAPUR 12 PANTAI | - | - | Semenisasi Jalan Lingkungan di Kampung Tua Dapur 12 Pantai RW. 09 ( 300 m² ) | - | 106.141.200 |
TO REPAIR FLOOR AT MOOLDING F2 | PURI INDUSTRIAL PARK 2000, BATAM CENTRE KEL. BALOI PERMAI | - | - | TO REPAIR FLOOR AT MOOLDING F2 | - | 18.980.000 |
UPGRADE KUBIKEL AIR INSULATED (PLG TM)/VM6-MG | GP BP BATAM BATAM CENTRE & GD MUTU MANIKAM | - | - | UPGRADE KUBIKEL AIR INSULATED (PLG TM)/VM6-MG | - | 19.696.000 |
PROYEK UNIVERSITAS INTERNASIONAL BATAM | SEI LADI, JL. GAJAH MADA, BALOI PERMAI, KEC. SEKUPANG, KOTA BATAM, KEPULAUAN RIAU 29442 | SEKUPANG | PT. MULTIBANGUN ADHITAMA KONTRUKSI | PEMBANGUNAN GEDUNG UTAMA DAN REKTOR | 2022 | 21.000.000.000 |
Gor badminton golden sand | tiban indah kota batam | SEKUPANG | - | pembangunan gor badminton | 2022 | 36.000.000.000 |
ruko golden sand | tiban indah kota batam | SEKUPANG | - | pembangunan ruko | 2022 | 56.000.000.000 |
PROYEK APARTEMEN NUVASA BAY | JL HANG LEKIU NONGSA | NONGSA | - | PEMBANGUNAN | 2021 | 3.000.000.000 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | PT BATINDO MEBEL PERKASA-KK PANAU KABIL | NONGSA | - | PEMBANGUNAN | 2021 | 135.779.794 |
REVITALISASI MASJID AL KAUTSAR PERUMAHAN MASYEBA GADING | KELURAHAN SEI HARAPAN, KECAMAN SEKUPANG, KOTA BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 115.683.273 |
SEMENISASI JALAN BLOK I KAVLING ABADI JAYA RT 01/RW 03 | KELURAHAN SUNGAI LEKOP, KECAMATAN SAGULUNG, KOTA BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 115.263.636 |
PENATAAN LINGKUNGAN PERUMAHAN CLASIK INDAH | KOTA BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 115.830.909 |
PEMANCANGAN RC PILE 400X400MM | PT MCDERMOTT INDONESIA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.387.000.000 |
RENOVASI BANGUNAN PANTI ASUHAN MUHAMMADIYAH AL ANSHORI, PERUMAHAN BAMBU KUNING BLOK B.16 NO. 16 | KEL. BUKIT TEMPAYAN KEC. BATU AJI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 77.142.727 |
PENATAAN LINGKUNGAN PERBAIKAN FASILITAS UMUM (FASUM) PERUM BAMBU KUNING RW 03 BLOK C | KEL. BUKIT TEMPAYAN, KECAMATAN BATU AJI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 77.190.909 |
REVITALISASI MUSHOLLA AT TAQWA PERUMAHAN PURI SURYA | KELURAHAN SUNGAI LANGKAI KEC. SAGULUNG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 77.130.909 |
PEKERJAAN STRUKTUR GEDUNG PERTAMA BUSINESS CENTRE | KAWASAN SHIPYARD PT. DOK WARISAN PERTAMA - PAX OCEAN | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.421.932.946 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU CANTOL DAN JTM-SUTM | BTS TELKOMSEL BTM569-KP CAKANG RT 03 RW 04 PULAU GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 55.749.903 |
PROYEK PRESERVASI KAPAL | DELTA SHIPYARD PANARAN DAPUR 12 SEI, PELUNGGUT | BATAM KOTA | - | PEMBANGUNAN | 2022 | 40.020.000 |
NEW CONSTRUCTION OF 6 LOT TYPE E FACTORY AT BATAMINDO INDUSTRIAL PARK | BATAMINDO INDUSTRIAL PARK | BATAM KOTA | - | PEMBANGUNAN | 2022 | 70.000.000.000 |
PEMBANGUNAN GUDANG UK. 30M X 42M | JALAN BRIGJEN KATAMSO (BUNDARAN), TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 780.000.000 |
PROYEK WORKSHOP PRODUKSI TAHAP 2 BA (2) | JL BRIGJEN KATAMSO LOT 8 KEL TANJUNG UNCANG KEC BATU AJI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 980.000.000 |
MECHANICAL INSTALLATION, ELECTRICAL, ENGINE FOUNDATION (SLAB) | POWER HOUSE KAWASAN INDUSTRIAL BATAMINDO PARK DAN JLN PUTRI HIJAU SAMPING PERUMAHAN GRIYA BATU AJI ASRI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.203.775.055 |
PEKERJAAN TAMBAHAN PENGADAAN DAN PEMASANGAN JARINGAN BARU | JL. BRIGJEN KATAMSO KM 7 KEL. TANJUNG UNCANG KEC. BATU AJI BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 754.002.951 |
INSTAL GENSET 1000KVA, SETTING LEVELING, SOUND PROFING DLL - NAGOYA | NAGOYA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 102.000.000 |
IMPROVEMENT AIRCON AT F1 STEP-2 (AIRCON WORK) | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 602.640.000 |
PEMASANGAN TIANG PANCANG MARVEL 2, 4200 TITIK | PT UNILEVER OLEOCHEMICAL INDONESIA SUMATERA UTARA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 35.233.020.000 |
PEMANCANGAN ONSHORE RC PILE 200 X 200 MM | BATAM - CENTRAL HILLS BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 262.909.091 |
PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | PT BERTUAH SAMUDERA ABADI - KP AIR NAGA KEL SIJANTUNG REMPANG - GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 127.654.673 |
RENOVATION UPPER CANTEEN LOT 207 | PT. EXCELITAS TECHNOLOGIES BATAM LOT 207 JLN. BERINGIN # 02-03 DAN WORKSHOP SEI BINTI TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 4.489.000.000 |
PENAMBAHAN RETAINING WALL BRONJONG DEPAN VILLA PANBIL BLOK BB2 | KAWASAN VILLA PANBIL, MUKA KUNING | BATAM KOTA | - | PEMBANGUNAN | 2022 | 82.324.250 |
COST FOR STINGER FULL SURFACE PREP & COATING | PELABUHAN SCN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.455.454.545 |
PENGECATAN HOTEL FOUR POINT, LAGOI - BINTAN | LAGOI, BINTAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 727.473.832 |
RENOVATION OF MAIN OFFICE BUILDING | JALAN BRIGJEN KATAMSO KM5, TANJUNG UNCANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.817.590.564 |
DECENTRALIZED STP IN PT BREDERO SHAW INDONESIA | JALAN HANG KESTURI I NO. 14, KAWASAN INDUSTRI TERPADU KABIL, BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 956.480.000 |
PENGECATAN HOTEL PLANET HOLIDAY BATAM | JL. RAJA ALI HAJI, JODOH - BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 798.615.000 |
PLTU SOFIFI 2X3 MW | DUSUN PASIGAU SOFIFI MALUKU UTARA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 75.990.000.000 |
SUPPLY AND INSTALL STEEL PLATE FOR REINFORCEMENT 2ND FLOOR AT PCL LINE #2 | PURI INDUSTRIAL PARK 2000 BATAM CENTER, KELURAHAN BALOI PERMAI, BATAM - 29463 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 32.120.000 |
PEKERJAAN PANCANG PHASE 2 | BATAM CENTRE | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.392.363.636 |
PEKERJAAN PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT TAHUN 2022 TAHAP 1 AREA BATAM | SAHID HOTEL BATAM CENTRE - OS STYLE T AJI - CATERING SEMERU BATAM CENTRE - SHIPURU HARBOUR BAY | BATU AMPAR | - | PEMBANGUNAN | 2022 | 532.929.990 |
NEW FIRE SPRINKLERS AE PLATS HOT OIL SYSTEM | KABIL KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 195.000.000 |
SEMENISASI JALAN LINGKUNGAN BLOK B RT 02 RW 09 KEL. DURIANGKANG (POKMAS DURIANGKANG 1 - 600 M2) | BLOK B RT 02 RW 09 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.721.000 |
SEMENISASI JALAN LINGKUNGAN BLOK I, J, K, L,M, N RT 04 RW 15 KEL. DURIANGKANG (POKMAS DURIANGKANG 2) | BLOK I, J, K, L, M, N RT 04 RW 15 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 210.588.400 |
SEMENISASI JALAN LINGKUNGAN DKT LAPANGAN SAKURA RT 01 RW 03 KEL. DURIANGKANG (POKMAS DURIANGKANG 3) | RT 01 RW 03 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 211.775.300 |
SEMENISASI JALAN LINGKUNGAN / GANG RT 02 RW 08 KEL. DURIANGKANG (POKMAS DURIANGKANG 4) | RT 02 RW 08 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 167.680.700 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 02 RW 02 KEL. DURIANGKANG (POKMAS DURIANGKANG 5) | RT 02 RW 02 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.808.000 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 03 RT 01 RW 07 KEL. DURIANGKANG (POKMAS DURIANGKANG 6) | RT 03 RT 01 RW 7 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 171.515.300 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 03, RT 04 RW 15 KEL. DURIANGKANG (POKMAS DURIANGKANG 7) | RT 03 RT 04 RW 15 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 180.728.900 |
SEMENISASI JALAN LINGKUNGAN RT 02, RT 06 RW 06 KEL. DURIANGKANG (POKMAS DURIANGKANG 8) | RT 02 RT 06 RW 06 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.333.500 |
DRAINASE/PARIT U-30 JLN. GANG JAMBU RT 03 RW 12 KEL. DURIANGKANG (POKMAS DURIANGKANG 14) | GANG JAMBU RT 03 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 29.437.100 |
DRAINASE / PARIT U-30 RT 05 RW 13 KEL. DURIANGKANG (POKMAS DURIANGKANG 15) | RT 05NRW 13 KEL DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 60.798.100 |
SEMENISASI JALAN LINGKUNGAN MANGSANG INDAH RT 01 RW 24 (POKMAS CEMARA) | RT 01 RW 24 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.633.600 |
SEMENISASI JALAN LINGKUNGAN BIDA AYU BLOK L DAN E RT 02 RW 15 (POKMAS PINUS) | BLOK L DAN E RT 02 RW 15 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.065.100 |
SEMENISASI JALAN LINGKUNGAN BIDA AYU RT 02 RW 13 (POKMAS BERINGIN) | BIDA AYU RT 02 RW 13 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 141.737.200 |
SEMENISASI JALAN LINGKUNGAN BIDADARI RT 04 DAN RT 05 RW 17 (POKMAS BAKAU) | BIDADARI RT 04 DAN RT 05 RW 17 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.534.100 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 02 KELURAHAN TIBAN LAMA (POKMAS ANGGUR 3 - 570 M2) | KELURAHAN TIBAN LAMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 195.285.200 |
SEMENISASI JALAN LINGKUNGAN BLOK D RT 01 RW 07 (POKMAS KETAPANG) | BLOK D RT 01 RW 07 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 171.986.100 |
SEMENISASI JALAN LINGKUNGAN MANGSANG KEBUN RT 01 RW 03 (POKMAS JATI) | MANGSANG KEBUN RT 01 RW 03 KEL MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.535.200 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 01 RW 25 (POKMAS WARU) | RT 01 RW 25 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 213.864.200 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 02 RW 23 | PURI AGUNG RT 02 RW 23 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 188.848.000 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 01,02,03,04 RW 06 (POKMAS BAMBU) | PURI AGUNG RT 01,02,03,04 RW 06 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 211.651.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 09 KELURAHAN TIBAN LAMA (POKMAS KUINI II - 188 M2) | KELURAHAN TIBAN LAMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 66.429.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 KELURAHAN TIBAN LAMA (POKMAS PEAR 1 - 400 M2) | KELURAHAN TIBAN LAMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 138.131.400 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 2 - 630 M2) | KELURAHAN TIBAN LAMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.992.300 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 09 KELURAHAN TIBAN LAMA (POKMAS KUINI - 50 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 17.901.400 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 1 - 149 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 53.339.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 1 - 298 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 101.857.800 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 4 - 332 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 114.959.900 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 11 KELURAHAN TIBAN LAMA (POKMAS SALAK 1 - 627 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 219.897.700 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 4 - 240 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 83.867.300 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 2 - 100 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 35.823.700 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 4 - 360 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 124.382.500 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 05 KELURAHAN TIBAN LAMA (MELON 1 - 240 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 85.968.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 3 - 90 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 32.244.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 11 KELURAHAN TIBAN LAMA (POKMAS SALAK 4 - 400 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 138.131.400 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 5 - 150 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 53.738.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 13 KELURAHAN TIBAN LAMA (POKMAS NANAS 2 - 288 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 103.112.900 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 2 - 220 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 76.302.600 |
SEMENISASI JALAN LINGKUNGAN RT 06 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 3 - 130 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 46.528.900 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 5 - 200 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 70.400.000 |
DRAINASE U30 RT 01 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 1 - 78 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 18.350.200 |
DRAINASE U30 RT 01 RW 03 KELURAHAN TIBAN LAMA (POKMAS BELIMBING I - 30 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 7.067.500 |
DRAINASE U30 RT 01 RW 06 KELURAHAN TIBAN LAMA (POKMAS ALPUKAT 3 - 158 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 37.078.800 |
DRAINASE U30 RT 01 RW 13 KELURAHAN TIBAN LAMA (POKMAS NANAS 1 - 113 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 26.618.900 |
DRAINASE U30 RT 02 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 3 - 101 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 23.790.800 |
DRAINASE U30 RT 03 RW 03 KELURAHAN TIBAN LAMA (POKMAS BELIMBING II - 57 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 13.429.350 |
DRAINASE U30 RT 06 RW 07 KELURAHAN TIBAN LAMA (POKMAS STRAWBERY III - 182 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 40.274.300 |
DRAINASE U40 RT 03 RW 06 KELURAHAN TIBAN LAMA (POKMAS ALPUKAT 2 - 21 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 6.011.500 |
DRAINASE U40 RT 03 RW 10 KELURAHAN TIBAN LAMA (POKMAS SEMANGKA 1 - 125 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 33.859.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) PERUM CENTRAL MELATI RT 01 RW 0 | PERUM CENTRAL MELATI RT 01 RW 08 | NONGSA | - | PEMBANGUNAN | 2022 | 207.337.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) | KAMPUNG TUA BELIAN PANTAI RT.02 RW.02 | NONGSA | - | PEMBANGUNAN | 2022 | 204.999.300 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BANDARA MAS RT.01 RW20 | NONGSA | - | PEMBANGUNAN | 2022 | 204.848.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BATARA RAYA RT.02 RW, RT.03 RW.03 | NONGSA | - | PEMBANGUNAN | 2022 | 206.783.500 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BUNGA RAYA RT.02 RW.27 | NONGSA | - | PEMBANGUNAN | 2022 | 207.313.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM GRAHA NUSA PERMAI RT.01 RW.13 | NONGSA | - | PEMBANGUNAN | 2022 | 207.337.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM GRIYA PANORAMA PERMAI RT.02 RW.44 | NONGSA | - | PEMBANGUNAN | 2022 | 206.829.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM MARBELLA RESIDENCE RT.04 RW.39 | NONGSA | - | PEMBANGUNAN | 2022 | 206.602.000 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM NADIM RAYA RT.01 RW.51 | NONGSA | - | PEMBANGUNAN | 2022 | 204.007.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM ODESSA RT.03 RW.40 | NONGSA | - | PEMBANGUNAN | 2022 | 206.331.400 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) | PERUM TAMAN RAYA TAHAP 2A RT.01 RW.35 | NONGSA | - | PEMBANGUNAN | 2022 | 199.524.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM TAMAN RAYA TAHAP III RT.02 RW.18 | NONGSA | - | PEMBANGUNAN | 2022 | 206.308.300 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM GRIYA KPN RT.01 RW.41 | PERUM GRIYA KPN RT.01 RW.41 | NONGSA | - | PEMBANGUNAN | 2022 | 198.793.000 |
PEMELIHARAAN PREVENTIVE TM, TR DAN GARDU PORTAL | AREA BATAM TERSEBAR | NONGSA | - | PEMBANGUNAN | 2022 | 99.647.357 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RT 3 RW 3 (POKMAS PERMATA 1) | RT 3 RW 3 BENGKONG KOLAM - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RT 5 RW 3 (POKMAS PERMATA 2) | RT 5 RW 3 BENGKONG KOLAM - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RT 5 RW 10 (POKMAS PERMATA 3) | RT 5 RW 10 BENGKONG SADAI - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RT 6 RW 10 (POKMAS PERMATA 4) | RT 6 RW 10 BENGKONG SADAI - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 05 RW 18 (POKMAS PERMATA 5) | RT 05 RW 18 BENGKONG TELAGA INDAH - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 1 RW 18 (POKMAS PERMATA 6) | RT 1 RW 18 BENGKONG TELAGA INDAH - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 5 RW 18 (POKMAS PERMATA 8) | RT 5 RW 18 BENGKONG TELAGA INDAH - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A1 KOMP. WINNER MILLENIUM RT 3 RW 17 (POKMAS PERMATA 10) | BLOK A1 KOMP. WINNER MILLENIUM RT 3 RW 17 - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A,B,C DAN D KAVLING HARAPAN JAYA RT 8 RW 13 (PERMATA 11) | BLOK A,B,C DAN D KAVLING HARAPAN JAYA RT 8 RW 13 - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK K BENGKONG SADAI RT 1 RW 10 (POKMAS PERMATA 12) | RT 1 RW 10 DI BLOK K BENGKONG SADAI - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 143.308.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BELIMBING RT 4 DAN RW 4 (POKMAS PERMATA 14) | RT 4 RW 4 KAMPUNG BELIMBING - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 161.221.500 |
PEMELIHARAAN DAN PERAWATAN TAMAN JALAN ARTERI DAN ROW WILAYAH PERAWATAN PERTAMANAN BP BATAM | KOTA BATAM | NONGSA | - | PEMBANGUNAN | 2022 | 1.191.942.552 |
SEMENISASI JALAN LINGKUNGAN KP. DURIAN RT 5 RW 6 (POKMAS PERMATA 16) | RT 5 RW 6 KAMPUNG DURIAN - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN PERUM.PKJ RT 2 RW 14 (POKMAS PERMATA 17) | RT 2 RW 14 PERUM PKJ - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. PKJ RT 3 RW 14 (POKMAS PERMATA 18) | RT 3 RW 14 PERUM PKJ - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN SEI NAYON RT 2 RW 12 (POKMAS PERMATA 19) | RT 2 RW 12 SEI NAYON - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 SAKURA GARDEN ( 400 M² ) POKMAS BUNGA SAKURA | RT 01 RW O4 SAKURA GARDEN | NONGSA | - | PEMBANGUNAN | 2022 | 142.591.900 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 04 SAKURA GARDEN ( 368 M² ) POKMAS MANGGA | RT 02 RW 04 SAKURA GARDEN | NONGSA | - | PEMBANGUNAN | 2022 | 131.684.300 |
POKMAS BM 04, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 | BATU MERAH RT 02 RW 08 | NONGSA | - | PEMBANGUNAN | 2022 | 81.634.300 |
POKMAS BM 01, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 15 RW 04 | BATU MERAH RT 15 RW 04 | NONGSA | - | PEMBANGUNAN | 2022 | 26.514.400 |
POKMAS BM 02, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 25 RW 01 | BATU MERAH RT 25 RW 01 | NONGSA | - | PEMBANGUNAN | 2022 | 19.860.500 |
POKMAS BM 03, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 30 RW 06 | BATU MERAH RT 30 RW 06 | NONGSA | - | PEMBANGUNAN | 2022 | 53.903.300 |
POKMAS BM 05, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 11 RW 03 | BATU MERAH RT 11 RW 03 | NONGSA | - | PEMBANGUNAN | 2022 | 71.634.200 |
POKMAS BM 06, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 14 RW 04 | BATU MERAH RT 14 RW 04 | NONGSA | - | PEMBANGUNAN | 2022 | 81.631.000 |
POKMAS BM 07, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 17 RW 05 | BATU MERAH RT 17 RW 05 | NONGSA | - | PEMBANGUNAN | 2022 | 29.338.100 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A1 KE MESJID PERUM. PKJ RT 1 RW 14 (POKMAS PERMATA 9) | RT 1 RW 14 PERUM PKJ - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.692.000 |
POKMAS BM 08, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 19 RW 06 | BATU MERAH RT 19 RW 06 | NONGSA | - | PEMBANGUNAN | 2022 | 35.033.900 |
POKMAS BM 11, PEMBANGUNAN JERAMBAH BETON RT 18 RW 05 | BATU MERAH RT 18 RW 05 | NONGSA | - | PEMBANGUNAN | 2022 | 121.330.000 |
SEMENISASI JALAN PERUM MUKA KUNING INDAH RT06RW06 (POKMAS AJANG KARYA MANDIRI) VOL-600M2 | KELURAHAN BULIANG | NONGSA | - | PEMBANGUNAN | 2022 | 214.043.500 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ABADI 2 RT 03 RW 04 (POKMAS TANJUNG 1) | RT 03 RW 04 BENGKONG ABADI 2 - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ABADI BARU DEKAT RT 03 DAN 06 RW 14 JLN BUNGA RAYA (POKMAS TG2) | RT 03 RW 14 BENGKONG ABADI BARU - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 171.969.600 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ASRAMA RT 04 RW 10 GG. SEMAR (POKMAS TANJUNG 3 ) | RT 04 RW 10 BENGKONG ASRAMA -TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 200.631.200 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ASRAMA RT 04 RW 10 JALAN UTAMA MASJID (POKMAS TANJUNG 4) | RT 04 RW 10 BENGKONG ASRAMA -TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 179.135.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG DALAM RT 04 RW 09 (TANJUNG 5) | RT 04 RW 09 | NONGSA | - | PEMBANGUNAN | 2022 | 118.229.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KARTINI RT 02 RW 12 (TANJUNG 6) | RT 02 RW 12 BENGKONG KARTINI - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 114.646.400 |
SEMENISASI JALAN LINGKUNGAN BENGKONG WAHYU RT 03 RW 17 JALAN TOWER (TANJUNG 7) | RT 03 RW 17 BENGKONG WAHYU - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN BENGKONG WAHYU RT 04 RW 17 JL. GEREJA (POKMAS TANJUNG 8) | RT 04 RW 17 BENGKONG WAHYU - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN JALAN TEMBUS MUSHOLLA RT 04 RW 03 (POKMAS TANJUNG 9) | RT 04 RW 03 BENGKONG ABADI 1 - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 143.308.000 |
SEMENISASI JALAN LINGKUNGAN PERUM PESONA MANTANG RT 02 RW 15 (POKMAS TANJUNG 10 ) | RT 02 RW 15 PERUM PESONA MANTANG - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN TANJUNG BUNTUNG BARU RT 07 RW 02 (POKMAS TANJUNG 12) | RT 07 RW 02 TANJUNG BUNTUNG BARU - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTABLE DAN SKTM | PORTABLE PT MULTIBANGUN ADHITAMA KONSTRUKSI - KK SEI LADI JL. GAJAH MADA SEKUPANG | NONGSA | - | PEMBANGUNAN | 2022 | 86.990.781 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | PT AMTEK ENGINEERING - KK KAWASAN INDUSTRI CAMMO ESTATE BLOK D3 NO. 1 BATAM CENTRE | NONGSA | - | PEMBANGUNAN | 2022 | 322.194.628 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL DAN SUTM | PT PUTRA JAYA BINTAN - KK PR TAMAN LESTARI BATU AJI | NONGSA | - | PEMBANGUNAN | 2022 | 83.579.361 |
SEMENISASI JALAN PERUM. TERING MAS RT 002 RW 018 ( POKMAS CERI ) 459 M2 | RT 002 RW 018 KEL TANJUNG SENGKUANG | NONGSA | - | PEMBANGUNAN | 2022 | 163.615.100 |
SEMENISASI JALAN RT 002 RW 007 ( POKMAS DUKU ) 560 M2 | RT 002 RW 007 KEL TANJUNG SENGKUANG | NONGSA | - | PEMBANGUNAN | 2022 | 200.600.400 |
SEMENISASI JALAN RT 004 RW 021 ( POKMAS KERJA SIAGA ) 600 M2 | RT 004 RW 021 KEL TANJUNG SENGKUANG | NONGSA | - | PEMBANGUNAN | 2022 | 214.522.000 |
SEMENISASI JALAN KAV. BUKIT MAKMUR RT 001 RW 013 ( POKMAS PISANG ) 375 M2 | RT 001 RW 013 KEL TANJUNG SENGKUANG | NONGSA | - | PEMBANGUNAN | 2022 | 133.906.300 |
SEMENISASI JALAN PERUM. GMP TAHAP II RT 002 RW 004 ( POKMAS RAJAWALI 2 ) 240 M2 | RT 002 RW 004 KEL TANJUNG SENGKUANG | NONGSA | - | PEMBANGUNAN | 2022 | 85.945.200 |
POKMAS BM 09 PELANTAR 1, PEMBANGUNAN JERAMBAH BETON RT 06 RW 02 (PELANTAR I) | BATU MERAH RT 06 RW 02 | NONGSA | - | PEMBANGUNAN | 2022 | 218.355.500 |
POKMAS BM 09 PELANTAR 2, PEMBANGUNAN JERAMBAH BETON RT 06 RW 02 (PELANTAR II) | BATU MERAH RT 06 RW 02 | NONGSA | - | PEMBANGUNAN | 2022 | 218.353.300 |
SEMENISASI JALAN LINGKUNGAN P=150M L=4M (PSPK) RT 01 RW 14 PERUM RHABAYU ASRI (POKMAS PTM 1)) | RT 01 RW 14 PERUM RHABAYU ASRI KEL TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 214.854.200 |
SEMENISASI JALAN LINGKUNGAN PERUM SARMEN RAYA RT 5 DAN 6 RW 05 ( POKMAS TANJUNG 11) | RT 06 RW 05 PERUM SARMEN RAYA - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN P=190 L=3M (PSPK) RT 01 RW 15 KAV. BARU SEI DAUN (POKMAS PTM 2) | RT 01 RW 15 KAV. BARU SEI DAUN KEL. TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 201.023.900 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=300M (PSPK) RT 02 RW 07 KAV. LAMA SEI DAUN (POKMAS PTM 3) | RT 02 RW 07 KAV. LAMA SEI DAUN KEL. TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 69.862.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=500 (PSPK) RT 01 RW 11 KAV. BARU SEI DAUN (POKMAS PTM 4) | RT 01 RW 11 KAV. BARU SEI DAUN KEL. TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 117.835.300 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=800M (PSPK) RT 03 RW 09 KAMPUNG BAGAN (POKMAS PTM 5) | RT 03 RW 09 KAMPUNG BAGAN KEL. TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 184.248.900 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=415M (PSPK) RT 01 02 RW 07 KAV BARU SEI DAUN (POKMAS PTM 6) | RT 01 02 RW 07 KAV BARU SEI DAUN KEL. TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 113.663.000 |
RENOVASI RUMAH TINGGAL DI PERUMAHAN MEKAR SARI BLOK D.17 | TIBAN | NONGSA | - | PEMBANGUNAN | 2022 | 35.000.000 |
PENAMBAHAN RETAINING WALL BRONJONG DEPAN VILLA PANBIL BLOK BB2 TAHAP-3 | KAWASAN VILLA PANBIL, MUKA KUNING | NONGSA | - | PEMBANGUNAN | 2022 | 77.395.625 |
PERBAIKAN RAILING DI CONDOTEL LANTAI 25 APARTEMENT PANBIL RESIDENCE | MUKA KUNING | NONGSA | - | PEMBANGUNAN | 2022 | 17.000.000 |
TAMBAHAN RANGKA BAJA DARI ATAP DI POS JAGA TAMAN WISATA ALAM | MUKA KUNING | NONGSA | - | PEMBANGUNAN | 2022 | 20.846.610 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT CHAMPION MATTRES INDONESIA - KK LATRADE INDUSTRIAL PARK BLOK E NO. 7 TG UNCANG | NONGSA | - | PEMBANGUNAN | 2022 | 38.162.859 |
PEMASANGAN DAN PENGADAAN SISIP PERALATAN GARDU, RENOVASI DAN BONGKAR PERALATAN GARDU DAN KWH PANTAU | PT BATAMA ARIASINDO - KK KAW BINTANG MAKMUR INDUSTRIAL BLOK B NO. 1-2 BATAM CENTRE | NONGSA | - | PEMBANGUNAN | 2022 | 26.602.502 |
PENGADAAN DAN PEMASANGAN GH-SKTM DARI DEPAN INTI SEHAT BATAM CENTRE KE GH LEGENDA UNTUK MENGATASI OV | JL. RAJA ISA BATAM CENTRE | NONGSA | - | PEMBANGUNAN | 2022 | 43.473.242 |
INSPECTOR TRANSMISSION LINE 150 KV | BATAM TERSEBAR | NONGSA | - | PEMBANGUNAN | 2022 | 328.067.148 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM BALOI RANTAU RT.01 RW.04 | PERUM BALOI RANTAU RT.01 RW.04 | NONGSA | - | PEMBANGUNAN | 2022 | 166.179.200 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM BUKIT INDAH SUKAJADI | PERUM BUKIT INDAH SUKAJADI JL.PALEM HIJAU RT.01 RW.01 | NONGSA | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN PERMUKIMAN RT. 01 RW. 25 KAVLING BESTARI KELURAHAN KABIL (POKMAS BESTARI VOL 585M2) | KABIL | NONGSA | - | PEMBANGUNAN | 2022 | 209.573.100 |
SEMENISASI JALAN PERMUKIMAN RT. 02 RW. 24 KAVLING TAMAN BALOI KELURAHAN KABIL POKMAS JUNI (509 M2) | KABIL | NONGSA | - | PEMBANGUNAN | 2022 | 182.327.200 |
SEMENISASI JALAN PERMUKIMAN RT. 03 RW. 21 KAVLING BIDA KABIL KELURAHAN KABIL POK. MEKAR SARI 330M2 | KABIL | NONGSA | - | PEMBANGUNAN | 2022 | 118.206.000 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KAMPUNG TUA RT 01 RW 01 | KEL. PATAM LESTARI, KEC. SEKUPANG | NONGSA | - | PEMBANGUNAN | 2022 | 198.636.796 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL | HARYANTO - RESTORAN GEK MOI, JL TRANS BARELANG SETELAH KEPRI CORAL | NONGSA | - | PEMBANGUNAN | 2022 | 11.696.315 |
PEMBANGUNAN GARDU 3X4 METER (SISIPAN) | POLRESTA BARELANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.980.442 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT CITRA SERAYA SUPREMNUSA - NAGOYA CITY WALK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 72.932.220 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM SKTM 20 KV | PT PRINCESS AURORA - KK PR KIBING RAYA TEMBESI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 76.819.905 |
SEMENISASI JLAN KAVLING KARTINI I RT.003 RW.002 SUNGAI HARAPAN (POKMAS HARAPAN 2) VOL. 343 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 113.361.600 |
SEMENISASI JALAN PERUM MELATI GARDEN RT.002 RW.013 SUNGAI HARAPAN (POKMAS HARAPAN 4) VOL. 240 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 81.728.900 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.001 RW.008 (HARAPAN 5) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.628.000 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.002 RW.008 (HARAPAN 6) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.402.400 |
SEMENISASI JALAN PERUM PONDOK PRATIWI III RT.006 RW.016 (POKMAS HARAPAN 7) VOL. 400M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.402.400 |
SEMENISASI JALAN KARTINI I GG. MULIA RT.004 RW.002 (POKMAS HARAPAN 1) VOLUME 400M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 130.150.900 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW.015 PERUMAHAN FAMILY DREAM, 529 M2 (POKMAS BERKAH FAMILY) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.379.600 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW.05 PERUMAHAN CITRA MAS INDAH, 450 M2 (POKMAS CITRA MANDIRI) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 155.928.300 |
PEKERJAAN PENGECATAN GEDUNG A,B, GEDUNG PARKIR DAN PEMBUATAN GUDANG AUDITORIUM-KANTOR PUSAT | JL RAJA ISA, TELUK TERING KEC. BATAM KOTA-KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 483.354.545 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW.04 KP.JABI KELURAHAN BATU BESAR, 400 M2 (POKMAS JABI BERSIH) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 139.992.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM PURILOKA 1 RT. 002/ RW. 11 | PERUM PURILOKA 1 RT. 002/ RW. 11 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.953.200 |
PEKERJAAN PEMBUATAN RETAINING WALL TOWER 04 SUTT 150 KV | TANJUNT KASAM - BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 428.090.873 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) TAMAN SENTOSA JL. LAKSMANA BINTA | TAMAN SENTOSA RT 005 RW 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.054.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) TAMAN BUANA INDAH RT. 002/ RW. 0 | TAMAN INDAH BUANA RT 002 RW 003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.228.800 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) JL. LAKSMANA BINTAN PERUM VILL | PERUMAHAN VILLA MAS RT 001 RW 009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 192.017.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUMAHAN KAMPUNG MELAYU BUKIT J | BUKIT JODOH RT 001 RW 002 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.135.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM PONDOK ASRI RT. 002/ RW. 0 | PONDOK ASRI RT 002 RW 010 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.312.700 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 003/ RW. 006 | KOMPLEK NUSA JAYA RT 003 RW 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 88.185.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) BANDAR SRIMAS RT. 005/RW. 012 | PERUM BANDAR SRIMAS RT 05 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 36.768.000 |
Pembangunan Jalan Lingkungan Semenisasi Tebal 15cm (Swakelola PSPK) Bandar Srimas RT. 004/ RW. 012 | PERUM BANDAR SRIMAS RT 04 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 38.938.900 |
PEMBANGUNAN BATU MIRING PERMUKIMAN DAN PERUMAHAN DENGAN BATU BATAM (SWAKELOLA PSPK) KAMPUNG MELAYU B | KAMPUNG MELAYU BUKIT JODOH RT 003 RW 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 37.167.900 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U30 (SWAKELOLA PSPK) KAMPUNG MELAYU BUKIT JODOH | KAMPUNG MELAYU BUKIT JODOH RT. 003 RW. 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 30.588.800 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 001/ RW. 007 | RT. 001 RW. 007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 24.295.700 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 001/ RW. 006 | RT. 001 RW. 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 17.176.500 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK D RT.002 RW.015 (580M2) | PERUMAHAN ANGGREK SARI BLOK D | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK E RT.004 RW.015 (520 M2) | PERUMAHAN ANGGREK SARI BLOK E RT. 004 RW.015 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.254.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENTRE VIEW RT.001 RW.003 (200 M2) | PERUMAHAN CENTRE VIEW RT.001 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 71.602.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GARDAN MASYEBA RT.002 RW.005 580M2 | PERUMAHAN GARDAN MASYEBA RT. 002 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GOLDEN LAND BLOK G RT.002 RW013 (580M2) | PERUMAHAN GOLDEN LAND BLOK G RT.002 RW.013 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GRIYA BUANA INDAH RT.001 RW.014 , 580 M2 | PERUMAHAN GRIYA BUANA INDAH RT. 001 RW.014 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE PAS BATU BELAH LINGKUNGAN PERUMAHAN CENTRE PARK BLOK H RT.002 RW.011 (97M) | PERUMAHAN CENTER PARK RT. 002 RW.011 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 191.175.600 |
DRAINASE LINGKUNGAN U30 PERUMAHAN WISMA BUANA INDAH RT.001 RW.010 (60M) | PERUMAHAN WISMA BUANA INDAH RT. 001 RW.010 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 14.129.500 |
DRAINASE LINGKUNGAN U40 PERUMAHAN TAMAN MARCHELIA RT.002 RW.009 (100M) | PERUMAHAN TAMAN MARCHELIA RT. 002 RW.009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 28.604.400 |
SEMENISASI JALAN BETON PERUM. TAMAN HANG TUAH RT.002 RW.006 | PERUM TAMAN HANG TUAH RT.002 RW.006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUM. TAMAN HANG TUAH RT.003 RW.006 | PERUM. TAMAN HANG TUAH RT.003 RW.006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE/SALURAN PERUM. HANG LEKIR RT.003 RW.005 | PERUM HANG LEKIR RT.003 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 119.762.500 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU CANTROL | PT PANTAI INDAH GALANG BARU, JL. TRANS BARELANG TG. PENGAPIT GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 82.759.367 |
SEMENISASI JALAN BETON PERUM. BIDA ASRI 1 RT.002 RW.009 | PERUM BIDA ASRI 1 RT.002 RW.009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUMAHAN TAMAN LEGENDA BALI BLOK E RT.005 RW.013 | PERUM TAMAN LEGENDA BALI BLOK E RT.005 RW.013 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 198.322.300 |
SEMENISASI JALAN BETON PERUM LEGENDA MALAKA BLOK E RT.001 RW.004 | PERUM LEGENDA MALAKA BLOK E RT.001 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.646.400 |
SEMENISASI JALAN BETON PERUM. LEGENDA MALAKA RT.001 RW.003 | PERUM LEGENDA MALAKA RT.001 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 94.967.400 |
SEMENISASI JALAN BETON PERUM. OMA BATAM CENTRE RT.003 RW.012 | PERUM OMA BATAM CENTRE RT.003 RW.012 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.007 RW.004 | PERUM LEGENDA MALAKA RT.007 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 42.939.600 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.004 RW.004 | PERUM LEGENDA MALAKA RT.004 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.416.500 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA BLOK G RT.003 RW.004 | PERUM LEGENDA MALAKA BLOK G RT.003 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.724.100 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.002, RT.003, DAN RT.004 RW.003 | PERUM LEGENDA MALAKA RT.002, RT.003, DAN RT.004 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 217.229.100 |
SEMENISASI JALAN BETON PERUM. MEDITERANIA RT.001 RW.008 | PERUM MEDITERANIA RT.001 RW.008 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN KOMPLEK KEJAKSAAN NO. 01 S/D 05 RT 04 RW 02 | KOMPLEK KEJAKSAAN NO. 01 S/D 05 RT 04 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 174.945.100 |
SEMENISASI JALAN LINGKUNGAN DARI GERBANG MASJID NURUL JANNAH BLOK S NO. 39 - 55 DAN T NO. 37 RT 07 | TIBAN INDAH PERMAI RT 07 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 195.800.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN DAMAI RT 04 RW 07 | TIBAN DAMAI RT 04 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.470.200 |
SUPPLY AND ISTALLATION OF EQUIPMENT INSULATION WORKS - OSBL STORAGE TANK HOT INSULATION | JL. RAYA PELABUHAN KABILM KM. 12,5, KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.250.000.000 |
PEMBANGUNAN SPAM PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG (DAK REGULER) | PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 6.235.958.000 |
SEMENISASI JALAN PERUMAHAN NAGOYA PERMAI RT.001 RW.005 VOL. 500M2 POKMAS NAGOYA PERMAI 1 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.140.200 |
SEMENISASI JALAN RT001/RW007 KELURAHAN TANJUNG UMA | RT 001 RW 007 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 49.167.800 |
SEMENISASI JALAN PEPAYA RT.001 RW.011 VOL. 564M2 POKMAS PEPAYA2 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 202.030.400 |
Semenisasi Jalan Semangka I RT.001 RW.010 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.237.700 |
SEMENISASI JALAN RT002/RW003 KELURAHAN TANJUNG UMA KECAMATAN LUBUK BAJA, V= 250M2 POKMAS ANGGREK 12 | RT 002 RW 003 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 89.563.100 |
SEMENISASI JALAN PENUIN RT 02 RW 011 VOL. 560M2 POKMAS PENUIN SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.574.000 |
SEMENISASI JALAN RT002/RW011 KELURAHAN TANJUNG UMA, V=540M2 POKMAS TERITIP | RT 002 RW 011 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.463.600 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 09 BALOI MAS INDAH VOL 556M2 POKMAS 3 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 199.192.400 |
SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 03 BALOI CENTRE VOL.520M2 POKMAS 6 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.238.800 |
SEMENISASI JALAN BLOK 6 RT 4 RW 3 VOL. 560M2 POKMAS FLAMBOYAN SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.574.000 |
SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT.003 RW.007 | PERUM PURI LEGENDA RT.003 RW.007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUM. HANG LEKIR BLOK AA RT.001 RW.005 | PERUM HANG LEKIR BLOK AA RT.001 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.589.400 |
SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT.004 RW.007 | PERUM PURI LEGENDA RT.004 RW.007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 05 TAMAN BALOI MAS VOL. 656M2 POKMAS 2 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.946.100 |
SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 06 BALOI MAS PERMAI VOL. 660 M2 POKMAS 7 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 217.272.000 |
PENGADAAN DAN PEMASANGAN PERALATAN GI - GD - SKTM PT CAKRA WISESA KARYA MAKMUR | PT. PLN BATAM / GI BALOI - GI SEI HARAPAN DAN JALAN GAJAH MADA (KAWASAN SOUTLINKS) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.971.736.400 |
PEKERJAAN RETAININGWALL VILLA PANBIL BLOK DD NO. 71,72,73,75 DAN 76 | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 162.257.872 |
SEMENISASI JALAN DEPAN KANTOR LURAH KAMPUNG PELITA RT.001 RW.004 VOL. 360 M2 POKMAS PELITA INDAH 3 | KELURAHAN KAMPUNG PELITA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 128.975.000 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL-JTM-JTR | PT SNEPAC INDO SERVICE - JL. TRANS BARELANG PANTAI MELUR GALANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.165.538 |
PEKERJAAN PERBAIKAN SEAWALL AREA JETTY 1 D I FUEL TERMINAL PULAU SAMBU | PULAU SAMBU, KELURAHAN, TJ. SARI, BELAKANG PADANG, KOTA BATAM, KEPULAUAN RIAU 29411 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.269.200 |
SEMENISASI JALAN BLOK 2 RT 4 RW 1 VOL. 484 M2 POKMAS MANGGA SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 173.360.000 |
PEKERJAAN PEMANCANGAN CLUBHOUSE DAN UNIT RUMAH | BATAM CENTER | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.448.765.000 |
BM5 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING KEL. TANJUNG RIAU, KEC. SEKUPANG | KEL. TANJUNG RIAU, KEC. SEKUPANG (PERUMAHAN GALAXY PARK RT 002, RT 003, RW 014) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 184.504.195 |
PEMBANGUNAN JALAN LINGKUNGAN SEMBULANG TANJUNG RT.002/ RW.001 (POKMAS SEMBULANG 25) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.531.200 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG PASIR MERAH RT.001/ RW.002 (POKMAS SEMBULANG 27) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.719.100 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG CAMPING RT.002 RW.002 (POKMAS SEMBULANG 28) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.478.400 |
DRAINASE PARIT U40 KAMPUNG PASIR MERAH RT.001/002 (POKMAS SEMBULANG 29) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 194.485.500 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG SEI RAYA RT.001/ RW.004 (POKMAS SEMBULANG 32) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 224.221.800 |
SEMENISASI JALAN MENUJU LAPANGAN BOLA KAKI KAMPUNG SERANGGON, RT.002 RW.004 (POKMAS SEMBULANG 33) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 222.843.500 |
SEMENISASI JALAN LINGKUNGAN DARI RUMAH BUTET SAMPAI SABARUDIN RT.002/RW.005 (POKMAS SEMBULANG 35) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.478.400 |
KAMPUNG BATU PUTIH RT 003 RW 004 (DARI RUMAH R. NAFISAH S/D RUMAH IBRAHIM (POKMAS 25) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 201.414.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG BATU PUTIH RT 001 RW 004 (DARI RUMAH SOM (POKMAS 26) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 268.538.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG RANGA RT.002 RW.004 DARI MUSHOLA S/D RUMAH JEMAIN (POKMAS 27) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 89.516.000 |
BATU MIRING PENAHAN TEBING KAMPUNG PADANG PENAGA RT.001 RW.006 (POKMAS 28) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 348.428.000 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG KETAPANG RT 002 RW 006 (DARI RUMAH HITAM (POKMAS 29) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 134.269.000 |
DRAINASE U30 KAMPUNG PADANG RT 002 RW 003 ( DARI RUMAH JEPRI S/D KANTOR LURAH) (POKMAS 30) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 82.196.000 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG PADANG RT 001 RW 003 ( DARI RUMAH KAMIL (POKMAS 31) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 181.258.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG LANGKANG RT 001 RW 002 DARI RUMAH NASER S/D KOKOL (POKMAS 32) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 268.538.000 |
PEMBANGUNAN JALAN LINGKUNGAN DARI KAMPUNG DARAT PULAU RT 002 RW 001 ( DARI RUMAH DEWI (POKMAS 33) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 134.269.000 |
BATU MIRING PENAHAN TEBING LINGKUNGAN KAMPUNG DARAT PULAU RT.001 RW.001 (POKMAS 34) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 295.281.000 |
JERAMBAH PULAU MUBUT RT.002 RW.005 (POKMAS 35) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 338.231.000 |
JERAMBAH AIR NAGA RT.01 RW.04 DARI RUMAH SAMAT KE RUMAH OKI (POKMAS AIR NAGA SEHATI 5) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 326.114.800 |
JERAMBAH DARI RUMAH ANDI KE RUMAH SIDAH RT.02 RW.04 AIR NAGA (POKMAS AIR NAGA SEHATI 6) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 253.652.300 |
PEMBANGUNAN JALAN LINGKUNGAN DARI RUMAH PAK AHMAD KE SUMUR RT.01 RW.04 (POKMAS AIR NAGA SEHATI 7) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 107.420.500 |
JERAMBAH RUMAH MARTINI, RIBUT SAMPAI HELDI RT.01 RW.02 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 7) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 253.663.000 |
JERAMBAH DARI RUMAH SALOMA RT.02 RW.02 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 8) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 253.675.000 |
JERAMBAH DARI AWANG SARI KE INDRA RT.03 RW.03 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 9) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 253.664.000 |
PEMBANGUNAN JALAN LINGKUNGAN RT.04 RW.03 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 11) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 268.533.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMIR RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 30) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 235.476.000 |
JERAMBAH DARI BATU MIRING KE RUMAH DOLAH RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 31) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 181.191.000 |
JERAMBAH DARI RUMAH AKMAL ATARIK KE RUMAH SARAH RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 32) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 369.644.000 |
JERAMBAH DARI RUMAH ANDIKA KE RUMAH MUNIR RT.002/RW.001 PULAU ABANG (POKMAS PULAU ABANG 33) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 289.905.000 |
JERAMBAH DARI RUMAH AKIB KE RUMAH ZAINURI RT.003/RW.001 PULAU ABANG (POKMAS PULAU ABANG 34) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 130.447.000 |
JERAMBAH DARI BATU MIRING KE RUMAH BASRI RT.004/RW.001 PULAU ABANG (POKMAS PULAU ABANG 35) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 126.829.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMAT DAN SAIFUL RT.002/RW.002 AIR SAGA (POKMAS PULAU ABANG 36) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 271.791.000 |
JERAMBAH DARI BATU MIRING KE RUMAH MADON RT.002 RW.002 AIR SAGA (POKMAS PULAU ABANG 37) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 163.064.000 |
DRAINASE PARIT U30 MASJID AL-FALAH RT.001 RW.002 (POKMAS PULAU ABANG 38) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 27.389.000 |
JERAMBAH DARI BATU MIRING KE RUMAH JONO RT.002/RW.003 PETONG (POKMAS PULAU ABANG 39) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 90.565.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMIR/ENGKOS RT.001/RW.003 PETONG (POKMAS PULAU ABANG 40) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 144.924.000 |
SEMENISASI JALAN PERUM PONDOK PRATIWI II RT.02 RW.16 (POKMAS HARAPAN 8) VOL. 120M2 | SUNGAI HARAPAN | GALANG | - | PEMBANGUNAN | 2022 | 42.229.000 |
SEMENISASI JALAN PERUM TAMAN KARTINI RAYA II RT003 RW010 (POKMAS HARAPAN 9) 560M2 | SUNGAI HARAPAN | GALANG | - | PEMBANGUNAN | 2022 | 186.769.000 |
SEMENISASI JALAN PERUM TAMAN KARTINI RAYA II RT004 RW010 (DAU) (POKMAS HARAPAN 10) 444M2 | SUNGAI HARAPAN | GALANG | - | PEMBANGUNAN | 2022 | 148.178.800 |
SEMENISASI JALAN LINGKUNGAN PERUM. BUKIT TIBAN SELARAS BLOK A, B, C RT 06 RW 07 | PERUM. BUKIT TIBAN SELARAS BLOK A, B, C RT 06 RW 07 | GALANG | - | PEMBANGUNAN | 2022 | 141.099.200 |
SEMENISASI JALAN PERUM PUTRI FORTUNA RT.003 RW.008 (POKMAS HARAPAN 11) VOL. 400 M2 | SUNGAI HARAPAN | SEKUPANG | - | PEMBANGUNAN | 2022 | 135.298.900 |
SEMENISASI JALAN LINGKUNGAN PERUM. SIRIAON REGENCY BLOK G - L RT 02 RW 11 | PERUM. SIRIAON REGENCY BLOK G - L RT 02 RW 11 | SEKUPANG | - | PEMBANGUNAN | 2022 | 135.652.000 |
SEMENISASI JALAN LINGKUNGAN TAMAN DUTA INDAH JAYA RT 01 RW 07 | TAMAN DUTA INDAH JAYA RT 01 RW 07 | SEKUPANG | - | PEMBANGUNAN | 2022 | 78.818.300 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK B2 RT 05 RW 05 | TIBAN INDAH PERMAI BLOK B2 RT 05 RW 05 | SEKUPANG | - | PEMBANGUNAN | 2022 | 135.625.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK L1 NO. 1 - 6 RT 01 RW 05 | TIBAN INDAH PERMAI BLOK L1 NO. 1 - 6 RT 01 RW 05 | SEKUPANG | - | PEMBANGUNAN | 2022 | 53.319.200 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN INDAH PERMAI BLOK Z-A RT 05 RW 05 | PERUM. TIBAN INDAH PERMAI BLOK Z-A RT 05 RW 05 | SEKUPANG | - | PEMBANGUNAN | 2022 | 172.269.900 |
SEMENISASI JALAN LINGKUNGAN PERUM PONDOK PELANGI RT 05 RW 09 | PERUM PONDOK PELANGI RT 05 RW 09 | SEKUPANG | - | PEMBANGUNAN | 2022 | 114.067.800 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BERLIAN RT 04 RW 13 | PERUM. TIBAN BERLIAN RT 04 RW 13 | SEKUPANG | - | PEMBANGUNAN | 2022 | 109.431.300 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK S NO. 39 DAN BLOK S NO. 43 RT 07 RW 03 | TIBAN INDAH PERMAI BLOK S NO. 39 DAN BLOK S NO. 43 RT 07 RW 03 | SEKUPANG | - | PEMBANGUNAN | 2022 | 97.057.400 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK T NO. 28 - 39 RT 07 RW 03 | TIBAN INDAH PERMAI BLOK T NO. 28 - 39 RT 07 RW 03 | SEKUPANG | - | PEMBANGUNAN | 2022 | 164.710.700 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI LORONG 1 & 2 RT 03 RW 03 | TIBAN INDAH PERMAI LORONG 1 & 2 RT 03 RW 03 | SEKUPANG | - | PEMBANGUNAN | 2022 | 101.693.900 |
SEMENISASI JALAN LINGKUNGAN KAVLING BAKAU SERIP RT. 003 RW. 002 POKMAS GANG KETUPAT (450 M2) | RT. 003 RW. 002 KAVLING BAKAU SERIP | SEKUPANG | - | PEMBANGUNAN | 2022 | 160.975.100 |
SEMENISASI JALAN LINGKUNGAN KAVLING BAKAU SERIP RT. 001 RW. 002 POKMAS POSKAL GROUP (450 M2) | RT. 001 RW. 002 KAVLING BAKAU SERIP | SEKUPANG | - | PEMBANGUNAN | 2022 | 161.194.000 |
SEMENISASI JALAN LINGKUNGAN KAVLING NONGSA RT. 005 DAN RT. 006 RW. 003 POKMAS CIPTA KARYA (535 M2) | RT. 005 DAN RT. 006 RW. 003 KAVLING NONGSA | SEKUPANG | - | PEMBANGUNAN | 2022 | 191.390.100 |
DRAINASE U30 AIR RAJA RT.001/RW.002 (POKMAS AIR RAJA 22) | KELURAHAN AIR RAJA | SEKUPANG | - | PEMBANGUNAN | 2022 | 164.403.000 |
DRAINASE U30 SIMPANG SRI BA'I AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 23) | KELURAHAN AIR RAJA | SEKUPANG | - | PEMBANGUNAN | 2022 | 109.586.000 |
DRAINASE U30 TOK SENIN AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 24) | KELURAHAN AIR RAJA | SEKUPANG | - | PEMBANGUNAN | 2022 | 109.586.000 |
BATU MIRING PENAHAN TEBING AIR RAJA RT.003/RW.002 (POKMAS AIR RAJA 21) | KELURAHAN AIR RAJA | SEKUPANG | - | PEMBANGUNAN | 2022 | 369.004.000 |
PEMBANGUNAN PENATAAN KAWASAN MASJID AGUNG KABUPATEN KEPULAUAN ANAMBAS | KEC. SIANTAN KEPULAUAN ANAMBAS | SEKUPANG | - | PEMBANGUNAN | 2022 | 5.591.100.000 |
PENATAAN LENGAN SIMP. BASECAMP (LANJUTAN) | BASECAMP SAGULUNG | SEKUPANG | - | PEMBANGUNAN | 2022 | 14.673.294.550 |
PENINGKATAN DRAINASE KAWASAN AVIARI KELURAHAN BULIANG (LANJUTAN) | KAWASAN AVIARI BATU AJI | SEKUPANG | - | PEMBANGUNAN | 2022 | 5.225.335.727 |
PENGADAAN DAN PEMASANGAN KUBIKEL GD & SKTM 20 KV | MASJID BANDARA HANGNADIM - KK KAWASAN BANDARA HANGNADIM | SEKUPANG | - | PEMBANGUNAN | 2022 | 174.248.140 |
SEMENISASI JALAN PERMUKIMAN RT 02 RW 22 TELUK LENGUNG (POKMAS TELUK LENGUNG MAJU 330M2) | KELURAHAN KABIL | SEKUPANG | - | PEMBANGUNAN | 2022 | 118.155.400 |
SEMENISASI JALAN PERMUKIMANRT 04 RW 17 KAV BIDA KABIL (POKMAS ANTORIUM 2 & 3 330 M2) | KELURAHAN KABIL | SEKUPANG | - | PEMBANGUNAN | 2022 | 118.147.700 |
SEMENISASI JALAN PERMUKIMAN RT 01 RW 18 KAV BIDA KABIL (POKMAS TULIP 2 165 M2) | KELURAHAN KABIL | SEKUPANG | - | PEMBANGUNAN | 2022 | 59.012.800 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 PERUM PURNA YUDHA (POKMAS BERSAMA KITA BISA 330 M2) | KELURAHAN KABIL | SEKUPANG | - | PEMBANGUNAN | 2022 | 118.206.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 001 RW 003 | KAMPUNG BARU RT 001 RW 003 | SEKUPANG | - | PEMBANGUNAN | 2022 | 36.152.700 |
REHABILITASI JALAN LINGKUNGAN KAMPUNG PONJEN RT 003 RW 005 | KAMPUNG PONJEN RT 003 RW 005 | SEKUPANG | - | PEMBANGUNAN | 2022 | 197.743.170 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 001 RW 004 | KAMPUNG BARU RT 001 RW 004 | SEKUPANG | - | PEMBANGUNAN | 2022 | 69.336.150 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 003 RW 004 | KAMPUNG BARU RT 003 RW 004 | SEKUPANG | - | PEMBANGUNAN | 2022 | 104.641.920 |
PENARIKAN SKTM, PENGISIAN PERALATAN GARDU DISTRIBUSI | YAYASAN AL KAUTSAR TELAGA PUNGGUR | SEKUPANG | - | PEMBANGUNAN | 2022 | 75.047.529 |
PEKERJAAN PENGGANTIAN ATAP WTP, CONTROL ROOM WTP DAN CHLORINE PLANT PLTGU TANJUNG UNCANG | PLTGU TANJUNG UNCANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 378.254.019 |
PENINGKATAN/PENATAAN JALAN SIMP. BARELANG (LANJUTAN) | SIMP. LAMPUR MERAH BARELANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 18.223.928.403 |
PENATAAN JALAN (PELEBARAN JALAN) SIMP. KABIL - SIMP. MASJID RAYA BATAM CENTRE (LANJUTAN) | SIMP. KABIL - SIMP. MASJID RAYA BATAM CENTRE | SEKUPANG | - | PEMBANGUNAN | 2022 | 16.244.904.604 |
PEMBANGUNAN JERAMBAH BETON SELAT NENEK RT 006 RW 003 (POKMAS TEMOYONG 34 - 150 M2) | RT 006 RW 003 SELAT NENEK | SEKUPANG | - | PEMBANGUNAN | 2022 | 307.011.000 |
PEMBANGUNAN JERAMBAH BETON PULAU AWENG RT 007 RW 003 (POKMAS TEMOYONG 35 - 150 M2) | RT 007 RW 003 PULAU AWENG | SEKUPANG | - | PEMBANGUNAN | 2022 | 296.307.000 |
PEMBANGUNAN JERAMBAH BETON TEMOYONG RT 001 RW 001 (POKMAS TEMOYONG 36 - 150 M2) | RT 001 RW 001 TEMOYONG | SEKUPANG | - | PEMBANGUNAN | 2022 | 306.950.000 |
PEMBANGUNAN JERAMBAH BETON RT 01 RW 02 SETOKOK (POKMAS SETOKOK 44 - 120 M2) | RT 01 RW 02 SETOKOK | SEKUPANG | - | PEMBANGUNAN | 2022 | 229.914.000 |
PEMBANGUNAN JERAMBAH BETON RT 02 RW 01 SETOKOK (POKMAS SETOKOK 46 - 120 M2) | RT 02 RW 01 SETOKOK | SEKUPANG | - | PEMBANGUNAN | 2022 | 240.367.000 |
PEMBANGUNAN JERAMBAH BETON RT 01 RW 01 SETOKOK (POKMAS SETOKOK 45 - 120 M2) | RT 01 RW 01 SETOKOK | SEKUPANG | - | PEMBANGUNAN | 2022 | 239.193.000 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=270M (PSPK) RT 04 RW 01 SEI PANCUR (POKMAS PTM 13) | RT 04 RW 01 SEI PANCUR TANJUNGPIAYU | SEKUPANG | - | PEMBANGUNAN | 2022 | 76.778.900 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 06 KEL. DURIANGKANG (POKMAS DURIANGKANG 9) | RT 03 RW 06 KEL DURIANGKANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.982.600 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 01 KEL DURIANGKANG (POKMAS DURIANGKANG 11) | RT 05 RW 01 KEL DURIANGKANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 208.766.800 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 02 KEL. DURIANGKANG (POKMAS DURIANGKANG 13) | RT 07 RW 02 KEL DURIANGKANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 212.877.500 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=210M (PSPK) RT 02 RW 13 TELAGA SAKINAH (POKMAS PTM 11) | RT 02 RW 13 TELAGA SAKINAH TANJUNGPIAYU | SEKUPANG | - | PEMBANGUNAN | 2022 | 54.817.400 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=100M (PSPK) RT 03 RW 01 SEI PANCUR (POKMAS PTM 9) | RT 03 RW 01 SEI PANCUR - TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 28.458.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=270M (PSPK) RT 01 RW 08 KAVLING BAGAN | RT 01 RW 08 KAVLING BAGAN | SEI BEDUK | - | PEMBANGUNAN | 2022 | 63.493.100 |
PEMBANGUNAN / REHABILITASI DRAINASE U-40 P=170M (PSPK) RT 02 RW 08 KAV. BAGAN | RT 02 RW 08 KEL. DURIANGKANG | SEI BEDUK | - | PEMBANGUNAN | 2022 | 48.595.800 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=200M (PSPK) RT 01 RW 05 PANCUR PELABUHAN | RT 01 RW 05 PENCUR PELABUHAN | SEI BEDUK | - | PEMBANGUNAN | 2022 | 46.931.500 |
PENINGKATAN DRAINASE PASAR PJB KELURAHAN SAGULUNG KOTA | PASAR PJB SAGULUNG KOTA - BATU AJI-BATAM | SEI BEDUK | - | PEMBANGUNAN | 2022 | 2.684.653.496 |
JL1 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 08 RW 02 MENUJU POSYANDU | KEL. TANJUNG BUNTUNG, KEC. BENGKONG | SEI BEDUK | - | PEMBANGUNAN | 2022 | 149.834.939 |
SEMENISASI JALAN PEMUKIMAN KAMPUNG BARU RT.002/RW.006 (POKMAS GALANG BARU 34) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 134.262.700 |
SEMENISASI JALAN PEMUKIMAN TANJUNG MELAGAN RT.002/RW.003 (POKMAS GALANG BARU 35) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 122.057.000 |
JERAMBAH AIR LINGKA RT.001/RW.005 (POKMAS GALANG BARU 36) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 241.585.300 |
JERAMBAH AIR LINGKA RT.002/RW.005 (POKMAS GALANG BARU 37) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 241.585.300 |
JERAMBAH KAMPUNG BARU RT.001/RW.006 (POKMAS GALANG BARU 38) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 362.402.700 |
JERAMBAH PULAU NANGA RT.001/RW.002 (POKMAS GALANG BARU 39) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 219.637.000 |
JERAMBAH TANJUNG MELAGAN RT.002/RW.003 (POKMAS GALANG BARU 40) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 329.451.000 |
JERAMBAH DARI RUMAH, SABARIAH, KAMAT, AZMAN KAMPUNG BARU RT,004/RW,002 (POKMAS KAMPUNG BARU 3) | KELURAHAN SUBANG MAS | SEI BEDUK | - | PEMBANGUNAN | 2022 | 362.374.000 |
JERAMBAH DARI RUMAH SAREP, MAIN, ROSLI PULAU JEMARA, RT,005/RW,002 (POKMAS PULAU JEMARA 4) | KELURAHAN SUBANG MAS | SEI BEDUK | - | PEMBANGUNAN | 2022 | 362.374.000 |
JERAMBAH DARI RUMAH, SARIMAN, SARUDIN, ASBULLAH RT. 01 RW. 01 SUBANG MAS (POKMAS SUBANG MAS 3) | KELURAHAN SUBANG MAS | SEI BEDUK | - | PEMBANGUNAN | 2022 | 434.884.000 |
PEMBANGUNAN JALAN LINGKUNGAN SUBANG MAS, RT.001/RW.001 (POKMAS SUBANG MAS 5) | KELURAHAN SUBANG MAS | SEI BEDUK | - | PEMBANGUNAN | 2022 | 268.539.000 |
PENINGKATAN JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI (TAHAP 2) | JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI | SEI BEDUK | - | PEMBANGUNAN | 2022 | 7.109.805.481 |
PEKERJAAN GROUTING, INJEKSI DAN PLESTER DINDING DI BCS MALL | BCS MALL, JALAN BUNGA RAYA SEI BALOI | SEI BEDUK | - | PEMBANGUNAN | 2022 | 40.000.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. BAITUL HASANAH RT 02 RW 19 | PERUM. BAITUL HASANAH RT 02 RW 19 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT ASRI RT 01 RW 10 | PERUM. TIBAN BUKIT ASRI RT 01 RW 10 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT ASRI RT 03 RW 10 | PERUM. TIBAN BUKIT ASRI RT 03 RW 10 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT PERMAI RT 01 RW 15 | PERUM. TIBAN BUKIT PERMAI RT 01 RW 15 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 02 RW 03 | PERUM. TAMAN SARI HIJAU RT 02 RW 03 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI RT 04 RW 02 | PERUM. TAMAN SARI RT 04 RW 02 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 06 RW 03 | PERUM. TAMAN SARI HIJAU RT 06 RW 03 | BATU AJI | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 01 RW 03 | PERUM. TAMAN SARI HIJAU RT 01 RW 03 | BATU AJI | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN KOPERASI RT 01 RW 07 | PERUM. TIBAN KOPERASI RT 01 RW 07 | BATU AJI | - | PEMBANGUNAN | 2022 | 114.078.030 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW. 012 CIPTA ASRI (POKMAS TBS 8) | RT. 04 RW. 012 CIPTA ASRI | BATU AJI | - | PEMBANGUNAN | 2022 | 179.707.890 |
SEMENISASI JALAN LINGKUNGAN RT.07 RW. 012 CIPTA ASRI (POKMAS TBS 12) | RT.07 RW. 012 CIPTA ASRI | BATU AJI | - | PEMBANGUNAN | 2022 | 193.727.190 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT GAJAH IZUMI MAS PERKASA - KAWASAN HIJRAH INDUSTRIAL ESTATE BLOK AI | BATU AJI | - | PEMBANGUNAN | 2022 | 97.894.968 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM PONDOK ASRI RT.001/RW.004 | PERUM PONDOK ASRI RT.001/RW.004 | BATU AJI | - | PEMBANGUNAN | 2022 | 22.738.350 |
PEMBANGUNAN JERAMBAH BETON PULAU BULUH RT 01 RW 01 ( POKMAS PULAU BULUH 31 - 135 M2 ) | RT 01 RW 01 PULAU BULUH | BATU AJI | - | PEMBANGUNAN | 2022 | 265.814.000 |
PEMBANGUNAN JERAMBAH BETON PULAU BULUH RT 02 RW 01 (POKKMAS PULAU BULUH 33 - 130,5 M2) | RT 02 RW 01 PULAU BULUH | BATU AJI | - | PEMBANGUNAN | 2022 | 250.159.000 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM VILLA PESONA ASRI RT 03 | PERUM VILLA PESONA ASRI RT.05 RT.03 RW.10 | BATU AJI | - | PEMBANGUNAN | 2022 | 204.945.960 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM VALENCIA RT.02 RW.25 | BATU AJI | - | PEMBANGUNAN | 2022 | 199.689.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM BUKIT RAYA RT.02 RW.38 | PERUM BUKIT RAYA RT.02 RW.38 | BATU AJI | - | PEMBANGUNAN | 2022 | 186.408.960 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM BIDA ASRI 2 RT.04 RW.17 | PERUM BIDA ASRI 2 RT.04 RW.17 | BATU AJI | - | PEMBANGUNAN | 2022 | 205.407.720 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM ALAM RAYA RT.01 RW.15 | PERUM ALAM RAYA RT.01 RW.15 | BATU AJI | - | PEMBANGUNAN | 2022 | 209.261.640 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN EIRENE RT 02 RW 14 | PERUM. TAMAN EIRENE RT 02 RW 14 | BATU AJI | - | PEMBANGUNAN | 2022 | 113.712.840 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. BUMI SAKINAH RW 11 MELEWATI JALAN PERUM. BUANA | PERUM. BUANA IMPIAN I RW 14, KEL. TEMBESI, KEC. SAGULUNG | BATU AJI | - | PEMBANGUNAN | 2022 | 163.297.912 |
PEMELIHARAAN GARDU DISTRIBUSI | AREA TIBAN | BATU AJI | - | PEMBANGUNAN | 2022 | 58.030.000 |
PEKERJAAN RENOVASI GARDU DISTRIBUSI DAN PEMASANGAN PERALATAN ISI GARDU SERTA PEMASANGAN KABEL SKTM | PT ADI BATAMUNI JAYA - KK MEGA CIPTA INDUSTRIAL PARK BATU AMPAR | BATU AJI | - | PEMBANGUNAN | 2022 | 33.467.346 |
REVITALISASI MASJID AL KAUTSAR PERUMAHAN MASYEBA GADING | KELURAHAN SEI HARAPAN, KECAMAN SEKUPANG, KOTA BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 115.683.273 |
SEMENISASI JALAN BLOK I KAVLING ABADI JAYA RT 01/RW 03 | KELURAHAN SUNGAI LEKOP, KECAMATAN SAGULUNG, KOTA BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 115.263.636 |
PENATAAN LINGKUNGAN PERUMAHAN CLASIK INDAH | KOTA BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 115.830.909 |
PEMANCANGAN RC PILE 400X400MM | PT MCDERMOTT INDONESIA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.387.000.000 |
RENOVASI BANGUNAN PANTI ASUHAN MUHAMMADIYAH AL ANSHORI, PERUMAHAN BAMBU KUNING BLOK B.16 NO. 16 | KEL. BUKIT TEMPAYAN KEC. BATU AJI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 77.142.727 |
PENATAAN LINGKUNGAN PERBAIKAN FASILITAS UMUM (FASUM) PERUM BAMBU KUNING RW 03 BLOK C | KEL. BUKIT TEMPAYAN, KECAMATAN BATU AJI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 77.190.909 |
REVITALISASI MUSHOLLA AT TAQWA PERUMAHAN PURI SURYA | KELURAHAN SUNGAI LANGKAI KEC. SAGULUNG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 77.130.909 |
PEKERJAAN STRUKTUR GEDUNG PERTAMA BUSINESS CENTRE | KAWASAN SHIPYARD PT. DOK WARISAN PERTAMA - PAX OCEAN | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.421.932.946 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU CANTOL DAN JTM-SUTM | BTS TELKOMSEL BTM569-KP CAKANG RT 03 RW 04 PULAU GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 55.749.903 |
PROYEK PRESERVASI KAPAL | DELTA SHIPYARD PANARAN DAPUR 12 SEI, PELUNGGUT | BATAM KOTA | - | PEMBANGUNAN | 2022 | 40.020.000 |
NEW CONSTRUCTION OF 6 LOT TYPE E FACTORY AT BATAMINDO INDUSTRIAL PARK | BATAMINDO INDUSTRIAL PARK | BATAM KOTA | - | PEMBANGUNAN | 2022 | 70.000.000.000 |
PEMBANGUNAN GUDANG UK. 30M X 42M | JALAN BRIGJEN KATAMSO (BUNDARAN), TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 780.000.000 |
PROYEK WORKSHOP PRODUKSI TAHAP 2 BA (2) | JL BRIGJEN KATAMSO LOT 8 KEL TANJUNG UNCANG KEC BATU AJI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 980.000.000 |
MECHANICAL INSTALLATION, ELECTRICAL, ENGINE FOUNDATION (SLAB) | POWER HOUSE KAWASAN INDUSTRIAL BATAMINDO PARK DAN JLN PUTRI HIJAU SAMPING PERUMAHAN GRIYA BATU AJI ASRI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.203.775.055 |
PEKERJAAN TAMBAHAN PENGADAAN DAN PEMASANGAN JARINGAN BARU | JL. BRIGJEN KATAMSO KM 7 KEL. TANJUNG UNCANG KEC. BATU AJI BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 754.002.951 |
INSTAL GENSET 1000KVA, SETTING LEVELING, SOUND PROFING DLL - NAGOYA | NAGOYA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 102.000.000 |
ADDITIONAL AIRCON AT BLASTING PROCESS AT FACTORY - 1 (AIRCON WORK) | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 691.180.000 |
IMPROVEMENT AIRCON AT F1 STEP-2 (AIRCON WORK) | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 602.640.000 |
PEMASANGAN TIANG PANCANG MARVEL 2, 4200 TITIK | PT UNILEVER OLEOCHEMICAL INDONESIA SUMATERA UTARA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 35.233.020.000 |
PEMANCANGAN ONSHORE RC PILE 200 X 200 MM | BATAM - CENTRAL HILLS BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 262.909.091 |
PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | PT BERTUAH SAMUDERA ABADI - KP AIR NAGA KEL SIJANTUNG REMPANG - GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 127.654.673 |
RENOVATION UPPER CANTEEN LOT 207 | PT. EXCELITAS TECHNOLOGIES BATAM LOT 207 JLN. BERINGIN # 02-03 DAN WORKSHOP SEI BINTI TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 4.489.000.000 |
PENAMBAHAN RETAINING WALL BRONJONG DEPAN VILLA PANBIL BLOK BB2 | KAWASAN VILLA PANBIL, MUKA KUNING | BATAM KOTA | - | PEMBANGUNAN | 2022 | 82.324.250 |
COST FOR STINGER FULL SURFACE PREP & COATING | PELABUHAN SCN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.455.454.545 |
PENGECATAN HOTEL FOUR POINT, LAGOI - BINTAN | LAGOI, BINTAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 727.473.832 |
RENOVATION OF MAIN OFFICE BUILDING | JALAN BRIGJEN KATAMSO KM5, TANJUNG UNCANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.817.590.564 |
DECENTRALIZED STP IN PT BREDERO SHAW INDONESIA | JALAN HANG KESTURI I NO. 14, KAWASAN INDUSTRI TERPADU KABIL, BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 956.480.000 |
PENGECATAN HOTEL PLANET HOLIDAY BATAM | JL. RAJA ALI HAJI, JODOH - BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 798.615.000 |
PLTU SOFIFI 2X3 MW | DUSUN PASIGAU SOFIFI MALUKU UTARA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 75.990.000.000 |
SUPPLY AND INSTALL STEEL PLATE FOR REINFORCEMENT 2ND FLOOR AT PCL LINE #2 | PURI INDUSTRIAL PARK 2000 BATAM CENTER, KELURAHAN BALOI PERMAI, BATAM - 29463 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 32.120.000 |
PEKERJAAN PANCANG PHASE 2 | BATAM CENTRE | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.392.363.636 |
PEKERJAAN PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT TAHUN 2022 TAHAP 1 AREA BATAM | SAHID HOTEL BATAM CENTRE - OS STYLE T AJI - CATERING SEMERU BATAM CENTRE - SHIPURU HARBOUR BAY | BATU AMPAR | - | PEMBANGUNAN | 2022 | 532.929.990 |
NEW FIRE SPRINKLERS AE PLATS HOT OIL SYSTEM | KABIL KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 195.000.000 |
SEMENISASI JALAN LINGKUNGAN BLOK B RT 02 RW 09 KEL. DURIANGKANG (POKMAS DURIANGKANG 1 - 600 M2) | BLOK B RT 02 RW 09 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.721.000 |
SEMENISASI JALAN LINGKUNGAN BLOK I, J, K, L,M, N RT 04 RW 15 KEL. DURIANGKANG (POKMAS DURIANGKANG 2) | BLOK I, J, K, L, M, N RT 04 RW 15 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 210.588.400 |
SEMENISASI JALAN LINGKUNGAN DKT LAPANGAN SAKURA RT 01 RW 03 KEL. DURIANGKANG (POKMAS DURIANGKANG 3) | RT 01 RW 03 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 211.775.300 |
SEMENISASI JALAN LINGKUNGAN / GANG RT 02 RW 08 KEL. DURIANGKANG (POKMAS DURIANGKANG 4) | RT 02 RW 08 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 167.680.700 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 02 RW 02 KEL. DURIANGKANG (POKMAS DURIANGKANG 5) | RT 02 RW 02 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.808.000 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 03 RT 01 RW 07 KEL. DURIANGKANG (POKMAS DURIANGKANG 6) | RT 03 RT 01 RW 7 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 171.515.300 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 03, RT 04 RW 15 KEL. DURIANGKANG (POKMAS DURIANGKANG 7) | RT 03 RT 04 RW 15 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 180.728.900 |
SEMENISASI JALAN LINGKUNGAN RT 02, RT 06 RW 06 KEL. DURIANGKANG (POKMAS DURIANGKANG 8) | RT 02 RT 06 RW 06 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.333.500 |
DRAINASE/PARIT U-30 JLN. GANG JAMBU RT 03 RW 12 KEL. DURIANGKANG (POKMAS DURIANGKANG 14) | GANG JAMBU RT 03 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 29.437.100 |
DRAINASE / PARIT U-30 RT 05 RW 13 KEL. DURIANGKANG (POKMAS DURIANGKANG 15) | RT 05NRW 13 KEL DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 60.798.100 |
SEMENISASI JALAN LINGKUNGAN MANGSANG INDAH RT 01 RW 24 (POKMAS CEMARA) | RT 01 RW 24 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.633.600 |
SEMENISASI JALAN LINGKUNGAN BIDA AYU BLOK L DAN E RT 02 RW 15 (POKMAS PINUS) | BLOK L DAN E RT 02 RW 15 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.065.100 |
SEMENISASI JALAN LINGKUNGAN BIDA AYU RT 02 RW 13 (POKMAS BERINGIN) | BIDA AYU RT 02 RW 13 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 141.737.200 |
SEMENISASI JALAN LINGKUNGAN BIDADARI RT 04 DAN RT 05 RW 17 (POKMAS BAKAU) | BIDADARI RT 04 DAN RT 05 RW 17 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.534.100 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 02 KELURAHAN TIBAN LAMA (POKMAS ANGGUR 3 - 570 M2) | KELURAHAN TIBAN LAMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 195.285.200 |
SEMENISASI JALAN LINGKUNGAN BLOK D RT 01 RW 07 (POKMAS KETAPANG) | BLOK D RT 01 RW 07 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 171.986.100 |
SEMENISASI JALAN LINGKUNGAN MANGSANG KEBUN RT 01 RW 03 (POKMAS JATI) | MANGSANG KEBUN RT 01 RW 03 KEL MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.535.200 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 01 RW 25 (POKMAS WARU) | RT 01 RW 25 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 213.864.200 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 02 RW 23 | PURI AGUNG RT 02 RW 23 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 188.848.000 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 01,02,03,04 RW 06 (POKMAS BAMBU) | PURI AGUNG RT 01,02,03,04 RW 06 KEL. MANGSANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 211.651.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 09 KELURAHAN TIBAN LAMA (POKMAS KUINI II - 188 M2) | KELURAHAN TIBAN LAMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 66.429.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 KELURAHAN TIBAN LAMA (POKMAS PEAR 1 - 400 M2) | KELURAHAN TIBAN LAMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 138.131.400 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 2 - 630 M2) | KELURAHAN TIBAN LAMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.992.300 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 09 KELURAHAN TIBAN LAMA (POKMAS KUINI - 50 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 17.901.400 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 1 - 149 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 53.339.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 1 - 298 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 101.857.800 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 4 - 332 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 114.959.900 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 11 KELURAHAN TIBAN LAMA (POKMAS SALAK 1 - 627 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 219.897.700 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 4 - 240 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 83.867.300 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 2 - 100 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 35.823.700 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 4 - 360 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 124.382.500 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 05 KELURAHAN TIBAN LAMA (MELON 1 - 240 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 85.968.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 3 - 90 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 32.244.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 11 KELURAHAN TIBAN LAMA (POKMAS SALAK 4 - 400 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 138.131.400 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 5 - 150 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 53.738.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 13 KELURAHAN TIBAN LAMA (POKMAS NANAS 2 - 288 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 103.112.900 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 2 - 220 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 76.302.600 |
SEMENISASI JALAN LINGKUNGAN RT 06 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 3 - 130 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 46.528.900 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 5 - 200 M2) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 70.400.000 |
DRAINASE U30 RT 01 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 1 - 78 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 18.350.200 |
DRAINASE U30 RT 01 RW 03 KELURAHAN TIBAN LAMA (POKMAS BELIMBING I - 30 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 7.067.500 |
DRAINASE U30 RT 01 RW 06 KELURAHAN TIBAN LAMA (POKMAS ALPUKAT 3 - 158 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 37.078.800 |
DRAINASE U30 RT 01 RW 13 KELURAHAN TIBAN LAMA (POKMAS NANAS 1 - 113 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 26.618.900 |
DRAINASE U30 RT 02 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 3 - 101 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 23.790.800 |
DRAINASE U30 RT 03 RW 03 KELURAHAN TIBAN LAMA (POKMAS BELIMBING II - 57 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 13.429.350 |
DRAINASE U30 RT 06 RW 07 KELURAHAN TIBAN LAMA (POKMAS STRAWBERY III - 182 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 40.274.300 |
DRAINASE U40 RT 03 RW 06 KELURAHAN TIBAN LAMA (POKMAS ALPUKAT 2 - 21 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 6.011.500 |
DRAINASE U40 RT 03 RW 10 KELURAHAN TIBAN LAMA (POKMAS SEMANGKA 1 - 125 M) | KELURAHAN TIBAN LAMA | NONGSA | - | PEMBANGUNAN | 2022 | 33.859.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) PERUM CENTRAL MELATI RT 01 RW 0 | PERUM CENTRAL MELATI RT 01 RW 08 | NONGSA | - | PEMBANGUNAN | 2022 | 207.337.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) | KAMPUNG TUA BELIAN PANTAI RT.02 RW.02 | NONGSA | - | PEMBANGUNAN | 2022 | 204.999.300 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BANDARA MAS RT.01 RW20 | NONGSA | - | PEMBANGUNAN | 2022 | 204.848.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BATARA RAYA RT.02 RW, RT.03 RW.03 | NONGSA | - | PEMBANGUNAN | 2022 | 206.783.500 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BUNGA RAYA RT.02 RW.27 | NONGSA | - | PEMBANGUNAN | 2022 | 207.313.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM GRAHA NUSA PERMAI RT.01 RW.13 | NONGSA | - | PEMBANGUNAN | 2022 | 207.337.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM GRIYA PANORAMA PERMAI RT.02 RW.44 | NONGSA | - | PEMBANGUNAN | 2022 | 206.829.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM MARBELLA RESIDENCE RT.04 RW.39 | NONGSA | - | PEMBANGUNAN | 2022 | 206.602.000 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM NADIM RAYA RT.01 RW.51 | NONGSA | - | PEMBANGUNAN | 2022 | 204.007.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM ODESSA RT.03 RW.40 | NONGSA | - | PEMBANGUNAN | 2022 | 206.331.400 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) | PERUM TAMAN RAYA TAHAP 2A RT.01 RW.35 | NONGSA | - | PEMBANGUNAN | 2022 | 199.524.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM TAMAN RAYA TAHAP III RT.02 RW.18 | NONGSA | - | PEMBANGUNAN | 2022 | 206.308.300 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM GRIYA KPN RT.01 RW.41 | PERUM GRIYA KPN RT.01 RW.41 | NONGSA | - | PEMBANGUNAN | 2022 | 198.793.000 |
PEMELIHARAAN PREVENTIVE TM, TR DAN GARDU PORTAL | AREA BATAM TERSEBAR | NONGSA | - | PEMBANGUNAN | 2022 | 99.647.357 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RT 3 RW 3 (POKMAS PERMATA 1) | RT 3 RW 3 BENGKONG KOLAM - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RT 5 RW 3 (POKMAS PERMATA 2) | RT 5 RW 3 BENGKONG KOLAM - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RT 5 RW 10 (POKMAS PERMATA 3) | RT 5 RW 10 BENGKONG SADAI - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RT 6 RW 10 (POKMAS PERMATA 4) | RT 6 RW 10 BENGKONG SADAI - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 05 RW 18 (POKMAS PERMATA 5) | RT 05 RW 18 BENGKONG TELAGA INDAH - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 1 RW 18 (POKMAS PERMATA 6) | RT 1 RW 18 BENGKONG TELAGA INDAH - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 5 RW 18 (POKMAS PERMATA 8) | RT 5 RW 18 BENGKONG TELAGA INDAH - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A1 KOMP. WINNER MILLENIUM RT 3 RW 17 (POKMAS PERMATA 10) | BLOK A1 KOMP. WINNER MILLENIUM RT 3 RW 17 - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A,B,C DAN D KAVLING HARAPAN JAYA RT 8 RW 13 (PERMATA 11) | BLOK A,B,C DAN D KAVLING HARAPAN JAYA RT 8 RW 13 - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK K BENGKONG SADAI RT 1 RW 10 (POKMAS PERMATA 12) | RT 1 RW 10 DI BLOK K BENGKONG SADAI - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 143.308.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BELIMBING RT 4 DAN RW 4 (POKMAS PERMATA 14) | RT 4 RW 4 KAMPUNG BELIMBING - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 161.221.500 |
PEMELIHARAAN DAN PERAWATAN TAMAN JALAN ARTERI DAN ROW WILAYAH PERAWATAN PERTAMANAN BP BATAM | KOTA BATAM | NONGSA | - | PEMBANGUNAN | 2022 | 1.191.942.552 |
SEMENISASI JALAN LINGKUNGAN KP. DURIAN RT 5 RW 6 (POKMAS PERMATA 16) | RT 5 RW 6 KAMPUNG DURIAN - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN PERUM.PKJ RT 2 RW 14 (POKMAS PERMATA 17) | RT 2 RW 14 PERUM PKJ - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. PKJ RT 3 RW 14 (POKMAS PERMATA 18) | RT 3 RW 14 PERUM PKJ - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN SEI NAYON RT 2 RW 12 (POKMAS PERMATA 19) | RT 2 RW 12 SEI NAYON - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 SAKURA GARDEN ( 400 M² ) POKMAS BUNGA SAKURA | RT 01 RW O4 SAKURA GARDEN | NONGSA | - | PEMBANGUNAN | 2022 | 142.591.900 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 04 SAKURA GARDEN ( 368 M² ) POKMAS MANGGA | RT 02 RW 04 SAKURA GARDEN | NONGSA | - | PEMBANGUNAN | 2022 | 131.684.300 |
POKMAS BM 04, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 | BATU MERAH RT 02 RW 08 | NONGSA | - | PEMBANGUNAN | 2022 | 81.634.300 |
POKMAS BM 01, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 15 RW 04 | BATU MERAH RT 15 RW 04 | NONGSA | - | PEMBANGUNAN | 2022 | 26.514.400 |
POKMAS BM 02, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 25 RW 01 | BATU MERAH RT 25 RW 01 | NONGSA | - | PEMBANGUNAN | 2022 | 19.860.500 |
POKMAS BM 03, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 30 RW 06 | BATU MERAH RT 30 RW 06 | NONGSA | - | PEMBANGUNAN | 2022 | 53.903.300 |
POKMAS BM 05, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 11 RW 03 | BATU MERAH RT 11 RW 03 | NONGSA | - | PEMBANGUNAN | 2022 | 71.634.200 |
POKMAS BM 06, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 14 RW 04 | BATU MERAH RT 14 RW 04 | NONGSA | - | PEMBANGUNAN | 2022 | 81.631.000 |
POKMAS BM 07, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 17 RW 05 | BATU MERAH RT 17 RW 05 | NONGSA | - | PEMBANGUNAN | 2022 | 29.338.100 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A1 KE MESJID PERUM. PKJ RT 1 RW 14 (POKMAS PERMATA 9) | RT 1 RW 14 PERUM PKJ - SADAI | NONGSA | - | PEMBANGUNAN | 2022 | 214.692.000 |
POKMAS BM 08, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 19 RW 06 | BATU MERAH RT 19 RW 06 | NONGSA | - | PEMBANGUNAN | 2022 | 35.033.900 |
POKMAS BM 11, PEMBANGUNAN JERAMBAH BETON RT 18 RW 05 | BATU MERAH RT 18 RW 05 | NONGSA | - | PEMBANGUNAN | 2022 | 121.330.000 |
SEMENISASI JALAN PERUM MUKA KUNING INDAH RT06RW06 (POKMAS AJANG KARYA MANDIRI) VOL-600M2 | KELURAHAN BULIANG | NONGSA | - | PEMBANGUNAN | 2022 | 214.043.500 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ABADI 2 RT 03 RW 04 (POKMAS TANJUNG 1) | RT 03 RW 04 BENGKONG ABADI 2 - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ABADI BARU DEKAT RT 03 DAN 06 RW 14 JLN BUNGA RAYA (POKMAS TG2) | RT 03 RW 14 BENGKONG ABADI BARU - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 171.969.600 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ASRAMA RT 04 RW 10 GG. SEMAR (POKMAS TANJUNG 3 ) | RT 04 RW 10 BENGKONG ASRAMA -TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 200.631.200 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ASRAMA RT 04 RW 10 JALAN UTAMA MASJID (POKMAS TANJUNG 4) | RT 04 RW 10 BENGKONG ASRAMA -TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 179.135.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG DALAM RT 04 RW 09 (TANJUNG 5) | RT 04 RW 09 | NONGSA | - | PEMBANGUNAN | 2022 | 118.229.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KARTINI RT 02 RW 12 (TANJUNG 6) | RT 02 RW 12 BENGKONG KARTINI - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 114.646.400 |
SEMENISASI JALAN LINGKUNGAN BENGKONG WAHYU RT 03 RW 17 JALAN TOWER (TANJUNG 7) | RT 03 RW 17 BENGKONG WAHYU - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN BENGKONG WAHYU RT 04 RW 17 JL. GEREJA (POKMAS TANJUNG 8) | RT 04 RW 17 BENGKONG WAHYU - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN JALAN TEMBUS MUSHOLLA RT 04 RW 03 (POKMAS TANJUNG 9) | RT 04 RW 03 BENGKONG ABADI 1 - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 143.308.000 |
SEMENISASI JALAN LINGKUNGAN PERUM PESONA MANTANG RT 02 RW 15 (POKMAS TANJUNG 10 ) | RT 02 RW 15 PERUM PESONA MANTANG - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN TANJUNG BUNTUNG BARU RT 07 RW 02 (POKMAS TANJUNG 12) | RT 07 RW 02 TANJUNG BUNTUNG BARU - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTABLE DAN SKTM | PORTABLE PT MULTIBANGUN ADHITAMA KONSTRUKSI - KK SEI LADI JL. GAJAH MADA SEKUPANG | NONGSA | - | PEMBANGUNAN | 2022 | 86.990.781 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | PT AMTEK ENGINEERING - KK KAWASAN INDUSTRI CAMMO ESTATE BLOK D3 NO. 1 BATAM CENTRE | NONGSA | - | PEMBANGUNAN | 2022 | 322.194.628 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL DAN SUTM | PT PUTRA JAYA BINTAN - KK PR TAMAN LESTARI BATU AJI | NONGSA | - | PEMBANGUNAN | 2022 | 83.579.361 |
SEMENISASI JALAN PERUM. TERING MAS RT 002 RW 018 ( POKMAS CERI ) 459 M2 | RT 002 RW 018 KEL TANJUNG SENGKUANG | NONGSA | - | PEMBANGUNAN | 2022 | 163.615.100 |
SEMENISASI JALAN RT 002 RW 007 ( POKMAS DUKU ) 560 M2 | RT 002 RW 007 KEL TANJUNG SENGKUANG | NONGSA | - | PEMBANGUNAN | 2022 | 200.600.400 |
SEMENISASI JALAN RT 004 RW 021 ( POKMAS KERJA SIAGA ) 600 M2 | RT 004 RW 021 KEL TANJUNG SENGKUANG | NONGSA | - | PEMBANGUNAN | 2022 | 214.522.000 |
SEMENISASI JALAN KAV. BUKIT MAKMUR RT 001 RW 013 ( POKMAS PISANG ) 375 M2 | RT 001 RW 013 KEL TANJUNG SENGKUANG | NONGSA | - | PEMBANGUNAN | 2022 | 133.906.300 |
SEMENISASI JALAN PERUM. GMP TAHAP II RT 002 RW 004 ( POKMAS RAJAWALI 2 ) 240 M2 | RT 002 RW 004 KEL TANJUNG SENGKUANG | NONGSA | - | PEMBANGUNAN | 2022 | 85.945.200 |
POKMAS BM 09 PELANTAR 1, PEMBANGUNAN JERAMBAH BETON RT 06 RW 02 (PELANTAR I) | BATU MERAH RT 06 RW 02 | NONGSA | - | PEMBANGUNAN | 2022 | 218.355.500 |
POKMAS BM 09 PELANTAR 2, PEMBANGUNAN JERAMBAH BETON RT 06 RW 02 (PELANTAR II) | BATU MERAH RT 06 RW 02 | NONGSA | - | PEMBANGUNAN | 2022 | 218.353.300 |
SEMENISASI JALAN LINGKUNGAN P=150M L=4M (PSPK) RT 01 RW 14 PERUM RHABAYU ASRI (POKMAS PTM 1)) | RT 01 RW 14 PERUM RHABAYU ASRI KEL TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 214.854.200 |
SEMENISASI JALAN LINGKUNGAN PERUM SARMEN RAYA RT 5 DAN 6 RW 05 ( POKMAS TANJUNG 11) | RT 06 RW 05 PERUM SARMEN RAYA - TANJUNG BUNTUNG | NONGSA | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN P=190 L=3M (PSPK) RT 01 RW 15 KAV. BARU SEI DAUN (POKMAS PTM 2) | RT 01 RW 15 KAV. BARU SEI DAUN KEL. TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 201.023.900 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=300M (PSPK) RT 02 RW 07 KAV. LAMA SEI DAUN (POKMAS PTM 3) | RT 02 RW 07 KAV. LAMA SEI DAUN KEL. TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 69.862.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=500 (PSPK) RT 01 RW 11 KAV. BARU SEI DAUN (POKMAS PTM 4) | RT 01 RW 11 KAV. BARU SEI DAUN KEL. TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 117.835.300 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=800M (PSPK) RT 03 RW 09 KAMPUNG BAGAN (POKMAS PTM 5) | RT 03 RW 09 KAMPUNG BAGAN KEL. TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 184.248.900 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=415M (PSPK) RT 01 02 RW 07 KAV BARU SEI DAUN (POKMAS PTM 6) | RT 01 02 RW 07 KAV BARU SEI DAUN KEL. TANJUNGPIAYU | NONGSA | - | PEMBANGUNAN | 2022 | 113.663.000 |
RENOVASI RUMAH TINGGAL DI PERUMAHAN MEKAR SARI BLOK D.17 | TIBAN | NONGSA | - | PEMBANGUNAN | 2022 | 35.000.000 |
PENAMBAHAN RETAINING WALL BRONJONG DEPAN VILLA PANBIL BLOK BB2 TAHAP-3 | KAWASAN VILLA PANBIL, MUKA KUNING | NONGSA | - | PEMBANGUNAN | 2022 | 77.395.625 |
PERBAIKAN RAILING DI CONDOTEL LANTAI 25 APARTEMENT PANBIL RESIDENCE | MUKA KUNING | NONGSA | - | PEMBANGUNAN | 2022 | 17.000.000 |
TAMBAHAN RANGKA BAJA DARI ATAP DI POS JAGA TAMAN WISATA ALAM | MUKA KUNING | NONGSA | - | PEMBANGUNAN | 2022 | 20.846.610 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT CHAMPION MATTRES INDONESIA - KK LATRADE INDUSTRIAL PARK BLOK E NO. 7 TG UNCANG | NONGSA | - | PEMBANGUNAN | 2022 | 38.162.859 |
PEMASANGAN DAN PENGADAAN SISIP PERALATAN GARDU, RENOVASI DAN BONGKAR PERALATAN GARDU DAN KWH PANTAU | PT BATAMA ARIASINDO - KK KAW BINTANG MAKMUR INDUSTRIAL BLOK B NO. 1-2 BATAM CENTRE | NONGSA | - | PEMBANGUNAN | 2022 | 26.602.502 |
PENGADAAN DAN PEMASANGAN GH-SKTM DARI DEPAN INTI SEHAT BATAM CENTRE KE GH LEGENDA UNTUK MENGATASI OV | JL. RAJA ISA BATAM CENTRE | NONGSA | - | PEMBANGUNAN | 2022 | 43.473.242 |
INSPECTOR TRANSMISSION LINE 150 KV | BATAM TERSEBAR | NONGSA | - | PEMBANGUNAN | 2022 | 328.067.148 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM BALOI RANTAU RT.01 RW.04 | PERUM BALOI RANTAU RT.01 RW.04 | NONGSA | - | PEMBANGUNAN | 2022 | 166.179.200 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM BUKIT INDAH SUKAJADI | PERUM BUKIT INDAH SUKAJADI JL.PALEM HIJAU RT.01 RW.01 | NONGSA | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN PERMUKIMAN RT. 01 RW. 25 KAVLING BESTARI KELURAHAN KABIL (POKMAS BESTARI VOL 585M2) | KABIL | NONGSA | - | PEMBANGUNAN | 2022 | 209.573.100 |
SEMENISASI JALAN PERMUKIMAN RT. 02 RW. 24 KAVLING TAMAN BALOI KELURAHAN KABIL POKMAS JUNI (509 M2) | KABIL | NONGSA | - | PEMBANGUNAN | 2022 | 182.327.200 |
SEMENISASI JALAN PERMUKIMAN RT. 03 RW. 21 KAVLING BIDA KABIL KELURAHAN KABIL POK. MEKAR SARI 330M2 | KABIL | NONGSA | - | PEMBANGUNAN | 2022 | 118.206.000 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KAMPUNG TUA RT 01 RW 01 | KEL. PATAM LESTARI, KEC. SEKUPANG | NONGSA | - | PEMBANGUNAN | 2022 | 198.636.796 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL | HARYANTO - RESTORAN GEK MOI, JL TRANS BARELANG SETELAH KEPRI CORAL | NONGSA | - | PEMBANGUNAN | 2022 | 11.696.315 |
PEMBANGUNAN GARDU 3X4 METER (SISIPAN) | POLRESTA BARELANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.980.442 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT CITRA SERAYA SUPREMNUSA - NAGOYA CITY WALK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 72.932.220 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM SKTM 20 KV | PT PRINCESS AURORA - KK PR KIBING RAYA TEMBESI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 76.819.905 |
SEMENISASI JLAN KAVLING KARTINI I RT.003 RW.002 SUNGAI HARAPAN (POKMAS HARAPAN 2) VOL. 343 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 113.361.600 |
SEMENISASI JALAN PERUM MELATI GARDEN RT.002 RW.013 SUNGAI HARAPAN (POKMAS HARAPAN 4) VOL. 240 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 81.728.900 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.001 RW.008 (HARAPAN 5) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.628.000 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.002 RW.008 (HARAPAN 6) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.402.400 |
SEMENISASI JALAN PERUM PONDOK PRATIWI III RT.006 RW.016 (POKMAS HARAPAN 7) VOL. 400M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.402.400 |
SEMENISASI JALAN KARTINI I GG. MULIA RT.004 RW.002 (POKMAS HARAPAN 1) VOLUME 400M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 130.150.900 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW.015 PERUMAHAN FAMILY DREAM, 529 M2 (POKMAS BERKAH FAMILY) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.379.600 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW.05 PERUMAHAN CITRA MAS INDAH, 450 M2 (POKMAS CITRA MANDIRI) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 155.928.300 |
PEKERJAAN PENGECATAN GEDUNG A,B, GEDUNG PARKIR DAN PEMBUATAN GUDANG AUDITORIUM-KANTOR PUSAT | JL RAJA ISA, TELUK TERING KEC. BATAM KOTA-KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 483.354.545 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW.04 KP.JABI KELURAHAN BATU BESAR, 400 M2 (POKMAS JABI BERSIH) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 139.992.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM PURILOKA 1 RT. 002/ RW. 11 | PERUM PURILOKA 1 RT. 002/ RW. 11 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.953.200 |
PEKERJAAN PEMBUATAN RETAINING WALL TOWER 04 SUTT 150 KV | TANJUNT KASAM - BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 428.090.873 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) TAMAN SENTOSA JL. LAKSMANA BINTA | TAMAN SENTOSA RT 005 RW 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.054.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) TAMAN BUANA INDAH RT. 002/ RW. 0 | TAMAN INDAH BUANA RT 002 RW 003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.228.800 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) JL. LAKSMANA BINTAN PERUM VILL | PERUMAHAN VILLA MAS RT 001 RW 009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 192.017.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUMAHAN KAMPUNG MELAYU BUKIT J | BUKIT JODOH RT 001 RW 002 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.135.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM PONDOK ASRI RT. 002/ RW. 0 | PONDOK ASRI RT 002 RW 010 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.312.700 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 003/ RW. 006 | KOMPLEK NUSA JAYA RT 003 RW 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 88.185.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) BANDAR SRIMAS RT. 005/RW. 012 | PERUM BANDAR SRIMAS RT 05 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 36.768.000 |
Pembangunan Jalan Lingkungan Semenisasi Tebal 15cm (Swakelola PSPK) Bandar Srimas RT. 004/ RW. 012 | PERUM BANDAR SRIMAS RT 04 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 38.938.900 |
PEMBANGUNAN BATU MIRING PERMUKIMAN DAN PERUMAHAN DENGAN BATU BATAM (SWAKELOLA PSPK) KAMPUNG MELAYU B | KAMPUNG MELAYU BUKIT JODOH RT 003 RW 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 37.167.900 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U30 (SWAKELOLA PSPK) KAMPUNG MELAYU BUKIT JODOH | KAMPUNG MELAYU BUKIT JODOH RT. 003 RW. 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 30.588.800 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 001/ RW. 007 | RT. 001 RW. 007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 24.295.700 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 001/ RW. 006 | RT. 001 RW. 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 17.176.500 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK D RT.002 RW.015 (580M2) | PERUMAHAN ANGGREK SARI BLOK D | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK E RT.004 RW.015 (520 M2) | PERUMAHAN ANGGREK SARI BLOK E RT. 004 RW.015 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.254.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENTRE VIEW RT.001 RW.003 (200 M2) | PERUMAHAN CENTRE VIEW RT.001 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 71.602.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GARDAN MASYEBA RT.002 RW.005 580M2 | PERUMAHAN GARDAN MASYEBA RT. 002 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GOLDEN LAND BLOK G RT.002 RW013 (580M2) | PERUMAHAN GOLDEN LAND BLOK G RT.002 RW.013 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GRIYA BUANA INDAH RT.001 RW.014 , 580 M2 | PERUMAHAN GRIYA BUANA INDAH RT. 001 RW.014 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE PAS BATU BELAH LINGKUNGAN PERUMAHAN CENTRE PARK BLOK H RT.002 RW.011 (97M) | PERUMAHAN CENTER PARK RT. 002 RW.011 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 191.175.600 |
DRAINASE LINGKUNGAN U30 PERUMAHAN WISMA BUANA INDAH RT.001 RW.010 (60M) | PERUMAHAN WISMA BUANA INDAH RT. 001 RW.010 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 14.129.500 |
DRAINASE LINGKUNGAN U40 PERUMAHAN TAMAN MARCHELIA RT.002 RW.009 (100M) | PERUMAHAN TAMAN MARCHELIA RT. 002 RW.009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 28.604.400 |
SEMENISASI JALAN BETON PERUM. TAMAN HANG TUAH RT.002 RW.006 | PERUM TAMAN HANG TUAH RT.002 RW.006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUM. TAMAN HANG TUAH RT.003 RW.006 | PERUM. TAMAN HANG TUAH RT.003 RW.006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE/SALURAN PERUM. HANG LEKIR RT.003 RW.005 | PERUM HANG LEKIR RT.003 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 119.762.500 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU CANTROL | PT PANTAI INDAH GALANG BARU, JL. TRANS BARELANG TG. PENGAPIT GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 82.759.367 |
SEMENISASI JALAN BETON PERUM. BIDA ASRI 1 RT.002 RW.009 | PERUM BIDA ASRI 1 RT.002 RW.009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUMAHAN TAMAN LEGENDA BALI BLOK E RT.005 RW.013 | PERUM TAMAN LEGENDA BALI BLOK E RT.005 RW.013 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 198.322.300 |
SEMENISASI JALAN BETON PERUM LEGENDA MALAKA BLOK E RT.001 RW.004 | PERUM LEGENDA MALAKA BLOK E RT.001 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.646.400 |
SEMENISASI JALAN BETON PERUM. LEGENDA MALAKA RT.001 RW.003 | PERUM LEGENDA MALAKA RT.001 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 94.967.400 |
SEMENISASI JALAN BETON PERUM. OMA BATAM CENTRE RT.003 RW.012 | PERUM OMA BATAM CENTRE RT.003 RW.012 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.007 RW.004 | PERUM LEGENDA MALAKA RT.007 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 42.939.600 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.004 RW.004 | PERUM LEGENDA MALAKA RT.004 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.416.500 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA BLOK G RT.003 RW.004 | PERUM LEGENDA MALAKA BLOK G RT.003 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.724.100 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.002, RT.003, DAN RT.004 RW.003 | PERUM LEGENDA MALAKA RT.002, RT.003, DAN RT.004 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 217.229.100 |
SEMENISASI JALAN BETON PERUM. MEDITERANIA RT.001 RW.008 | PERUM MEDITERANIA RT.001 RW.008 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN KOMPLEK KEJAKSAAN NO. 01 S/D 05 RT 04 RW 02 | KOMPLEK KEJAKSAAN NO. 01 S/D 05 RT 04 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 174.945.100 |
SEMENISASI JALAN LINGKUNGAN DARI GERBANG MASJID NURUL JANNAH BLOK S NO. 39 - 55 DAN T NO. 37 RT 07 | TIBAN INDAH PERMAI RT 07 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 195.800.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN DAMAI RT 04 RW 07 | TIBAN DAMAI RT 04 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.470.200 |
SUPPLY AND ISTALLATION OF EQUIPMENT INSULATION WORKS - OSBL STORAGE TANK HOT INSULATION | JL. RAYA PELABUHAN KABILM KM. 12,5, KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.250.000.000 |
PEMBANGUNAN SPAM PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG (DAK REGULER) | PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 6.235.958.000 |
SEMENISASI JALAN PERUMAHAN NAGOYA PERMAI RT.001 RW.005 VOL. 500M2 POKMAS NAGOYA PERMAI 1 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.140.200 |
SEMENISASI JALAN RT001/RW007 KELURAHAN TANJUNG UMA | RT 001 RW 007 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 49.167.800 |
SEMENISASI JALAN PEPAYA RT.001 RW.011 VOL. 564M2 POKMAS PEPAYA2 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 202.030.400 |
Semenisasi Jalan Semangka I RT.001 RW.010 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.237.700 |
SEMENISASI JALAN RT002/RW003 KELURAHAN TANJUNG UMA KECAMATAN LUBUK BAJA, V= 250M2 POKMAS ANGGREK 12 | RT 002 RW 003 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 89.563.100 |
SEMENISASI JALAN PENUIN RT 02 RW 011 VOL. 560M2 POKMAS PENUIN SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.574.000 |
SEMENISASI JALAN RT002/RW011 KELURAHAN TANJUNG UMA, V=540M2 POKMAS TERITIP | RT 002 RW 011 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.463.600 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 09 BALOI MAS INDAH VOL 556M2 POKMAS 3 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 199.192.400 |
SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 03 BALOI CENTRE VOL.520M2 POKMAS 6 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.238.800 |
SEMENISASI JALAN BLOK 6 RT 4 RW 3 VOL. 560M2 POKMAS FLAMBOYAN SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.574.000 |
SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT.003 RW.007 | PERUM PURI LEGENDA RT.003 RW.007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUM. HANG LEKIR BLOK AA RT.001 RW.005 | PERUM HANG LEKIR BLOK AA RT.001 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.589.400 |
SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT.004 RW.007 | PERUM PURI LEGENDA RT.004 RW.007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 05 TAMAN BALOI MAS VOL. 656M2 POKMAS 2 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.946.100 |
SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 06 BALOI MAS PERMAI VOL. 660 M2 POKMAS 7 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 217.272.000 |
PENGADAAN DAN PEMASANGAN PERALATAN GI - GD - SKTM PT CAKRA WISESA KARYA MAKMUR | PT. PLN BATAM / GI BALOI - GI SEI HARAPAN DAN JALAN GAJAH MADA (KAWASAN SOUTLINKS) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.971.736.400 |
PEKERJAAN RETAININGWALL VILLA PANBIL BLOK DD NO. 71,72,73,75 DAN 76 | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 162.257.872 |
SEMENISASI JALAN DEPAN KANTOR LURAH KAMPUNG PELITA RT.001 RW.004 VOL. 360 M2 POKMAS PELITA INDAH 3 | KELURAHAN KAMPUNG PELITA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 128.975.000 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL-JTM-JTR | PT SNEPAC INDO SERVICE - JL. TRANS BARELANG PANTAI MELUR GALANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.165.538 |
PEKERJAAN PERBAIKAN SEAWALL AREA JETTY 1 D I FUEL TERMINAL PULAU SAMBU | PULAU SAMBU, KELURAHAN, TJ. SARI, BELAKANG PADANG, KOTA BATAM, KEPULAUAN RIAU 29411 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.269.200 |
SEMENISASI JALAN BLOK 2 RT 4 RW 1 VOL. 484 M2 POKMAS MANGGA SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 173.360.000 |
PEKERJAAN PEMANCANGAN CLUBHOUSE DAN UNIT RUMAH | BATAM CENTER | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.448.765.000 |
BM5 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING KEL. TANJUNG RIAU, KEC. SEKUPANG | KEL. TANJUNG RIAU, KEC. SEKUPANG (PERUMAHAN GALAXY PARK RT 002, RT 003, RW 014) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 184.504.195 |
PEMBANGUNAN JALAN LINGKUNGAN SEMBULANG TANJUNG RT.002/ RW.001 (POKMAS SEMBULANG 25) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.531.200 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG PASIR MERAH RT.001/ RW.002 (POKMAS SEMBULANG 27) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.719.100 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG CAMPING RT.002 RW.002 (POKMAS SEMBULANG 28) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.478.400 |
DRAINASE PARIT U40 KAMPUNG PASIR MERAH RT.001/002 (POKMAS SEMBULANG 29) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 194.485.500 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG SEI RAYA RT.001/ RW.004 (POKMAS SEMBULANG 32) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 224.221.800 |
SEMENISASI JALAN MENUJU LAPANGAN BOLA KAKI KAMPUNG SERANGGON, RT.002 RW.004 (POKMAS SEMBULANG 33) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 222.843.500 |
SEMENISASI JALAN LINGKUNGAN DARI RUMAH BUTET SAMPAI SABARUDIN RT.002/RW.005 (POKMAS SEMBULANG 35) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.478.400 |
KAMPUNG BATU PUTIH RT 003 RW 004 (DARI RUMAH R. NAFISAH S/D RUMAH IBRAHIM (POKMAS 25) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 201.414.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG BATU PUTIH RT 001 RW 004 (DARI RUMAH SOM (POKMAS 26) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 268.538.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG RANGA RT.002 RW.004 DARI MUSHOLA S/D RUMAH JEMAIN (POKMAS 27) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 89.516.000 |
BATU MIRING PENAHAN TEBING KAMPUNG PADANG PENAGA RT.001 RW.006 (POKMAS 28) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 348.428.000 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG KETAPANG RT 002 RW 006 (DARI RUMAH HITAM (POKMAS 29) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 134.269.000 |
DRAINASE U30 KAMPUNG PADANG RT 002 RW 003 ( DARI RUMAH JEPRI S/D KANTOR LURAH) (POKMAS 30) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 82.196.000 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG PADANG RT 001 RW 003 ( DARI RUMAH KAMIL (POKMAS 31) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 181.258.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG LANGKANG RT 001 RW 002 DARI RUMAH NASER S/D KOKOL (POKMAS 32) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 268.538.000 |
PEMBANGUNAN JALAN LINGKUNGAN DARI KAMPUNG DARAT PULAU RT 002 RW 001 ( DARI RUMAH DEWI (POKMAS 33) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 134.269.000 |
BATU MIRING PENAHAN TEBING LINGKUNGAN KAMPUNG DARAT PULAU RT.001 RW.001 (POKMAS 34) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 295.281.000 |
JERAMBAH PULAU MUBUT RT.002 RW.005 (POKMAS 35) | KELURAHAN KARAS | GALANG | - | PEMBANGUNAN | 2022 | 338.231.000 |
JERAMBAH AIR NAGA RT.01 RW.04 DARI RUMAH SAMAT KE RUMAH OKI (POKMAS AIR NAGA SEHATI 5) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 326.114.800 |
JERAMBAH DARI RUMAH ANDI KE RUMAH SIDAH RT.02 RW.04 AIR NAGA (POKMAS AIR NAGA SEHATI 6) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 253.652.300 |
PEMBANGUNAN JALAN LINGKUNGAN DARI RUMAH PAK AHMAD KE SUMUR RT.01 RW.04 (POKMAS AIR NAGA SEHATI 7) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 107.420.500 |
JERAMBAH RUMAH MARTINI, RIBUT SAMPAI HELDI RT.01 RW.02 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 7) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 253.663.000 |
JERAMBAH DARI RUMAH SALOMA RT.02 RW.02 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 8) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 253.675.000 |
JERAMBAH DARI AWANG SARI KE INDRA RT.03 RW.03 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 9) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 253.664.000 |
PEMBANGUNAN JALAN LINGKUNGAN RT.04 RW.03 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 11) | KELURAHAN SIJANTUNG | GALANG | - | PEMBANGUNAN | 2022 | 268.533.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMIR RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 30) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 235.476.000 |
JERAMBAH DARI BATU MIRING KE RUMAH DOLAH RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 31) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 181.191.000 |
JERAMBAH DARI RUMAH AKMAL ATARIK KE RUMAH SARAH RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 32) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 369.644.000 |
JERAMBAH DARI RUMAH ANDIKA KE RUMAH MUNIR RT.002/RW.001 PULAU ABANG (POKMAS PULAU ABANG 33) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 289.905.000 |
JERAMBAH DARI RUMAH AKIB KE RUMAH ZAINURI RT.003/RW.001 PULAU ABANG (POKMAS PULAU ABANG 34) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 130.447.000 |
JERAMBAH DARI BATU MIRING KE RUMAH BASRI RT.004/RW.001 PULAU ABANG (POKMAS PULAU ABANG 35) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 126.829.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMAT DAN SAIFUL RT.002/RW.002 AIR SAGA (POKMAS PULAU ABANG 36) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 271.791.000 |
JERAMBAH DARI BATU MIRING KE RUMAH MADON RT.002 RW.002 AIR SAGA (POKMAS PULAU ABANG 37) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 163.064.000 |
DRAINASE PARIT U30 MASJID AL-FALAH RT.001 RW.002 (POKMAS PULAU ABANG 38) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 27.389.000 |
JERAMBAH DARI BATU MIRING KE RUMAH JONO RT.002/RW.003 PETONG (POKMAS PULAU ABANG 39) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 90.565.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMIR/ENGKOS RT.001/RW.003 PETONG (POKMAS PULAU ABANG 40) | KELURAHAN PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 144.924.000 |
SEMENISASI JALAN PERUM PONDOK PRATIWI II RT.02 RW.16 (POKMAS HARAPAN 8) VOL. 120M2 | SUNGAI HARAPAN | GALANG | - | PEMBANGUNAN | 2022 | 42.229.000 |
SEMENISASI JALAN PERUM TAMAN KARTINI RAYA II RT003 RW010 (POKMAS HARAPAN 9) 560M2 | SUNGAI HARAPAN | GALANG | - | PEMBANGUNAN | 2022 | 186.769.000 |
SEMENISASI JALAN PERUM TAMAN KARTINI RAYA II RT004 RW010 (DAU) (POKMAS HARAPAN 10) 444M2 | SUNGAI HARAPAN | GALANG | - | PEMBANGUNAN | 2022 | 148.178.800 |
SEMENISASI JALAN LINGKUNGAN PERUM. BUKIT TIBAN SELARAS BLOK A, B, C RT 06 RW 07 | PERUM. BUKIT TIBAN SELARAS BLOK A, B, C RT 06 RW 07 | GALANG | - | PEMBANGUNAN | 2022 | 141.099.200 |
SEMENISASI JALAN PERUM PUTRI FORTUNA RT.003 RW.008 (POKMAS HARAPAN 11) VOL. 400 M2 | SUNGAI HARAPAN | SEKUPANG | - | PEMBANGUNAN | 2022 | 135.298.900 |
SEMENISASI JALAN LINGKUNGAN PERUM. SIRIAON REGENCY BLOK G - L RT 02 RW 11 | PERUM. SIRIAON REGENCY BLOK G - L RT 02 RW 11 | SEKUPANG | - | PEMBANGUNAN | 2022 | 135.652.000 |
SEMENISASI JALAN LINGKUNGAN TAMAN DUTA INDAH JAYA RT 01 RW 07 | TAMAN DUTA INDAH JAYA RT 01 RW 07 | SEKUPANG | - | PEMBANGUNAN | 2022 | 78.818.300 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK B2 RT 05 RW 05 | TIBAN INDAH PERMAI BLOK B2 RT 05 RW 05 | SEKUPANG | - | PEMBANGUNAN | 2022 | 135.625.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK L1 NO. 1 - 6 RT 01 RW 05 | TIBAN INDAH PERMAI BLOK L1 NO. 1 - 6 RT 01 RW 05 | SEKUPANG | - | PEMBANGUNAN | 2022 | 53.319.200 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN INDAH PERMAI BLOK Z-A RT 05 RW 05 | PERUM. TIBAN INDAH PERMAI BLOK Z-A RT 05 RW 05 | SEKUPANG | - | PEMBANGUNAN | 2022 | 172.269.900 |
SEMENISASI JALAN LINGKUNGAN PERUM PONDOK PELANGI RT 05 RW 09 | PERUM PONDOK PELANGI RT 05 RW 09 | SEKUPANG | - | PEMBANGUNAN | 2022 | 114.067.800 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BERLIAN RT 04 RW 13 | PERUM. TIBAN BERLIAN RT 04 RW 13 | SEKUPANG | - | PEMBANGUNAN | 2022 | 109.431.300 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK S NO. 39 DAN BLOK S NO. 43 RT 07 RW 03 | TIBAN INDAH PERMAI BLOK S NO. 39 DAN BLOK S NO. 43 RT 07 RW 03 | SEKUPANG | - | PEMBANGUNAN | 2022 | 97.057.400 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK T NO. 28 - 39 RT 07 RW 03 | TIBAN INDAH PERMAI BLOK T NO. 28 - 39 RT 07 RW 03 | SEKUPANG | - | PEMBANGUNAN | 2022 | 164.710.700 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI LORONG 1 & 2 RT 03 RW 03 | TIBAN INDAH PERMAI LORONG 1 & 2 RT 03 RW 03 | SEKUPANG | - | PEMBANGUNAN | 2022 | 101.693.900 |
SEMENISASI JALAN LINGKUNGAN KAVLING BAKAU SERIP RT. 003 RW. 002 POKMAS GANG KETUPAT (450 M2) | RT. 003 RW. 002 KAVLING BAKAU SERIP | SEKUPANG | - | PEMBANGUNAN | 2022 | 160.975.100 |
SEMENISASI JALAN LINGKUNGAN KAVLING BAKAU SERIP RT. 001 RW. 002 POKMAS POSKAL GROUP (450 M2) | RT. 001 RW. 002 KAVLING BAKAU SERIP | SEKUPANG | - | PEMBANGUNAN | 2022 | 161.194.000 |
SEMENISASI JALAN LINGKUNGAN KAVLING NONGSA RT. 005 DAN RT. 006 RW. 003 POKMAS CIPTA KARYA (535 M2) | RT. 005 DAN RT. 006 RW. 003 KAVLING NONGSA | SEKUPANG | - | PEMBANGUNAN | 2022 | 191.390.100 |
DRAINASE U30 AIR RAJA RT.001/RW.002 (POKMAS AIR RAJA 22) | KELURAHAN AIR RAJA | SEKUPANG | - | PEMBANGUNAN | 2022 | 164.403.000 |
DRAINASE U30 SIMPANG SRI BA'I AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 23) | KELURAHAN AIR RAJA | SEKUPANG | - | PEMBANGUNAN | 2022 | 109.586.000 |
DRAINASE U30 TOK SENIN AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 24) | KELURAHAN AIR RAJA | SEKUPANG | - | PEMBANGUNAN | 2022 | 109.586.000 |
BATU MIRING PENAHAN TEBING AIR RAJA RT.003/RW.002 (POKMAS AIR RAJA 21) | KELURAHAN AIR RAJA | SEKUPANG | - | PEMBANGUNAN | 2022 | 369.004.000 |
PEMBANGUNAN PENATAAN KAWASAN MASJID AGUNG KABUPATEN KEPULAUAN ANAMBAS | KEC. SIANTAN KEPULAUAN ANAMBAS | SEKUPANG | - | PEMBANGUNAN | 2022 | 5.591.100.000 |
PENATAAN LENGAN SIMP. BASECAMP (LANJUTAN) | BASECAMP SAGULUNG | SEKUPANG | - | PEMBANGUNAN | 2022 | 14.673.294.550 |
PENINGKATAN DRAINASE KAWASAN AVIARI KELURAHAN BULIANG (LANJUTAN) | KAWASAN AVIARI BATU AJI | SEKUPANG | - | PEMBANGUNAN | 2022 | 5.225.335.727 |
PENGADAAN DAN PEMASANGAN KUBIKEL GD & SKTM 20 KV | MASJID BANDARA HANGNADIM - KK KAWASAN BANDARA HANGNADIM | SEKUPANG | - | PEMBANGUNAN | 2022 | 174.248.140 |
SEMENISASI JALAN PERMUKIMAN RT 02 RW 22 TELUK LENGUNG (POKMAS TELUK LENGUNG MAJU 330M2) | KELURAHAN KABIL | SEKUPANG | - | PEMBANGUNAN | 2022 | 118.155.400 |
SEMENISASI JALAN PERMUKIMANRT 04 RW 17 KAV BIDA KABIL (POKMAS ANTORIUM 2 & 3 330 M2) | KELURAHAN KABIL | SEKUPANG | - | PEMBANGUNAN | 2022 | 118.147.700 |
SEMENISASI JALAN PERMUKIMAN RT 01 RW 18 KAV BIDA KABIL (POKMAS TULIP 2 165 M2) | KELURAHAN KABIL | SEKUPANG | - | PEMBANGUNAN | 2022 | 59.012.800 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 PERUM PURNA YUDHA (POKMAS BERSAMA KITA BISA 330 M2) | KELURAHAN KABIL | SEKUPANG | - | PEMBANGUNAN | 2022 | 118.206.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 001 RW 003 | KAMPUNG BARU RT 001 RW 003 | SEKUPANG | - | PEMBANGUNAN | 2022 | 36.152.700 |
REHABILITASI JALAN LINGKUNGAN KAMPUNG PONJEN RT 003 RW 005 | KAMPUNG PONJEN RT 003 RW 005 | SEKUPANG | - | PEMBANGUNAN | 2022 | 197.743.170 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 001 RW 004 | KAMPUNG BARU RT 001 RW 004 | SEKUPANG | - | PEMBANGUNAN | 2022 | 69.336.150 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 003 RW 004 | KAMPUNG BARU RT 003 RW 004 | SEKUPANG | - | PEMBANGUNAN | 2022 | 104.641.920 |
PENARIKAN SKTM, PENGISIAN PERALATAN GARDU DISTRIBUSI | YAYASAN AL KAUTSAR TELAGA PUNGGUR | SEKUPANG | - | PEMBANGUNAN | 2022 | 75.047.529 |
PEKERJAAN PENGGANTIAN ATAP WTP, CONTROL ROOM WTP DAN CHLORINE PLANT PLTGU TANJUNG UNCANG | PLTGU TANJUNG UNCANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 378.254.019 |
PENINGKATAN/PENATAAN JALAN SIMP. BARELANG (LANJUTAN) | SIMP. LAMPUR MERAH BARELANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 18.223.928.403 |
PENATAAN JALAN (PELEBARAN JALAN) SIMP. KABIL - SIMP. MASJID RAYA BATAM CENTRE (LANJUTAN) | SIMP. KABIL - SIMP. MASJID RAYA BATAM CENTRE | SEKUPANG | - | PEMBANGUNAN | 2022 | 16.244.904.604 |
PEMBANGUNAN JERAMBAH BETON SELAT NENEK RT 006 RW 003 (POKMAS TEMOYONG 34 - 150 M2) | RT 006 RW 003 SELAT NENEK | SEKUPANG | - | PEMBANGUNAN | 2022 | 307.011.000 |
PEMBANGUNAN JERAMBAH BETON PULAU AWENG RT 007 RW 003 (POKMAS TEMOYONG 35 - 150 M2) | RT 007 RW 003 PULAU AWENG | SEKUPANG | - | PEMBANGUNAN | 2022 | 296.307.000 |
PEMBANGUNAN JERAMBAH BETON TEMOYONG RT 001 RW 001 (POKMAS TEMOYONG 36 - 150 M2) | RT 001 RW 001 TEMOYONG | SEKUPANG | - | PEMBANGUNAN | 2022 | 306.950.000 |
PEMBANGUNAN JERAMBAH BETON RT 01 RW 02 SETOKOK (POKMAS SETOKOK 44 - 120 M2) | RT 01 RW 02 SETOKOK | SEKUPANG | - | PEMBANGUNAN | 2022 | 229.914.000 |
PEMBANGUNAN JERAMBAH BETON RT 02 RW 01 SETOKOK (POKMAS SETOKOK 46 - 120 M2) | RT 02 RW 01 SETOKOK | SEKUPANG | - | PEMBANGUNAN | 2022 | 240.367.000 |
PEMBANGUNAN JERAMBAH BETON RT 01 RW 01 SETOKOK (POKMAS SETOKOK 45 - 120 M2) | RT 01 RW 01 SETOKOK | SEKUPANG | - | PEMBANGUNAN | 2022 | 239.193.000 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=270M (PSPK) RT 04 RW 01 SEI PANCUR (POKMAS PTM 13) | RT 04 RW 01 SEI PANCUR TANJUNGPIAYU | SEKUPANG | - | PEMBANGUNAN | 2022 | 76.778.900 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 06 KEL. DURIANGKANG (POKMAS DURIANGKANG 9) | RT 03 RW 06 KEL DURIANGKANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.982.600 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 01 KEL DURIANGKANG (POKMAS DURIANGKANG 11) | RT 05 RW 01 KEL DURIANGKANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 208.766.800 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 02 KEL. DURIANGKANG (POKMAS DURIANGKANG 13) | RT 07 RW 02 KEL DURIANGKANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 212.877.500 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=210M (PSPK) RT 02 RW 13 TELAGA SAKINAH (POKMAS PTM 11) | RT 02 RW 13 TELAGA SAKINAH TANJUNGPIAYU | SEKUPANG | - | PEMBANGUNAN | 2022 | 54.817.400 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=100M (PSPK) RT 03 RW 01 SEI PANCUR (POKMAS PTM 9) | RT 03 RW 01 SEI PANCUR - TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 28.458.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=270M (PSPK) RT 01 RW 08 KAVLING BAGAN | RT 01 RW 08 KAVLING BAGAN | SEI BEDUK | - | PEMBANGUNAN | 2022 | 63.493.100 |
PEMBANGUNAN / REHABILITASI DRAINASE U-40 P=170M (PSPK) RT 02 RW 08 KAV. BAGAN | RT 02 RW 08 KEL. DURIANGKANG | SEI BEDUK | - | PEMBANGUNAN | 2022 | 48.595.800 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=200M (PSPK) RT 01 RW 05 PANCUR PELABUHAN | RT 01 RW 05 PENCUR PELABUHAN | SEI BEDUK | - | PEMBANGUNAN | 2022 | 46.931.500 |
PENINGKATAN DRAINASE PASAR PJB KELURAHAN SAGULUNG KOTA | PASAR PJB SAGULUNG KOTA - BATU AJI-BATAM | SEI BEDUK | - | PEMBANGUNAN | 2022 | 2.684.653.496 |
JL1 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 08 RW 02 MENUJU POSYANDU | KEL. TANJUNG BUNTUNG, KEC. BENGKONG | SEI BEDUK | - | PEMBANGUNAN | 2022 | 149.834.939 |
SEMENISASI JALAN PEMUKIMAN KAMPUNG BARU RT.002/RW.006 (POKMAS GALANG BARU 34) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 134.262.700 |
SEMENISASI JALAN PEMUKIMAN TANJUNG MELAGAN RT.002/RW.003 (POKMAS GALANG BARU 35) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 122.057.000 |
JERAMBAH AIR LINGKA RT.001/RW.005 (POKMAS GALANG BARU 36) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 241.585.300 |
JERAMBAH AIR LINGKA RT.002/RW.005 (POKMAS GALANG BARU 37) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 241.585.300 |
JERAMBAH KAMPUNG BARU RT.001/RW.006 (POKMAS GALANG BARU 38) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 362.402.700 |
JERAMBAH PULAU NANGA RT.001/RW.002 (POKMAS GALANG BARU 39) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 219.637.000 |
JERAMBAH TANJUNG MELAGAN RT.002/RW.003 (POKMAS GALANG BARU 40) | KELURAHAN GALANG BARU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 329.451.000 |
JERAMBAH DARI RUMAH, SABARIAH, KAMAT, AZMAN KAMPUNG BARU RT,004/RW,002 (POKMAS KAMPUNG BARU 3) | KELURAHAN SUBANG MAS | SEI BEDUK | - | PEMBANGUNAN | 2022 | 362.374.000 |
JERAMBAH DARI RUMAH SAREP, MAIN, ROSLI PULAU JEMARA, RT,005/RW,002 (POKMAS PULAU JEMARA 4) | KELURAHAN SUBANG MAS | SEI BEDUK | - | PEMBANGUNAN | 2022 | 362.374.000 |
JERAMBAH DARI RUMAH, SARIMAN, SARUDIN, ASBULLAH RT. 01 RW. 01 SUBANG MAS (POKMAS SUBANG MAS 3) | KELURAHAN SUBANG MAS | SEI BEDUK | - | PEMBANGUNAN | 2022 | 434.884.000 |
PEMBANGUNAN JALAN LINGKUNGAN SUBANG MAS, RT.001/RW.001 (POKMAS SUBANG MAS 5) | KELURAHAN SUBANG MAS | SEI BEDUK | - | PEMBANGUNAN | 2022 | 268.539.000 |
PENINGKATAN JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI (TAHAP 2) | JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI | SEI BEDUK | - | PEMBANGUNAN | 2022 | 7.109.805.481 |
PEKERJAAN GROUTING, INJEKSI DAN PLESTER DINDING DI BCS MALL | BCS MALL, JALAN BUNGA RAYA SEI BALOI | SEI BEDUK | - | PEMBANGUNAN | 2022 | 40.000.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. BAITUL HASANAH RT 02 RW 19 | PERUM. BAITUL HASANAH RT 02 RW 19 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT ASRI RT 01 RW 10 | PERUM. TIBAN BUKIT ASRI RT 01 RW 10 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT ASRI RT 03 RW 10 | PERUM. TIBAN BUKIT ASRI RT 03 RW 10 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT PERMAI RT 01 RW 15 | PERUM. TIBAN BUKIT PERMAI RT 01 RW 15 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 02 RW 03 | PERUM. TAMAN SARI HIJAU RT 02 RW 03 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI RT 04 RW 02 | PERUM. TAMAN SARI RT 04 RW 02 | SEI BEDUK | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 06 RW 03 | PERUM. TAMAN SARI HIJAU RT 06 RW 03 | BATU AJI | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 01 RW 03 | PERUM. TAMAN SARI HIJAU RT 01 RW 03 | BATU AJI | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN KOPERASI RT 01 RW 07 | PERUM. TIBAN KOPERASI RT 01 RW 07 | BATU AJI | - | PEMBANGUNAN | 2022 | 114.078.030 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW. 012 CIPTA ASRI (POKMAS TBS 8) | RT. 04 RW. 012 CIPTA ASRI | BATU AJI | - | PEMBANGUNAN | 2022 | 179.707.890 |
SEMENISASI JALAN LINGKUNGAN RT.07 RW. 012 CIPTA ASRI (POKMAS TBS 12) | RT.07 RW. 012 CIPTA ASRI | BATU AJI | - | PEMBANGUNAN | 2022 | 193.727.190 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT GAJAH IZUMI MAS PERKASA - KAWASAN HIJRAH INDUSTRIAL ESTATE BLOK AI | BATU AJI | - | PEMBANGUNAN | 2022 | 97.894.968 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM PONDOK ASRI RT.001/RW.004 | PERUM PONDOK ASRI RT.001/RW.004 | BATU AJI | - | PEMBANGUNAN | 2022 | 22.738.350 |
PEMBANGUNAN JERAMBAH BETON PULAU BULUH RT 01 RW 01 ( POKMAS PULAU BULUH 31 - 135 M2 ) | RT 01 RW 01 PULAU BULUH | BATU AJI | - | PEMBANGUNAN | 2022 | 265.814.000 |
PEMBANGUNAN JERAMBAH BETON PULAU BULUH RT 02 RW 01 (POKKMAS PULAU BULUH 33 - 130,5 M2) | RT 02 RW 01 PULAU BULUH | BATU AJI | - | PEMBANGUNAN | 2022 | 250.159.000 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM VILLA PESONA ASRI RT 03 | PERUM VILLA PESONA ASRI RT.05 RT.03 RW.10 | BATU AJI | - | PEMBANGUNAN | 2022 | 204.945.960 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM VALENCIA RT.02 RW.25 | BATU AJI | - | PEMBANGUNAN | 2022 | 199.689.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM BUKIT RAYA RT.02 RW.38 | PERUM BUKIT RAYA RT.02 RW.38 | BATU AJI | - | PEMBANGUNAN | 2022 | 186.408.960 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM BIDA ASRI 2 RT.04 RW.17 | PERUM BIDA ASRI 2 RT.04 RW.17 | BATU AJI | - | PEMBANGUNAN | 2022 | 205.407.720 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM ALAM RAYA RT.01 RW.15 | PERUM ALAM RAYA RT.01 RW.15 | BATU AJI | - | PEMBANGUNAN | 2022 | 209.261.640 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN EIRENE RT 02 RW 14 | PERUM. TAMAN EIRENE RT 02 RW 14 | BATU AJI | - | PEMBANGUNAN | 2022 | 113.712.840 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. BUMI SAKINAH RW 11 MELEWATI JALAN PERUM. BUANA | PERUM. BUANA IMPIAN I RW 14, KEL. TEMBESI, KEC. SAGULUNG | BATU AJI | - | PEMBANGUNAN | 2022 | 163.297.912 |
PEMELIHARAAN GARDU DISTRIBUSI | AREA TIBAN | BATU AJI | - | PEMBANGUNAN | 2022 | 58.030.000 |
PEKERJAAN RENOVASI GARDU DISTRIBUSI DAN PEMASANGAN PERALATAN ISI GARDU SERTA PEMASANGAN KABEL SKTM | PT ADI BATAMUNI JAYA - KK MEGA CIPTA INDUSTRIAL PARK BATU AMPAR | BATU AJI | - | PEMBANGUNAN | 2022 | 33.467.346 |
THE SOUTH CONDO ONE AVENUE BATAM | Jl. Raja H. Fisabilillah, Sungai Panas, Kec.Batam Kota, Kota Batam, Kepulauan Riau | BATAM KOTA | - | PEMBANGUNAN APARTEMEN | 2021 | 44.517.000.000 |
proyek Jasa pergudangan komplek Golden BCI | Komp.Golden BCI,Bengkong laut | BENGKONG | - | PEMBANGUNAN | 2022 | 340.000 |
proyek Pt putra pesisir ( Perum dan jasa) | Jl.Golden City,Tj.Buntung | BENGKONG | - | PEMBANGUNAN | 2022 | 350.000 |
komplek Cahaya Garden Residence | Twon House, Jl. Cahaya Garden no 3A,sadai,bengkoNG,,Batam City,Riau Islands 29444 | BENGKONG | - | Ruko dan Rumah | 2022 | 1.000.000.000 |
proyek Alibaba Commercial Center (Ruko & Bangunan) | sungai langkai.kota batam | SAGULUNG | - | pembangunan | 2022 | 38.000.000.000 |
PEKERJAAN SISIP PERALATAN GARDU DISTRIBUSI DI GARDU EXISTING DAN KWH PANTAU ts | PT EKADI TRISAKTI MAS-KK PR PERMATA RIVERVIEW BUKIT PERMATA | LUBUK BAJA | - | - | - | 22.656.774 |
PEKERJAAN SISIP PERALATAN GARDU DISTRIBUSI DI GARDU EXISTING DAN KWH PANTAU ts | PT EKADI TRISAKTI MAS-KK PR PERMATA RIVERVIEW BUKIT PERMATA | LUBUK BAJA | - | - | - | 22.656.774 |
PEKERJAAN SISIP PERALATAN GARDU DISTRIBUSI DI GARDU EXISTING DAN KWH PANTAU ts | PT EKADI TRISAKTI MAS-KK PR PERMATA RIVERVIEW BUKIT PERMATA | LUBUK BAJA | - | - | - | 22.656.774 |
PEKERJAAN SISIP PERALATAN GARDU DISTRIBUSI DI GARDU EXISTING DAN KWH PANTAU ts | PT EKADI TRISAKTI MAS-KK PR PERMATA RIVERVIEW BUKIT PERMATA | LUBUK BAJA | - | - | - | 22.656.774 |
PEKERJAAN SISIP PERALATAN GARDU DISTRIBUSI DI GARDU EXISTING DAN KWH PANTAU ts | PT EKADI TRISAKTI MAS-KK PR PERMATA RIVERVIEW BUKIT PERMATA | LUBUK BAJA | - | - | - | 22.656.774 |
proyek pertokoan Golden city | Jl.golden City,TJ.Buntung | BENGKONG | - | pembangunan | 2022 | 3.000.000.000 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | PT BATINDO MEBEL PERKASA-KK PANAU KABIL | NONGSA | - | - | - | 135.779.794 |
PEMBANGUNAN GARDU BETON DISTRIBUSI 3.5M X 5.5 M | PT INTAN KARYA LESTARI-KK PR RHABAYU ESTUARIO PATAM SEKUPANG | SEKUPANG | - | - | - | 146.055.910 |
PEMINDAHAN SLUDGE TOILET | PANASONIC INDUSTRIAL DEVICES BATAM | BATAM KOTA | - | - | - | 1.363.636 |
PEKERJAAN SISIP PERALATAN GARDU DISTRIBUSI DI GARDU EXISTING DAN KWH PANTAU | PT EKADI TRISAKTI MAS-KK PR PERMATA RIVERVIEW BUKIT PERMATA | LUBUK BAJA | - | - | - | 22.656.774 |
SUPPLY OR FABRICATION AND INSTALLATION TURBIN VENTILATOR | PT. CITRA TUBINDO TBK JL HANG KESTURI I NO 2 KAWASAN INDUSTRI TERPADU KABIL | NONGSA | - | - | - | 39.285.000 |
CRAFT LABOR HGPI UNTUK PEKERJAAN HGPI UNIT-1 DI ELB | PT.ENERGI LISTRIK BATAM | BATU AJI | - | - | - | 129.500.000 |
PEMASANGAN DAN PENGADAAN SISIP PERALATAN GARDU BETON DAN KWH PANTAU GARDU | PT PANDUTAMA PERKASA-KK PR PONDOK BUKIT BARELANG TAHAP 2 TG PIAYU | SEI BEDUK | - | - | - | 23.477.386 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20KV | PT PELINTAS BATAS BUANA-KK PR PESONA SIMPANG LAGUNA | BATAM KOTA | - | - | - | 95.813.834 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20 KV | PT JAYA LAGUNA TERUS-KK PR BUKIT CITRA LAGUNA BARELANG | SAGULUNG | - | - | - | 153.794.185 |
REPLACEMENT ATAP STUDIO 2 | JL HANG LEKIU KM 2 TELUK MATA IKAN NONGSA | NONGSA | - | - | - | 705.884.000 |
D4 PEMBANGUNAN DRAINASE LINGKUNGAN KAVLING SAGULUNG MANDIRI BLOK C DAN BLOK D | RT 03 RW 10 KEL SUNGAI PELUNGGUT KEC SAGULUNG | SAGULUNG | - | - | - | 143.653.529 |
PEMBERSIHAN ISOLATOR DAN PENGENCANGAN BAUT PERALATAN TOWER TRANSMISI 150 KV DAN GANTRY 150 KV | BATAM | SAGULUNG | - | - | - | 484.912.650 |
PEMBUATAN JEMBATAN, DRAINASE, GREEN DAN BUNKER | JL GAJAH MADA KM 9 SEI LADI | SEKUPANG | - | - | - | 880.000.000 |
RENOVASI KENANGA ROOM, FEMALE TOILET, PUMP ROOM DAN MALE TOILET | JL GAJAH MADA KM 9 SEI LADI | SEKUPANG | - | - | - | 650.000.000 |
PEMANGKASAN POHON DI BAWAH SUTM | FEEDER BAKAU | SEKUPANG | - | - | - | 105.387.500 |
PEMBANGUNAN GARDU BETON DISTRIBUSI 3.5MX5.5M | PT TRIAS JAYA PROPERTINDO-KK PR PUTRA JAYA RESIDANCE CLUSTER B TJ UNCANG | BATU AJI | - | - | - | 146.055.910 |
PRODUCTION REST AREA | PT. CITRA TUBINDO TBK JL HANG KESTURI I NO 2 KAWASAN INDUSTRI TERPADU KABIL | NONGSA | - | - | - | 340.000.000 |
INSTALL 300MM HEIGHT BUND WALL AT ENAMEL KETTLE AREA | JL HANG KESTURI I NO. 14 KAWASAN TERPADU KABIL | NONGSA | - | - | - | 87.626.750 |
JERAMBAH BETON -RT.002/RW.02 SETOKOK P =80M, L = 1,5M | RT02 RW/RW02 SETOKOK | BULANG | - | - | - | 227.331.000 |
PEMELIHARAAN GARDU DISTRIBUSI | AREA NAGOYA | LUBUK BAJA | - | - | - | 112.105.000 |
JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. KABIL 6, KEC. NONGSA (RW 21 - LANJUTAN) | KEC NONGSA | NONGSA | - | - | - | 150.482.999 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | TANJUNG KOROK KERTANG JEMBATAN IV BARELANG | GALANG | - | - | - | 73.616.271 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL SUNGAI HARAPAN, KEC SEKUPANG (PERUM PONDOK AWAL IN | KEC SEKUPANG | SEKUPANG | - | - | - | 151.106.126 |
BODY BUILDING BAY -1 EXPANSION | JL BRIGJEN KATAMSO KM 6 TANJUNG UNCANG | BATU AJI | - | - | - | 25.890.359.602 |
CITRA PLAZA NAGOYA | KOMP. NAGOYA CITYWALK BLOK NORTHWORK A NO.1 LUBUK BAJA | LUBUK BAJA | - | - | - | 6.670.000.000 |
INSTAL GROUNDING | KOMPLEX DRAGON INDUSTRIAL PARK - KABIL | NONGSA | - | - | - | 30.184.500 |
BM5 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING KEL TIBAN BARU, KEC SEKUPANG | PERUM TIBAN KOPERASI BLOK T, RT 03 RW 07 | SEKUPANG | - | - | - | 189.732.912 |
JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN TAMAN RAYA TAHAP 3 RT 01 RW 24, KEL. BELIAN | KEC BATAM KOTA | BATAM KOTA | - | - | - | 137.110.331 |
BM5 PEMBANGUNAN BATU MIRING PERUMAHAN PONDOK PELANGI TAHAP I RT 03 / RW 09, KEL. TIBAN INDAH, KEC. S | KEC SEKUPANG | SEKUPANG | - | - | - | 183.906.862 |
JL.5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUMAHAN BUKIT INDAH RT02 RW17,RT02 RW18 KIBING | KEC BATU AJI | BATU AJI | - | - | - | 194.807.721 |
SEMENISASI JALAN KOMP MASYEBA PERMAI BLOK I 5 S/D I 20 RT 01 RW 06 | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 146.369.000 |
SEMENISASI JALAN GANG BLOK A4 DAN A5 PERUM.BATAM NIRWANA RESIDENCE RT 03 RW 07 | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 164.084.000 |
SEMENISASI JALAN PERUM.MELATI RAYA BLOK B1 S/D B 12 RT 05 RW 09 (POKMAS PATAM 3- 400 M2 ) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 122.184.000 |
SEMENISASI JALAN BIDA KSB KAV.MENTARAU RT 01 RW 10 (POKMAS PATAM 4 585 M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 177.821.000 |
SEMENISASI JALAN PATAM INDAH RT 07 RW 01 (POKMAS PATAM 5 300 M2 ) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 92.256.000 |
SEMENISASI JALAN PERUM.SIRION INDAH RT 01 RW 15(POKMAS PATAM 6 584 M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 177.252.000 |
SEMENISASI JALAN TIBAN I RT 02 RW 03 (POKMAS PATAM 7 400 M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 122.184.000 |
SEMENISASI JALAN DEPAN POS SECURITY PERUM.TAMAN SADE RT 03 RW 04 (POKMAS 8 320M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 98.241.000 |
SEMENISASI JALAN TIBAN 3 RT 04 RW 05 ( POKMAS PATAM 9 584M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 177.252.000 |
SEMENISASI JALAN KOMP.MASYEBA PERMAI BLOK C RT 04 RW 06 (POKMAS PATAM 10 88M) 2 | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 28.523.000 |
SEMENISASI JALAN PERUM.MASYEBA PERMAI THP 2 RT 01 RW 11 ( POKMAS PATAM 11 542M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 164.926.000 |
SEMENISASI JALAN TIBAN I BLOK D RT 04 RW 03 (POKMAS PATAM 12 168 M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 52.701.000 |
PEMBUATAN DAN PENAMBAHAN SALURAN TRAYPAN COOLANT MS-15 | PT. CITRA TUBINDO TBK JL HANG KESTURI I NO 2 KAWASAN INDUSTRI TERPADU KABIL | NONGSA | - | - | - | 4.900.000 |
PROCUREMENT SERVICE CENTER | PT CATERPILLAR INDONESIA BATAM TANJUNG UNCANG | BATU AJI | - | - | - | 125.800.000 |
SEMENISASI JALAN LINGKUNGAN CULINDO PERDANA RT 01 RW 04 | CULINDO PERDANA RT 01 RW 04 | SEKUPANG | - | - | - | 135.962.200 |
D3 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PEMUKIMAN RT02 RW24 KEL MANGSANG | KEC SUNGAI BEDUK | SEI BEDUK | - | - | - | 180.930.575 |
BM3 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING PERMUKIMAN KEL MANGSANG&DURIANGKANG | RT03, RT 05/RW16, PERMUKIMAN ANTARA BLOK A DAN B BUKIT BERBUNGA | SEI BEDUK | - | - | - | 195.476.066 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT RMC TECHNOLOGY - KAWASAN BINTANG INDUSTRI 2 LOT 201-2015 | BATAM KOTA | - | - | - | 48.261.791 |
PENINGKATAN JALAN SIMP. PATUNG KUDA-SIMP BENGKONG SEKEN (LANJUTAN) | BENGKONG | BENGKONG | - | - | - | 14.713.452.164 |
PENINGKATAN STRUKTUR JL TENGKU SULUNG (DAK PENUGASAN) | BATAM CENTRE | BATAM KOTA | - | - | - | 7.729.864.851 |
PENATAAN JALAN SIMP TIBAN PRINCES - CIPTALAND TIBAN INDAH (LANJUTAN) | TIBAN | SEKUPANG | - | - | - | 14.915.341.026 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | PT BATINDO MEBEL PERKASA-KK PANAU KABIL | NONGSA | - | - | - | 135.779.794 |
PEMBANGUNAN GARDU BETON DISTRIBUSI 3.5M X 5.5 M | PT INTAN KARYA LESTARI-KK PR RHABAYU ESTUARIO PATAM SEKUPANG | SEKUPANG | - | - | - | 146.055.910 |
PEMINDAHAN SLUDGE TOILET | PANASONIC INDUSTRIAL DEVICES BATAM | BATAM KOTA | - | - | - | 1.363.636 |
PEKERJAAN SISIP PERALATAN GARDU DISTRIBUSI DI GARDU EXISTING DAN KWH PANTAU | PT EKADI TRISAKTI MAS-KK PR PERMATA RIVERVIEW BUKIT PERMATA | LUBUK BAJA | - | - | - | 22.656.774 |
SUPPLY OR FABRICATION AND INSTALLATION TURBIN VENTILATOR | PT. CITRA TUBINDO TBK JL HANG KESTURI I NO 2 KAWASAN INDUSTRI TERPADU KABIL | NONGSA | - | - | - | 39.285.000 |
CRAFT LABOR HGPI UNTUK PEKERJAAN HGPI UNIT-1 DI ELB | PT.ENERGI LISTRIK BATAM | BATU AJI | - | - | - | 129.500.000 |
PEMASANGAN DAN PENGADAAN SISIP PERALATAN GARDU BETON DAN KWH PANTAU GARDU | PT PANDUTAMA PERKASA-KK PR PONDOK BUKIT BARELANG TAHAP 2 TG PIAYU | SEI BEDUK | - | - | - | 23.477.386 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20KV | PT PELINTAS BATAS BUANA-KK PR PESONA SIMPANG LAGUNA | BATAM KOTA | - | - | - | 95.813.834 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20 KV | PT JAYA LAGUNA TERUS-KK PR BUKIT CITRA LAGUNA BARELANG | SAGULUNG | - | - | - | 153.794.185 |
REPLACEMENT ATAP STUDIO 2 | JL HANG LEKIU KM 2 TELUK MATA IKAN NONGSA | NONGSA | - | - | - | 705.884.000 |
D4 PEMBANGUNAN DRAINASE LINGKUNGAN KAVLING SAGULUNG MANDIRI BLOK C DAN BLOK D | RT 03 RW 10 KEL SUNGAI PELUNGGUT KEC SAGULUNG | SAGULUNG | - | - | - | 143.653.529 |
PEMBERSIHAN ISOLATOR DAN PENGENCANGAN BAUT PERALATAN TOWER TRANSMISI 150 KV DAN GANTRY 150 KV | BATAM | SAGULUNG | - | - | - | 484.912.650 |
PEMBUATAN JEMBATAN, DRAINASE, GREEN DAN BUNKER | JL GAJAH MADA KM 9 SEI LADI | SEKUPANG | - | - | - | 880.000.000 |
RENOVASI KENANGA ROOM, FEMALE TOILET, PUMP ROOM DAN MALE TOILET | JL GAJAH MADA KM 9 SEI LADI | SEKUPANG | - | - | - | 650.000.000 |
PEMANGKASAN POHON DI BAWAH SUTM | FEEDER BAKAU | SEKUPANG | - | - | - | 105.387.500 |
PEMBANGUNAN GARDU BETON DISTRIBUSI 3.5MX5.5M | PT TRIAS JAYA PROPERTINDO-KK PR PUTRA JAYA RESIDANCE CLUSTER B TJ UNCANG | BATU AJI | - | - | - | 146.055.910 |
PEMINDAHAN SLUDGE TOILET | PURI INDUSTRIAL PARK 2000 KEL BALOI PERMAI | BATAM KOTA | - | - | - | 1.500.000 |
PRODUCTION REST AREA | PT. CITRA TUBINDO TBK JL HANG KESTURI I NO 2 KAWASAN INDUSTRI TERPADU KABIL | NONGSA | - | - | - | 340.000.000 |
INSTALL 300MM HEIGHT BUND WALL AT ENAMEL KETTLE AREA | JL HANG KESTURI I NO. 14 KAWASAN TERPADU KABIL | NONGSA | - | - | - | 87.626.750 |
JERAMBAH BETON -RT.002/RW.02 SETOKOK P =80M, L = 1,5M | RT02 RW/RW02 SETOKOK | BULANG | - | - | - | 227.331.000 |
PEMELIHARAAN GARDU DISTRIBUSI | AREA NAGOYA | LUBUK BAJA | - | - | - | 112.105.000 |
JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. KABIL 6, KEC. NONGSA (RW 21 - LANJUTAN) | KEC NONGSA | NONGSA | - | - | - | 150.482.999 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | TANJUNG KOROK KERTANG JEMBATAN IV BARELANG | GALANG | - | - | - | 73.616.271 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL SUNGAI HARAPAN, KEC SEKUPANG (PERUM PONDOK AWAL IN | KEC SEKUPANG | SEKUPANG | - | - | - | 151.106.126 |
BODY BUILDING BAY -1 EXPANSION | JL BRIGJEN KATAMSO KM 6 TANJUNG UNCANG | BATU AJI | - | - | - | 25.890.359.602 |
CITRA PLAZA NAGOYA | KOMP. NAGOYA CITYWALK BLOK NORTHWORK A NO.1 LUBUK BAJA | LUBUK BAJA | - | - | - | 6.670.000.000 |
INSTAL GROUNDING | KOMPLEX DRAGON INDUSTRIAL PARK - KABIL | NONGSA | - | - | - | 30.184.500 |
BM5 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING KEL TIBAN BARU, KEC SEKUPANG | PERUM TIBAN KOPERASI BLOK T, RT 03 RW 07 | SEKUPANG | - | - | - | 189.732.912 |
JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN TAMAN RAYA TAHAP 3 RT 01 RW 24, KEL. BELIAN | KEC BATAM KOTA | BATAM KOTA | - | - | - | 137.110.331 |
BM5 PEMBANGUNAN BATU MIRING PERUMAHAN PONDOK PELANGI TAHAP I RT 03 / RW 09, KEL. TIBAN INDAH, KEC. S | KEC SEKUPANG | SEKUPANG | - | - | - | 183.906.862 |
JL.5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUMAHAN BUKIT INDAH RT02 RW17,RT02 RW18 KIBING | KEC BATU AJI | BATU AJI | - | - | - | 194.807.721 |
SEMENISASI JALAN KOMP MASYEBA PERMAI BLOK I 5 S/D I 20 RT 01 RW 06 | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 146.369.000 |
SEMENISASI JALAN GANG BLOK A4 DAN A5 PERUM.BATAM NIRWANA RESIDENCE RT 03 RW 07 | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 164.084.000 |
SEMENISASI JALAN PERUM.MELATI RAYA BLOK B1 S/D B 12 RT 05 RW 09 (POKMAS PATAM 3- 400 M2 ) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 122.184.000 |
SEMENISASI JALAN BIDA KSB KAV.MENTARAU RT 01 RW 10 (POKMAS PATAM 4 585 M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 177.821.000 |
SEMENISASI JALAN PATAM INDAH RT 07 RW 01 (POKMAS PATAM 5 300 M2 ) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 92.256.000 |
SEMENISASI JALAN PERUM.SIRION INDAH RT 01 RW 15(POKMAS PATAM 6 584 M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 177.252.000 |
SEMENISASI JALAN TIBAN I RT 02 RW 03 (POKMAS PATAM 7 400 M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 122.184.000 |
SEMENISASI JALAN DEPAN POS SECURITY PERUM.TAMAN SADE RT 03 RW 04 (POKMAS 8 320M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 98.241.000 |
SEMENISASI JALAN TIBAN 3 RT 04 RW 05 ( POKMAS PATAM 9 584M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 177.252.000 |
SEMENISASI JALAN KOMP.MASYEBA PERMAI BLOK C RT 04 RW 06 (POKMAS PATAM 10 88M) 2 | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 28.523.000 |
SEMENISASI JALAN PERUM.MASYEBA PERMAI THP 2 RT 01 RW 11 ( POKMAS PATAM 11 542M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 164.926.000 |
SEMENISASI JALAN TIBAN I BLOK D RT 04 RW 03 (POKMAS PATAM 12 168 M2) | KELURAHAN PATAM LESTARI | SEKUPANG | - | - | - | 52.701.000 |
PEMBUATAN DAN PENAMBAHAN SALURAN TRAYPAN COOLANT MS-15 | PT. CITRA TUBINDO TBK JL HANG KESTURI I NO 2 KAWASAN INDUSTRI TERPADU KABIL | NONGSA | - | - | - | 4.900.000 |
PROCUREMENT SERVICE CENTER | PT CATERPILLAR INDONESIA BATAM TANJUNG UNCANG | BATU AJI | - | - | - | 125.800.000 |
SEMENISASI JALAN LINGKUNGAN CULINDO PERDANA RT 01 RW 04 | CULINDO PERDANA RT 01 RW 04 | SEKUPANG | - | - | - | 135.962.200 |
D3 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PEMUKIMAN RT02 RW24 KEL MANGSANG | KEC SUNGAI BEDUK | SEI BEDUK | - | - | - | 180.930.575 |
BM3 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING PERMUKIMAN KEL MANGSANG&DURIANGKANG | RT03, RT 05/RW16, PERMUKIMAN ANTARA BLOK A DAN B BUKIT BERBUNGA | SEI BEDUK | - | - | - | 195.476.066 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT RMC TECHNOLOGY - KAWASAN BINTANG INDUSTRI 2 LOT 201-2015 | BATAM KOTA | - | - | - | 48.261.791 |
PENINGKATAN JALAN SIMP. PATUNG KUDA-SIMP BENGKONG SEKEN (LANJUTAN) | BENGKONG | BENGKONG | - | - | - | 14.713.452.164 |
PENINGKATAN STRUKTUR JL TENGKU SULUNG (DAK PENUGASAN) | BATAM CENTRE | BATAM KOTA | - | - | - | 7.729.864.851 |
PENATAAN JALAN SIMP TIBAN PRINCES - CIPTALAND TIBAN INDAH (LANJUTAN) | TIBAN | SEKUPANG | - | - | - | 14.915.341.026 |
PEKERJAAN SISIP PERALATAN GARDU DISTRIBUSI DI GARDU EXISTING DAN KWH PANTAU ts | PT EKADI TRISAKTI MAS-KK PR PERMATA RIVERVIEW BUKIT PERMATA | LUBUK BAJA | - | - | - | 22.656.774 |
PEKERJAAN PEMBANGUNAN PENATAAN JALAN RE MARTADINATA TAHAP 1 | SEKUPANG, JL. RE MARTADINATA | NONGSA | - | PEMBANGUNAN | 2022 | 48.586.235.000 |
REVITALISASI MASJID AL KAUTSAR PERUMAHAN MASYEBA GADING | KELURAHAN SEI HARAPAN, KECAMAN SEKUPANG, KOTA BATAM | NONGSA | - | PEMBANGUNAN | 2022 | 115.683.273 |
SEMENISASI JALAN BLOK I KAVLING ABADI JAYA RT 01/RW 03 | KELURAHAN SUNGAI LEKOP, KECAMATAN SAGULUNG, KOTA BATAM | BATU AJI | - | PEMBANGUNAN | 2022 | 115.263.637 |
PENATAAN LINGKUNGAN PERUMAHAN CLASIK INDAH | KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.158.309.010 |
PEMANCANGAN RC PILE 400X400MM | PT MCDERMOTT INDONESIA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.387.000.000 |
RENOVASI BANGUNAN PANTI ASUHAN MUHAMMADIYAH AL ANSHORI, PERUMAHAN BAMBU KUNING BLOK B.16 NO. 16 | KEL. BUKIT TEMPAYAN KEC. BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 77.142.727 |
PENATAAN LINGKUNGAN PERBAIKAN FASILITAS UMUM (FASUM) PERUM BAMBU KUNING RW 03 BLOK C | KEL. BUKIT TEMPAYAN, KECAMATAN BATU AJI | BATU AJI | - | PEMBANGUNAN | 2022 | 77.190.910 |
REVITALISASI MUSHOLLA AT TAQWA PERUMAHAN PURI SURYA | KELURAHAN SUNGAI LANGKAI KEC. SAGULUNG | SAGULUNG | - | PEMBANGUNAN | 2022 | 77.130.910 |
PEKERJAAN STRUKTUR GEDUNG PERTAMA BUSINESS CENTRE | KAWASAN SHIPYARD PT. DOK WARISAN PERTAMA - PAX OCEAN | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.421.932.946 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU CANTOL DAN JTM-SUTM | BTS TELKOMSEL BTM569-KP CAKANG RT 03 RW 04 PULAU GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 55.749.903 |
PROYEK PRESERVASI KAPAL | DELTA SHIPYARD PANARAN DAPUR 12 SEI, PELUNGGUT | BATAM KOTA | - | PEMBANGUNAN | 2022 | 40.020.000 |
NEW CONSTRUCTION OF 6 LOT TYPE E FACTORY AT BATAMINDO INDUSTRIAL PARK | BATAMINDO INDUSTRIAL PARK | BATAM KOTA | - | PEMBANGUNAN | 2022 | 70.000.000.000 |
PEMBANGUNAN GUDANG UK. 30M X 42M | JALAN BRIGJEN KATAMSO (BUNDARAN), TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 780.000.000 |
PROYEK WORKSHOP PRODUKSI TAHAP 2 BA (2) | JL BRIGJEN KATAMSO LOT 8 KEL TANJUNG UNCANG KEC BATU AJI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 980.000.000 |
MECHANICAL INSTALLATION, ELECTRICAL, ENGINE FOUNDATION (SLAB) | POWER HOUSE KAWASAN INDUSTRIAL BATAMINDO PARK DAN JLN PUTRI HIJAU SAMPING PERUMAHAN GRIYA BATU AJI ASRI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.203.775.055 |
PEKERJAAN TAMBAHAN PENGADAAN DAN PEMASANGAN JARINGAN BARU | JL. BRIGJEN KATAMSO KM 7 KEL. TANJUNG UNCANG KEC. BATU AJI BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 754.002.951 |
INSTAL GENSET 1000KVA, SETTING LEVELING, SOUND PROFING DLL - NAGOYA | NAGOYA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 102.000.000 |
ADDITIONAL AIRCON AT BLASTING PROCESS AT FACTORY - 1 (AIRCON WORK) | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 691.180.000 |
IMPROVEMENT AIRCON AT F1 STEP-2 (AIRCON WORK) | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 602.640.000 |
PEMASANGAN TIANG PANCANG MARVEL 2, 4200 TITIK | PT UNILEVER OLEOCHEMICAL INDONESIA SUMATERA UTARA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 35.233.020.000 |
PEMANCANGAN ONSHORE RC PILE 200 X 200 MM | BATAM - CENTRAL HILLS BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 262.909.091 |
PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | PT BERTUAH SAMUDERA ABADI - KP AIR NAGA KEL SIJANTUNG REMPANG - GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 127.654.673 |
RENOVATION UPPER CANTEEN LOT 207 | PT. EXCELITAS TECHNOLOGIES BATAM LOT 207 JLN. BERINGIN # 02-03 DAN WORKSHOP SEI BINTI TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 4.489.000.000 |
PENAMBAHAN RETAINING WALL BRONJONG DEPAN VILLA PANBIL BLOK BB2 | KAWASAN VILLA PANBIL, MUKA KUNING | BATAM KOTA | - | PEMBANGUNAN | 2022 | 82.324.250 |
COST FOR STINGER FULL SURFACE PREP & COATING | PELABUHAN SCN KABIL | BATAM KOTA | - | PEMBANGUNAN | 2022 | 1.455.454.546 |
RENOVATION OF MAIN OFFICE BUILDING | JALAN BRIGJEN KATAMSO KM5, TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.817.590.564 |
DECENTRALIZED STP IN PT BREDERO SHAW INDONESIA | JALAN HANG KESTURI I NO. 14, KAWASAN INDUSTRI TERPADU KABIL, BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 956.480.000 |
PENGECATAN HOTEL PLANET HOLIDAY BATAM | JL. RAJA ALI HAJI, JODOH - BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 798.615.000 |
PLTU SOFIFI 2X3 MW | DUSUN PASIGAU SOFIFI MALUKU UTARA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 75.990.000.000 |
SUPPLY AND INSTALL STEEL PLATE FOR REINFORCEMENT 2ND FLOOR AT PCL LINE #2 | PURI INDUSTRIAL PARK 2000 BATAM CENTER, KELURAHAN BALOI PERMAI, BATAM - 29463 | BATAM KOTA | - | PEMBANGUNAN | 2022 | 32.120.000 |
PEKERJAAN PANCANG PHASE 2 | BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 1.392.363.636 |
PEKERJAAN PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT TAHUN 2022 TAHAP 1 AREA BATAM | SAHID HOTEL BATAM CENTRE - OS STYLE T AJI - CATERING SEMERU BATAM CENTRE - SHIPURU HARBOUR BAY | BATAM KOTA | - | PEMBANGUNAN | 2022 | 532.929.990 |
NEW FIRE SPRINKLERS AE PLATS HOT OIL SYSTEM | KABIL KOTA BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 195.000.000 |
SEMENISASI JALAN LINGKUNGAN BLOK B RT 02 RW 09 KEL. DURIANGKANG (POKMAS DURIANGKANG 1 - 600 M2) | BLOK B RT 02 RW 09 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 204.721.000 |
SEMENISASI JALAN LINGKUNGAN BLOK I, J, K, L,M, N RT 04 RW 15 KEL. DURIANGKANG (POKMAS DURIANGKANG 2) | BLOK I, J, K, L, M, N RT 04 RW 15 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 210.588.400 |
SEMENISASI JALAN LINGKUNGAN DKT LAPANGAN SAKURA RT 01 RW 03 KEL. DURIANGKANG (POKMAS DURIANGKANG 3) | RT 01 RW 03 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 211.775.300 |
SEMENISASI JALAN LINGKUNGAN / GANG RT 02 RW 08 KEL. DURIANGKANG (POKMAS DURIANGKANG 4) | RT 02 RW 08 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 167.680.700 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 02 RW 02 KEL. DURIANGKANG (POKMAS DURIANGKANG 5) | RT 02 RW 02 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 214.808.000 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 03 RT 01 RW 07 KEL. DURIANGKANG (POKMAS DURIANGKANG 6) | RT 03 RT 01 RW 7 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 171.515.300 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 03, RT 04 RW 15 KEL. DURIANGKANG (POKMAS DURIANGKANG 7) | RT 03 RT 04 RW 15 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 180.728.900 |
SEMENISASI JALAN LINGKUNGAN RT 02, RT 06 RW 06 KEL. DURIANGKANG (POKMAS DURIANGKANG 8) | RT 02 RT 06 RW 06 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 207.333.500 |
DRAINASE/PARIT U-30 JLN. GANG JAMBU RT 03 RW 12 KEL. DURIANGKANG (POKMAS DURIANGKANG 14) | GANG JAMBU RT 03 RW 12 | BATAM KOTA | - | PEMBANGUNAN | 2022 | 29.437.100 |
DRAINASE / PARIT U-30 RT 05 RW 13 KEL. DURIANGKANG (POKMAS DURIANGKANG 15) | RT 05NRW 13 KEL DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 60.798.100 |
SEMENISASI JALAN LINGKUNGAN MANGSANG INDAH RT 01 RW 24 (POKMAS CEMARA) | RT 01 RW 24 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 209.633.600 |
SEMENISASI JALAN LINGKUNGAN BIDA AYU BLOK L DAN E RT 02 RW 15 (POKMAS PINUS) | BLOK L DAN E RT 02 RW 15 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 207.065.100 |
SEMENISASI JALAN LINGKUNGAN BIDA AYU RT 02 RW 13 (POKMAS BERINGIN) | BIDA AYU RT 02 RW 13 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 141.737.200 |
SEMENISASI JALAN LINGKUNGAN BIDADARI RT 04 DAN RT 05 RW 17 (POKMAS BAKAU) | BIDADARI RT 04 DAN RT 05 RW 17 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 214.534.100 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 02 KELURAHAN TIBAN LAMA (POKMAS ANGGUR 3 - 570 M2) | KELURAHAN TIBAN LAMA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 195.285.200 |
SEMENISASI JALAN LINGKUNGAN BLOK D RT 01 RW 07 (POKMAS KETAPANG) | BLOK D RT 01 RW 07 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 171.986.100 |
SEMENISASI JALAN LINGKUNGAN MANGSANG KEBUN RT 01 RW 03 (POKMAS JATI) | MANGSANG KEBUN RT 01 RW 03 KEL MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 214.535.200 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 01 RW 25 (POKMAS WARU) | RT 01 RW 25 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 213.864.200 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 02 RW 23 | PURI AGUNG RT 02 RW 23 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 188.848.000 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 01,02,03,04 RW 06 (POKMAS BAMBU) | PURI AGUNG RT 01,02,03,04 RW 06 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 211.651.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 09 KELURAHAN TIBAN LAMA (POKMAS KUINI II - 188 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 66.429.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 KELURAHAN TIBAN LAMA (POKMAS PEAR 1 - 400 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 138.131.400 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 2 - 630 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 219.992.300 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 09 KELURAHAN TIBAN LAMA (POKMAS KUINI - 50 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 17.901.400 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 1 - 149 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 53.339.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 1 - 298 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 101.857.800 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 4 - 332 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 114.959.900 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 11 KELURAHAN TIBAN LAMA (POKMAS SALAK 1 - 627 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 219.897.700 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 4 - 240 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 83.867.300 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 2 - 100 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 35.823.700 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 4 - 360 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 124.382.500 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 05 KELURAHAN TIBAN LAMA (MELON 1 - 240 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 85.968.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 3 - 90 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 32.244.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 11 KELURAHAN TIBAN LAMA (POKMAS SALAK 4 - 400 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 138.131.400 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 5 - 150 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 53.738.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 13 KELURAHAN TIBAN LAMA (POKMAS NANAS 2 - 288 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 103.112.900 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 2 - 220 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 76.302.600 |
SEMENISASI JALAN LINGKUNGAN RT 06 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 3 - 130 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 46.528.900 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 5 - 200 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 70.400.000 |
DRAINASE U30 RT 01 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 1 - 78 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 18.350.200 |
DRAINASE U30 RT 01 RW 03 KELURAHAN TIBAN LAMA (POKMAS BELIMBING I - 30 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 7.067.500 |
DRAINASE U30 RT 01 RW 06 KELURAHAN TIBAN LAMA (POKMAS ALPUKAT 3 - 158 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 37.078.800 |
DRAINASE U30 RT 01 RW 13 KELURAHAN TIBAN LAMA (POKMAS NANAS 1 - 113 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 26.618.900 |
DRAINASE U30 RT 02 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 3 - 101 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 23.790.800 |
DRAINASE U30 RT 03 RW 03 KELURAHAN TIBAN LAMA (POKMAS BELIMBING II - 57 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 13.429.350 |
DRAINASE U30 RT 06 RW 07 KELURAHAN TIBAN LAMA (POKMAS STRAWBERY III - 182 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 40.274.300 |
DRAINASE U40 RT 03 RW 06 KELURAHAN TIBAN LAMA (POKMAS ALPUKAT 2 - 21 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 6.011.500 |
DRAINASE U40 RT 03 RW 10 KELURAHAN TIBAN LAMA (POKMAS SEMANGKA 1 - 125 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 33.859.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) PERUM CENTRAL MELATI RT 01 RW 0 | PERUM CENTRAL MELATI RT 01 RW 08 | SEKUPANG | - | PEMBANGUNAN | 2022 | 207.337.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) | KAMPUNG TUA BELIAN PANTAI RT.02 RW.02 | SEKUPANG | - | PEMBANGUNAN | 2022 | 204.999.300 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BANDARA MAS RT.01 RW20 | SEKUPANG | - | PEMBANGUNAN | 2022 | 204.848.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BATARA RAYA RT.02 RW, RT.03 RW.03 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.783.500 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BUNGA RAYA RT.02 RW.27 | SEKUPANG | - | PEMBANGUNAN | 2022 | 207.313.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM GRAHA NUSA PERMAI RT.01 RW.13 | SEKUPANG | - | PEMBANGUNAN | 2022 | 207.337.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM GRIYA PANORAMA PERMAI RT.02 RW.44 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.829.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM MARBELLA RESIDENCE RT.04 RW.39 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.602.000 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM NADIM RAYA RT.01 RW.51 | SEKUPANG | - | PEMBANGUNAN | 2022 | 204.007.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM ODESSA RT.03 RW.40 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.331.400 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) | PERUM TAMAN RAYA TAHAP 2A RT.01 RW.35 | SEKUPANG | - | PEMBANGUNAN | 2022 | 199.524.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM TAMAN RAYA TAHAP III RT.02 RW.18 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.308.300 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM GRIYA KPN RT.01 RW.41 | PERUM GRIYA KPN RT.01 RW.41 | SEKUPANG | - | PEMBANGUNAN | 2022 | 198.793.000 |
PEMELIHARAAN PREVENTIVE TM, TR DAN GARDU PORTAL | AREA BATAM TERSEBAR | BENGKONG | - | PEMBANGUNAN | 2022 | 99.647.357 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RT 3 RW 3 (POKMAS PERMATA 1) | RT 3 RW 3 BENGKONG KOLAM - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RT 5 RW 3 (POKMAS PERMATA 2) | RT 5 RW 3 BENGKONG KOLAM - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RT 5 RW 10 (POKMAS PERMATA 3) | RT 5 RW 10 BENGKONG SADAI - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RT 6 RW 10 (POKMAS PERMATA 4) | RT 6 RW 10 BENGKONG SADAI - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 05 RW 18 (POKMAS PERMATA 5) | RT 05 RW 18 BENGKONG TELAGA INDAH - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 1 RW 18 (POKMAS PERMATA 6) | RT 1 RW 18 BENGKONG TELAGA INDAH - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 5 RW 18 (POKMAS PERMATA 8) | RT 5 RW 18 BENGKONG TELAGA INDAH - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A1 KOMP. WINNER MILLENIUM RT 3 RW 17 (POKMAS PERMATA 10) | BLOK A1 KOMP. WINNER MILLENIUM RT 3 RW 17 - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A,B,C DAN D KAVLING HARAPAN JAYA RT 8 RW 13 (PERMATA 11) | BLOK A,B,C DAN D KAVLING HARAPAN JAYA RT 8 RW 13 - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK K BENGKONG SADAI RT 1 RW 10 (POKMAS PERMATA 12) | RT 1 RW 10 DI BLOK K BENGKONG SADAI - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 143.308.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BELIMBING RT 4 DAN RW 4 (POKMAS PERMATA 14) | RT 4 RW 4 KAMPUNG BELIMBING - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 161.221.500 |
PEMELIHARAAN DAN PERAWATAN TAMAN JALAN ARTERI DAN ROW WILAYAH PERAWATAN PERTAMANAN BP BATAM | KOTA BATAM | BENGKONG | - | PEMBANGUNAN | 2022 | 1.191.942.552 |
SEMENISASI JALAN LINGKUNGAN KP. DURIAN RT 5 RW 6 (POKMAS PERMATA 16) | RT 5 RW 6 KAMPUNG DURIAN - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN PERUM.PKJ RT 2 RW 14 (POKMAS PERMATA 17) | RT 2 RW 14 PERUM PKJ - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. PKJ RT 3 RW 14 (POKMAS PERMATA 18) | RT 3 RW 14 PERUM PKJ - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN SEI NAYON RT 2 RW 12 (POKMAS PERMATA 19) | RT 2 RW 12 SEI NAYON - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 SAKURA GARDEN ( 400 M² ) POKMAS BUNGA SAKURA | RT 01 RW O4 SAKURA GARDEN | BENGKONG | - | PEMBANGUNAN | 2022 | 142.591.900 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 04 SAKURA GARDEN ( 368 M² ) POKMAS MANGGA | RT 02 RW 04 SAKURA GARDEN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 131.684.300 |
POKMAS BM 04, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 | BATU MERAH RT 02 RW 08 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 81.634.300 |
POKMAS BM 01, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 15 RW 04 | BATU MERAH RT 15 RW 04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 26.514.400 |
POKMAS BM 02, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 25 RW 01 | BATU MERAH RT 25 RW 01 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 19.860.500 |
POKMAS BM 03, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 30 RW 06 | BATU MERAH RT 30 RW 06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 53.903.300 |
POKMAS BM 05, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 11 RW 03 | BATU MERAH RT 11 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 71.634.200 |
POKMAS BM 06, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 14 RW 04 | BATU MERAH RT 14 RW 04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 81.631.000 |
POKMAS BM 07, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 17 RW 05 | BATU MERAH RT 17 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 29.338.100 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A1 KE MESJID PERUM. PKJ RT 1 RW 14 (POKMAS PERMATA 9) | RT 1 RW 14 PERUM PKJ - SADAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.692.000 |
POKMAS BM 08, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 19 RW 06 | BATU MERAH RT 19 RW 06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 35.033.900 |
POKMAS BM 11, PEMBANGUNAN JERAMBAH BETON RT 18 RW 05 | BATU MERAH RT 18 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 121.330.000 |
SEMENISASI JALAN PERUM MUKA KUNING INDAH RT06RW06 (POKMAS AJANG KARYA MANDIRI) VOL-600M2 | KELURAHAN BULIANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.043.500 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ABADI 2 RT 03 RW 04 (POKMAS TANJUNG 1) | RT 03 RW 04 BENGKONG ABADI 2 - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ABADI BARU DEKAT RT 03 DAN 06 RW 14 JLN BUNGA RAYA (POKMAS TG2) | RT 03 RW 14 BENGKONG ABADI BARU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 171.969.600 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ASRAMA RT 04 RW 10 GG. SEMAR (POKMAS TANJUNG 3 ) | RT 04 RW 10 BENGKONG ASRAMA -TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 200.631.200 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ASRAMA RT 04 RW 10 JALAN UTAMA MASJID (POKMAS TANJUNG 4) | RT 04 RW 10 BENGKONG ASRAMA -TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 179.135.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG DALAM RT 04 RW 09 (TANJUNG 5) | RT 04 RW 09 | BENGKONG | - | PEMBANGUNAN | 2022 | 118.229.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KARTINI RT 02 RW 12 (TANJUNG 6) | RT 02 RW 12 BENGKONG KARTINI - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 114.646.400 |
SEMENISASI JALAN LINGKUNGAN BENGKONG WAHYU RT 03 RW 17 JALAN TOWER (TANJUNG 7) | RT 03 RW 17 BENGKONG WAHYU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN BENGKONG WAHYU RT 04 RW 17 JL. GEREJA (POKMAS TANJUNG 8) | RT 04 RW 17 BENGKONG WAHYU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN JALAN TEMBUS MUSHOLLA RT 04 RW 03 (POKMAS TANJUNG 9) | RT 04 RW 03 BENGKONG ABADI 1 - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 143.308.000 |
SEMENISASI JALAN LINGKUNGAN PERUM PESONA MANTANG RT 02 RW 15 (POKMAS TANJUNG 10 ) | RT 02 RW 15 PERUM PESONA MANTANG - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN TANJUNG BUNTUNG BARU RT 07 RW 02 (POKMAS TANJUNG 12) | RT 07 RW 02 TANJUNG BUNTUNG BARU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTABLE DAN SKTM | PORTABLE PT MULTIBANGUN ADHITAMA KONSTRUKSI - KK SEI LADI JL. GAJAH MADA SEKUPANG | BENGKONG | - | PEMBANGUNAN | 2022 | 86.990.781 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | PT AMTEK ENGINEERING - KK KAWASAN INDUSTRI CAMMO ESTATE BLOK D3 NO. 1 BATAM CENTRE | BENGKONG | - | PEMBANGUNAN | 2022 | 322.194.628 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL DAN SUTM | PT PUTRA JAYA BINTAN - KK PR TAMAN LESTARI BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 83.579.361 |
SEMENISASI JALAN PERUM. TERING MAS RT 002 RW 018 ( POKMAS CERI ) 459 M2 | RT 002 RW 018 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 163.615.100 |
SEMENISASI JALAN RT 002 RW 007 ( POKMAS DUKU ) 560 M2 | RT 002 RW 007 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.600.400 |
SEMENISASI JALAN RT 004 RW 021 ( POKMAS KERJA SIAGA ) 600 M2 | RT 004 RW 021 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.522.000 |
SEMENISASI JALAN KAV. BUKIT MAKMUR RT 001 RW 013 ( POKMAS PISANG ) 375 M2 | RT 001 RW 013 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.906.300 |
SEMENISASI JALAN PERUM. GMP TAHAP II RT 002 RW 004 ( POKMAS RAJAWALI 2 ) 240 M2 | RT 002 RW 004 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.945.200 |
POKMAS BM 09 PELANTAR 1, PEMBANGUNAN JERAMBAH BETON RT 06 RW 02 (PELANTAR I) | BATU MERAH RT 06 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 218.355.500 |
POKMAS BM 09 PELANTAR 2, PEMBANGUNAN JERAMBAH BETON RT 06 RW 02 (PELANTAR II) | BATU MERAH RT 06 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 218.353.300 |
SEMENISASI JALAN LINGKUNGAN P=150M L=4M (PSPK) RT 01 RW 14 PERUM RHABAYU ASRI (POKMAS PTM 1)) | RT 01 RW 14 PERUM RHABAYU ASRI KEL TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 214.854.200 |
SEMENISASI JALAN LINGKUNGAN PERUM SARMEN RAYA RT 5 DAN 6 RW 05 ( POKMAS TANJUNG 11) | RT 06 RW 05 PERUM SARMEN RAYA - TANJUNG BUNTUNG | SEI BEDUK | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN P=190 L=3M (PSPK) RT 01 RW 15 KAV. BARU SEI DAUN (POKMAS PTM 2) | RT 01 RW 15 KAV. BARU SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 201.023.900 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=300M (PSPK) RT 02 RW 07 KAV. LAMA SEI DAUN (POKMAS PTM 3) | RT 02 RW 07 KAV. LAMA SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 69.862.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=500 (PSPK) RT 01 RW 11 KAV. BARU SEI DAUN (POKMAS PTM 4) | RT 01 RW 11 KAV. BARU SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 117.835.300 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=800M (PSPK) RT 03 RW 09 KAMPUNG BAGAN (POKMAS PTM 5) | RT 03 RW 09 KAMPUNG BAGAN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 184.248.900 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=415M (PSPK) RT 01 02 RW 07 KAV BARU SEI DAUN (POKMAS PTM 6) | RT 01 02 RW 07 KAV BARU SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 113.663.000 |
RENOVASI RUMAH TINGGAL DI PERUMAHAN MEKAR SARI BLOK D.17 | TIBAN | SEI BEDUK | - | PEMBANGUNAN | 2022 | 35.000.000 |
PENAMBAHAN RETAINING WALL BRONJONG DEPAN VILLA PANBIL BLOK BB2 TAHAP-3 | KAWASAN VILLA PANBIL, MUKA KUNING | SEI BEDUK | - | PEMBANGUNAN | 2022 | 77.395.626 |
PERBAIKAN RAILING DI CONDOTEL LANTAI 25 APARTEMENT PANBIL RESIDENCE | MUKA KUNING | SEI BEDUK | - | PEMBANGUNAN | 2022 | 17.000.000 |
TAMBAHAN RANGKA BAJA DARI ATAP DI POS JAGA TAMAN WISATA ALAM | MUKA KUNING | SEI BEDUK | - | PEMBANGUNAN | 2022 | 20.846.610 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT CHAMPION MATTRES INDONESIA - KK LATRADE INDUSTRIAL PARK BLOK E NO. 7 TG UNCANG | SEI BEDUK | - | PEMBANGUNAN | 2022 | 38.162.859 |
PEMASANGAN DAN PENGADAAN SISIP PERALATAN GARDU, RENOVASI DAN BONGKAR PERALATAN GARDU DAN KWH PANTAU | PT BATAMA ARIASINDO - KK KAW BINTANG MAKMUR INDUSTRIAL BLOK B NO. 1-2 BATAM CENTRE | SEI BEDUK | - | PEMBANGUNAN | 2022 | 26.602.502 |
PENGADAAN DAN PEMASANGAN GH-SKTM DARI DEPAN INTI SEHAT BATAM CENTRE KE GH LEGENDA UNTUK MENGATASI OV | JL. RAJA ISA BATAM CENTRE | SEI BEDUK | - | PEMBANGUNAN | 2022 | 43.473.242 |
INSPECTOR TRANSMISSION LINE 150 KV | BATAM TERSEBAR | SEI BEDUK | - | PEMBANGUNAN | 2022 | 328.067.148 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM BALOI RANTAU RT.01 RW.04 | PERUM BALOI RANTAU RT.01 RW.04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 166.179.200 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM BUKIT INDAH SUKAJADI | PERUM BUKIT INDAH SUKAJADI JL.PALEM HIJAU RT.01 RW.01 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN PERMUKIMAN RT. 01 RW. 25 KAVLING BESTARI KELURAHAN KABIL (POKMAS BESTARI VOL 585M2) | KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.573.100 |
SEMENISASI JALAN PERMUKIMAN RT. 02 RW. 24 KAVLING TAMAN BALOI KELURAHAN KABIL POKMAS JUNI (509 M2) | KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 182.327.200 |
SEMENISASI JALAN PERMUKIMAN RT. 03 RW. 21 KAVLING BIDA KABIL KELURAHAN KABIL POK. MEKAR SARI 330M2 | KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.206.000 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KAMPUNG TUA RT 01 RW 01 | KEL. PATAM LESTARI, KEC. SEKUPANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 198.636.796 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL | HARYANTO - RESTORAN GEK MOI, JL TRANS BARELANG SETELAH KEPRI CORAL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 11.696.316 |
PEMBANGUNAN GARDU 3X4 METER (SISIPAN) | POLRESTA BARELANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.980.442 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT CITRA SERAYA SUPREMNUSA - NAGOYA CITY WALK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 72.932.220 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM SKTM 20 KV | PT PRINCESS AURORA - KK PR KIBING RAYA TEMBESI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 76.819.905 |
SEMENISASI JLAN KAVLING KARTINI I RT.003 RW.002 SUNGAI HARAPAN (POKMAS HARAPAN 2) VOL. 343 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 113.361.600 |
SEMENISASI JALAN PERUM MELATI GARDEN RT.002 RW.013 SUNGAI HARAPAN (POKMAS HARAPAN 4) VOL. 240 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 81.728.900 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.001 RW.008 (HARAPAN 5) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.628.000 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.002 RW.008 (HARAPAN 6) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.402.400 |
SEMENISASI JALAN PERUM PONDOK PRATIWI III RT.006 RW.016 (POKMAS HARAPAN 7) VOL. 400M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.402.400 |
SEMENISASI JALAN KARTINI I GG. MULIA RT.004 RW.002 (POKMAS HARAPAN 1) VOLUME 400M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 130.150.900 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW.015 PERUMAHAN FAMILY DREAM, 529 M2 (POKMAS BERKAH FAMILY) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.379.600 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW.05 PERUMAHAN CITRA MAS INDAH, 450 M2 (POKMAS CITRA MANDIRI) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 155.928.300 |
PEKERJAAN PENGECATAN GEDUNG A,B, GEDUNG PARKIR DAN PEMBUATAN GUDANG AUDITORIUM-KANTOR PUSAT | JL RAJA ISA, TELUK TERING KEC. BATAM KOTA-KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 483.354.546 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW.04 KP.JABI KELURAHAN BATU BESAR, 400 M2 (POKMAS JABI BERSIH) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 139.992.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM PURILOKA 1 RT. 002/ RW. 11 | PERUM PURILOKA 1 RT. 002/ RW. 11 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.953.200 |
PEKERJAAN PEMBUATAN RETAINING WALL TOWER 04 SUTT 150 KV | TANJUNT KASAM - BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 428.090.873 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) TAMAN SENTOSA JL. LAKSMANA BINTA | TAMAN SENTOSA RT 005 RW 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.054.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) TAMAN BUANA INDAH RT. 002/ RW. 0 | TAMAN INDAH BUANA RT 002 RW 003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.228.800 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) JL. LAKSMANA BINTAN PERUM VILL | PERUMAHAN VILLA MAS RT 001 RW 009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 192.017.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUMAHAN KAMPUNG MELAYU BUKIT J | BUKIT JODOH RT 001 RW 002 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.135.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM PONDOK ASRI RT. 002/ RW. 0 | PONDOK ASRI RT 002 RW 010 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.312.700 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 003/ RW. 006 | KOMPLEK NUSA JAYA RT 003 RW 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 88.185.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) BANDAR SRIMAS RT. 005/RW. 012 | PERUM BANDAR SRIMAS RT 05 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 36.768.000 |
Pembangunan Jalan Lingkungan Semenisasi Tebal 15cm (Swakelola PSPK) Bandar Srimas RT. 004/ RW. 012 | PERUM BANDAR SRIMAS RT 04 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 38.938.900 |
PEMBANGUNAN BATU MIRING PERMUKIMAN DAN PERUMAHAN DENGAN BATU BATAM (SWAKELOLA PSPK) KAMPUNG MELAYU B | KAMPUNG MELAYU BUKIT JODOH RT 003 RW 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 37.167.900 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U30 (SWAKELOLA PSPK) KAMPUNG MELAYU BUKIT JODOH | KAMPUNG MELAYU BUKIT JODOH RT. 003 RW. 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 30.588.800 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 001/ RW. 007 | RT. 001 RW. 007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 24.295.700 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 001/ RW. 006 | RT. 001 RW. 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 17.176.500 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK D RT.002 RW.015 (580M2) | PERUMAHAN ANGGREK SARI BLOK D | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK E RT.004 RW.015 (520 M2) | PERUMAHAN ANGGREK SARI BLOK E RT. 004 RW.015 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.254.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENTRE VIEW RT.001 RW.003 (200 M2) | PERUMAHAN CENTRE VIEW RT.001 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 71.602.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GARDAN MASYEBA RT.002 RW.005 580M2 | PERUMAHAN GARDAN MASYEBA RT. 002 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GOLDEN LAND BLOK G RT.002 RW013 (580M2) | PERUMAHAN GOLDEN LAND BLOK G RT.002 RW.013 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GRIYA BUANA INDAH RT.001 RW.014 , 580 M2 | PERUMAHAN GRIYA BUANA INDAH RT. 001 RW.014 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE PAS BATU BELAH LINGKUNGAN PERUMAHAN CENTRE PARK BLOK H RT.002 RW.011 (97M) | PERUMAHAN CENTER PARK RT. 002 RW.011 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 191.175.600 |
DRAINASE LINGKUNGAN U30 PERUMAHAN WISMA BUANA INDAH RT.001 RW.010 (60M) | PERUMAHAN WISMA BUANA INDAH RT. 001 RW.010 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 14.129.500 |
DRAINASE LINGKUNGAN U40 PERUMAHAN TAMAN MARCHELIA RT.002 RW.009 (100M) | PERUMAHAN TAMAN MARCHELIA RT. 002 RW.009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 28.604.400 |
SEMENISASI JALAN BETON PERUM. TAMAN HANG TUAH RT.002 RW.006 | PERUM TAMAN HANG TUAH RT.002 RW.006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUM. TAMAN HANG TUAH RT.003 RW.006 | PERUM. TAMAN HANG TUAH RT.003 RW.006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE/SALURAN PERUM. HANG LEKIR RT.003 RW.005 | PERUM HANG LEKIR RT.003 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 119.762.500 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU CANTROL | PT PANTAI INDAH GALANG BARU, JL. TRANS BARELANG TG. PENGAPIT GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 82.759.367 |
SEMENISASI JALAN BETON PERUM. BIDA ASRI 1 RT.002 RW.009 | PERUM BIDA ASRI 1 RT.002 RW.009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUMAHAN TAMAN LEGENDA BALI BLOK E RT.005 RW.013 | PERUM TAMAN LEGENDA BALI BLOK E RT.005 RW.013 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 198.322.300 |
SEMENISASI JALAN BETON PERUM LEGENDA MALAKA BLOK E RT.001 RW.004 | PERUM LEGENDA MALAKA BLOK E RT.001 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.646.400 |
SEMENISASI JALAN BETON PERUM. LEGENDA MALAKA RT.001 RW.003 | PERUM LEGENDA MALAKA RT.001 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 94.967.400 |
SEMENISASI JALAN BETON PERUM. OMA BATAM CENTRE RT.003 RW.012 | PERUM OMA BATAM CENTRE RT.003 RW.012 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.007 RW.004 | PERUM LEGENDA MALAKA RT.007 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 42.939.600 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.004 RW.004 | PERUM LEGENDA MALAKA RT.004 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.416.500 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA BLOK G RT.003 RW.004 | PERUM LEGENDA MALAKA BLOK G RT.003 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.724.100 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.002, RT.003, DAN RT.004 RW.003 | PERUM LEGENDA MALAKA RT.002, RT.003, DAN RT.004 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 217.229.100 |
SEMENISASI JALAN BETON PERUM. MEDITERANIA RT.001 RW.008 | PERUM MEDITERANIA RT.001 RW.008 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN KOMPLEK KEJAKSAAN NO. 01 S/D 05 RT 04 RW 02 | KOMPLEK KEJAKSAAN NO. 01 S/D 05 RT 04 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 174.945.100 |
SEMENISASI JALAN LINGKUNGAN DARI GERBANG MASJID NURUL JANNAH BLOK S NO. 39 - 55 DAN T NO. 37 RT 07 | TIBAN INDAH PERMAI RT 07 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 195.800.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN DAMAI RT 04 RW 07 | TIBAN DAMAI RT 04 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.470.200 |
SUPPLY AND ISTALLATION OF EQUIPMENT INSULATION WORKS - OSBL STORAGE TANK HOT INSULATION | JL. RAYA PELABUHAN KABILM KM. 12,5, KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.250.000.000 |
PEMBANGUNAN SPAM PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG (DAK REGULER) | PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 6.235.958.000 |
SEMENISASI JALAN PERUMAHAN NAGOYA PERMAI RT.001 RW.005 VOL. 500M2 POKMAS NAGOYA PERMAI 1 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.140.200 |
SEMENISASI JALAN RT001/RW007 KELURAHAN TANJUNG UMA | RT 001 RW 007 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 49.167.800 |
SEMENISASI JALAN PEPAYA RT.001 RW.011 VOL. 564M2 POKMAS PEPAYA2 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 202.030.400 |
Semenisasi Jalan Semangka I RT.001 RW.010 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.237.700 |
SEMENISASI JALAN RT002/RW003 KELURAHAN TANJUNG UMA KECAMATAN LUBUK BAJA, V= 250M2 POKMAS ANGGREK 12 | RT 002 RW 003 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 89.563.100 |
SEMENISASI JALAN PENUIN RT 02 RW 011 VOL. 560M2 POKMAS PENUIN SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.574.000 |
SEMENISASI JALAN RT002/RW011 KELURAHAN TANJUNG UMA, V=540M2 POKMAS TERITIP | RT 002 RW 011 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.463.600 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 09 BALOI MAS INDAH VOL 556M2 POKMAS 3 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 199.192.400 |
SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 03 BALOI CENTRE VOL.520M2 POKMAS 6 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.238.800 |
SEMENISASI JALAN BLOK 6 RT 4 RW 3 VOL. 560M2 POKMAS FLAMBOYAN SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.574.000 |
SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT.003 RW.007 | PERUM PURI LEGENDA RT.003 RW.007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUM. HANG LEKIR BLOK AA RT.001 RW.005 | PERUM HANG LEKIR BLOK AA RT.001 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.589.400 |
SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT.004 RW.007 | PERUM PURI LEGENDA RT.004 RW.007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 05 TAMAN BALOI MAS VOL. 656M2 POKMAS 2 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.946.100 |
SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 06 BALOI MAS PERMAI VOL. 660 M2 POKMAS 7 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 217.272.000 |
PENGADAAN DAN PEMASANGAN PERALATAN GI - GD - SKTM PT CAKRA WISESA KARYA MAKMUR | PT. PLN BATAM / GI BALOI - GI SEI HARAPAN DAN JALAN GAJAH MADA (KAWASAN SOUTLINKS) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.971.736.400 |
PEKERJAAN RETAININGWALL VILLA PANBIL BLOK DD NO. 71,72,73,75 DAN 76 | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 162.257.872 |
SEMENISASI JALAN DEPAN KANTOR LURAH KAMPUNG PELITA RT.001 RW.004 VOL. 360 M2 POKMAS PELITA INDAH 3 | KELURAHAN KAMPUNG PELITA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 128.975.000 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL-JTM-JTR | PT SNEPAC INDO SERVICE - JL. TRANS BARELANG PANTAI MELUR GALANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.165.538 |
PEKERJAAN PERBAIKAN SEAWALL AREA JETTY 1 D I FUEL TERMINAL PULAU SAMBU | PULAU SAMBU, KELURAHAN, TJ. SARI, BELAKANG PADANG, KOTA BATAM, KEPULAUAN RIAU 29411 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.269.200 |
SEMENISASI JALAN BLOK 2 RT 4 RW 1 VOL. 484 M2 POKMAS MANGGA SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 173.360.000 |
PEKERJAAN PEMANCANGAN CLUBHOUSE DAN UNIT RUMAH | BATAM CENTER | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.448.765.000 |
BM5 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING KEL. TANJUNG RIAU, KEC. SEKUPANG | KEL. TANJUNG RIAU, KEC. SEKUPANG (PERUMAHAN GALAXY PARK RT 002, RT 003, RW 014) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 184.504.196 |
PEMBANGUNAN JALAN LINGKUNGAN SEMBULANG TANJUNG RT.002/ RW.001 (POKMAS SEMBULANG 25) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.531.200 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG PASIR MERAH RT.001/ RW.002 (POKMAS SEMBULANG 27) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.719.100 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG CAMPING RT.002 RW.002 (POKMAS SEMBULANG 28) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.478.400 |
DRAINASE PARIT U40 KAMPUNG PASIR MERAH RT.001/002 (POKMAS SEMBULANG 29) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 194.485.500 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG SEI RAYA RT.001/ RW.004 (POKMAS SEMBULANG 32) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 224.221.800 |
SEMENISASI JALAN MENUJU LAPANGAN BOLA KAKI KAMPUNG SERANGGON, RT.002 RW.004 (POKMAS SEMBULANG 33) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 222.843.500 |
SEMENISASI JALAN LINGKUNGAN DARI RUMAH BUTET SAMPAI SABARUDIN RT.002/RW.005 (POKMAS SEMBULANG 35) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.478.400 |
KAMPUNG BATU PUTIH RT 003 RW 004 (DARI RUMAH R. NAFISAH S/D RUMAH IBRAHIM (POKMAS 25) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 201.414.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG BATU PUTIH RT 001 RW 004 (DARI RUMAH SOM (POKMAS 26) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.538.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG RANGA RT.002 RW.004 DARI MUSHOLA S/D RUMAH JEMAIN (POKMAS 27) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 89.516.000 |
BATU MIRING PENAHAN TEBING KAMPUNG PADANG PENAGA RT.001 RW.006 (POKMAS 28) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 348.428.000 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG KETAPANG RT 002 RW 006 (DARI RUMAH HITAM (POKMAS 29) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.269.000 |
DRAINASE U30 KAMPUNG PADANG RT 002 RW 003 ( DARI RUMAH JEPRI S/D KANTOR LURAH) (POKMAS 30) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 82.196.000 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG PADANG RT 001 RW 003 ( DARI RUMAH KAMIL (POKMAS 31) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 181.258.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG LANGKANG RT 001 RW 002 DARI RUMAH NASER S/D KOKOL (POKMAS 32) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.538.000 |
PEMBANGUNAN JALAN LINGKUNGAN DARI KAMPUNG DARAT PULAU RT 002 RW 001 ( DARI RUMAH DEWI (POKMAS 33) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.269.000 |
BATU MIRING PENAHAN TEBING LINGKUNGAN KAMPUNG DARAT PULAU RT.001 RW.001 (POKMAS 34) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 295.281.000 |
JERAMBAH PULAU MUBUT RT.002 RW.005 (POKMAS 35) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 338.231.000 |
JERAMBAH AIR NAGA RT.01 RW.04 DARI RUMAH SAMAT KE RUMAH OKI (POKMAS AIR NAGA SEHATI 5) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 326.114.800 |
JERAMBAH DARI RUMAH ANDI KE RUMAH SIDAH RT.02 RW.04 AIR NAGA (POKMAS AIR NAGA SEHATI 6) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.652.300 |
PEMBANGUNAN JALAN LINGKUNGAN DARI RUMAH PAK AHMAD KE SUMUR RT.01 RW.04 (POKMAS AIR NAGA SEHATI 7) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 107.420.500 |
JERAMBAH RUMAH MARTINI, RIBUT SAMPAI HELDI RT.01 RW.02 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 7) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.663.000 |
JERAMBAH DARI RUMAH SALOMA RT.02 RW.02 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 8) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.675.000 |
JERAMBAH DARI AWANG SARI KE INDRA RT.03 RW.03 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 9) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.664.000 |
PEMBANGUNAN JALAN LINGKUNGAN RT.04 RW.03 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 11) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.533.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMIR RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 30) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 235.476.000 |
JERAMBAH DARI BATU MIRING KE RUMAH DOLAH RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 31) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 181.191.000 |
JERAMBAH DARI RUMAH AKMAL ATARIK KE RUMAH SARAH RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 32) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 369.644.000 |
JERAMBAH DARI RUMAH ANDIKA KE RUMAH MUNIR RT.002/RW.001 PULAU ABANG (POKMAS PULAU ABANG 33) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 289.905.000 |
JERAMBAH DARI RUMAH AKIB KE RUMAH ZAINURI RT.003/RW.001 PULAU ABANG (POKMAS PULAU ABANG 34) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 130.447.000 |
JERAMBAH DARI BATU MIRING KE RUMAH BASRI RT.004/RW.001 PULAU ABANG (POKMAS PULAU ABANG 35) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 126.829.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMAT DAN SAIFUL RT.002/RW.002 AIR SAGA (POKMAS PULAU ABANG 36) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 271.791.000 |
JERAMBAH DARI BATU MIRING KE RUMAH MADON RT.002 RW.002 AIR SAGA (POKMAS PULAU ABANG 37) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 163.064.000 |
DRAINASE PARIT U30 MASJID AL-FALAH RT.001 RW.002 (POKMAS PULAU ABANG 38) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 27.389.000 |
JERAMBAH DARI BATU MIRING KE RUMAH JONO RT.002/RW.003 PETONG (POKMAS PULAU ABANG 39) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 90.565.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMIR/ENGKOS RT.001/RW.003 PETONG (POKMAS PULAU ABANG 40) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 144.924.000 |
SEMENISASI JALAN PERUM PONDOK PRATIWI II RT.02 RW.16 (POKMAS HARAPAN 8) VOL. 120M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 42.229.000 |
SEMENISASI JALAN PERUM TAMAN KARTINI RAYA II RT003 RW010 (POKMAS HARAPAN 9) 560M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.769.000 |
SEMENISASI JALAN PERUM TAMAN KARTINI RAYA II RT004 RW010 (DAU) (POKMAS HARAPAN 10) 444M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 148.178.800 |
SEMENISASI JALAN LINGKUNGAN PERUM. BUKIT TIBAN SELARAS BLOK A, B, C RT 06 RW 07 | PERUM. BUKIT TIBAN SELARAS BLOK A, B, C RT 06 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 141.099.200 |
SEMENISASI JALAN PERUM PUTRI FORTUNA RT.003 RW.008 (POKMAS HARAPAN 11) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.298.900 |
SEMENISASI JALAN LINGKUNGAN PERUM. SIRIAON REGENCY BLOK G - L RT 02 RW 11 | PERUM. SIRIAON REGENCY BLOK G - L RT 02 RW 11 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.652.000 |
SEMENISASI JALAN LINGKUNGAN TAMAN DUTA INDAH JAYA RT 01 RW 07 | TAMAN DUTA INDAH JAYA RT 01 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 78.818.300 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK B2 RT 05 RW 05 | TIBAN INDAH PERMAI BLOK B2 RT 05 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.625.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK L1 NO. 1 - 6 RT 01 RW 05 | TIBAN INDAH PERMAI BLOK L1 NO. 1 - 6 RT 01 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 53.319.200 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN INDAH PERMAI BLOK Z-A RT 05 RW 05 | PERUM. TIBAN INDAH PERMAI BLOK Z-A RT 05 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 172.269.900 |
SEMENISASI JALAN LINGKUNGAN PERUM PONDOK PELANGI RT 05 RW 09 | PERUM PONDOK PELANGI RT 05 RW 09 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.067.800 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BERLIAN RT 04 RW 13 | PERUM. TIBAN BERLIAN RT 04 RW 13 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 109.431.300 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK S NO. 39 DAN BLOK S NO. 43 RT 07 RW 03 | TIBAN INDAH PERMAI BLOK S NO. 39 DAN BLOK S NO. 43 RT 07 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 97.057.400 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK T NO. 28 - 39 RT 07 RW 03 | TIBAN INDAH PERMAI BLOK T NO. 28 - 39 RT 07 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 164.710.700 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI LORONG 1 & 2 RT 03 RW 03 | TIBAN INDAH PERMAI LORONG 1 & 2 RT 03 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 101.693.900 |
SEMENISASI JALAN LINGKUNGAN KAVLING BAKAU SERIP RT. 003 RW. 002 POKMAS GANG KETUPAT (450 M2) | RT. 003 RW. 002 KAVLING BAKAU SERIP | BATU AMPAR | - | PEMBANGUNAN | 2022 | 160.975.100 |
SEMENISASI JALAN LINGKUNGAN KAVLING BAKAU SERIP RT. 001 RW. 002 POKMAS POSKAL GROUP (450 M2) | RT. 001 RW. 002 KAVLING BAKAU SERIP | BATU AMPAR | - | PEMBANGUNAN | 2022 | 161.194.000 |
SEMENISASI JALAN LINGKUNGAN KAVLING NONGSA RT. 005 DAN RT. 006 RW. 003 POKMAS CIPTA KARYA (535 M2) | RT. 005 DAN RT. 006 RW. 003 KAVLING NONGSA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 191.390.100 |
DRAINASE U30 AIR RAJA RT.001/RW.002 (POKMAS AIR RAJA 22) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 164.403.000 |
DRAINASE U30 SIMPANG SRI BA'I AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 23) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 109.586.000 |
DRAINASE U30 TOK SENIN AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 24) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 109.586.000 |
BATU MIRING PENAHAN TEBING AIR RAJA RT.003/RW.002 (POKMAS AIR RAJA 21) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 369.004.000 |
PEMBANGUNAN PENATAAN KAWASAN MASJID AGUNG KABUPATEN KEPULAUAN ANAMBAS | KEC. SIANTAN KEPULAUAN ANAMBAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 5.591.100.000 |
PENATAAN LENGAN SIMP. BASECAMP (LANJUTAN) | BASECAMP SAGULUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 14.673.294.551 |
PENINGKATAN DRAINASE KAWASAN AVIARI KELURAHAN BULIANG (LANJUTAN) | KAWASAN AVIARI BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 5.225.335.727 |
PENGADAAN DAN PEMASANGAN KUBIKEL GD & SKTM 20 KV | MASJID BANDARA HANGNADIM - KK KAWASAN BANDARA HANGNADIM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 174.248.140 |
SEMENISASI JALAN PERMUKIMAN RT 02 RW 22 TELUK LENGUNG (POKMAS TELUK LENGUNG MAJU 330M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.155.400 |
SEMENISASI JALAN PERMUKIMANRT 04 RW 17 KAV BIDA KABIL (POKMAS ANTORIUM 2 & 3 330 M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.147.700 |
SEMENISASI JALAN PERMUKIMAN RT 01 RW 18 KAV BIDA KABIL (POKMAS TULIP 2 165 M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 59.012.800 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 PERUM PURNA YUDHA (POKMAS BERSAMA KITA BISA 330 M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.206.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 001 RW 003 | KAMPUNG BARU RT 001 RW 003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 36.152.700 |
REHABILITASI JALAN LINGKUNGAN KAMPUNG PONJEN RT 003 RW 005 | KAMPUNG PONJEN RT 003 RW 005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 197.743.170 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 001 RW 004 | KAMPUNG BARU RT 001 RW 004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 69.336.150 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 003 RW 004 | KAMPUNG BARU RT 003 RW 004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 104.641.920 |
REHABILITASI JALAN LINGKUNGAN KAMPUNG BUKIT RT 001 RW 006 | KAMPUNG BUKIT RT 001 RW 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.992.580 |
REHABILITASI JALAN LINGKUNGAN KAMPUNG BUKIT RT 003 RW 006 | KAMPUNG BUKIT RT 003 RW 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 203.606.190 |
PENARIKAN SKTM, PENGISIAN PERALATAN GARDU DISTRIBUSI | YAYASAN AL KAUTSAR TELAGA PUNGGUR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 75.047.529 |
PEKERJAAN PENGGANTIAN ATAP WTP, CONTROL ROOM WTP DAN CHLORINE PLANT PLTGU TANJUNG UNCANG | PLTGU TANJUNG UNCANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 378.254.019 |
PENINGKATAN/PENATAAN JALAN SIMP. BARELANG (LANJUTAN) | SIMP. LAMPUR MERAH BARELANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 18.223.928.403 |
PENATAAN JALAN (PELEBARAN JALAN) SIMP. KABIL - SIMP. MASJID RAYA BATAM CENTRE (LANJUTAN) | SIMP. KABIL - SIMP. MASJID RAYA BATAM CENTRE | BATU AMPAR | - | PEMBANGUNAN | 2022 | 16.244.904.604 |
PEMBANGUNAN JERAMBAH BETON SELAT NENEK RT 006 RW 003 (POKMAS TEMOYONG 34 - 150 M2) | RT 006 RW 003 SELAT NENEK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 307.011.000 |
PEMBANGUNAN JERAMBAH BETON PULAU AWENG RT 007 RW 003 (POKMAS TEMOYONG 35 - 150 M2) | RT 007 RW 003 PULAU AWENG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 296.307.000 |
PEMBANGUNAN JERAMBAH BETON TEMOYONG RT 001 RW 001 (POKMAS TEMOYONG 36 - 150 M2) | RT 001 RW 001 TEMOYONG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 306.950.000 |
PEMBANGUNAN JERAMBAH BETON RT 01 RW 02 SETOKOK (POKMAS SETOKOK 44 - 120 M2) | RT 01 RW 02 SETOKOK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 229.914.000 |
PEMBANGUNAN JERAMBAH BETON RT 02 RW 01 SETOKOK (POKMAS SETOKOK 46 - 120 M2) | RT 02 RW 01 SETOKOK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 240.367.000 |
PEMBANGUNAN JERAMBAH BETON RT 01 RW 01 SETOKOK (POKMAS SETOKOK 45 - 120 M2) | RT 01 RW 01 SETOKOK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 239.193.000 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=270M (PSPK) RT 04 RW 01 SEI PANCUR (POKMAS PTM 13) | RT 04 RW 01 SEI PANCUR TANJUNGPIAYU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 76.778.900 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 06 KEL. DURIANGKANG (POKMAS DURIANGKANG 9) | RT 03 RW 06 KEL DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 206.982.600 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 01 KEL DURIANGKANG (POKMAS DURIANGKANG 11) | RT 05 RW 01 KEL DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 208.766.800 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 02 KEL. DURIANGKANG (POKMAS DURIANGKANG 13) | RT 07 RW 02 KEL DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.877.500 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=210M (PSPK) RT 02 RW 13 TELAGA SAKINAH (POKMAS PTM 11) | RT 02 RW 13 TELAGA SAKINAH TANJUNGPIAYU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 54.817.400 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=100M (PSPK) RT 03 RW 01 SEI PANCUR (POKMAS PTM 9) | RT 03 RW 01 SEI PANCUR - TANJUNGPIAYU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 28.458.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=270M (PSPK) RT 01 RW 08 KAVLING BAGAN | RT 01 RW 08 KAVLING BAGAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 63.493.100 |
PEMBANGUNAN / REHABILITASI DRAINASE U-40 P=170M (PSPK) RT 02 RW 08 KAV. BAGAN | RT 02 RW 08 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 48.595.800 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=200M (PSPK) RT 01 RW 05 PANCUR PELABUHAN | RT 01 RW 05 PENCUR PELABUHAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 46.931.500 |
PENINGKATAN DRAINASE PASAR PJB KELURAHAN SAGULUNG KOTA | PASAR PJB SAGULUNG KOTA - BATU AJI-BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.684.653.496 |
JL1 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 08 RW 02 MENUJU POSYANDU | KEL. TANJUNG BUNTUNG, KEC. BENGKONG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 149.834.939 |
SEMENISASI JALAN PEMUKIMAN KAMPUNG BARU RT.002/RW.006 (POKMAS GALANG BARU 34) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.262.700 |
SEMENISASI JALAN PEMUKIMAN TANJUNG MELAGAN RT.002/RW.003 (POKMAS GALANG BARU 35) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 122.057.000 |
JERAMBAH AIR LINGKA RT.001/RW.005 (POKMAS GALANG BARU 36) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 241.585.300 |
JERAMBAH AIR LINGKA RT.002/RW.005 (POKMAS GALANG BARU 37) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 241.585.300 |
JERAMBAH KAMPUNG BARU RT.001/RW.006 (POKMAS GALANG BARU 38) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.402.700 |
JERAMBAH PULAU NANGA RT.001/RW.002 (POKMAS GALANG BARU 39) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.637.000 |
JERAMBAH TANJUNG MELAGAN RT.002/RW.003 (POKMAS GALANG BARU 40) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 329.451.000 |
BATU MIRING AIR LINGKA RT.001/RW.005 (POKMAS GALANG BARU 41) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.722.700 |
BATU MIRING AIR LINGKA RT.003/RW.005 (POKMAS GALANG BARU 42) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.444.300 |
BATU MIRING PULAU KOREK RT.004/RW.001 (POKMAS GALANG BARU 43) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 265.740.000 |
JERAMBAH DARI RUMAH, SABARIAH, KAMAT, AZMAN KAMPUNG BARU RT,004/RW,002 (POKMAS KAMPUNG BARU 3) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.374.000 |
JERAMBAH DARI RUMAH SAREP, MAIN, ROSLI PULAU JEMARA, RT,005/RW,002 (POKMAS PULAU JEMARA 4) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.374.000 |
JERAMBAH DARI RUMAH, SARIMAN, SARUDIN, ASBULLAH RT. 01 RW. 01 SUBANG MAS (POKMAS SUBANG MAS 3) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 434.884.000 |
PEMBANGUNAN JALAN LINGKUNGAN SUBANG MAS, RT.001/RW.001 (POKMAS SUBANG MAS 5) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.539.000 |
PENINGKATAN JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI (TAHAP 2) | JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 7.109.805.481 |
PEKERJAAN GROUTING, INJEKSI DAN PLESTER DINDING DI BCS MALL | BCS MALL, JALAN BUNGA RAYA SEI BALOI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 40.000.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. BAITUL HASANAH RT 02 RW 19 | PERUM. BAITUL HASANAH RT 02 RW 19 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT ASRI RT 01 RW 10 | PERUM. TIBAN BUKIT ASRI RT 01 RW 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT ASRI RT 03 RW 10 | PERUM. TIBAN BUKIT ASRI RT 03 RW 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT PERMAI RT 01 RW 15 | PERUM. TIBAN BUKIT PERMAI RT 01 RW 15 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 02 RW 03 | PERUM. TAMAN SARI HIJAU RT 02 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI RT 04 RW 02 | PERUM. TAMAN SARI RT 04 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 06 RW 03 | PERUM. TAMAN SARI HIJAU RT 06 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 01 RW 03 | PERUM. TAMAN SARI HIJAU RT 01 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN KOPERASI RT 01 RW 07 | PERUM. TIBAN KOPERASI RT 01 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.078.030 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW. 012 CIPTA ASRI (POKMAS TBS 8) | RT. 04 RW. 012 CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.707.890 |
SEMENISASI JALAN LINGKUNGAN RT.07 RW. 012 CIPTA ASRI (POKMAS TBS 12) | RT.07 RW. 012 CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.727.190 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT GAJAH IZUMI MAS PERKASA - KAWASAN HIJRAH INDUSTRIAL ESTATE BLOK AI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 97.894.968 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM PONDOK ASRI RT.001/RW.004 | PERUM PONDOK ASRI RT.001/RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 22.738.350 |
PEMBANGUNAN JERAMBAH BETON PULAU BULUH RT 01 RW 01 ( POKMAS PULAU BULUH 31 - 135 M2 ) | RT 01 RW 01 PULAU BULUH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 265.814.000 |
PEMBANGUNAN JERAMBAH BETON PULAU BULUH RT 02 RW 01 (POKKMAS PULAU BULUH 33 - 130,5 M2) | RT 02 RW 01 PULAU BULUH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 250.159.000 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM VILLA PESONA ASRI RT 03 | PERUM VILLA PESONA ASRI RT.05 RT.03 RW.10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.945.960 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM VALENCIA RT.02 RW.25 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 199.689.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM BUKIT RAYA RT.02 RW.38 | PERUM BUKIT RAYA RT.02 RW.38 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.408.960 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM BIDA ASRI 2 RT.04 RW.17 | PERUM BIDA ASRI 2 RT.04 RW.17 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 205.407.720 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM ALAM RAYA RT.01 RW.15 | PERUM ALAM RAYA RT.01 RW.15 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.261.640 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN EIRENE RT 02 RW 14 | PERUM. TAMAN EIRENE RT 02 RW 14 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 113.712.840 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. BUMI SAKINAH RW 11 MELEWATI JALAN PERUM. BUANA | PERUM. BUANA IMPIAN I RW 14, KEL. TEMBESI, KEC. SAGULUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 163.297.912 |
PEMELIHARAAN GARDU DISTRIBUSI | AREA TIBAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 58.030.000 |
PEKERJAAN RENOVASI GARDU DISTRIBUSI DAN PEMASANGAN PERALATAN ISI GARDU SERTA PEMASANGAN KABEL SKTM | PT ADI BATAMUNI JAYA - KK MEGA CIPTA INDUSTRIAL PARK BATU AMPAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 33.467.346 |
PEKERJAAN SOIL INVESTIGATION | TANJUNG UNCANG KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 88.738.739 |
SEMENISASI JALAN LINGKUNGAN RT.01 DAN 06 RW.03 | RT.01 DAN 06 RW.03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 180.670.260 |
Pembangunan Semenisasi Jalan Lingkungan RT.01 RW.01 Kav Mandiri Kel. Sungai Pelunggut | RT.01 RW 01 Kelurahan Sungai Pelunggut | BATU AMPAR | - | PEMBANGUNAN | 2022 | 105.805.200 |
SEMENISASI JALAN LINGKUNGAN RT.02 DAN 03 RW.04 KELURAHAN SUNGAI LEKOP | RT.02 DAN 03 RW.04 KELURAHAN SUNGAI LEKOP | BATU AMPAR | - | PEMBANGUNAN | 2022 | 210.996.570 |
Pembangunan Semenisasi Jalan Lingkungan RT.02,03 RW.12 Kav Mandiri Blok.E | RT.02,03 RW 12 Kelurahan Sungai Pelunggut | BATU AMPAR | - | PEMBANGUNAN | 2022 | 173.400.870 |
Semenisasi Jalan Lingkungan RT.04 dan 05 RW.04 | RT.04 dan 05 RW.04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 210.198.480 |
Pembangunan Drainase Lingkungan U-30 RT.02 RW.13 Kav Kamboja | RT.02 RW.13 Kav Kamboja | BATU AMPAR | - | PEMBANGUNAN | 2022 | 87.337.020 |
Pembangunan Drainase Lingkungan U-30 RT.02 RW.04 Kav Kamboja | RT.02 RW.04 Kav Kamboja | BATU AMPAR | - | PEMBANGUNAN | 2022 | 88.519.170 |
Pembangunan Semenisasi Jalan Lingkungan RT.01,02,03,04 RW 14 Kav Flamboyan | RT.01,02,03,04 RW 14 Kav Flamboyan | BATU AMPAR | - | PEMBANGUNAN | 2022 | 198.429.150 |
SEMENISASI JALAN LINGKUNGAN RT.06 DAN 07 RW.06 | RT.06 DAN 07 RW.06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 208.220.460 |
SEMENISASI JALAN LINGKUNGAN RT.02 DAN 04 RW.02 | RT.02 DAN 04 RW.02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 142.793.730 |
SEMENISASI JALAN PERUM FORTUNA RAYA I RT.01 RW.13 | RT.01 RW.13 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 211.726.950 |
PEKERJAAN PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT TAHUN 2022 TAHAP II AREA BATAM | PT WARLBOR INTERNATIONAL INDONESIA DAN SWESS KOPITIAM NAGOYA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 4.749.133.000 |
PEKERJAAN SALURAN DI VILLA PANBIL BLOK DD MINI | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 56.233.076 |
PEKERJAAN ELEKTRIKAL VILLA PANBIL DI BLOK DD NO. 53-55 MINI | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 75.332.500 |
SEMENISASI JALAN LINGKUNGAN RW. 01 KAV. NATO BERSERI VOLUME 525 M2 POKMAS NATO BERSERI 01 | RW. 01 KAV. NATO BERSERI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 187.141.560 |
SEMENISASI JALAN PERUM FORTUNA RAYA I RT.02 RW.13 | FORTUNA RAYA I RT.02 RW.13 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.229.780 |
SEMENISASI JALAN KAV. LAMA RT.04 RW. 10 | KAV. LAMA RT.04 RW. 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.108.670 |
SEMENISASI JALAN KAV. LAMA RT.06 RW.10 | KAV. LAMA RT.06 RW.10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 213.744.930 |
SEMENISASI JALAN KAV. LAMA RT.07 RW. 10 | KAV. LAMA RT.07 RW. 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.326.790 |
SEMENISASI JALAN LINGKUNGAN RT.03 RW. 012 (POKMAS TBS 5) | RT.03 RW. 012 TAMAN CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 174.871.620 |
SEMENISASI JALAN LINGKUNGAN RT.06/08 RW. 12 CIPTA ASRI (POKMAS TBS 11) | RT. 06/08 RW.12 TAMAN CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 152.192.100 |
Semenisasi Jalan Lingkungan RT.09 RW. 010 Villa Muka Kuning | RT. 09 RW. 0010 VILLA MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.273.200 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW. 01 GREEN LAGUNA (POKMAS TBS 10) | RT.05 RW.01 GREEN LAGUNA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.727.190 |
SEMENISASI JALAN LINGKUNGAN RT.01 / 02 RW. 020 SENTOSA PERDANA (POKMAS TBS 1) | RT. 01/02 RW. 020 SENTOSA PERDANA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 121.212.000 |
Semenisasi Jalan Lingkungan RT.03 dan 04 RW.03 Kelurahan Sungai Lekop | RT.03 dan 04 RW.03 Kelurahan Sungai Lekop | BATU AMPAR | - | PEMBANGUNAN | 2022 | 197.071.620 |
SEMENISASI JALAN LINGKUNGAN RW. 22 PERUM. BATUAJI RIAU BERTUAH VOLUME 525 M2 POKMAS RIAU BERTUAH 22 | RW. 22 PERUM. BATUAJI RIAU BERTUAH KEL. SUNGAI LANGKAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 185.060.310 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 18 PERUM. GRIYA VOLUMEN 455 M2 POKMAS GRIYA RT. 01 RW. 18 | RW. 18 PERUM. GRIYA BATUAJI ASRI KEL. SUNGAI LANGKAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 160.016.490 |
SEMENISASI JALAN LINGKUNGAN RW. 02 KAV. NATO PERMATA VOLUME 601 M2 POKMAS NATO PERMATA 02 | RW. 02 NATO PERMATA KEL. SUNGAI LANGKAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.704.860 |
SEMENISASI JALAN LINGKUNGAN RW. 20 PERUM. GRIYA VOLUME 510 M2 POKMAS GRIYA 20 | RW. 20 PERUM. GRIYA BATUAJI ASRI TAHAP 6 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 178.880.940 |
SEMENISASI JALAN PERUM MUKA KUNING INDAH I RT02,RT04 RW 05 VOL-600M2 | KELURAHAN BULIANG (POKMAS FLAMBOYAN 05 MEMBANGUN) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 201.583.770 |
SEMENISASI JALAN PERUM MKI I RT 06 RW 07 VOL- 600M2 | KELURAHAN BULIANG (POKMAS BANGUN KARYA MANDIRI) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 202.927.980 |
ELECTRICAL RETICULATION FLEXTRONICS | JL. RASAMAIA NO. 1, MUKA KUNING SE BEDUK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 13.800.000.000 |
CONCRETE PAVEMENT WORK | JLN BRIGJEN KATAMSO KM 5 TANJUNG UNCANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.080.000.000 |
PEMBANGUNAN SALURAN DRAINASE PRA-CETAK TYPE U40 PERUMAHAN TAMAN RAYA TAHAP III RT.03 RW.24 | PERUMAHAN TAMAN RAYA TAHAP III RT.03 RW.24 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 24.454.410 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN II RT.01 RW.09 (100 M X 4 M) - POKMAS MUTIARA LAUT 1 | RT 01 RW 09 BENGKONG HARAPAN II BENGKONG LAUT | BATU AMPAR | - | PEMBANGUNAN | 2022 | 144.610.800 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN II RT.02 RW.09 (100 M X 4 M) - POKMAS MUTIARA LAUT 2 | RT 02 RW 09 BENGKONG HARAPAN II | BATU AMPAR | - | PEMBANGUNAN | 2022 | 144.610.800 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN I RT.03 RW.08 (100 M X 3 M) - POKMAS MUTIARA LAUT 3 | RT 03 RW 08 BENGKONG HARAPAN I | BATU AMPAR | - | PEMBANGUNAN | 2022 | 108.458.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG LAUT RT.04 RW.01 (150 M X 4 M) - POKMAS MUTIARA LAUT 5 | RT 04 RW 01 BENGKONG LAUT | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN BENGKONG RATU RT.03 RW.06 (150 M X 4 M) - POKMAS MUTIARA LAUT 7 | RT 03 RW 06 BENGKONG RATU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN KOMP. GREEN TOWN RT.01 RW.10 (50 M X 4 M) - POKMAS MUTIARA LAUT 8 | RT 01 RW 10 KOMP. GREEN TOWN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 72.305.400 |
SEMENISASI JALAN LINGKUNGAN KOMP. GREEN TOWN RT.03 RW.10 (150 M X 4 M) - POKMAS MUTIARA LAUT 9 | RT 03 RW 10 KOMP. GREEN TOWN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN KOMP. YKB RT.03 RW.11 (150 M X 4 M) - POKMAS MUTIARA LAUT 10 | RT 03 RW 11 KOMP. YKB | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN BALOI HARAPAN II SAMPING MASJID DARUL MUTALIM RT. 01 RW. 03 (100M X 3M) | BALOI HARAPAN II SAMPING MASJID DARUL MUTALIM RT. 01 RW. 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 108.458.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN I RT. 02 RW. 06 (125 M X 3 M) POKMAS 47 | BENGKONG HARAPAN I RT. 02 RW. 06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.572.625 |
SEMENISASI JALAN LINGKUNGAN BENGKONG INDAH RT. 01 RW. 01 (40 M X 4 M) POKMAS 48 | BENGKONG INDAH RT. 01 RW. 01 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 57.844.320 |
SEMENISASI JALAN LINGKUNGAN BALOI HARAPAN II RT.04 RW.03 (120M X 3M) POKMAS INDAH 44 | BALOI HARAPAN II RT.04 RW.03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 130.149.720 |
RENOVASI STRUKTUR DAN FINISHING DI VILLA PANBIL BLOK R NO. 12, KAWASAN VILLA PANBIL | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 35.500.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN II RT. 06 RW. 10 (100M X 4M) | BENGKONG HARAPAN II RT. 06 RW. 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 115.949.200 |
RETAINING WALL BRONJONG SEKTOR VII DI KAV.9 INDUSTRI BARU, KAWASAN PANBIL INDUSTRIAL | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 71.324.000 |
DRIVEWAY AREA VILLA PANBIL DD NO. 53-58 MINI. KAWASAN VILLA PANBIL | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 33.867.720 |
STRUKTUR TANGKI AIR DAN RUANG POMPA TAMAN WISATA ALAM | TAMAN WISATA ALAM, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 23.087.000 |
STRUKTUR RESTAURAN DI TAMAN WISATA ALAM | TAMAN WISATA ALAM, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 23.844.000 |
PEMBANGUNAN BATU MIRING PERMUKIMAN DAN PERUMAHAN DENGAN BATU (SWAKELOLA PSPK) CIPTA REGENCY RT.04 | CIPTA REGENCY RT.04 RW.21 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 211.365.090 |
PEMBANGUNAN SALURAN DRAINASE PRA-CETAK TYPE U40 (SWAKELOLA PSPK) | PERUM BOTANIA GARDEN RT.02 RW.43 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 86.604.420 |
PEMBANGUNAN BATU MIRING PERMUKIMAN DAN PERUMAHAN DENGAN BATU (SWAKELOLA PSPK) | PERUM GARDAN RAYA RT.01 RW.53 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.667.120 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW. 24 MEDIO RAYA (POKMAS TBS 2) | RT. 01 RW. 24 MEDIO RAYA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.960.970 |
SEMENISASI JALAN LINGKUNGAN RT.03 RW.15 TAMAN ANUGRAH (POKMAS TBS 7) | RT. 03 RW. 15 TAMAN ANUGRAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 176.164.770 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW. 23 CITRA LAGUNA (POKMAS TBS 4) | RT. 02 RW. 23 CITRA LAGUNA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 192.939.090 |
PEMBANGUNAN DRAINASE RT 001 RW 006 ( 375 M ) POKMAS JAMBU | RT 001 RW 006 Kel Tanjung Sengkuang | BATU AMPAR | - | PEMBANGUNAN | 2022 | 108.330.450 |
PEMBANGUNAN JALAN LINGKUNGAN AIR RAJA RT.001/RW.001 (POKMAS AIR RAJA 15) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.550.000 |
PEMBANGUNAN JALAN LINGKUNGAN SIMPANG LIMA S/D SOYAH RT.002/RW.001 AIR RAJA (POKMAS AIR RAJA 16) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.543.000 |
PEMBANGUNAN JALAN LINGKUNGAN AIR RAJA RT.003/RW.001 (POKMAS AIR RAJA 17) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 187.916.000 |
PEMBANGUNAN JALAN LINGKUNGAN TOK SENIN S/D MENCARAS AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 18) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.018.000 |
SEMENISASI JALAN LINGKUNGAN JALAN SOYAH S/D MASJID NURUL RT.001/RW.001 AIR RAJA (POKMAS AIR RAJA 19) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.543.000 |
PEMBANGUNAN JALAN LINGKUNGAN AIR RAJA RT.002/RW.001 (POKMAS AIR RAJA 20) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.791.000 |
PEMBANGUNAN GARDU BETON 3,5 M2 X 5,5 M2 | PT KALIBAN BANGUN PERKASA - KK RUKO WINNER KALIBAN SUPERBLOCK KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 146.055.910 |
PEMANGKASAN POHON DIBAWAH SUTM | AREA BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 129.762.500 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM/SKTM 20KV | PT TRIAS JAYA PROPERTINDO - KK PR PUTRA JAYA RESIDANCE CLUSTER B TJ UNCANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 58.593.897 |
SEMENISASI JALAN LINGKUNGAN DARI GAPURA KP.TUA KEARAH SMK PERTIWI RT.01 RW. 08 | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 190.105.000 |
PEMBUATAN RUANGAN BARU | JL. HANG KESTURI I NO. 2 KAWASAN TERPADU KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 107.740.000 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW.06 KELURAHAN BATU BESAR | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 165.260.000 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW.12 PERUMAHAN NONGSA ASRI RW.12 | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 181.548.000 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW.08 KP.MELAYU KELURAHAN BATU BESAR | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 172.263.000 |
PENINGKATAN DRAINASE HOTEL 01 MENUJU MAKAM PAHLAWAN KELURAHAN BUKIT TEMPAYAN (LANJUTAN) | KELURAHAN BUKIT TEMPAYAN BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 6.296.591.820 |
PEMBANGUNAN SPAM PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG (PENDUKUNG DAK REGULER) | PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG | GALANG | - | PEMBANGUNAN | 2022 | 2.291.183.000 |
OPTIMALISASI SWRO BELAKANG PADANG | BELAKANG PADANG | GALANG | - | PEMBANGUNAN | 2022 | 2.831.274.000 |
OPTIMALISASI WTP PULAU ABANG | PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 3.144.928.000 |
PEMBANGUNAN SPAM PULAU LABU KEL. BATU LEGONG KEC. BULANG | PULAU LABU KEL. BATU LEGONG KEC. BULANG | GALANG | - | PEMBANGUNAN | 2022 | 9.391.583.000 |
PEMBANGUNAN / REHABILITASI DRAINASE U-30 P=475M (PSPK) RT 03 RW 05 PANCUR PELABUHAN (POKMAS PTM 23) | RT 003 RW 005 PANCUR PELABUHAN TANJUNGPIAYU | GALANG | - | PEMBANGUNAN | 2022 | 84.598.800 |
JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. ANGGREK MAS I | RT 01 RW 06, KEL. TAMAN BALOI, KEC. BATAM KOTA | GALANG | - | PEMBANGUNAN | 2022 | 160.935.355 |
PEKERJAAN RELOKASI GARDU PORTAL | SEI LEKOP 2 SAGULUNG | GALANG | - | PEMBANGUNAN | 2022 | 222.690.312 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW. 01 TANJUNG GUNDAP (POKMAS TBS 3) | RT.02 RW.01 TANJUNG GUNDAP | GALANG | - | PEMBANGUNAN | 2022 | 189.989.820 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW. 11 BUMI SAKINAH (POKMAS TBS 9) | RT. 05 RW. 11 BUMI SAKINAH | GALANG | - | PEMBANGUNAN | 2022 | 154.636.320 |
PEMBANGUNAN DRAINASE U 40 NGENANG RT 04 RW 01 KELURAHAN NGENANG - POKMAS SINAR REMBULAN | RT 04 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 30.298.000 |
PEMBANGUNAN DRAINASE U 40 PULAU KUBUNG RT 01 RW 03 KELURAHAN NGENANG - POKMAS KUBUNG MEMBANGUN | PULAU KUBUNG RT 01 RW 03 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 30.298.000 |
PEMBUATAN DRAINASE U40 NGENANG RT 03 RW 01 KELURAHAN NGENANG - POKMAS SEJAHTERA NGENANG | RT 03 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 90.931.000 |
SEMENISASI JALAN LINGKUNGAN NGENANG RT 01 RW 01 KELURAHAN NGENANG - POKMAS BETON JAYA | RT 01 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 122.018.000 |
SEMENISASI JALAN LINGKUNGAN NGENANG RT 02 RW 01 KELURAHAN NGENANG - POKMAS KUDA LAUT | RT 02 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 183.016.000 |
SEMENISASI JALAN LINGKUNGAN NGENANG RT 04 RW 01 KELURAHAN NGENANG - POKMAS MAKMUR | RT 04 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 183.016.000 |
SEMENISASI JALAN LINGKUNGAN PULAU TODAK RT 02 RW 03 KELURAHAN NGENANG - POKMAS TODAK ANUGERAH | PULAU TODAK RT 02 RW 03 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 81.368.000 |
PEMBANGUNAN / REHABILITASI DRAINASE U-40 RT 01 RW 03 (POKMAS GAHARU) | RT 01 RW 03 KELURAHAN MANGSANG | GALANG | - | PEMBANGUNAN | 2022 | 169.348.300 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | PT GRAHA ANUGERAH KEDIRI - KK SEI BURUS SEBELAH KANAN BUKIT GALANG BARU | GALANG | - | PEMBANGUNAN | 2022 | 67.575.226 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 RT 01, 02, 03 RW 23 (POKMAS DAMAR) | RT 01 RW 23 MANGSANG | GALANG | - | PEMBANGUNAN | 2022 | 77.463.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 RT 08 RW 02 (POKMAS MERANTI) | MANGSANG PERMAI RT 08 RW 02 | GALANG | - | PEMBANGUNAN | 2022 | 118.706.500 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 MANGSANG PERMAI BLOK C RT 01 RW 01 | RT 01 RW 01 MANGSANG PERMAI | GALANG | - | PEMBANGUNAN | 2022 | 165.731.500 |
PEMBANGUNAN GEDUNG NEGARA SEDERHANA 1 (SATU) LANTAI RT.001/RW.001 (POKMAS REMPANG 14) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 313.101.800 |
PEMBANGUNAN GEDUNG SERBAGUNA MONGGAK RT.001/RW.004 (POKMAS REMPANG 15) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 313.101.800 |
PEMBANGUNAN JALAN LINGKUNGAN RT.002/RW.001 REMPANG CATE (POKMAS REMPANG 16) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 236.316.300 |
PEMBANGUNAN JALAN LINGKUNGAN KP. TRALING RT.005/RW.001 (POKMAS REMPANG 17) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 335.610.000 |
PEMBANGUNAN JALAN LINGKUNGAN TANJUNG KELENGKING RT.003/RW.002 (POKMAS REMPANG 18) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 268.516.600 |
PEMBANGUNAN JALAN LINGKUNGAN PASIR PANJANG RT.001/RW.003 (POKMAS REMPANG 19) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 268.544.100 |
PEMBANGUNAN JALAN LINGKUNGAN MONGGAK RT.002/RW.004 (POKMAS REMPANG 20) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 358.013.700 |
PEMBANGUNAN SEMINISASI JALAN LINGKUNGAN TG. KERTANG RT.001/RW.002 (POKMAS REMPANG 21) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 178.985.400 |
PEMBANGUNAN BATU MIRING BELONGKENG RT.003/RW.004 | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 372.049.700 |
BATU MIRING LANJUTAN RT 02 RW 04 SAKURA GARDEN ( 175 M² ) POKMAS DURIAN | RT 02 RW 04 SAKURA GARDEN | GALANG | - | PEMBANGUNAN | 2022 | 218.884.230 |
PEMBUATAN RETAINING WALL TOWER 30A SUTT 150 KV PHI CONNCETION SAGULUNG - HARAPAN | PT PLN BATAM | GALANG | - | PEMBANGUNAN | 2022 | 92.904.637 |
PENGADAAN DAN PEMASANGAN PERALATAN KUBIKEL DAN SKTM 20KV DARI RUSUN BP-GD BUMI ABADI | PT BUMIABADI TEGARSAKTI 2 - JL HANG KESTURI KABIL | GALANG | - | PEMBANGUNAN | 2022 | 352.588.294 |
PENGADAAN DAN PEMASANGAN JTM & PERALATAN GARDU | PORTABLE RIZA HAERUDIN - JL TPU SEI GOA REMPANG CATE DUSUN TEBING TINGGI | GALANG | - | PEMBANGUNAN | 2022 | 253.041.329 |
PRESERVASI JALAN DAN JEMBATAN NONGSA - BATU AMPAR - TEMBESI - GALANG (PULAU BATAM - GALANG) | PULAU BATAM - GALANG | GALANG | - | PEMBANGUNAN | 2022 | 23.518.769.000 |
BLASTING & PAINTING SHOP | PT FEEN MARINE, TG RIAU KEC SEKUPANG | GALANG | - | PEMBANGUNAN | 2022 | 3.723.576.751 |
PENGADAAN DAN PEMASANGAN PAGAR SPANDEK DI LAHAN TEMBESI | INDUSTRIAL ESTATE TEMBESI | GALANG | - | PEMBANGUNAN | 2022 | 68.000.000 |
PENGADAAN DAN PEMASANGAN SKTM 20 KV DARI STO TELKOM - RUSUN BP BATAM | PT BUMIABDI TEGARSAKTI 2 - JL HANG KESTURI KABIL | GALANG | - | PEMBANGUNAN | 2022 | 277.346.242 |
PENGADAAN DAN PEMASANGAN SKTM DARI AGUNG AUTOMALL KE GD MAIDERA (PECAH BEBAN FEEDER MAWAR) | JL JENDERAL SOEDIRMAN - JL AHMAD YANI - BATAM CENTER | GALANG | - | PEMBANGUNAN | 2022 | 287.699.500 |
PENGADAANN DAN PEMASANGAN SKTM DARI GI BALOI KE AGUNG AUTOMALL (PECAH BEBAN FEEDER MAWAR) | JL JENDRAL SUDIRMAN - JL AHMAD YANI -BATAM CENTER | GALANG | - | PEMBANGUNAN | 2022 | 273.539.621 |
PEKERJAAN PEMBANGUNAN PENATAAN JALAN RE MARTADINATA TAHAP 1 | SEKUPANG, JL. RE MARTADINATA | NONGSA | - | PEMBANGUNAN | 2022 | 48.586.235.000 |
REVITALISASI MASJID AL KAUTSAR PERUMAHAN MASYEBA GADING | KELURAHAN SEI HARAPAN, KECAMAN SEKUPANG, KOTA BATAM | NONGSA | - | PEMBANGUNAN | 2022 | 115.683.273 |
SEMENISASI JALAN BLOK I KAVLING ABADI JAYA RT 01/RW 03 | KELURAHAN SUNGAI LEKOP, KECAMATAN SAGULUNG, KOTA BATAM | BATU AJI | - | PEMBANGUNAN | 2022 | 115.263.637 |
PENATAAN LINGKUNGAN PERUMAHAN CLASIK INDAH | KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.158.309.010 |
PEMANCANGAN RC PILE 400X400MM | PT MCDERMOTT INDONESIA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.387.000.000 |
RENOVASI BANGUNAN PANTI ASUHAN MUHAMMADIYAH AL ANSHORI, PERUMAHAN BAMBU KUNING BLOK B.16 NO. 16 | KEL. BUKIT TEMPAYAN KEC. BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 77.142.727 |
PENATAAN LINGKUNGAN PERBAIKAN FASILITAS UMUM (FASUM) PERUM BAMBU KUNING RW 03 BLOK C | KEL. BUKIT TEMPAYAN, KECAMATAN BATU AJI | BATU AJI | - | PEMBANGUNAN | 2022 | 77.190.910 |
REVITALISASI MUSHOLLA AT TAQWA PERUMAHAN PURI SURYA | KELURAHAN SUNGAI LANGKAI KEC. SAGULUNG | SAGULUNG | - | PEMBANGUNAN | 2022 | 77.130.910 |
PEKERJAAN STRUKTUR GEDUNG PERTAMA BUSINESS CENTRE | KAWASAN SHIPYARD PT. DOK WARISAN PERTAMA - PAX OCEAN | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.421.932.946 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU CANTOL DAN JTM-SUTM | BTS TELKOMSEL BTM569-KP CAKANG RT 03 RW 04 PULAU GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 55.749.903 |
PROYEK PRESERVASI KAPAL | DELTA SHIPYARD PANARAN DAPUR 12 SEI, PELUNGGUT | BATAM KOTA | - | PEMBANGUNAN | 2022 | 40.020.000 |
NEW CONSTRUCTION OF 6 LOT TYPE E FACTORY AT BATAMINDO INDUSTRIAL PARK | BATAMINDO INDUSTRIAL PARK | BATAM KOTA | - | PEMBANGUNAN | 2022 | 70.000.000.000 |
PEMBANGUNAN GUDANG UK. 30M X 42M | JALAN BRIGJEN KATAMSO (BUNDARAN), TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 780.000.000 |
PROYEK WORKSHOP PRODUKSI TAHAP 2 BA (2) | JL BRIGJEN KATAMSO LOT 8 KEL TANJUNG UNCANG KEC BATU AJI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 980.000.000 |
MECHANICAL INSTALLATION, ELECTRICAL, ENGINE FOUNDATION (SLAB) | POWER HOUSE KAWASAN INDUSTRIAL BATAMINDO PARK DAN JLN PUTRI HIJAU SAMPING PERUMAHAN GRIYA BATU AJI ASRI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.203.775.055 |
PEKERJAAN TAMBAHAN PENGADAAN DAN PEMASANGAN JARINGAN BARU | JL. BRIGJEN KATAMSO KM 7 KEL. TANJUNG UNCANG KEC. BATU AJI BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 754.002.951 |
INSTAL GENSET 1000KVA, SETTING LEVELING, SOUND PROFING DLL - NAGOYA | NAGOYA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 102.000.000 |
ADDITIONAL AIRCON AT BLASTING PROCESS AT FACTORY - 1 (AIRCON WORK) | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 691.180.000 |
IMPROVEMENT AIRCON AT F1 STEP-2 (AIRCON WORK) | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 602.640.000 |
PEMASANGAN TIANG PANCANG MARVEL 2, 4200 TITIK | PT UNILEVER OLEOCHEMICAL INDONESIA SUMATERA UTARA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 35.233.020.000 |
PEMANCANGAN ONSHORE RC PILE 200 X 200 MM | BATAM - CENTRAL HILLS BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 262.909.091 |
PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | PT BERTUAH SAMUDERA ABADI - KP AIR NAGA KEL SIJANTUNG REMPANG - GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 127.654.673 |
RENOVATION UPPER CANTEEN LOT 207 | PT. EXCELITAS TECHNOLOGIES BATAM LOT 207 JLN. BERINGIN # 02-03 DAN WORKSHOP SEI BINTI TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 4.489.000.000 |
PENAMBAHAN RETAINING WALL BRONJONG DEPAN VILLA PANBIL BLOK BB2 | KAWASAN VILLA PANBIL, MUKA KUNING | BATAM KOTA | - | PEMBANGUNAN | 2022 | 82.324.250 |
COST FOR STINGER FULL SURFACE PREP & COATING | PELABUHAN SCN KABIL | BATAM KOTA | - | PEMBANGUNAN | 2022 | 1.455.454.546 |
RENOVATION OF MAIN OFFICE BUILDING | JALAN BRIGJEN KATAMSO KM5, TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.817.590.564 |
DECENTRALIZED STP IN PT BREDERO SHAW INDONESIA | JALAN HANG KESTURI I NO. 14, KAWASAN INDUSTRI TERPADU KABIL, BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 956.480.000 |
PENGECATAN HOTEL PLANET HOLIDAY BATAM | JL. RAJA ALI HAJI, JODOH - BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 798.615.000 |
PLTU SOFIFI 2X3 MW | DUSUN PASIGAU SOFIFI MALUKU UTARA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 75.990.000.000 |
SUPPLY AND INSTALL STEEL PLATE FOR REINFORCEMENT 2ND FLOOR AT PCL LINE #2 | PURI INDUSTRIAL PARK 2000 BATAM CENTER, KELURAHAN BALOI PERMAI, BATAM - 29463 | BATAM KOTA | - | PEMBANGUNAN | 2022 | 32.120.000 |
PEKERJAAN PANCANG PHASE 2 | BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 1.392.363.636 |
PEKERJAAN PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT TAHUN 2022 TAHAP 1 AREA BATAM | SAHID HOTEL BATAM CENTRE - OS STYLE T AJI - CATERING SEMERU BATAM CENTRE - SHIPURU HARBOUR BAY | BATAM KOTA | - | PEMBANGUNAN | 2022 | 532.929.990 |
NEW FIRE SPRINKLERS AE PLATS HOT OIL SYSTEM | KABIL KOTA BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 195.000.000 |
SEMENISASI JALAN LINGKUNGAN BLOK B RT 02 RW 09 KEL. DURIANGKANG (POKMAS DURIANGKANG 1 - 600 M2) | BLOK B RT 02 RW 09 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 204.721.000 |
SEMENISASI JALAN LINGKUNGAN BLOK I, J, K, L,M, N RT 04 RW 15 KEL. DURIANGKANG (POKMAS DURIANGKANG 2) | BLOK I, J, K, L, M, N RT 04 RW 15 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 210.588.400 |
SEMENISASI JALAN LINGKUNGAN DKT LAPANGAN SAKURA RT 01 RW 03 KEL. DURIANGKANG (POKMAS DURIANGKANG 3) | RT 01 RW 03 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 211.775.300 |
SEMENISASI JALAN LINGKUNGAN / GANG RT 02 RW 08 KEL. DURIANGKANG (POKMAS DURIANGKANG 4) | RT 02 RW 08 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 167.680.700 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 02 RW 02 KEL. DURIANGKANG (POKMAS DURIANGKANG 5) | RT 02 RW 02 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 214.808.000 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 03 RT 01 RW 07 KEL. DURIANGKANG (POKMAS DURIANGKANG 6) | RT 03 RT 01 RW 7 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 171.515.300 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 03, RT 04 RW 15 KEL. DURIANGKANG (POKMAS DURIANGKANG 7) | RT 03 RT 04 RW 15 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 180.728.900 |
SEMENISASI JALAN LINGKUNGAN RT 02, RT 06 RW 06 KEL. DURIANGKANG (POKMAS DURIANGKANG 8) | RT 02 RT 06 RW 06 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 207.333.500 |
DRAINASE/PARIT U-30 JLN. GANG JAMBU RT 03 RW 12 KEL. DURIANGKANG (POKMAS DURIANGKANG 14) | GANG JAMBU RT 03 RW 12 | BATAM KOTA | - | PEMBANGUNAN | 2022 | 29.437.100 |
DRAINASE / PARIT U-30 RT 05 RW 13 KEL. DURIANGKANG (POKMAS DURIANGKANG 15) | RT 05NRW 13 KEL DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 60.798.100 |
SEMENISASI JALAN LINGKUNGAN MANGSANG INDAH RT 01 RW 24 (POKMAS CEMARA) | RT 01 RW 24 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 209.633.600 |
SEMENISASI JALAN LINGKUNGAN BIDA AYU BLOK L DAN E RT 02 RW 15 (POKMAS PINUS) | BLOK L DAN E RT 02 RW 15 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 207.065.100 |
SEMENISASI JALAN LINGKUNGAN BIDA AYU RT 02 RW 13 (POKMAS BERINGIN) | BIDA AYU RT 02 RW 13 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 141.737.200 |
SEMENISASI JALAN LINGKUNGAN BIDADARI RT 04 DAN RT 05 RW 17 (POKMAS BAKAU) | BIDADARI RT 04 DAN RT 05 RW 17 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 214.534.100 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 02 KELURAHAN TIBAN LAMA (POKMAS ANGGUR 3 - 570 M2) | KELURAHAN TIBAN LAMA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 195.285.200 |
SEMENISASI JALAN LINGKUNGAN BLOK D RT 01 RW 07 (POKMAS KETAPANG) | BLOK D RT 01 RW 07 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 171.986.100 |
SEMENISASI JALAN LINGKUNGAN MANGSANG KEBUN RT 01 RW 03 (POKMAS JATI) | MANGSANG KEBUN RT 01 RW 03 KEL MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 214.535.200 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 01 RW 25 (POKMAS WARU) | RT 01 RW 25 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 213.864.200 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 02 RW 23 | PURI AGUNG RT 02 RW 23 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 188.848.000 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 01,02,03,04 RW 06 (POKMAS BAMBU) | PURI AGUNG RT 01,02,03,04 RW 06 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 211.651.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 09 KELURAHAN TIBAN LAMA (POKMAS KUINI II - 188 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 66.429.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 KELURAHAN TIBAN LAMA (POKMAS PEAR 1 - 400 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 138.131.400 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 2 - 630 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 219.992.300 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 09 KELURAHAN TIBAN LAMA (POKMAS KUINI - 50 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 17.901.400 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 1 - 149 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 53.339.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 1 - 298 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 101.857.800 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 4 - 332 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 114.959.900 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 11 KELURAHAN TIBAN LAMA (POKMAS SALAK 1 - 627 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 219.897.700 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 4 - 240 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 83.867.300 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 2 - 100 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 35.823.700 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 4 - 360 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 124.382.500 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 05 KELURAHAN TIBAN LAMA (MELON 1 - 240 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 85.968.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 3 - 90 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 32.244.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 11 KELURAHAN TIBAN LAMA (POKMAS SALAK 4 - 400 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 138.131.400 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 5 - 150 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 53.738.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 13 KELURAHAN TIBAN LAMA (POKMAS NANAS 2 - 288 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 103.112.900 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 2 - 220 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 76.302.600 |
SEMENISASI JALAN LINGKUNGAN RT 06 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 3 - 130 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 46.528.900 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 5 - 200 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 70.400.000 |
DRAINASE U30 RT 01 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 1 - 78 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 18.350.200 |
DRAINASE U30 RT 01 RW 03 KELURAHAN TIBAN LAMA (POKMAS BELIMBING I - 30 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 7.067.500 |
DRAINASE U30 RT 01 RW 06 KELURAHAN TIBAN LAMA (POKMAS ALPUKAT 3 - 158 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 37.078.800 |
DRAINASE U30 RT 01 RW 13 KELURAHAN TIBAN LAMA (POKMAS NANAS 1 - 113 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 26.618.900 |
DRAINASE U30 RT 02 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 3 - 101 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 23.790.800 |
DRAINASE U30 RT 03 RW 03 KELURAHAN TIBAN LAMA (POKMAS BELIMBING II - 57 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 13.429.350 |
DRAINASE U30 RT 06 RW 07 KELURAHAN TIBAN LAMA (POKMAS STRAWBERY III - 182 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 40.274.300 |
DRAINASE U40 RT 03 RW 06 KELURAHAN TIBAN LAMA (POKMAS ALPUKAT 2 - 21 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 6.011.500 |
DRAINASE U40 RT 03 RW 10 KELURAHAN TIBAN LAMA (POKMAS SEMANGKA 1 - 125 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 33.859.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) PERUM CENTRAL MELATI RT 01 RW 0 | PERUM CENTRAL MELATI RT 01 RW 08 | SEKUPANG | - | PEMBANGUNAN | 2022 | 207.337.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) | KAMPUNG TUA BELIAN PANTAI RT.02 RW.02 | SEKUPANG | - | PEMBANGUNAN | 2022 | 204.999.300 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BANDARA MAS RT.01 RW20 | SEKUPANG | - | PEMBANGUNAN | 2022 | 204.848.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BATARA RAYA RT.02 RW, RT.03 RW.03 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.783.500 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BUNGA RAYA RT.02 RW.27 | SEKUPANG | - | PEMBANGUNAN | 2022 | 207.313.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM GRAHA NUSA PERMAI RT.01 RW.13 | SEKUPANG | - | PEMBANGUNAN | 2022 | 207.337.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM GRIYA PANORAMA PERMAI RT.02 RW.44 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.829.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM MARBELLA RESIDENCE RT.04 RW.39 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.602.000 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM NADIM RAYA RT.01 RW.51 | SEKUPANG | - | PEMBANGUNAN | 2022 | 204.007.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM ODESSA RT.03 RW.40 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.331.400 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) | PERUM TAMAN RAYA TAHAP 2A RT.01 RW.35 | SEKUPANG | - | PEMBANGUNAN | 2022 | 199.524.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM TAMAN RAYA TAHAP III RT.02 RW.18 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.308.300 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM GRIYA KPN RT.01 RW.41 | PERUM GRIYA KPN RT.01 RW.41 | SEKUPANG | - | PEMBANGUNAN | 2022 | 198.793.000 |
PEMELIHARAAN PREVENTIVE TM, TR DAN GARDU PORTAL | AREA BATAM TERSEBAR | BENGKONG | - | PEMBANGUNAN | 2022 | 99.647.357 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RT 3 RW 3 (POKMAS PERMATA 1) | RT 3 RW 3 BENGKONG KOLAM - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RT 5 RW 3 (POKMAS PERMATA 2) | RT 5 RW 3 BENGKONG KOLAM - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RT 5 RW 10 (POKMAS PERMATA 3) | RT 5 RW 10 BENGKONG SADAI - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RT 6 RW 10 (POKMAS PERMATA 4) | RT 6 RW 10 BENGKONG SADAI - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 05 RW 18 (POKMAS PERMATA 5) | RT 05 RW 18 BENGKONG TELAGA INDAH - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 1 RW 18 (POKMAS PERMATA 6) | RT 1 RW 18 BENGKONG TELAGA INDAH - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 5 RW 18 (POKMAS PERMATA 8) | RT 5 RW 18 BENGKONG TELAGA INDAH - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A1 KOMP. WINNER MILLENIUM RT 3 RW 17 (POKMAS PERMATA 10) | BLOK A1 KOMP. WINNER MILLENIUM RT 3 RW 17 - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A,B,C DAN D KAVLING HARAPAN JAYA RT 8 RW 13 (PERMATA 11) | BLOK A,B,C DAN D KAVLING HARAPAN JAYA RT 8 RW 13 - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK K BENGKONG SADAI RT 1 RW 10 (POKMAS PERMATA 12) | RT 1 RW 10 DI BLOK K BENGKONG SADAI - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 143.308.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BELIMBING RT 4 DAN RW 4 (POKMAS PERMATA 14) | RT 4 RW 4 KAMPUNG BELIMBING - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 161.221.500 |
PEMELIHARAAN DAN PERAWATAN TAMAN JALAN ARTERI DAN ROW WILAYAH PERAWATAN PERTAMANAN BP BATAM | KOTA BATAM | BENGKONG | - | PEMBANGUNAN | 2022 | 1.191.942.552 |
SEMENISASI JALAN LINGKUNGAN KP. DURIAN RT 5 RW 6 (POKMAS PERMATA 16) | RT 5 RW 6 KAMPUNG DURIAN - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN PERUM.PKJ RT 2 RW 14 (POKMAS PERMATA 17) | RT 2 RW 14 PERUM PKJ - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. PKJ RT 3 RW 14 (POKMAS PERMATA 18) | RT 3 RW 14 PERUM PKJ - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN SEI NAYON RT 2 RW 12 (POKMAS PERMATA 19) | RT 2 RW 12 SEI NAYON - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 SAKURA GARDEN ( 400 M² ) POKMAS BUNGA SAKURA | RT 01 RW O4 SAKURA GARDEN | BENGKONG | - | PEMBANGUNAN | 2022 | 142.591.900 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 04 SAKURA GARDEN ( 368 M² ) POKMAS MANGGA | RT 02 RW 04 SAKURA GARDEN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 131.684.300 |
POKMAS BM 04, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 | BATU MERAH RT 02 RW 08 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 81.634.300 |
POKMAS BM 01, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 15 RW 04 | BATU MERAH RT 15 RW 04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 26.514.400 |
POKMAS BM 02, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 25 RW 01 | BATU MERAH RT 25 RW 01 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 19.860.500 |
POKMAS BM 03, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 30 RW 06 | BATU MERAH RT 30 RW 06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 53.903.300 |
POKMAS BM 05, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 11 RW 03 | BATU MERAH RT 11 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 71.634.200 |
POKMAS BM 06, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 14 RW 04 | BATU MERAH RT 14 RW 04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 81.631.000 |
POKMAS BM 07, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 17 RW 05 | BATU MERAH RT 17 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 29.338.100 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A1 KE MESJID PERUM. PKJ RT 1 RW 14 (POKMAS PERMATA 9) | RT 1 RW 14 PERUM PKJ - SADAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.692.000 |
POKMAS BM 08, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 19 RW 06 | BATU MERAH RT 19 RW 06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 35.033.900 |
POKMAS BM 11, PEMBANGUNAN JERAMBAH BETON RT 18 RW 05 | BATU MERAH RT 18 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 121.330.000 |
SEMENISASI JALAN PERUM MUKA KUNING INDAH RT06RW06 (POKMAS AJANG KARYA MANDIRI) VOL-600M2 | KELURAHAN BULIANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.043.500 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ABADI 2 RT 03 RW 04 (POKMAS TANJUNG 1) | RT 03 RW 04 BENGKONG ABADI 2 - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ABADI BARU DEKAT RT 03 DAN 06 RW 14 JLN BUNGA RAYA (POKMAS TG2) | RT 03 RW 14 BENGKONG ABADI BARU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 171.969.600 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ASRAMA RT 04 RW 10 GG. SEMAR (POKMAS TANJUNG 3 ) | RT 04 RW 10 BENGKONG ASRAMA -TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 200.631.200 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ASRAMA RT 04 RW 10 JALAN UTAMA MASJID (POKMAS TANJUNG 4) | RT 04 RW 10 BENGKONG ASRAMA -TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 179.135.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG DALAM RT 04 RW 09 (TANJUNG 5) | RT 04 RW 09 | BENGKONG | - | PEMBANGUNAN | 2022 | 118.229.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KARTINI RT 02 RW 12 (TANJUNG 6) | RT 02 RW 12 BENGKONG KARTINI - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 114.646.400 |
SEMENISASI JALAN LINGKUNGAN BENGKONG WAHYU RT 03 RW 17 JALAN TOWER (TANJUNG 7) | RT 03 RW 17 BENGKONG WAHYU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN BENGKONG WAHYU RT 04 RW 17 JL. GEREJA (POKMAS TANJUNG 8) | RT 04 RW 17 BENGKONG WAHYU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN JALAN TEMBUS MUSHOLLA RT 04 RW 03 (POKMAS TANJUNG 9) | RT 04 RW 03 BENGKONG ABADI 1 - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 143.308.000 |
SEMENISASI JALAN LINGKUNGAN PERUM PESONA MANTANG RT 02 RW 15 (POKMAS TANJUNG 10 ) | RT 02 RW 15 PERUM PESONA MANTANG - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN TANJUNG BUNTUNG BARU RT 07 RW 02 (POKMAS TANJUNG 12) | RT 07 RW 02 TANJUNG BUNTUNG BARU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTABLE DAN SKTM | PORTABLE PT MULTIBANGUN ADHITAMA KONSTRUKSI - KK SEI LADI JL. GAJAH MADA SEKUPANG | BENGKONG | - | PEMBANGUNAN | 2022 | 86.990.781 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | PT AMTEK ENGINEERING - KK KAWASAN INDUSTRI CAMMO ESTATE BLOK D3 NO. 1 BATAM CENTRE | BENGKONG | - | PEMBANGUNAN | 2022 | 322.194.628 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL DAN SUTM | PT PUTRA JAYA BINTAN - KK PR TAMAN LESTARI BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 83.579.361 |
SEMENISASI JALAN PERUM. TERING MAS RT 002 RW 018 ( POKMAS CERI ) 459 M2 | RT 002 RW 018 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 163.615.100 |
SEMENISASI JALAN RT 002 RW 007 ( POKMAS DUKU ) 560 M2 | RT 002 RW 007 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.600.400 |
SEMENISASI JALAN RT 004 RW 021 ( POKMAS KERJA SIAGA ) 600 M2 | RT 004 RW 021 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.522.000 |
SEMENISASI JALAN KAV. BUKIT MAKMUR RT 001 RW 013 ( POKMAS PISANG ) 375 M2 | RT 001 RW 013 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.906.300 |
SEMENISASI JALAN PERUM. GMP TAHAP II RT 002 RW 004 ( POKMAS RAJAWALI 2 ) 240 M2 | RT 002 RW 004 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.945.200 |
POKMAS BM 09 PELANTAR 1, PEMBANGUNAN JERAMBAH BETON RT 06 RW 02 (PELANTAR I) | BATU MERAH RT 06 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 218.355.500 |
POKMAS BM 09 PELANTAR 2, PEMBANGUNAN JERAMBAH BETON RT 06 RW 02 (PELANTAR II) | BATU MERAH RT 06 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 218.353.300 |
SEMENISASI JALAN LINGKUNGAN P=150M L=4M (PSPK) RT 01 RW 14 PERUM RHABAYU ASRI (POKMAS PTM 1)) | RT 01 RW 14 PERUM RHABAYU ASRI KEL TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 214.854.200 |
SEMENISASI JALAN LINGKUNGAN PERUM SARMEN RAYA RT 5 DAN 6 RW 05 ( POKMAS TANJUNG 11) | RT 06 RW 05 PERUM SARMEN RAYA - TANJUNG BUNTUNG | SEI BEDUK | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN P=190 L=3M (PSPK) RT 01 RW 15 KAV. BARU SEI DAUN (POKMAS PTM 2) | RT 01 RW 15 KAV. BARU SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 201.023.900 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=300M (PSPK) RT 02 RW 07 KAV. LAMA SEI DAUN (POKMAS PTM 3) | RT 02 RW 07 KAV. LAMA SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 69.862.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=500 (PSPK) RT 01 RW 11 KAV. BARU SEI DAUN (POKMAS PTM 4) | RT 01 RW 11 KAV. BARU SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 117.835.300 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=800M (PSPK) RT 03 RW 09 KAMPUNG BAGAN (POKMAS PTM 5) | RT 03 RW 09 KAMPUNG BAGAN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 184.248.900 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=415M (PSPK) RT 01 02 RW 07 KAV BARU SEI DAUN (POKMAS PTM 6) | RT 01 02 RW 07 KAV BARU SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 113.663.000 |
RENOVASI RUMAH TINGGAL DI PERUMAHAN MEKAR SARI BLOK D.17 | TIBAN | SEI BEDUK | - | PEMBANGUNAN | 2022 | 35.000.000 |
PENAMBAHAN RETAINING WALL BRONJONG DEPAN VILLA PANBIL BLOK BB2 TAHAP-3 | KAWASAN VILLA PANBIL, MUKA KUNING | SEI BEDUK | - | PEMBANGUNAN | 2022 | 77.395.626 |
PERBAIKAN RAILING DI CONDOTEL LANTAI 25 APARTEMENT PANBIL RESIDENCE | MUKA KUNING | SEI BEDUK | - | PEMBANGUNAN | 2022 | 17.000.000 |
TAMBAHAN RANGKA BAJA DARI ATAP DI POS JAGA TAMAN WISATA ALAM | MUKA KUNING | SEI BEDUK | - | PEMBANGUNAN | 2022 | 20.846.610 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT CHAMPION MATTRES INDONESIA - KK LATRADE INDUSTRIAL PARK BLOK E NO. 7 TG UNCANG | SEI BEDUK | - | PEMBANGUNAN | 2022 | 38.162.859 |
PEMASANGAN DAN PENGADAAN SISIP PERALATAN GARDU, RENOVASI DAN BONGKAR PERALATAN GARDU DAN KWH PANTAU | PT BATAMA ARIASINDO - KK KAW BINTANG MAKMUR INDUSTRIAL BLOK B NO. 1-2 BATAM CENTRE | SEI BEDUK | - | PEMBANGUNAN | 2022 | 26.602.502 |
PENGADAAN DAN PEMASANGAN GH-SKTM DARI DEPAN INTI SEHAT BATAM CENTRE KE GH LEGENDA UNTUK MENGATASI OV | JL. RAJA ISA BATAM CENTRE | SEI BEDUK | - | PEMBANGUNAN | 2022 | 43.473.242 |
INSPECTOR TRANSMISSION LINE 150 KV | BATAM TERSEBAR | SEI BEDUK | - | PEMBANGUNAN | 2022 | 328.067.148 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM BALOI RANTAU RT.01 RW.04 | PERUM BALOI RANTAU RT.01 RW.04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 166.179.200 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM BUKIT INDAH SUKAJADI | PERUM BUKIT INDAH SUKAJADI JL.PALEM HIJAU RT.01 RW.01 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN PERMUKIMAN RT. 01 RW. 25 KAVLING BESTARI KELURAHAN KABIL (POKMAS BESTARI VOL 585M2) | KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.573.100 |
SEMENISASI JALAN PERMUKIMAN RT. 02 RW. 24 KAVLING TAMAN BALOI KELURAHAN KABIL POKMAS JUNI (509 M2) | KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 182.327.200 |
SEMENISASI JALAN PERMUKIMAN RT. 03 RW. 21 KAVLING BIDA KABIL KELURAHAN KABIL POK. MEKAR SARI 330M2 | KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.206.000 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KAMPUNG TUA RT 01 RW 01 | KEL. PATAM LESTARI, KEC. SEKUPANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 198.636.796 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL | HARYANTO - RESTORAN GEK MOI, JL TRANS BARELANG SETELAH KEPRI CORAL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 11.696.316 |
PEMBANGUNAN GARDU 3X4 METER (SISIPAN) | POLRESTA BARELANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.980.442 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT CITRA SERAYA SUPREMNUSA - NAGOYA CITY WALK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 72.932.220 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM SKTM 20 KV | PT PRINCESS AURORA - KK PR KIBING RAYA TEMBESI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 76.819.905 |
SEMENISASI JLAN KAVLING KARTINI I RT.003 RW.002 SUNGAI HARAPAN (POKMAS HARAPAN 2) VOL. 343 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 113.361.600 |
SEMENISASI JALAN PERUM MELATI GARDEN RT.002 RW.013 SUNGAI HARAPAN (POKMAS HARAPAN 4) VOL. 240 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 81.728.900 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.001 RW.008 (HARAPAN 5) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.628.000 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.002 RW.008 (HARAPAN 6) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.402.400 |
SEMENISASI JALAN PERUM PONDOK PRATIWI III RT.006 RW.016 (POKMAS HARAPAN 7) VOL. 400M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.402.400 |
SEMENISASI JALAN KARTINI I GG. MULIA RT.004 RW.002 (POKMAS HARAPAN 1) VOLUME 400M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 130.150.900 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW.015 PERUMAHAN FAMILY DREAM, 529 M2 (POKMAS BERKAH FAMILY) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.379.600 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW.05 PERUMAHAN CITRA MAS INDAH, 450 M2 (POKMAS CITRA MANDIRI) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 155.928.300 |
PEKERJAAN PENGECATAN GEDUNG A,B, GEDUNG PARKIR DAN PEMBUATAN GUDANG AUDITORIUM-KANTOR PUSAT | JL RAJA ISA, TELUK TERING KEC. BATAM KOTA-KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 483.354.546 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW.04 KP.JABI KELURAHAN BATU BESAR, 400 M2 (POKMAS JABI BERSIH) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 139.992.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM PURILOKA 1 RT. 002/ RW. 11 | PERUM PURILOKA 1 RT. 002/ RW. 11 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.953.200 |
PEKERJAAN PEMBUATAN RETAINING WALL TOWER 04 SUTT 150 KV | TANJUNT KASAM - BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 428.090.873 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) TAMAN SENTOSA JL. LAKSMANA BINTA | TAMAN SENTOSA RT 005 RW 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.054.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) TAMAN BUANA INDAH RT. 002/ RW. 0 | TAMAN INDAH BUANA RT 002 RW 003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.228.800 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) JL. LAKSMANA BINTAN PERUM VILL | PERUMAHAN VILLA MAS RT 001 RW 009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 192.017.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUMAHAN KAMPUNG MELAYU BUKIT J | BUKIT JODOH RT 001 RW 002 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.135.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM PONDOK ASRI RT. 002/ RW. 0 | PONDOK ASRI RT 002 RW 010 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.312.700 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 003/ RW. 006 | KOMPLEK NUSA JAYA RT 003 RW 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 88.185.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) BANDAR SRIMAS RT. 005/RW. 012 | PERUM BANDAR SRIMAS RT 05 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 36.768.000 |
Pembangunan Jalan Lingkungan Semenisasi Tebal 15cm (Swakelola PSPK) Bandar Srimas RT. 004/ RW. 012 | PERUM BANDAR SRIMAS RT 04 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 38.938.900 |
PEMBANGUNAN BATU MIRING PERMUKIMAN DAN PERUMAHAN DENGAN BATU BATAM (SWAKELOLA PSPK) KAMPUNG MELAYU B | KAMPUNG MELAYU BUKIT JODOH RT 003 RW 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 37.167.900 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U30 (SWAKELOLA PSPK) KAMPUNG MELAYU BUKIT JODOH | KAMPUNG MELAYU BUKIT JODOH RT. 003 RW. 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 30.588.800 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 001/ RW. 007 | RT. 001 RW. 007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 24.295.700 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 001/ RW. 006 | RT. 001 RW. 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 17.176.500 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK D RT.002 RW.015 (580M2) | PERUMAHAN ANGGREK SARI BLOK D | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK E RT.004 RW.015 (520 M2) | PERUMAHAN ANGGREK SARI BLOK E RT. 004 RW.015 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.254.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENTRE VIEW RT.001 RW.003 (200 M2) | PERUMAHAN CENTRE VIEW RT.001 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 71.602.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GARDAN MASYEBA RT.002 RW.005 580M2 | PERUMAHAN GARDAN MASYEBA RT. 002 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GOLDEN LAND BLOK G RT.002 RW013 (580M2) | PERUMAHAN GOLDEN LAND BLOK G RT.002 RW.013 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GRIYA BUANA INDAH RT.001 RW.014 , 580 M2 | PERUMAHAN GRIYA BUANA INDAH RT. 001 RW.014 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE PAS BATU BELAH LINGKUNGAN PERUMAHAN CENTRE PARK BLOK H RT.002 RW.011 (97M) | PERUMAHAN CENTER PARK RT. 002 RW.011 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 191.175.600 |
DRAINASE LINGKUNGAN U30 PERUMAHAN WISMA BUANA INDAH RT.001 RW.010 (60M) | PERUMAHAN WISMA BUANA INDAH RT. 001 RW.010 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 14.129.500 |
DRAINASE LINGKUNGAN U40 PERUMAHAN TAMAN MARCHELIA RT.002 RW.009 (100M) | PERUMAHAN TAMAN MARCHELIA RT. 002 RW.009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 28.604.400 |
SEMENISASI JALAN BETON PERUM. TAMAN HANG TUAH RT.002 RW.006 | PERUM TAMAN HANG TUAH RT.002 RW.006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUM. TAMAN HANG TUAH RT.003 RW.006 | PERUM. TAMAN HANG TUAH RT.003 RW.006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE/SALURAN PERUM. HANG LEKIR RT.003 RW.005 | PERUM HANG LEKIR RT.003 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 119.762.500 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU CANTROL | PT PANTAI INDAH GALANG BARU, JL. TRANS BARELANG TG. PENGAPIT GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 82.759.367 |
SEMENISASI JALAN BETON PERUM. BIDA ASRI 1 RT.002 RW.009 | PERUM BIDA ASRI 1 RT.002 RW.009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUMAHAN TAMAN LEGENDA BALI BLOK E RT.005 RW.013 | PERUM TAMAN LEGENDA BALI BLOK E RT.005 RW.013 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 198.322.300 |
SEMENISASI JALAN BETON PERUM LEGENDA MALAKA BLOK E RT.001 RW.004 | PERUM LEGENDA MALAKA BLOK E RT.001 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.646.400 |
SEMENISASI JALAN BETON PERUM. LEGENDA MALAKA RT.001 RW.003 | PERUM LEGENDA MALAKA RT.001 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 94.967.400 |
SEMENISASI JALAN BETON PERUM. OMA BATAM CENTRE RT.003 RW.012 | PERUM OMA BATAM CENTRE RT.003 RW.012 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.007 RW.004 | PERUM LEGENDA MALAKA RT.007 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 42.939.600 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.004 RW.004 | PERUM LEGENDA MALAKA RT.004 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.416.500 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA BLOK G RT.003 RW.004 | PERUM LEGENDA MALAKA BLOK G RT.003 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.724.100 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.002, RT.003, DAN RT.004 RW.003 | PERUM LEGENDA MALAKA RT.002, RT.003, DAN RT.004 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 217.229.100 |
SEMENISASI JALAN BETON PERUM. MEDITERANIA RT.001 RW.008 | PERUM MEDITERANIA RT.001 RW.008 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN KOMPLEK KEJAKSAAN NO. 01 S/D 05 RT 04 RW 02 | KOMPLEK KEJAKSAAN NO. 01 S/D 05 RT 04 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 174.945.100 |
SEMENISASI JALAN LINGKUNGAN DARI GERBANG MASJID NURUL JANNAH BLOK S NO. 39 - 55 DAN T NO. 37 RT 07 | TIBAN INDAH PERMAI RT 07 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 195.800.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN DAMAI RT 04 RW 07 | TIBAN DAMAI RT 04 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.470.200 |
SUPPLY AND ISTALLATION OF EQUIPMENT INSULATION WORKS - OSBL STORAGE TANK HOT INSULATION | JL. RAYA PELABUHAN KABILM KM. 12,5, KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.250.000.000 |
PEMBANGUNAN SPAM PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG (DAK REGULER) | PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 6.235.958.000 |
SEMENISASI JALAN PERUMAHAN NAGOYA PERMAI RT.001 RW.005 VOL. 500M2 POKMAS NAGOYA PERMAI 1 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.140.200 |
SEMENISASI JALAN RT001/RW007 KELURAHAN TANJUNG UMA | RT 001 RW 007 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 49.167.800 |
SEMENISASI JALAN PEPAYA RT.001 RW.011 VOL. 564M2 POKMAS PEPAYA2 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 202.030.400 |
Semenisasi Jalan Semangka I RT.001 RW.010 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.237.700 |
SEMENISASI JALAN RT002/RW003 KELURAHAN TANJUNG UMA KECAMATAN LUBUK BAJA, V= 250M2 POKMAS ANGGREK 12 | RT 002 RW 003 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 89.563.100 |
SEMENISASI JALAN PENUIN RT 02 RW 011 VOL. 560M2 POKMAS PENUIN SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.574.000 |
SEMENISASI JALAN RT002/RW011 KELURAHAN TANJUNG UMA, V=540M2 POKMAS TERITIP | RT 002 RW 011 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.463.600 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 09 BALOI MAS INDAH VOL 556M2 POKMAS 3 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 199.192.400 |
SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 03 BALOI CENTRE VOL.520M2 POKMAS 6 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.238.800 |
SEMENISASI JALAN BLOK 6 RT 4 RW 3 VOL. 560M2 POKMAS FLAMBOYAN SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.574.000 |
SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT.003 RW.007 | PERUM PURI LEGENDA RT.003 RW.007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUM. HANG LEKIR BLOK AA RT.001 RW.005 | PERUM HANG LEKIR BLOK AA RT.001 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.589.400 |
SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT.004 RW.007 | PERUM PURI LEGENDA RT.004 RW.007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 05 TAMAN BALOI MAS VOL. 656M2 POKMAS 2 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.946.100 |
SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 06 BALOI MAS PERMAI VOL. 660 M2 POKMAS 7 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 217.272.000 |
PENGADAAN DAN PEMASANGAN PERALATAN GI - GD - SKTM PT CAKRA WISESA KARYA MAKMUR | PT. PLN BATAM / GI BALOI - GI SEI HARAPAN DAN JALAN GAJAH MADA (KAWASAN SOUTLINKS) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.971.736.400 |
PEKERJAAN RETAININGWALL VILLA PANBIL BLOK DD NO. 71,72,73,75 DAN 76 | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 162.257.872 |
SEMENISASI JALAN DEPAN KANTOR LURAH KAMPUNG PELITA RT.001 RW.004 VOL. 360 M2 POKMAS PELITA INDAH 3 | KELURAHAN KAMPUNG PELITA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 128.975.000 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL-JTM-JTR | PT SNEPAC INDO SERVICE - JL. TRANS BARELANG PANTAI MELUR GALANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.165.538 |
PEKERJAAN PERBAIKAN SEAWALL AREA JETTY 1 D I FUEL TERMINAL PULAU SAMBU | PULAU SAMBU, KELURAHAN, TJ. SARI, BELAKANG PADANG, KOTA BATAM, KEPULAUAN RIAU 29411 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.269.200 |
SEMENISASI JALAN BLOK 2 RT 4 RW 1 VOL. 484 M2 POKMAS MANGGA SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 173.360.000 |
PEKERJAAN PEMANCANGAN CLUBHOUSE DAN UNIT RUMAH | BATAM CENTER | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.448.765.000 |
BM5 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING KEL. TANJUNG RIAU, KEC. SEKUPANG | KEL. TANJUNG RIAU, KEC. SEKUPANG (PERUMAHAN GALAXY PARK RT 002, RT 003, RW 014) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 184.504.196 |
PEMBANGUNAN JALAN LINGKUNGAN SEMBULANG TANJUNG RT.002/ RW.001 (POKMAS SEMBULANG 25) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.531.200 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG PASIR MERAH RT.001/ RW.002 (POKMAS SEMBULANG 27) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.719.100 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG CAMPING RT.002 RW.002 (POKMAS SEMBULANG 28) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.478.400 |
DRAINASE PARIT U40 KAMPUNG PASIR MERAH RT.001/002 (POKMAS SEMBULANG 29) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 194.485.500 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG SEI RAYA RT.001/ RW.004 (POKMAS SEMBULANG 32) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 224.221.800 |
SEMENISASI JALAN MENUJU LAPANGAN BOLA KAKI KAMPUNG SERANGGON, RT.002 RW.004 (POKMAS SEMBULANG 33) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 222.843.500 |
SEMENISASI JALAN LINGKUNGAN DARI RUMAH BUTET SAMPAI SABARUDIN RT.002/RW.005 (POKMAS SEMBULANG 35) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.478.400 |
KAMPUNG BATU PUTIH RT 003 RW 004 (DARI RUMAH R. NAFISAH S/D RUMAH IBRAHIM (POKMAS 25) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 201.414.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG BATU PUTIH RT 001 RW 004 (DARI RUMAH SOM (POKMAS 26) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.538.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG RANGA RT.002 RW.004 DARI MUSHOLA S/D RUMAH JEMAIN (POKMAS 27) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 89.516.000 |
BATU MIRING PENAHAN TEBING KAMPUNG PADANG PENAGA RT.001 RW.006 (POKMAS 28) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 348.428.000 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG KETAPANG RT 002 RW 006 (DARI RUMAH HITAM (POKMAS 29) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.269.000 |
DRAINASE U30 KAMPUNG PADANG RT 002 RW 003 ( DARI RUMAH JEPRI S/D KANTOR LURAH) (POKMAS 30) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 82.196.000 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG PADANG RT 001 RW 003 ( DARI RUMAH KAMIL (POKMAS 31) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 181.258.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG LANGKANG RT 001 RW 002 DARI RUMAH NASER S/D KOKOL (POKMAS 32) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.538.000 |
PEMBANGUNAN JALAN LINGKUNGAN DARI KAMPUNG DARAT PULAU RT 002 RW 001 ( DARI RUMAH DEWI (POKMAS 33) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.269.000 |
BATU MIRING PENAHAN TEBING LINGKUNGAN KAMPUNG DARAT PULAU RT.001 RW.001 (POKMAS 34) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 295.281.000 |
JERAMBAH PULAU MUBUT RT.002 RW.005 (POKMAS 35) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 338.231.000 |
JERAMBAH AIR NAGA RT.01 RW.04 DARI RUMAH SAMAT KE RUMAH OKI (POKMAS AIR NAGA SEHATI 5) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 326.114.800 |
JERAMBAH DARI RUMAH ANDI KE RUMAH SIDAH RT.02 RW.04 AIR NAGA (POKMAS AIR NAGA SEHATI 6) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.652.300 |
PEMBANGUNAN JALAN LINGKUNGAN DARI RUMAH PAK AHMAD KE SUMUR RT.01 RW.04 (POKMAS AIR NAGA SEHATI 7) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 107.420.500 |
JERAMBAH RUMAH MARTINI, RIBUT SAMPAI HELDI RT.01 RW.02 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 7) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.663.000 |
JERAMBAH DARI RUMAH SALOMA RT.02 RW.02 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 8) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.675.000 |
JERAMBAH DARI AWANG SARI KE INDRA RT.03 RW.03 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 9) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.664.000 |
PEMBANGUNAN JALAN LINGKUNGAN RT.04 RW.03 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 11) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.533.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMIR RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 30) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 235.476.000 |
JERAMBAH DARI BATU MIRING KE RUMAH DOLAH RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 31) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 181.191.000 |
JERAMBAH DARI RUMAH AKMAL ATARIK KE RUMAH SARAH RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 32) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 369.644.000 |
JERAMBAH DARI RUMAH ANDIKA KE RUMAH MUNIR RT.002/RW.001 PULAU ABANG (POKMAS PULAU ABANG 33) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 289.905.000 |
JERAMBAH DARI RUMAH AKIB KE RUMAH ZAINURI RT.003/RW.001 PULAU ABANG (POKMAS PULAU ABANG 34) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 130.447.000 |
JERAMBAH DARI BATU MIRING KE RUMAH BASRI RT.004/RW.001 PULAU ABANG (POKMAS PULAU ABANG 35) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 126.829.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMAT DAN SAIFUL RT.002/RW.002 AIR SAGA (POKMAS PULAU ABANG 36) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 271.791.000 |
JERAMBAH DARI BATU MIRING KE RUMAH MADON RT.002 RW.002 AIR SAGA (POKMAS PULAU ABANG 37) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 163.064.000 |
DRAINASE PARIT U30 MASJID AL-FALAH RT.001 RW.002 (POKMAS PULAU ABANG 38) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 27.389.000 |
JERAMBAH DARI BATU MIRING KE RUMAH JONO RT.002/RW.003 PETONG (POKMAS PULAU ABANG 39) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 90.565.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMIR/ENGKOS RT.001/RW.003 PETONG (POKMAS PULAU ABANG 40) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 144.924.000 |
SEMENISASI JALAN PERUM PONDOK PRATIWI II RT.02 RW.16 (POKMAS HARAPAN 8) VOL. 120M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 42.229.000 |
SEMENISASI JALAN PERUM TAMAN KARTINI RAYA II RT003 RW010 (POKMAS HARAPAN 9) 560M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.769.000 |
SEMENISASI JALAN PERUM TAMAN KARTINI RAYA II RT004 RW010 (DAU) (POKMAS HARAPAN 10) 444M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 148.178.800 |
SEMENISASI JALAN LINGKUNGAN PERUM. BUKIT TIBAN SELARAS BLOK A, B, C RT 06 RW 07 | PERUM. BUKIT TIBAN SELARAS BLOK A, B, C RT 06 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 141.099.200 |
SEMENISASI JALAN PERUM PUTRI FORTUNA RT.003 RW.008 (POKMAS HARAPAN 11) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.298.900 |
SEMENISASI JALAN LINGKUNGAN PERUM. SIRIAON REGENCY BLOK G - L RT 02 RW 11 | PERUM. SIRIAON REGENCY BLOK G - L RT 02 RW 11 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.652.000 |
SEMENISASI JALAN LINGKUNGAN TAMAN DUTA INDAH JAYA RT 01 RW 07 | TAMAN DUTA INDAH JAYA RT 01 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 78.818.300 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK B2 RT 05 RW 05 | TIBAN INDAH PERMAI BLOK B2 RT 05 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.625.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK L1 NO. 1 - 6 RT 01 RW 05 | TIBAN INDAH PERMAI BLOK L1 NO. 1 - 6 RT 01 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 53.319.200 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN INDAH PERMAI BLOK Z-A RT 05 RW 05 | PERUM. TIBAN INDAH PERMAI BLOK Z-A RT 05 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 172.269.900 |
SEMENISASI JALAN LINGKUNGAN PERUM PONDOK PELANGI RT 05 RW 09 | PERUM PONDOK PELANGI RT 05 RW 09 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.067.800 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BERLIAN RT 04 RW 13 | PERUM. TIBAN BERLIAN RT 04 RW 13 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 109.431.300 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK S NO. 39 DAN BLOK S NO. 43 RT 07 RW 03 | TIBAN INDAH PERMAI BLOK S NO. 39 DAN BLOK S NO. 43 RT 07 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 97.057.400 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK T NO. 28 - 39 RT 07 RW 03 | TIBAN INDAH PERMAI BLOK T NO. 28 - 39 RT 07 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 164.710.700 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI LORONG 1 & 2 RT 03 RW 03 | TIBAN INDAH PERMAI LORONG 1 & 2 RT 03 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 101.693.900 |
SEMENISASI JALAN LINGKUNGAN KAVLING BAKAU SERIP RT. 003 RW. 002 POKMAS GANG KETUPAT (450 M2) | RT. 003 RW. 002 KAVLING BAKAU SERIP | BATU AMPAR | - | PEMBANGUNAN | 2022 | 160.975.100 |
SEMENISASI JALAN LINGKUNGAN KAVLING BAKAU SERIP RT. 001 RW. 002 POKMAS POSKAL GROUP (450 M2) | RT. 001 RW. 002 KAVLING BAKAU SERIP | BATU AMPAR | - | PEMBANGUNAN | 2022 | 161.194.000 |
SEMENISASI JALAN LINGKUNGAN KAVLING NONGSA RT. 005 DAN RT. 006 RW. 003 POKMAS CIPTA KARYA (535 M2) | RT. 005 DAN RT. 006 RW. 003 KAVLING NONGSA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 191.390.100 |
DRAINASE U30 AIR RAJA RT.001/RW.002 (POKMAS AIR RAJA 22) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 164.403.000 |
DRAINASE U30 SIMPANG SRI BA'I AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 23) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 109.586.000 |
DRAINASE U30 TOK SENIN AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 24) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 109.586.000 |
BATU MIRING PENAHAN TEBING AIR RAJA RT.003/RW.002 (POKMAS AIR RAJA 21) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 369.004.000 |
PEMBANGUNAN PENATAAN KAWASAN MASJID AGUNG KABUPATEN KEPULAUAN ANAMBAS | KEC. SIANTAN KEPULAUAN ANAMBAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 5.591.100.000 |
PENATAAN LENGAN SIMP. BASECAMP (LANJUTAN) | BASECAMP SAGULUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 14.673.294.551 |
PENINGKATAN DRAINASE KAWASAN AVIARI KELURAHAN BULIANG (LANJUTAN) | KAWASAN AVIARI BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 5.225.335.727 |
PENGADAAN DAN PEMASANGAN KUBIKEL GD & SKTM 20 KV | MASJID BANDARA HANGNADIM - KK KAWASAN BANDARA HANGNADIM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 174.248.140 |
SEMENISASI JALAN PERMUKIMAN RT 02 RW 22 TELUK LENGUNG (POKMAS TELUK LENGUNG MAJU 330M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.155.400 |
SEMENISASI JALAN PERMUKIMANRT 04 RW 17 KAV BIDA KABIL (POKMAS ANTORIUM 2 & 3 330 M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.147.700 |
SEMENISASI JALAN PERMUKIMAN RT 01 RW 18 KAV BIDA KABIL (POKMAS TULIP 2 165 M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 59.012.800 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 PERUM PURNA YUDHA (POKMAS BERSAMA KITA BISA 330 M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.206.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 001 RW 003 | KAMPUNG BARU RT 001 RW 003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 36.152.700 |
REHABILITASI JALAN LINGKUNGAN KAMPUNG PONJEN RT 003 RW 005 | KAMPUNG PONJEN RT 003 RW 005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 197.743.170 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 001 RW 004 | KAMPUNG BARU RT 001 RW 004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 69.336.150 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 003 RW 004 | KAMPUNG BARU RT 003 RW 004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 104.641.920 |
REHABILITASI JALAN LINGKUNGAN KAMPUNG BUKIT RT 001 RW 006 | KAMPUNG BUKIT RT 001 RW 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.992.580 |
REHABILITASI JALAN LINGKUNGAN KAMPUNG BUKIT RT 003 RW 006 | KAMPUNG BUKIT RT 003 RW 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 203.606.190 |
PENARIKAN SKTM, PENGISIAN PERALATAN GARDU DISTRIBUSI | YAYASAN AL KAUTSAR TELAGA PUNGGUR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 75.047.529 |
PEKERJAAN PENGGANTIAN ATAP WTP, CONTROL ROOM WTP DAN CHLORINE PLANT PLTGU TANJUNG UNCANG | PLTGU TANJUNG UNCANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 378.254.019 |
PENINGKATAN/PENATAAN JALAN SIMP. BARELANG (LANJUTAN) | SIMP. LAMPUR MERAH BARELANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 18.223.928.403 |
PENATAAN JALAN (PELEBARAN JALAN) SIMP. KABIL - SIMP. MASJID RAYA BATAM CENTRE (LANJUTAN) | SIMP. KABIL - SIMP. MASJID RAYA BATAM CENTRE | BATU AMPAR | - | PEMBANGUNAN | 2022 | 16.244.904.604 |
PEMBANGUNAN JERAMBAH BETON SELAT NENEK RT 006 RW 003 (POKMAS TEMOYONG 34 - 150 M2) | RT 006 RW 003 SELAT NENEK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 307.011.000 |
PEMBANGUNAN JERAMBAH BETON PULAU AWENG RT 007 RW 003 (POKMAS TEMOYONG 35 - 150 M2) | RT 007 RW 003 PULAU AWENG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 296.307.000 |
PEMBANGUNAN JERAMBAH BETON TEMOYONG RT 001 RW 001 (POKMAS TEMOYONG 36 - 150 M2) | RT 001 RW 001 TEMOYONG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 306.950.000 |
PEMBANGUNAN JERAMBAH BETON RT 01 RW 02 SETOKOK (POKMAS SETOKOK 44 - 120 M2) | RT 01 RW 02 SETOKOK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 229.914.000 |
PEMBANGUNAN JERAMBAH BETON RT 02 RW 01 SETOKOK (POKMAS SETOKOK 46 - 120 M2) | RT 02 RW 01 SETOKOK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 240.367.000 |
PEMBANGUNAN JERAMBAH BETON RT 01 RW 01 SETOKOK (POKMAS SETOKOK 45 - 120 M2) | RT 01 RW 01 SETOKOK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 239.193.000 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=270M (PSPK) RT 04 RW 01 SEI PANCUR (POKMAS PTM 13) | RT 04 RW 01 SEI PANCUR TANJUNGPIAYU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 76.778.900 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 06 KEL. DURIANGKANG (POKMAS DURIANGKANG 9) | RT 03 RW 06 KEL DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 206.982.600 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 01 KEL DURIANGKANG (POKMAS DURIANGKANG 11) | RT 05 RW 01 KEL DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 208.766.800 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 02 KEL. DURIANGKANG (POKMAS DURIANGKANG 13) | RT 07 RW 02 KEL DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.877.500 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=210M (PSPK) RT 02 RW 13 TELAGA SAKINAH (POKMAS PTM 11) | RT 02 RW 13 TELAGA SAKINAH TANJUNGPIAYU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 54.817.400 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=100M (PSPK) RT 03 RW 01 SEI PANCUR (POKMAS PTM 9) | RT 03 RW 01 SEI PANCUR - TANJUNGPIAYU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 28.458.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=270M (PSPK) RT 01 RW 08 KAVLING BAGAN | RT 01 RW 08 KAVLING BAGAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 63.493.100 |
PEMBANGUNAN / REHABILITASI DRAINASE U-40 P=170M (PSPK) RT 02 RW 08 KAV. BAGAN | RT 02 RW 08 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 48.595.800 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=200M (PSPK) RT 01 RW 05 PANCUR PELABUHAN | RT 01 RW 05 PENCUR PELABUHAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 46.931.500 |
PENINGKATAN DRAINASE PASAR PJB KELURAHAN SAGULUNG KOTA | PASAR PJB SAGULUNG KOTA - BATU AJI-BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.684.653.496 |
JL1 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 08 RW 02 MENUJU POSYANDU | KEL. TANJUNG BUNTUNG, KEC. BENGKONG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 149.834.939 |
SEMENISASI JALAN PEMUKIMAN KAMPUNG BARU RT.002/RW.006 (POKMAS GALANG BARU 34) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.262.700 |
SEMENISASI JALAN PEMUKIMAN TANJUNG MELAGAN RT.002/RW.003 (POKMAS GALANG BARU 35) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 122.057.000 |
JERAMBAH AIR LINGKA RT.001/RW.005 (POKMAS GALANG BARU 36) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 241.585.300 |
JERAMBAH AIR LINGKA RT.002/RW.005 (POKMAS GALANG BARU 37) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 241.585.300 |
JERAMBAH KAMPUNG BARU RT.001/RW.006 (POKMAS GALANG BARU 38) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.402.700 |
JERAMBAH PULAU NANGA RT.001/RW.002 (POKMAS GALANG BARU 39) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.637.000 |
JERAMBAH TANJUNG MELAGAN RT.002/RW.003 (POKMAS GALANG BARU 40) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 329.451.000 |
BATU MIRING AIR LINGKA RT.001/RW.005 (POKMAS GALANG BARU 41) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.722.700 |
BATU MIRING AIR LINGKA RT.003/RW.005 (POKMAS GALANG BARU 42) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.444.300 |
BATU MIRING PULAU KOREK RT.004/RW.001 (POKMAS GALANG BARU 43) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 265.740.000 |
JERAMBAH DARI RUMAH, SABARIAH, KAMAT, AZMAN KAMPUNG BARU RT,004/RW,002 (POKMAS KAMPUNG BARU 3) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.374.000 |
JERAMBAH DARI RUMAH SAREP, MAIN, ROSLI PULAU JEMARA, RT,005/RW,002 (POKMAS PULAU JEMARA 4) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.374.000 |
JERAMBAH DARI RUMAH, SARIMAN, SARUDIN, ASBULLAH RT. 01 RW. 01 SUBANG MAS (POKMAS SUBANG MAS 3) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 434.884.000 |
PEMBANGUNAN JALAN LINGKUNGAN SUBANG MAS, RT.001/RW.001 (POKMAS SUBANG MAS 5) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.539.000 |
PENINGKATAN JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI (TAHAP 2) | JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 7.109.805.481 |
PEKERJAAN GROUTING, INJEKSI DAN PLESTER DINDING DI BCS MALL | BCS MALL, JALAN BUNGA RAYA SEI BALOI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 40.000.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. BAITUL HASANAH RT 02 RW 19 | PERUM. BAITUL HASANAH RT 02 RW 19 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT ASRI RT 01 RW 10 | PERUM. TIBAN BUKIT ASRI RT 01 RW 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT ASRI RT 03 RW 10 | PERUM. TIBAN BUKIT ASRI RT 03 RW 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT PERMAI RT 01 RW 15 | PERUM. TIBAN BUKIT PERMAI RT 01 RW 15 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 02 RW 03 | PERUM. TAMAN SARI HIJAU RT 02 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI RT 04 RW 02 | PERUM. TAMAN SARI RT 04 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 06 RW 03 | PERUM. TAMAN SARI HIJAU RT 06 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 01 RW 03 | PERUM. TAMAN SARI HIJAU RT 01 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN KOPERASI RT 01 RW 07 | PERUM. TIBAN KOPERASI RT 01 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.078.030 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW. 012 CIPTA ASRI (POKMAS TBS 8) | RT. 04 RW. 012 CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.707.890 |
SEMENISASI JALAN LINGKUNGAN RT.07 RW. 012 CIPTA ASRI (POKMAS TBS 12) | RT.07 RW. 012 CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.727.190 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT GAJAH IZUMI MAS PERKASA - KAWASAN HIJRAH INDUSTRIAL ESTATE BLOK AI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 97.894.968 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM PONDOK ASRI RT.001/RW.004 | PERUM PONDOK ASRI RT.001/RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 22.738.350 |
PEMBANGUNAN JERAMBAH BETON PULAU BULUH RT 01 RW 01 ( POKMAS PULAU BULUH 31 - 135 M2 ) | RT 01 RW 01 PULAU BULUH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 265.814.000 |
PEMBANGUNAN JERAMBAH BETON PULAU BULUH RT 02 RW 01 (POKKMAS PULAU BULUH 33 - 130,5 M2) | RT 02 RW 01 PULAU BULUH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 250.159.000 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM VILLA PESONA ASRI RT 03 | PERUM VILLA PESONA ASRI RT.05 RT.03 RW.10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.945.960 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM VALENCIA RT.02 RW.25 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 199.689.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM BUKIT RAYA RT.02 RW.38 | PERUM BUKIT RAYA RT.02 RW.38 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.408.960 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM BIDA ASRI 2 RT.04 RW.17 | PERUM BIDA ASRI 2 RT.04 RW.17 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 205.407.720 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM ALAM RAYA RT.01 RW.15 | PERUM ALAM RAYA RT.01 RW.15 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.261.640 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN EIRENE RT 02 RW 14 | PERUM. TAMAN EIRENE RT 02 RW 14 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 113.712.840 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. BUMI SAKINAH RW 11 MELEWATI JALAN PERUM. BUANA | PERUM. BUANA IMPIAN I RW 14, KEL. TEMBESI, KEC. SAGULUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 163.297.912 |
PEMELIHARAAN GARDU DISTRIBUSI | AREA TIBAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 58.030.000 |
PEKERJAAN RENOVASI GARDU DISTRIBUSI DAN PEMASANGAN PERALATAN ISI GARDU SERTA PEMASANGAN KABEL SKTM | PT ADI BATAMUNI JAYA - KK MEGA CIPTA INDUSTRIAL PARK BATU AMPAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 33.467.346 |
PEKERJAAN SOIL INVESTIGATION | TANJUNG UNCANG KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 88.738.739 |
SEMENISASI JALAN LINGKUNGAN RT.01 DAN 06 RW.03 | RT.01 DAN 06 RW.03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 180.670.260 |
Pembangunan Semenisasi Jalan Lingkungan RT.01 RW.01 Kav Mandiri Kel. Sungai Pelunggut | RT.01 RW 01 Kelurahan Sungai Pelunggut | BATU AMPAR | - | PEMBANGUNAN | 2022 | 105.805.200 |
SEMENISASI JALAN LINGKUNGAN RT.02 DAN 03 RW.04 KELURAHAN SUNGAI LEKOP | RT.02 DAN 03 RW.04 KELURAHAN SUNGAI LEKOP | BATU AMPAR | - | PEMBANGUNAN | 2022 | 210.996.570 |
Pembangunan Semenisasi Jalan Lingkungan RT.02,03 RW.12 Kav Mandiri Blok.E | RT.02,03 RW 12 Kelurahan Sungai Pelunggut | BATU AMPAR | - | PEMBANGUNAN | 2022 | 173.400.870 |
Semenisasi Jalan Lingkungan RT.04 dan 05 RW.04 | RT.04 dan 05 RW.04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 210.198.480 |
Pembangunan Drainase Lingkungan U-30 RT.02 RW.13 Kav Kamboja | RT.02 RW.13 Kav Kamboja | BATU AMPAR | - | PEMBANGUNAN | 2022 | 87.337.020 |
Pembangunan Drainase Lingkungan U-30 RT.02 RW.04 Kav Kamboja | RT.02 RW.04 Kav Kamboja | BATU AMPAR | - | PEMBANGUNAN | 2022 | 88.519.170 |
Pembangunan Semenisasi Jalan Lingkungan RT.01,02,03,04 RW 14 Kav Flamboyan | RT.01,02,03,04 RW 14 Kav Flamboyan | BATU AMPAR | - | PEMBANGUNAN | 2022 | 198.429.150 |
SEMENISASI JALAN LINGKUNGAN RT.06 DAN 07 RW.06 | RT.06 DAN 07 RW.06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 208.220.460 |
SEMENISASI JALAN LINGKUNGAN RT.02 DAN 04 RW.02 | RT.02 DAN 04 RW.02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 142.793.730 |
SEMENISASI JALAN PERUM FORTUNA RAYA I RT.01 RW.13 | RT.01 RW.13 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 211.726.950 |
PEKERJAAN PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT TAHUN 2022 TAHAP II AREA BATAM | PT WARLBOR INTERNATIONAL INDONESIA DAN SWESS KOPITIAM NAGOYA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 4.749.133.000 |
PEKERJAAN SALURAN DI VILLA PANBIL BLOK DD MINI | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 56.233.076 |
PEKERJAAN ELEKTRIKAL VILLA PANBIL DI BLOK DD NO. 53-55 MINI | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 75.332.500 |
SEMENISASI JALAN LINGKUNGAN RW. 01 KAV. NATO BERSERI VOLUME 525 M2 POKMAS NATO BERSERI 01 | RW. 01 KAV. NATO BERSERI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 187.141.560 |
SEMENISASI JALAN PERUM FORTUNA RAYA I RT.02 RW.13 | FORTUNA RAYA I RT.02 RW.13 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.229.780 |
SEMENISASI JALAN KAV. LAMA RT.04 RW. 10 | KAV. LAMA RT.04 RW. 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.108.670 |
SEMENISASI JALAN KAV. LAMA RT.06 RW.10 | KAV. LAMA RT.06 RW.10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 213.744.930 |
SEMENISASI JALAN KAV. LAMA RT.07 RW. 10 | KAV. LAMA RT.07 RW. 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.326.790 |
SEMENISASI JALAN LINGKUNGAN RT.03 RW. 012 (POKMAS TBS 5) | RT.03 RW. 012 TAMAN CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 174.871.620 |
SEMENISASI JALAN LINGKUNGAN RT.06/08 RW. 12 CIPTA ASRI (POKMAS TBS 11) | RT. 06/08 RW.12 TAMAN CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 152.192.100 |
Semenisasi Jalan Lingkungan RT.09 RW. 010 Villa Muka Kuning | RT. 09 RW. 0010 VILLA MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.273.200 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW. 01 GREEN LAGUNA (POKMAS TBS 10) | RT.05 RW.01 GREEN LAGUNA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.727.190 |
SEMENISASI JALAN LINGKUNGAN RT.01 / 02 RW. 020 SENTOSA PERDANA (POKMAS TBS 1) | RT. 01/02 RW. 020 SENTOSA PERDANA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 121.212.000 |
Semenisasi Jalan Lingkungan RT.03 dan 04 RW.03 Kelurahan Sungai Lekop | RT.03 dan 04 RW.03 Kelurahan Sungai Lekop | BATU AMPAR | - | PEMBANGUNAN | 2022 | 197.071.620 |
SEMENISASI JALAN LINGKUNGAN RW. 22 PERUM. BATUAJI RIAU BERTUAH VOLUME 525 M2 POKMAS RIAU BERTUAH 22 | RW. 22 PERUM. BATUAJI RIAU BERTUAH KEL. SUNGAI LANGKAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 185.060.310 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 18 PERUM. GRIYA VOLUMEN 455 M2 POKMAS GRIYA RT. 01 RW. 18 | RW. 18 PERUM. GRIYA BATUAJI ASRI KEL. SUNGAI LANGKAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 160.016.490 |
SEMENISASI JALAN LINGKUNGAN RW. 02 KAV. NATO PERMATA VOLUME 601 M2 POKMAS NATO PERMATA 02 | RW. 02 NATO PERMATA KEL. SUNGAI LANGKAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.704.860 |
SEMENISASI JALAN LINGKUNGAN RW. 20 PERUM. GRIYA VOLUME 510 M2 POKMAS GRIYA 20 | RW. 20 PERUM. GRIYA BATUAJI ASRI TAHAP 6 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 178.880.940 |
SEMENISASI JALAN PERUM MUKA KUNING INDAH I RT02,RT04 RW 05 VOL-600M2 | KELURAHAN BULIANG (POKMAS FLAMBOYAN 05 MEMBANGUN) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 201.583.770 |
SEMENISASI JALAN PERUM MKI I RT 06 RW 07 VOL- 600M2 | KELURAHAN BULIANG (POKMAS BANGUN KARYA MANDIRI) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 202.927.980 |
ELECTRICAL RETICULATION FLEXTRONICS | JL. RASAMAIA NO. 1, MUKA KUNING SE BEDUK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 13.800.000.000 |
CONCRETE PAVEMENT WORK | JLN BRIGJEN KATAMSO KM 5 TANJUNG UNCANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.080.000.000 |
PEMBANGUNAN SALURAN DRAINASE PRA-CETAK TYPE U40 PERUMAHAN TAMAN RAYA TAHAP III RT.03 RW.24 | PERUMAHAN TAMAN RAYA TAHAP III RT.03 RW.24 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 24.454.410 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN II RT.01 RW.09 (100 M X 4 M) - POKMAS MUTIARA LAUT 1 | RT 01 RW 09 BENGKONG HARAPAN II BENGKONG LAUT | BATU AMPAR | - | PEMBANGUNAN | 2022 | 144.610.800 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN II RT.02 RW.09 (100 M X 4 M) - POKMAS MUTIARA LAUT 2 | RT 02 RW 09 BENGKONG HARAPAN II | BATU AMPAR | - | PEMBANGUNAN | 2022 | 144.610.800 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN I RT.03 RW.08 (100 M X 3 M) - POKMAS MUTIARA LAUT 3 | RT 03 RW 08 BENGKONG HARAPAN I | BATU AMPAR | - | PEMBANGUNAN | 2022 | 108.458.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG LAUT RT.04 RW.01 (150 M X 4 M) - POKMAS MUTIARA LAUT 5 | RT 04 RW 01 BENGKONG LAUT | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN BENGKONG RATU RT.03 RW.06 (150 M X 4 M) - POKMAS MUTIARA LAUT 7 | RT 03 RW 06 BENGKONG RATU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN KOMP. GREEN TOWN RT.01 RW.10 (50 M X 4 M) - POKMAS MUTIARA LAUT 8 | RT 01 RW 10 KOMP. GREEN TOWN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 72.305.400 |
SEMENISASI JALAN LINGKUNGAN KOMP. GREEN TOWN RT.03 RW.10 (150 M X 4 M) - POKMAS MUTIARA LAUT 9 | RT 03 RW 10 KOMP. GREEN TOWN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN KOMP. YKB RT.03 RW.11 (150 M X 4 M) - POKMAS MUTIARA LAUT 10 | RT 03 RW 11 KOMP. YKB | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN BALOI HARAPAN II SAMPING MASJID DARUL MUTALIM RT. 01 RW. 03 (100M X 3M) | BALOI HARAPAN II SAMPING MASJID DARUL MUTALIM RT. 01 RW. 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 108.458.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN I RT. 02 RW. 06 (125 M X 3 M) POKMAS 47 | BENGKONG HARAPAN I RT. 02 RW. 06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.572.625 |
SEMENISASI JALAN LINGKUNGAN BENGKONG INDAH RT. 01 RW. 01 (40 M X 4 M) POKMAS 48 | BENGKONG INDAH RT. 01 RW. 01 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 57.844.320 |
SEMENISASI JALAN LINGKUNGAN BALOI HARAPAN II RT.04 RW.03 (120M X 3M) POKMAS INDAH 44 | BALOI HARAPAN II RT.04 RW.03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 130.149.720 |
RENOVASI STRUKTUR DAN FINISHING DI VILLA PANBIL BLOK R NO. 12, KAWASAN VILLA PANBIL | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 35.500.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN II RT. 06 RW. 10 (100M X 4M) | BENGKONG HARAPAN II RT. 06 RW. 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 115.949.200 |
RETAINING WALL BRONJONG SEKTOR VII DI KAV.9 INDUSTRI BARU, KAWASAN PANBIL INDUSTRIAL | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 71.324.000 |
DRIVEWAY AREA VILLA PANBIL DD NO. 53-58 MINI. KAWASAN VILLA PANBIL | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 33.867.720 |
STRUKTUR TANGKI AIR DAN RUANG POMPA TAMAN WISATA ALAM | TAMAN WISATA ALAM, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 23.087.000 |
STRUKTUR RESTAURAN DI TAMAN WISATA ALAM | TAMAN WISATA ALAM, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 23.844.000 |
PEMBANGUNAN BATU MIRING PERMUKIMAN DAN PERUMAHAN DENGAN BATU (SWAKELOLA PSPK) CIPTA REGENCY RT.04 | CIPTA REGENCY RT.04 RW.21 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 211.365.090 |
PEMBANGUNAN SALURAN DRAINASE PRA-CETAK TYPE U40 (SWAKELOLA PSPK) | PERUM BOTANIA GARDEN RT.02 RW.43 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 86.604.420 |
PEMBANGUNAN BATU MIRING PERMUKIMAN DAN PERUMAHAN DENGAN BATU (SWAKELOLA PSPK) | PERUM GARDAN RAYA RT.01 RW.53 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.667.120 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW. 24 MEDIO RAYA (POKMAS TBS 2) | RT. 01 RW. 24 MEDIO RAYA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.960.970 |
SEMENISASI JALAN LINGKUNGAN RT.03 RW.15 TAMAN ANUGRAH (POKMAS TBS 7) | RT. 03 RW. 15 TAMAN ANUGRAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 176.164.770 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW. 23 CITRA LAGUNA (POKMAS TBS 4) | RT. 02 RW. 23 CITRA LAGUNA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 192.939.090 |
PEMBANGUNAN DRAINASE RT 001 RW 006 ( 375 M ) POKMAS JAMBU | RT 001 RW 006 Kel Tanjung Sengkuang | BATU AMPAR | - | PEMBANGUNAN | 2022 | 108.330.450 |
PEMBANGUNAN JALAN LINGKUNGAN AIR RAJA RT.001/RW.001 (POKMAS AIR RAJA 15) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.550.000 |
PEMBANGUNAN JALAN LINGKUNGAN SIMPANG LIMA S/D SOYAH RT.002/RW.001 AIR RAJA (POKMAS AIR RAJA 16) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.543.000 |
PEMBANGUNAN JALAN LINGKUNGAN AIR RAJA RT.003/RW.001 (POKMAS AIR RAJA 17) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 187.916.000 |
PEMBANGUNAN JALAN LINGKUNGAN TOK SENIN S/D MENCARAS AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 18) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.018.000 |
SEMENISASI JALAN LINGKUNGAN JALAN SOYAH S/D MASJID NURUL RT.001/RW.001 AIR RAJA (POKMAS AIR RAJA 19) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.543.000 |
PEMBANGUNAN JALAN LINGKUNGAN AIR RAJA RT.002/RW.001 (POKMAS AIR RAJA 20) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.791.000 |
PEMBANGUNAN GARDU BETON 3,5 M2 X 5,5 M2 | PT KALIBAN BANGUN PERKASA - KK RUKO WINNER KALIBAN SUPERBLOCK KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 146.055.910 |
PEMANGKASAN POHON DIBAWAH SUTM | AREA BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 129.762.500 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM/SKTM 20KV | PT TRIAS JAYA PROPERTINDO - KK PR PUTRA JAYA RESIDANCE CLUSTER B TJ UNCANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 58.593.897 |
SEMENISASI JALAN LINGKUNGAN DARI GAPURA KP.TUA KEARAH SMK PERTIWI RT.01 RW. 08 | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 190.105.000 |
PEMBUATAN RUANGAN BARU | JL. HANG KESTURI I NO. 2 KAWASAN TERPADU KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 107.740.000 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW.06 KELURAHAN BATU BESAR | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 165.260.000 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW.12 PERUMAHAN NONGSA ASRI RW.12 | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 181.548.000 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW.08 KP.MELAYU KELURAHAN BATU BESAR | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 172.263.000 |
PENINGKATAN DRAINASE HOTEL 01 MENUJU MAKAM PAHLAWAN KELURAHAN BUKIT TEMPAYAN (LANJUTAN) | KELURAHAN BUKIT TEMPAYAN BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 6.296.591.820 |
PEMBANGUNAN SPAM PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG (PENDUKUNG DAK REGULER) | PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG | GALANG | - | PEMBANGUNAN | 2022 | 2.291.183.000 |
OPTIMALISASI SWRO BELAKANG PADANG | BELAKANG PADANG | GALANG | - | PEMBANGUNAN | 2022 | 2.831.274.000 |
OPTIMALISASI WTP PULAU ABANG | PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 3.144.928.000 |
PEMBANGUNAN SPAM PULAU LABU KEL. BATU LEGONG KEC. BULANG | PULAU LABU KEL. BATU LEGONG KEC. BULANG | GALANG | - | PEMBANGUNAN | 2022 | 9.391.583.000 |
PEMBANGUNAN / REHABILITASI DRAINASE U-30 P=475M (PSPK) RT 03 RW 05 PANCUR PELABUHAN (POKMAS PTM 23) | RT 003 RW 005 PANCUR PELABUHAN TANJUNGPIAYU | GALANG | - | PEMBANGUNAN | 2022 | 84.598.800 |
JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. ANGGREK MAS I | RT 01 RW 06, KEL. TAMAN BALOI, KEC. BATAM KOTA | GALANG | - | PEMBANGUNAN | 2022 | 160.935.355 |
PEKERJAAN RELOKASI GARDU PORTAL | SEI LEKOP 2 SAGULUNG | GALANG | - | PEMBANGUNAN | 2022 | 222.690.312 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW. 01 TANJUNG GUNDAP (POKMAS TBS 3) | RT.02 RW.01 TANJUNG GUNDAP | GALANG | - | PEMBANGUNAN | 2022 | 189.989.820 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW. 11 BUMI SAKINAH (POKMAS TBS 9) | RT. 05 RW. 11 BUMI SAKINAH | GALANG | - | PEMBANGUNAN | 2022 | 154.636.320 |
PEMBANGUNAN DRAINASE U 40 NGENANG RT 04 RW 01 KELURAHAN NGENANG - POKMAS SINAR REMBULAN | RT 04 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 30.298.000 |
PEMBANGUNAN DRAINASE U 40 PULAU KUBUNG RT 01 RW 03 KELURAHAN NGENANG - POKMAS KUBUNG MEMBANGUN | PULAU KUBUNG RT 01 RW 03 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 30.298.000 |
PEMBUATAN DRAINASE U40 NGENANG RT 03 RW 01 KELURAHAN NGENANG - POKMAS SEJAHTERA NGENANG | RT 03 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 90.931.000 |
SEMENISASI JALAN LINGKUNGAN NGENANG RT 01 RW 01 KELURAHAN NGENANG - POKMAS BETON JAYA | RT 01 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 122.018.000 |
SEMENISASI JALAN LINGKUNGAN NGENANG RT 02 RW 01 KELURAHAN NGENANG - POKMAS KUDA LAUT | RT 02 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 183.016.000 |
SEMENISASI JALAN LINGKUNGAN NGENANG RT 04 RW 01 KELURAHAN NGENANG - POKMAS MAKMUR | RT 04 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 183.016.000 |
SEMENISASI JALAN LINGKUNGAN PULAU TODAK RT 02 RW 03 KELURAHAN NGENANG - POKMAS TODAK ANUGERAH | PULAU TODAK RT 02 RW 03 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 81.368.000 |
PEMBANGUNAN / REHABILITASI DRAINASE U-40 RT 01 RW 03 (POKMAS GAHARU) | RT 01 RW 03 KELURAHAN MANGSANG | GALANG | - | PEMBANGUNAN | 2022 | 169.348.300 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | PT GRAHA ANUGERAH KEDIRI - KK SEI BURUS SEBELAH KANAN BUKIT GALANG BARU | GALANG | - | PEMBANGUNAN | 2022 | 67.575.226 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 RT 01, 02, 03 RW 23 (POKMAS DAMAR) | RT 01 RW 23 MANGSANG | GALANG | - | PEMBANGUNAN | 2022 | 77.463.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 RT 08 RW 02 (POKMAS MERANTI) | MANGSANG PERMAI RT 08 RW 02 | GALANG | - | PEMBANGUNAN | 2022 | 118.706.500 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 MANGSANG PERMAI BLOK C RT 01 RW 01 | RT 01 RW 01 MANGSANG PERMAI | GALANG | - | PEMBANGUNAN | 2022 | 165.731.500 |
PEMBANGUNAN GEDUNG NEGARA SEDERHANA 1 (SATU) LANTAI RT.001/RW.001 (POKMAS REMPANG 14) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 313.101.800 |
PEMBANGUNAN GEDUNG SERBAGUNA MONGGAK RT.001/RW.004 (POKMAS REMPANG 15) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 313.101.800 |
PEMBANGUNAN JALAN LINGKUNGAN RT.002/RW.001 REMPANG CATE (POKMAS REMPANG 16) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 236.316.300 |
PEMBANGUNAN JALAN LINGKUNGAN KP. TRALING RT.005/RW.001 (POKMAS REMPANG 17) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 335.610.000 |
PEMBANGUNAN JALAN LINGKUNGAN TANJUNG KELENGKING RT.003/RW.002 (POKMAS REMPANG 18) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 268.516.600 |
PEMBANGUNAN JALAN LINGKUNGAN PASIR PANJANG RT.001/RW.003 (POKMAS REMPANG 19) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 268.544.100 |
PEMBANGUNAN JALAN LINGKUNGAN MONGGAK RT.002/RW.004 (POKMAS REMPANG 20) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 358.013.700 |
PEMBANGUNAN SEMINISASI JALAN LINGKUNGAN TG. KERTANG RT.001/RW.002 (POKMAS REMPANG 21) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 178.985.400 |
PEMBANGUNAN BATU MIRING BELONGKENG RT.003/RW.004 | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 372.049.700 |
BATU MIRING LANJUTAN RT 02 RW 04 SAKURA GARDEN ( 175 M² ) POKMAS DURIAN | RT 02 RW 04 SAKURA GARDEN | GALANG | - | PEMBANGUNAN | 2022 | 218.884.230 |
PEMBUATAN RETAINING WALL TOWER 30A SUTT 150 KV PHI CONNCETION SAGULUNG - HARAPAN | PT PLN BATAM | GALANG | - | PEMBANGUNAN | 2022 | 92.904.637 |
PENGADAAN DAN PEMASANGAN PERALATAN KUBIKEL DAN SKTM 20KV DARI RUSUN BP-GD BUMI ABADI | PT BUMIABADI TEGARSAKTI 2 - JL HANG KESTURI KABIL | GALANG | - | PEMBANGUNAN | 2022 | 352.588.294 |
PENGADAAN DAN PEMASANGAN JTM & PERALATAN GARDU | PORTABLE RIZA HAERUDIN - JL TPU SEI GOA REMPANG CATE DUSUN TEBING TINGGI | GALANG | - | PEMBANGUNAN | 2022 | 253.041.329 |
PRESERVASI JALAN DAN JEMBATAN NONGSA - BATU AMPAR - TEMBESI - GALANG (PULAU BATAM - GALANG) | PULAU BATAM - GALANG | GALANG | - | PEMBANGUNAN | 2022 | 23.518.769.000 |
BLASTING & PAINTING SHOP | PT FEEN MARINE, TG RIAU KEC SEKUPANG | GALANG | - | PEMBANGUNAN | 2022 | 3.723.576.751 |
PENGADAAN DAN PEMASANGAN PAGAR SPANDEK DI LAHAN TEMBESI | INDUSTRIAL ESTATE TEMBESI | GALANG | - | PEMBANGUNAN | 2022 | 68.000.000 |
PENGADAAN DAN PEMASANGAN SKTM 20 KV DARI STO TELKOM - RUSUN BP BATAM | PT BUMIABDI TEGARSAKTI 2 - JL HANG KESTURI KABIL | GALANG | - | PEMBANGUNAN | 2022 | 277.346.242 |
PENGADAAN DAN PEMASANGAN SKTM DARI AGUNG AUTOMALL KE GD MAIDERA (PECAH BEBAN FEEDER MAWAR) | JL JENDERAL SOEDIRMAN - JL AHMAD YANI - BATAM CENTER | GALANG | - | PEMBANGUNAN | 2022 | 287.699.500 |
PENGADAANN DAN PEMASANGAN SKTM DARI GI BALOI KE AGUNG AUTOMALL (PECAH BEBAN FEEDER MAWAR) | JL JENDRAL SUDIRMAN - JL AHMAD YANI -BATAM CENTER | GALANG | - | PEMBANGUNAN | 2022 | 273.539.621 |
PEKERJAAN PEMBANGUNAN PENATAAN JALAN RE MARTADINATA TAHAP 1 | SEKUPANG, JL. RE MARTADINATA | NONGSA | - | PEMBANGUNAN | 2022 | 48.586.235.000 |
PEKERJAAN PEMBANGUNAN PENATAAN JALAN RE MARTADINATA TAHAP 1 | SEKUPANG, JL. RE MARTADINATA | NONGSA | - | PEMBANGUNAN | 2022 | 48.586.235.000 |
REVITALISASI MASJID AL KAUTSAR PERUMAHAN MASYEBA GADING | KELURAHAN SEI HARAPAN, KECAMAN SEKUPANG, KOTA BATAM | NONGSA | - | PEMBANGUNAN | 2022 | 115.683.273 |
SEMENISASI JALAN BLOK I KAVLING ABADI JAYA RT 01/RW 03 | KELURAHAN SUNGAI LEKOP, KECAMATAN SAGULUNG, KOTA BATAM | BATU AJI | - | PEMBANGUNAN | 2022 | 115.263.637 |
PENATAAN LINGKUNGAN PERUMAHAN CLASIK INDAH | KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.158.309.010 |
PEMANCANGAN RC PILE 400X400MM | PT MCDERMOTT INDONESIA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.387.000.000 |
RENOVASI BANGUNAN PANTI ASUHAN MUHAMMADIYAH AL ANSHORI, PERUMAHAN BAMBU KUNING BLOK B.16 NO. 16 | KEL. BUKIT TEMPAYAN KEC. BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 77.142.727 |
PENATAAN LINGKUNGAN PERBAIKAN FASILITAS UMUM (FASUM) PERUM BAMBU KUNING RW 03 BLOK C | KEL. BUKIT TEMPAYAN, KECAMATAN BATU AJI | BATU AJI | - | PEMBANGUNAN | 2022 | 77.190.910 |
REVITALISASI MUSHOLLA AT TAQWA PERUMAHAN PURI SURYA | KELURAHAN SUNGAI LANGKAI KEC. SAGULUNG | SAGULUNG | - | PEMBANGUNAN | 2022 | 77.130.910 |
PEKERJAAN STRUKTUR GEDUNG PERTAMA BUSINESS CENTRE | KAWASAN SHIPYARD PT. DOK WARISAN PERTAMA - PAX OCEAN | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.421.932.946 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU CANTOL DAN JTM-SUTM | BTS TELKOMSEL BTM569-KP CAKANG RT 03 RW 04 PULAU GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 55.749.903 |
PROYEK PRESERVASI KAPAL | DELTA SHIPYARD PANARAN DAPUR 12 SEI, PELUNGGUT | BATAM KOTA | - | PEMBANGUNAN | 2022 | 40.020.000 |
NEW CONSTRUCTION OF 6 LOT TYPE E FACTORY AT BATAMINDO INDUSTRIAL PARK | BATAMINDO INDUSTRIAL PARK | BATAM KOTA | - | PEMBANGUNAN | 2022 | 70.000.000.000 |
PEMBANGUNAN GUDANG UK. 30M X 42M | JALAN BRIGJEN KATAMSO (BUNDARAN), TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 780.000.000 |
PROYEK WORKSHOP PRODUKSI TAHAP 2 BA (2) | JL BRIGJEN KATAMSO LOT 8 KEL TANJUNG UNCANG KEC BATU AJI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 980.000.000 |
MECHANICAL INSTALLATION, ELECTRICAL, ENGINE FOUNDATION (SLAB) | POWER HOUSE KAWASAN INDUSTRIAL BATAMINDO PARK DAN JLN PUTRI HIJAU SAMPING PERUMAHAN GRIYA BATU AJI ASRI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.203.775.055 |
PEKERJAAN TAMBAHAN PENGADAAN DAN PEMASANGAN JARINGAN BARU | JL. BRIGJEN KATAMSO KM 7 KEL. TANJUNG UNCANG KEC. BATU AJI BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 754.002.951 |
INSTAL GENSET 1000KVA, SETTING LEVELING, SOUND PROFING DLL - NAGOYA | NAGOYA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 102.000.000 |
ADDITIONAL AIRCON AT BLASTING PROCESS AT FACTORY - 1 (AIRCON WORK) | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 691.180.000 |
IMPROVEMENT AIRCON AT F1 STEP-2 (AIRCON WORK) | PURI INDUSTRIAL PARK 2000, BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 602.640.000 |
PEMASANGAN TIANG PANCANG MARVEL 2, 4200 TITIK | PT UNILEVER OLEOCHEMICAL INDONESIA SUMATERA UTARA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 35.233.020.000 |
PEMANCANGAN ONSHORE RC PILE 200 X 200 MM | BATAM - CENTRAL HILLS BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 262.909.091 |
PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | PT BERTUAH SAMUDERA ABADI - KP AIR NAGA KEL SIJANTUNG REMPANG - GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 127.654.673 |
RENOVATION UPPER CANTEEN LOT 207 | PT. EXCELITAS TECHNOLOGIES BATAM LOT 207 JLN. BERINGIN # 02-03 DAN WORKSHOP SEI BINTI TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 4.489.000.000 |
PENAMBAHAN RETAINING WALL BRONJONG DEPAN VILLA PANBIL BLOK BB2 | KAWASAN VILLA PANBIL, MUKA KUNING | BATAM KOTA | - | PEMBANGUNAN | 2022 | 82.324.250 |
COST FOR STINGER FULL SURFACE PREP & COATING | PELABUHAN SCN KABIL | BATAM KOTA | - | PEMBANGUNAN | 2022 | 1.455.454.546 |
RENOVATION OF MAIN OFFICE BUILDING | JALAN BRIGJEN KATAMSO KM5, TANJUNG UNCANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 2.817.590.564 |
DECENTRALIZED STP IN PT BREDERO SHAW INDONESIA | JALAN HANG KESTURI I NO. 14, KAWASAN INDUSTRI TERPADU KABIL, BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 956.480.000 |
PENGECATAN HOTEL PLANET HOLIDAY BATAM | JL. RAJA ALI HAJI, JODOH - BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 798.615.000 |
PLTU SOFIFI 2X3 MW | DUSUN PASIGAU SOFIFI MALUKU UTARA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 75.990.000.000 |
SUPPLY AND INSTALL STEEL PLATE FOR REINFORCEMENT 2ND FLOOR AT PCL LINE #2 | PURI INDUSTRIAL PARK 2000 BATAM CENTER, KELURAHAN BALOI PERMAI, BATAM - 29463 | BATAM KOTA | - | PEMBANGUNAN | 2022 | 32.120.000 |
PEKERJAAN PANCANG PHASE 2 | BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 1.392.363.636 |
PEKERJAAN PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT TAHUN 2022 TAHAP 1 AREA BATAM | SAHID HOTEL BATAM CENTRE - OS STYLE T AJI - CATERING SEMERU BATAM CENTRE - SHIPURU HARBOUR BAY | BATAM KOTA | - | PEMBANGUNAN | 2022 | 532.929.990 |
NEW FIRE SPRINKLERS AE PLATS HOT OIL SYSTEM | KABIL KOTA BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 195.000.000 |
SEMENISASI JALAN LINGKUNGAN BLOK B RT 02 RW 09 KEL. DURIANGKANG (POKMAS DURIANGKANG 1 - 600 M2) | BLOK B RT 02 RW 09 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 204.721.000 |
SEMENISASI JALAN LINGKUNGAN BLOK I, J, K, L,M, N RT 04 RW 15 KEL. DURIANGKANG (POKMAS DURIANGKANG 2) | BLOK I, J, K, L, M, N RT 04 RW 15 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 210.588.400 |
SEMENISASI JALAN LINGKUNGAN DKT LAPANGAN SAKURA RT 01 RW 03 KEL. DURIANGKANG (POKMAS DURIANGKANG 3) | RT 01 RW 03 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 211.775.300 |
SEMENISASI JALAN LINGKUNGAN / GANG RT 02 RW 08 KEL. DURIANGKANG (POKMAS DURIANGKANG 4) | RT 02 RW 08 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 167.680.700 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 02 RW 02 KEL. DURIANGKANG (POKMAS DURIANGKANG 5) | RT 02 RW 02 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 214.808.000 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 03 RT 01 RW 07 KEL. DURIANGKANG (POKMAS DURIANGKANG 6) | RT 03 RT 01 RW 7 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 171.515.300 |
SEMENISASI JALAN LINGKUNGAN JALAN UTAMA RT 03, RT 04 RW 15 KEL. DURIANGKANG (POKMAS DURIANGKANG 7) | RT 03 RT 04 RW 15 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 180.728.900 |
SEMENISASI JALAN LINGKUNGAN RT 02, RT 06 RW 06 KEL. DURIANGKANG (POKMAS DURIANGKANG 8) | RT 02 RT 06 RW 06 KEL. DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 207.333.500 |
DRAINASE/PARIT U-30 JLN. GANG JAMBU RT 03 RW 12 KEL. DURIANGKANG (POKMAS DURIANGKANG 14) | GANG JAMBU RT 03 RW 12 | BATAM KOTA | - | PEMBANGUNAN | 2022 | 29.437.100 |
DRAINASE / PARIT U-30 RT 05 RW 13 KEL. DURIANGKANG (POKMAS DURIANGKANG 15) | RT 05NRW 13 KEL DURIANGKANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 60.798.100 |
SEMENISASI JALAN LINGKUNGAN MANGSANG INDAH RT 01 RW 24 (POKMAS CEMARA) | RT 01 RW 24 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 209.633.600 |
SEMENISASI JALAN LINGKUNGAN BIDA AYU BLOK L DAN E RT 02 RW 15 (POKMAS PINUS) | BLOK L DAN E RT 02 RW 15 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 207.065.100 |
SEMENISASI JALAN LINGKUNGAN BIDA AYU RT 02 RW 13 (POKMAS BERINGIN) | BIDA AYU RT 02 RW 13 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 141.737.200 |
SEMENISASI JALAN LINGKUNGAN BIDADARI RT 04 DAN RT 05 RW 17 (POKMAS BAKAU) | BIDADARI RT 04 DAN RT 05 RW 17 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 214.534.100 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 02 KELURAHAN TIBAN LAMA (POKMAS ANGGUR 3 - 570 M2) | KELURAHAN TIBAN LAMA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 195.285.200 |
SEMENISASI JALAN LINGKUNGAN BLOK D RT 01 RW 07 (POKMAS KETAPANG) | BLOK D RT 01 RW 07 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 171.986.100 |
SEMENISASI JALAN LINGKUNGAN MANGSANG KEBUN RT 01 RW 03 (POKMAS JATI) | MANGSANG KEBUN RT 01 RW 03 KEL MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 214.535.200 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 01 RW 25 (POKMAS WARU) | RT 01 RW 25 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 213.864.200 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 02 RW 23 | PURI AGUNG RT 02 RW 23 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 188.848.000 |
SEMENISASI JALAN LINGKUNGAN PURI AGUNG RT 01,02,03,04 RW 06 (POKMAS BAMBU) | PURI AGUNG RT 01,02,03,04 RW 06 KEL. MANGSANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 211.651.000 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 09 KELURAHAN TIBAN LAMA (POKMAS KUINI II - 188 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 66.429.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 KELURAHAN TIBAN LAMA (POKMAS PEAR 1 - 400 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 138.131.400 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 2 - 630 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 219.992.300 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 09 KELURAHAN TIBAN LAMA (POKMAS KUINI - 50 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 17.901.400 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 1 - 149 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 53.339.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 1 - 298 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 101.857.800 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 4 - 332 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 114.959.900 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 11 KELURAHAN TIBAN LAMA (POKMAS SALAK 1 - 627 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 219.897.700 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 4 - 240 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 83.867.300 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 2 - 100 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 35.823.700 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 4 - 360 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 124.382.500 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 05 KELURAHAN TIBAN LAMA (MELON 1 - 240 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 85.968.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 08 KELURAHAN TIBAN LAMA (POKMAS CEMPEDAK 3 - 90 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 32.244.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 11 KELURAHAN TIBAN LAMA (POKMAS SALAK 4 - 400 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 138.131.400 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 12 KELURAHAN TIBAN LAMA (POKMAS KEDONDONG 5 - 150 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 53.738.300 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 13 KELURAHAN TIBAN LAMA (POKMAS NANAS 2 - 288 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 103.112.900 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 2 - 220 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 76.302.600 |
SEMENISASI JALAN LINGKUNGAN RT 06 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 3 - 130 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 46.528.900 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 5 - 200 M2) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 70.400.000 |
DRAINASE U30 RT 01 RW 01 KELURAHAN TIBAN LAMA (POKMAS PEPAYA 1 - 78 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 18.350.200 |
DRAINASE U30 RT 01 RW 03 KELURAHAN TIBAN LAMA (POKMAS BELIMBING I - 30 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 7.067.500 |
DRAINASE U30 RT 01 RW 06 KELURAHAN TIBAN LAMA (POKMAS ALPUKAT 3 - 158 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 37.078.800 |
DRAINASE U30 RT 01 RW 13 KELURAHAN TIBAN LAMA (POKMAS NANAS 1 - 113 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 26.618.900 |
DRAINASE U30 RT 02 RW 15 KELURAHAN TIBAN LAMA (POKMAS SIRSAK 3 - 101 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 23.790.800 |
DRAINASE U30 RT 03 RW 03 KELURAHAN TIBAN LAMA (POKMAS BELIMBING II - 57 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 13.429.350 |
DRAINASE U30 RT 06 RW 07 KELURAHAN TIBAN LAMA (POKMAS STRAWBERY III - 182 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 40.274.300 |
DRAINASE U40 RT 03 RW 06 KELURAHAN TIBAN LAMA (POKMAS ALPUKAT 2 - 21 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 6.011.500 |
DRAINASE U40 RT 03 RW 10 KELURAHAN TIBAN LAMA (POKMAS SEMANGKA 1 - 125 M) | KELURAHAN TIBAN LAMA | SEKUPANG | - | PEMBANGUNAN | 2022 | 33.859.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) PERUM CENTRAL MELATI RT 01 RW 0 | PERUM CENTRAL MELATI RT 01 RW 08 | SEKUPANG | - | PEMBANGUNAN | 2022 | 207.337.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) | KAMPUNG TUA BELIAN PANTAI RT.02 RW.02 | SEKUPANG | - | PEMBANGUNAN | 2022 | 204.999.300 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BANDARA MAS RT.01 RW20 | SEKUPANG | - | PEMBANGUNAN | 2022 | 204.848.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BATARA RAYA RT.02 RW, RT.03 RW.03 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.783.500 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM BUNGA RAYA RT.02 RW.27 | SEKUPANG | - | PEMBANGUNAN | 2022 | 207.313.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM GRAHA NUSA PERMAI RT.01 RW.13 | SEKUPANG | - | PEMBANGUNAN | 2022 | 207.337.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM GRIYA PANORAMA PERMAI RT.02 RW.44 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.829.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM MARBELLA RESIDENCE RT.04 RW.39 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.602.000 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM NADIM RAYA RT.01 RW.51 | SEKUPANG | - | PEMBANGUNAN | 2022 | 204.007.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM ODESSA RT.03 RW.40 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.331.400 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15 CM (SWAKELOLA PSPK) | PERUM TAMAN RAYA TAHAP 2A RT.01 RW.35 | SEKUPANG | - | PEMBANGUNAN | 2022 | 199.524.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM TAMAN RAYA TAHAP III RT.02 RW.18 | SEKUPANG | - | PEMBANGUNAN | 2022 | 206.308.300 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM GRIYA KPN RT.01 RW.41 | PERUM GRIYA KPN RT.01 RW.41 | SEKUPANG | - | PEMBANGUNAN | 2022 | 198.793.000 |
PEMELIHARAAN PREVENTIVE TM, TR DAN GARDU PORTAL | AREA BATAM TERSEBAR | BENGKONG | - | PEMBANGUNAN | 2022 | 99.647.357 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RT 3 RW 3 (POKMAS PERMATA 1) | RT 3 RW 3 BENGKONG KOLAM - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KOLAM RT 5 RW 3 (POKMAS PERMATA 2) | RT 5 RW 3 BENGKONG KOLAM - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RT 5 RW 10 (POKMAS PERMATA 3) | RT 5 RW 10 BENGKONG SADAI - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG SADAI RT 6 RW 10 (POKMAS PERMATA 4) | RT 6 RW 10 BENGKONG SADAI - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 05 RW 18 (POKMAS PERMATA 5) | RT 05 RW 18 BENGKONG TELAGA INDAH - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 1 RW 18 (POKMAS PERMATA 6) | RT 1 RW 18 BENGKONG TELAGA INDAH - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG TELAGA INDAH RT 5 RW 18 (POKMAS PERMATA 8) | RT 5 RW 18 BENGKONG TELAGA INDAH - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A1 KOMP. WINNER MILLENIUM RT 3 RW 17 (POKMAS PERMATA 10) | BLOK A1 KOMP. WINNER MILLENIUM RT 3 RW 17 - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A,B,C DAN D KAVLING HARAPAN JAYA RT 8 RW 13 (PERMATA 11) | BLOK A,B,C DAN D KAVLING HARAPAN JAYA RT 8 RW 13 - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN DI BLOK K BENGKONG SADAI RT 1 RW 10 (POKMAS PERMATA 12) | RT 1 RW 10 DI BLOK K BENGKONG SADAI - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 143.308.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BELIMBING RT 4 DAN RW 4 (POKMAS PERMATA 14) | RT 4 RW 4 KAMPUNG BELIMBING - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 161.221.500 |
PEMELIHARAAN DAN PERAWATAN TAMAN JALAN ARTERI DAN ROW WILAYAH PERAWATAN PERTAMANAN BP BATAM | KOTA BATAM | BENGKONG | - | PEMBANGUNAN | 2022 | 1.191.942.552 |
SEMENISASI JALAN LINGKUNGAN KP. DURIAN RT 5 RW 6 (POKMAS PERMATA 16) | RT 5 RW 6 KAMPUNG DURIAN - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN PERUM.PKJ RT 2 RW 14 (POKMAS PERMATA 17) | RT 2 RW 14 PERUM PKJ - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.962.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. PKJ RT 3 RW 14 (POKMAS PERMATA 18) | RT 3 RW 14 PERUM PKJ - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN SEI NAYON RT 2 RW 12 (POKMAS PERMATA 19) | RT 2 RW 12 SEI NAYON - SADAI | BENGKONG | - | PEMBANGUNAN | 2022 | 214.692.000 |
SEMENISASI JALAN LINGKUNGAN RT 01 RW 04 SAKURA GARDEN ( 400 M² ) POKMAS BUNGA SAKURA | RT 01 RW O4 SAKURA GARDEN | BENGKONG | - | PEMBANGUNAN | 2022 | 142.591.900 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 04 SAKURA GARDEN ( 368 M² ) POKMAS MANGGA | RT 02 RW 04 SAKURA GARDEN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 131.684.300 |
POKMAS BM 04, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 | BATU MERAH RT 02 RW 08 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 81.634.300 |
POKMAS BM 01, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 15 RW 04 | BATU MERAH RT 15 RW 04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 26.514.400 |
POKMAS BM 02, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 25 RW 01 | BATU MERAH RT 25 RW 01 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 19.860.500 |
POKMAS BM 03, PEMBANGUNAN PAVING BLOCK JALAN LINGKUNGAN RT 30 RW 06 | BATU MERAH RT 30 RW 06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 53.903.300 |
POKMAS BM 05, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 11 RW 03 | BATU MERAH RT 11 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 71.634.200 |
POKMAS BM 06, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 14 RW 04 | BATU MERAH RT 14 RW 04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 81.631.000 |
POKMAS BM 07, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 17 RW 05 | BATU MERAH RT 17 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 29.338.100 |
SEMENISASI JALAN LINGKUNGAN DI BLOK A1 KE MESJID PERUM. PKJ RT 1 RW 14 (POKMAS PERMATA 9) | RT 1 RW 14 PERUM PKJ - SADAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.692.000 |
POKMAS BM 08, PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN RT 19 RW 06 | BATU MERAH RT 19 RW 06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 35.033.900 |
POKMAS BM 11, PEMBANGUNAN JERAMBAH BETON RT 18 RW 05 | BATU MERAH RT 18 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 121.330.000 |
SEMENISASI JALAN PERUM MUKA KUNING INDAH RT06RW06 (POKMAS AJANG KARYA MANDIRI) VOL-600M2 | KELURAHAN BULIANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.043.500 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ABADI 2 RT 03 RW 04 (POKMAS TANJUNG 1) | RT 03 RW 04 BENGKONG ABADI 2 - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ABADI BARU DEKAT RT 03 DAN 06 RW 14 JLN BUNGA RAYA (POKMAS TG2) | RT 03 RW 14 BENGKONG ABADI BARU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 171.969.600 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ASRAMA RT 04 RW 10 GG. SEMAR (POKMAS TANJUNG 3 ) | RT 04 RW 10 BENGKONG ASRAMA -TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 200.631.200 |
SEMENISASI JALAN LINGKUNGAN BENGKONG ASRAMA RT 04 RW 10 JALAN UTAMA MASJID (POKMAS TANJUNG 4) | RT 04 RW 10 BENGKONG ASRAMA -TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 179.135.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG DALAM RT 04 RW 09 (TANJUNG 5) | RT 04 RW 09 | BENGKONG | - | PEMBANGUNAN | 2022 | 118.229.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG KARTINI RT 02 RW 12 (TANJUNG 6) | RT 02 RW 12 BENGKONG KARTINI - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 114.646.400 |
SEMENISASI JALAN LINGKUNGAN BENGKONG WAHYU RT 03 RW 17 JALAN TOWER (TANJUNG 7) | RT 03 RW 17 BENGKONG WAHYU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN BENGKONG WAHYU RT 04 RW 17 JL. GEREJA (POKMAS TANJUNG 8) | RT 04 RW 17 BENGKONG WAHYU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN JALAN TEMBUS MUSHOLLA RT 04 RW 03 (POKMAS TANJUNG 9) | RT 04 RW 03 BENGKONG ABADI 1 - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 143.308.000 |
SEMENISASI JALAN LINGKUNGAN PERUM PESONA MANTANG RT 02 RW 15 (POKMAS TANJUNG 10 ) | RT 02 RW 15 PERUM PESONA MANTANG - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN TANJUNG BUNTUNG BARU RT 07 RW 02 (POKMAS TANJUNG 12) | RT 07 RW 02 TANJUNG BUNTUNG BARU - TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 209.229.680 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTABLE DAN SKTM | PORTABLE PT MULTIBANGUN ADHITAMA KONSTRUKSI - KK SEI LADI JL. GAJAH MADA SEKUPANG | BENGKONG | - | PEMBANGUNAN | 2022 | 86.990.781 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | PT AMTEK ENGINEERING - KK KAWASAN INDUSTRI CAMMO ESTATE BLOK D3 NO. 1 BATAM CENTRE | BENGKONG | - | PEMBANGUNAN | 2022 | 322.194.628 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL DAN SUTM | PT PUTRA JAYA BINTAN - KK PR TAMAN LESTARI BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 83.579.361 |
SEMENISASI JALAN PERUM. TERING MAS RT 002 RW 018 ( POKMAS CERI ) 459 M2 | RT 002 RW 018 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 163.615.100 |
SEMENISASI JALAN RT 002 RW 007 ( POKMAS DUKU ) 560 M2 | RT 002 RW 007 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.600.400 |
SEMENISASI JALAN RT 004 RW 021 ( POKMAS KERJA SIAGA ) 600 M2 | RT 004 RW 021 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.522.000 |
SEMENISASI JALAN KAV. BUKIT MAKMUR RT 001 RW 013 ( POKMAS PISANG ) 375 M2 | RT 001 RW 013 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.906.300 |
SEMENISASI JALAN PERUM. GMP TAHAP II RT 002 RW 004 ( POKMAS RAJAWALI 2 ) 240 M2 | RT 002 RW 004 KEL TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.945.200 |
POKMAS BM 09 PELANTAR 1, PEMBANGUNAN JERAMBAH BETON RT 06 RW 02 (PELANTAR I) | BATU MERAH RT 06 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 218.355.500 |
POKMAS BM 09 PELANTAR 2, PEMBANGUNAN JERAMBAH BETON RT 06 RW 02 (PELANTAR II) | BATU MERAH RT 06 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 218.353.300 |
SEMENISASI JALAN LINGKUNGAN P=150M L=4M (PSPK) RT 01 RW 14 PERUM RHABAYU ASRI (POKMAS PTM 1)) | RT 01 RW 14 PERUM RHABAYU ASRI KEL TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 214.854.200 |
SEMENISASI JALAN LINGKUNGAN PERUM SARMEN RAYA RT 5 DAN 6 RW 05 ( POKMAS TANJUNG 11) | RT 06 RW 05 PERUM SARMEN RAYA - TANJUNG BUNTUNG | SEI BEDUK | - | PEMBANGUNAN | 2022 | 209.229.680 |
SEMENISASI JALAN LINGKUNGAN P=190 L=3M (PSPK) RT 01 RW 15 KAV. BARU SEI DAUN (POKMAS PTM 2) | RT 01 RW 15 KAV. BARU SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 201.023.900 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=300M (PSPK) RT 02 RW 07 KAV. LAMA SEI DAUN (POKMAS PTM 3) | RT 02 RW 07 KAV. LAMA SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 69.862.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=500 (PSPK) RT 01 RW 11 KAV. BARU SEI DAUN (POKMAS PTM 4) | RT 01 RW 11 KAV. BARU SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 117.835.300 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=800M (PSPK) RT 03 RW 09 KAMPUNG BAGAN (POKMAS PTM 5) | RT 03 RW 09 KAMPUNG BAGAN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 184.248.900 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=415M (PSPK) RT 01 02 RW 07 KAV BARU SEI DAUN (POKMAS PTM 6) | RT 01 02 RW 07 KAV BARU SEI DAUN KEL. TANJUNGPIAYU | SEI BEDUK | - | PEMBANGUNAN | 2022 | 113.663.000 |
RENOVASI RUMAH TINGGAL DI PERUMAHAN MEKAR SARI BLOK D.17 | TIBAN | SEI BEDUK | - | PEMBANGUNAN | 2022 | 35.000.000 |
PENAMBAHAN RETAINING WALL BRONJONG DEPAN VILLA PANBIL BLOK BB2 TAHAP-3 | KAWASAN VILLA PANBIL, MUKA KUNING | SEI BEDUK | - | PEMBANGUNAN | 2022 | 77.395.626 |
PERBAIKAN RAILING DI CONDOTEL LANTAI 25 APARTEMENT PANBIL RESIDENCE | MUKA KUNING | SEI BEDUK | - | PEMBANGUNAN | 2022 | 17.000.000 |
TAMBAHAN RANGKA BAJA DARI ATAP DI POS JAGA TAMAN WISATA ALAM | MUKA KUNING | SEI BEDUK | - | PEMBANGUNAN | 2022 | 20.846.610 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT CHAMPION MATTRES INDONESIA - KK LATRADE INDUSTRIAL PARK BLOK E NO. 7 TG UNCANG | SEI BEDUK | - | PEMBANGUNAN | 2022 | 38.162.859 |
PEMASANGAN DAN PENGADAAN SISIP PERALATAN GARDU, RENOVASI DAN BONGKAR PERALATAN GARDU DAN KWH PANTAU | PT BATAMA ARIASINDO - KK KAW BINTANG MAKMUR INDUSTRIAL BLOK B NO. 1-2 BATAM CENTRE | SEI BEDUK | - | PEMBANGUNAN | 2022 | 26.602.502 |
PENGADAAN DAN PEMASANGAN GH-SKTM DARI DEPAN INTI SEHAT BATAM CENTRE KE GH LEGENDA UNTUK MENGATASI OV | JL. RAJA ISA BATAM CENTRE | SEI BEDUK | - | PEMBANGUNAN | 2022 | 43.473.242 |
INSPECTOR TRANSMISSION LINE 150 KV | BATAM TERSEBAR | SEI BEDUK | - | PEMBANGUNAN | 2022 | 328.067.148 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM BALOI RANTAU RT.01 RW.04 | PERUM BALOI RANTAU RT.01 RW.04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 166.179.200 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM BUKIT INDAH SUKAJADI | PERUM BUKIT INDAH SUKAJADI JL.PALEM HIJAU RT.01 RW.01 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN PERMUKIMAN RT. 01 RW. 25 KAVLING BESTARI KELURAHAN KABIL (POKMAS BESTARI VOL 585M2) | KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.573.100 |
SEMENISASI JALAN PERMUKIMAN RT. 02 RW. 24 KAVLING TAMAN BALOI KELURAHAN KABIL POKMAS JUNI (509 M2) | KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 182.327.200 |
SEMENISASI JALAN PERMUKIMAN RT. 03 RW. 21 KAVLING BIDA KABIL KELURAHAN KABIL POK. MEKAR SARI 330M2 | KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.206.000 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KAMPUNG TUA RT 01 RW 01 | KEL. PATAM LESTARI, KEC. SEKUPANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 198.636.796 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL | HARYANTO - RESTORAN GEK MOI, JL TRANS BARELANG SETELAH KEPRI CORAL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 11.696.316 |
PEMBANGUNAN GARDU 3X4 METER (SISIPAN) | POLRESTA BARELANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.980.442 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT CITRA SERAYA SUPREMNUSA - NAGOYA CITY WALK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 72.932.220 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM SKTM 20 KV | PT PRINCESS AURORA - KK PR KIBING RAYA TEMBESI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 76.819.905 |
SEMENISASI JLAN KAVLING KARTINI I RT.003 RW.002 SUNGAI HARAPAN (POKMAS HARAPAN 2) VOL. 343 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 113.361.600 |
SEMENISASI JALAN PERUM MELATI GARDEN RT.002 RW.013 SUNGAI HARAPAN (POKMAS HARAPAN 4) VOL. 240 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 81.728.900 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.001 RW.008 (HARAPAN 5) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133.628.000 |
SEMENISASI JALAN PERUM PONDOK AWAL INDAH RT.002 RW.008 (HARAPAN 6) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.402.400 |
SEMENISASI JALAN PERUM PONDOK PRATIWI III RT.006 RW.016 (POKMAS HARAPAN 7) VOL. 400M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.402.400 |
SEMENISASI JALAN KARTINI I GG. MULIA RT.004 RW.002 (POKMAS HARAPAN 1) VOLUME 400M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 130.150.900 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW.015 PERUMAHAN FAMILY DREAM, 529 M2 (POKMAS BERKAH FAMILY) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.379.600 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW.05 PERUMAHAN CITRA MAS INDAH, 450 M2 (POKMAS CITRA MANDIRI) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 155.928.300 |
PEKERJAAN PENGECATAN GEDUNG A,B, GEDUNG PARKIR DAN PEMBUATAN GUDANG AUDITORIUM-KANTOR PUSAT | JL RAJA ISA, TELUK TERING KEC. BATAM KOTA-KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 483.354.546 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW.04 KP.JABI KELURAHAN BATU BESAR, 400 M2 (POKMAS JABI BERSIH) | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 139.992.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM PURILOKA 1 RT. 002/ RW. 11 | PERUM PURILOKA 1 RT. 002/ RW. 11 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 214.953.200 |
PEKERJAAN PEMBUATAN RETAINING WALL TOWER 04 SUTT 150 KV | TANJUNT KASAM - BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 428.090.873 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) TAMAN SENTOSA JL. LAKSMANA BINTA | TAMAN SENTOSA RT 005 RW 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.054.700 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) TAMAN BUANA INDAH RT. 002/ RW. 0 | TAMAN INDAH BUANA RT 002 RW 003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.228.800 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) JL. LAKSMANA BINTAN PERUM VILL | PERUMAHAN VILLA MAS RT 001 RW 009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 192.017.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUMAHAN KAMPUNG MELAYU BUKIT J | BUKIT JODOH RT 001 RW 002 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.135.600 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM PONDOK ASRI RT. 002/ RW. 0 | PONDOK ASRI RT 002 RW 010 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.312.700 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 003/ RW. 006 | KOMPLEK NUSA JAYA RT 003 RW 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 88.185.900 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) BANDAR SRIMAS RT. 005/RW. 012 | PERUM BANDAR SRIMAS RT 05 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 36.768.000 |
Pembangunan Jalan Lingkungan Semenisasi Tebal 15cm (Swakelola PSPK) Bandar Srimas RT. 004/ RW. 012 | PERUM BANDAR SRIMAS RT 04 RW 12 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 38.938.900 |
PEMBANGUNAN BATU MIRING PERMUKIMAN DAN PERUMAHAN DENGAN BATU BATAM (SWAKELOLA PSPK) KAMPUNG MELAYU B | KAMPUNG MELAYU BUKIT JODOH RT 003 RW 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 37.167.900 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U30 (SWAKELOLA PSPK) KAMPUNG MELAYU BUKIT JODOH | KAMPUNG MELAYU BUKIT JODOH RT. 003 RW. 001 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 30.588.800 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 001/ RW. 007 | RT. 001 RW. 007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 24.295.700 |
PEMBANGUNAN SALURAN LINGKUNGAN BETON PRA CETAK TYPE U40 (SWAKELOLA PSPK) RT. 001/ RW. 006 | RT. 001 RW. 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 17.176.500 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK D RT.002 RW.015 (580M2) | PERUMAHAN ANGGREK SARI BLOK D | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN ANGGREK SARI BLOK E RT.004 RW.015 (520 M2) | PERUMAHAN ANGGREK SARI BLOK E RT. 004 RW.015 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.254.200 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN CENTRE VIEW RT.001 RW.003 (200 M2) | PERUMAHAN CENTRE VIEW RT.001 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 71.602.300 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GARDAN MASYEBA RT.002 RW.005 580M2 | PERUMAHAN GARDAN MASYEBA RT. 002 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GOLDEN LAND BLOK G RT.002 RW013 (580M2) | PERUMAHAN GOLDEN LAND BLOK G RT.002 RW.013 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GRIYA BUANA INDAH RT.001 RW.014 , 580 M2 | PERUMAHAN GRIYA BUANA INDAH RT. 001 RW.014 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE PAS BATU BELAH LINGKUNGAN PERUMAHAN CENTRE PARK BLOK H RT.002 RW.011 (97M) | PERUMAHAN CENTER PARK RT. 002 RW.011 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 191.175.600 |
DRAINASE LINGKUNGAN U30 PERUMAHAN WISMA BUANA INDAH RT.001 RW.010 (60M) | PERUMAHAN WISMA BUANA INDAH RT. 001 RW.010 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 14.129.500 |
DRAINASE LINGKUNGAN U40 PERUMAHAN TAMAN MARCHELIA RT.002 RW.009 (100M) | PERUMAHAN TAMAN MARCHELIA RT. 002 RW.009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 28.604.400 |
SEMENISASI JALAN BETON PERUM. TAMAN HANG TUAH RT.002 RW.006 | PERUM TAMAN HANG TUAH RT.002 RW.006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUM. TAMAN HANG TUAH RT.003 RW.006 | PERUM. TAMAN HANG TUAH RT.003 RW.006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE/SALURAN PERUM. HANG LEKIR RT.003 RW.005 | PERUM HANG LEKIR RT.003 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 119.762.500 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU CANTROL | PT PANTAI INDAH GALANG BARU, JL. TRANS BARELANG TG. PENGAPIT GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 82.759.367 |
SEMENISASI JALAN BETON PERUM. BIDA ASRI 1 RT.002 RW.009 | PERUM BIDA ASRI 1 RT.002 RW.009 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUMAHAN TAMAN LEGENDA BALI BLOK E RT.005 RW.013 | PERUM TAMAN LEGENDA BALI BLOK E RT.005 RW.013 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 198.322.300 |
SEMENISASI JALAN BETON PERUM LEGENDA MALAKA BLOK E RT.001 RW.004 | PERUM LEGENDA MALAKA BLOK E RT.001 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.646.400 |
SEMENISASI JALAN BETON PERUM. LEGENDA MALAKA RT.001 RW.003 | PERUM LEGENDA MALAKA RT.001 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 94.967.400 |
SEMENISASI JALAN BETON PERUM. OMA BATAM CENTRE RT.003 RW.012 | PERUM OMA BATAM CENTRE RT.003 RW.012 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.007 RW.004 | PERUM LEGENDA MALAKA RT.007 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 42.939.600 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.004 RW.004 | PERUM LEGENDA MALAKA RT.004 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.416.500 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA BLOK G RT.003 RW.004 | PERUM LEGENDA MALAKA BLOK G RT.003 RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 85.724.100 |
DRAINASE/SALURAN PERUM. LEGENDA MALAKA RT.002, RT.003, DAN RT.004 RW.003 | PERUM LEGENDA MALAKA RT.002, RT.003, DAN RT.004 RW.003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 217.229.100 |
SEMENISASI JALAN BETON PERUM. MEDITERANIA RT.001 RW.008 | PERUM MEDITERANIA RT.001 RW.008 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN KOMPLEK KEJAKSAAN NO. 01 S/D 05 RT 04 RW 02 | KOMPLEK KEJAKSAAN NO. 01 S/D 05 RT 04 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 174.945.100 |
SEMENISASI JALAN LINGKUNGAN DARI GERBANG MASJID NURUL JANNAH BLOK S NO. 39 - 55 DAN T NO. 37 RT 07 | TIBAN INDAH PERMAI RT 07 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 195.800.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN DAMAI RT 04 RW 07 | TIBAN DAMAI RT 04 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.470.200 |
SUPPLY AND ISTALLATION OF EQUIPMENT INSULATION WORKS - OSBL STORAGE TANK HOT INSULATION | JL. RAYA PELABUHAN KABILM KM. 12,5, KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.250.000.000 |
PEMBANGUNAN SPAM PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG (DAK REGULER) | PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 6.235.958.000 |
SEMENISASI JALAN PERUMAHAN NAGOYA PERMAI RT.001 RW.005 VOL. 500M2 POKMAS NAGOYA PERMAI 1 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.140.200 |
SEMENISASI JALAN RT001/RW007 KELURAHAN TANJUNG UMA | RT 001 RW 007 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 49.167.800 |
SEMENISASI JALAN PEPAYA RT.001 RW.011 VOL. 564M2 POKMAS PEPAYA2 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 202.030.400 |
Semenisasi Jalan Semangka I RT.001 RW.010 | KELURAHAN LUBUK BAJA KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.237.700 |
SEMENISASI JALAN RT002/RW003 KELURAHAN TANJUNG UMA KECAMATAN LUBUK BAJA, V= 250M2 POKMAS ANGGREK 12 | RT 002 RW 003 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 89.563.100 |
SEMENISASI JALAN PENUIN RT 02 RW 011 VOL. 560M2 POKMAS PENUIN SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.574.000 |
SEMENISASI JALAN RT002/RW011 KELURAHAN TANJUNG UMA, V=540M2 POKMAS TERITIP | RT 002 RW 011 KELURAHAN TANJUNG UMA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.463.600 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 09 BALOI MAS INDAH VOL 556M2 POKMAS 3 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 199.192.400 |
SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 03 BALOI CENTRE VOL.520M2 POKMAS 6 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.238.800 |
SEMENISASI JALAN BLOK 6 RT 4 RW 3 VOL. 560M2 POKMAS FLAMBOYAN SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.574.000 |
SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT.003 RW.007 | PERUM PURI LEGENDA RT.003 RW.007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN BETON PERUM. HANG LEKIR BLOK AA RT.001 RW.005 | PERUM HANG LEKIR BLOK AA RT.001 RW.005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 200.589.400 |
SEMENISASI JALAN BETON PERUM. PURI LEGENDA RT.004 RW.007 | PERUM PURI LEGENDA RT.004 RW.007 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 207.779.000 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 05 TAMAN BALOI MAS VOL. 656M2 POKMAS 2 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.946.100 |
SEMENISASI JALAN LINGKUNGAN RT. 03 RW. 06 BALOI MAS PERMAI VOL. 660 M2 POKMAS 7 BALOI INDAH | KELURAHAN BALOI INDAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 217.272.000 |
PENGADAAN DAN PEMASANGAN PERALATAN GI - GD - SKTM PT CAKRA WISESA KARYA MAKMUR | PT. PLN BATAM / GI BALOI - GI SEI HARAPAN DAN JALAN GAJAH MADA (KAWASAN SOUTLINKS) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.971.736.400 |
PEKERJAAN RETAININGWALL VILLA PANBIL BLOK DD NO. 71,72,73,75 DAN 76 | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 162.257.872 |
SEMENISASI JALAN DEPAN KANTOR LURAH KAMPUNG PELITA RT.001 RW.004 VOL. 360 M2 POKMAS PELITA INDAH 3 | KELURAHAN KAMPUNG PELITA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 128.975.000 |
PENGADAAN DAN PEMASANGAN GARDU PORTAL-JTM-JTR | PT SNEPAC INDO SERVICE - JL. TRANS BARELANG PANTAI MELUR GALANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.165.538 |
PEKERJAAN PERBAIKAN SEAWALL AREA JETTY 1 D I FUEL TERMINAL PULAU SAMBU | PULAU SAMBU, KELURAHAN, TJ. SARI, BELAKANG PADANG, KOTA BATAM, KEPULAUAN RIAU 29411 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.269.200 |
SEMENISASI JALAN BLOK 2 RT 4 RW 1 VOL. 484 M2 POKMAS MANGGA SEJAHTERA | KELURAHAN BATU SELICIN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 173.360.000 |
PEKERJAAN PEMANCANGAN CLUBHOUSE DAN UNIT RUMAH | BATAM CENTER | BATU AMPAR | - | PEMBANGUNAN | 2022 | 1.448.765.000 |
BM5 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING KEL. TANJUNG RIAU, KEC. SEKUPANG | KEL. TANJUNG RIAU, KEC. SEKUPANG (PERUMAHAN GALAXY PARK RT 002, RT 003, RW 014) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 184.504.196 |
PEMBANGUNAN JALAN LINGKUNGAN SEMBULANG TANJUNG RT.002/ RW.001 (POKMAS SEMBULANG 25) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.531.200 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG PASIR MERAH RT.001/ RW.002 (POKMAS SEMBULANG 27) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.719.100 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG CAMPING RT.002 RW.002 (POKMAS SEMBULANG 28) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.478.400 |
DRAINASE PARIT U40 KAMPUNG PASIR MERAH RT.001/002 (POKMAS SEMBULANG 29) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 194.485.500 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG SEI RAYA RT.001/ RW.004 (POKMAS SEMBULANG 32) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 224.221.800 |
SEMENISASI JALAN MENUJU LAPANGAN BOLA KAKI KAMPUNG SERANGGON, RT.002 RW.004 (POKMAS SEMBULANG 33) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 222.843.500 |
SEMENISASI JALAN LINGKUNGAN DARI RUMAH BUTET SAMPAI SABARUDIN RT.002/RW.005 (POKMAS SEMBULANG 35) | KELURAHAN SEMBULANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.478.400 |
KAMPUNG BATU PUTIH RT 003 RW 004 (DARI RUMAH R. NAFISAH S/D RUMAH IBRAHIM (POKMAS 25) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 201.414.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG BATU PUTIH RT 001 RW 004 (DARI RUMAH SOM (POKMAS 26) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.538.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG RANGA RT.002 RW.004 DARI MUSHOLA S/D RUMAH JEMAIN (POKMAS 27) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 89.516.000 |
BATU MIRING PENAHAN TEBING KAMPUNG PADANG PENAGA RT.001 RW.006 (POKMAS 28) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 348.428.000 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG KETAPANG RT 002 RW 006 (DARI RUMAH HITAM (POKMAS 29) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.269.000 |
DRAINASE U30 KAMPUNG PADANG RT 002 RW 003 ( DARI RUMAH JEPRI S/D KANTOR LURAH) (POKMAS 30) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 82.196.000 |
PEMBANGUNAN JALAN LINGKUNGAN KAMPUNG PADANG RT 001 RW 003 ( DARI RUMAH KAMIL (POKMAS 31) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 181.258.000 |
PEMBANGUNAN JALAN LINGKUNG KAMPUNG LANGKANG RT 001 RW 002 DARI RUMAH NASER S/D KOKOL (POKMAS 32) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.538.000 |
PEMBANGUNAN JALAN LINGKUNGAN DARI KAMPUNG DARAT PULAU RT 002 RW 001 ( DARI RUMAH DEWI (POKMAS 33) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.269.000 |
BATU MIRING PENAHAN TEBING LINGKUNGAN KAMPUNG DARAT PULAU RT.001 RW.001 (POKMAS 34) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 295.281.000 |
JERAMBAH PULAU MUBUT RT.002 RW.005 (POKMAS 35) | KELURAHAN KARAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 338.231.000 |
JERAMBAH AIR NAGA RT.01 RW.04 DARI RUMAH SAMAT KE RUMAH OKI (POKMAS AIR NAGA SEHATI 5) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 326.114.800 |
JERAMBAH DARI RUMAH ANDI KE RUMAH SIDAH RT.02 RW.04 AIR NAGA (POKMAS AIR NAGA SEHATI 6) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.652.300 |
PEMBANGUNAN JALAN LINGKUNGAN DARI RUMAH PAK AHMAD KE SUMUR RT.01 RW.04 (POKMAS AIR NAGA SEHATI 7) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 107.420.500 |
JERAMBAH RUMAH MARTINI, RIBUT SAMPAI HELDI RT.01 RW.02 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 7) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.663.000 |
JERAMBAH DARI RUMAH SALOMA RT.02 RW.02 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 8) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.675.000 |
JERAMBAH DARI AWANG SARI KE INDRA RT.03 RW.03 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 9) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 253.664.000 |
PEMBANGUNAN JALAN LINGKUNGAN RT.04 RW.03 PULAU PANJANG (POKMAS PULAU PANJANG SEHATI 11) | KELURAHAN SIJANTUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.533.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMIR RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 30) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 235.476.000 |
JERAMBAH DARI BATU MIRING KE RUMAH DOLAH RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 31) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 181.191.000 |
JERAMBAH DARI RUMAH AKMAL ATARIK KE RUMAH SARAH RT.001/RW.001 PULAU ABANG (POKMAS PULAU ABANG 32) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 369.644.000 |
JERAMBAH DARI RUMAH ANDIKA KE RUMAH MUNIR RT.002/RW.001 PULAU ABANG (POKMAS PULAU ABANG 33) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 289.905.000 |
JERAMBAH DARI RUMAH AKIB KE RUMAH ZAINURI RT.003/RW.001 PULAU ABANG (POKMAS PULAU ABANG 34) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 130.447.000 |
JERAMBAH DARI BATU MIRING KE RUMAH BASRI RT.004/RW.001 PULAU ABANG (POKMAS PULAU ABANG 35) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 126.829.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMAT DAN SAIFUL RT.002/RW.002 AIR SAGA (POKMAS PULAU ABANG 36) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 271.791.000 |
JERAMBAH DARI BATU MIRING KE RUMAH MADON RT.002 RW.002 AIR SAGA (POKMAS PULAU ABANG 37) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 163.064.000 |
DRAINASE PARIT U30 MASJID AL-FALAH RT.001 RW.002 (POKMAS PULAU ABANG 38) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 27.389.000 |
JERAMBAH DARI BATU MIRING KE RUMAH JONO RT.002/RW.003 PETONG (POKMAS PULAU ABANG 39) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 90.565.000 |
JERAMBAH DARI BATU MIRING KE RUMAH AMIR/ENGKOS RT.001/RW.003 PETONG (POKMAS PULAU ABANG 40) | KELURAHAN PULAU ABANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 144.924.000 |
SEMENISASI JALAN PERUM PONDOK PRATIWI II RT.02 RW.16 (POKMAS HARAPAN 8) VOL. 120M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 42.229.000 |
SEMENISASI JALAN PERUM TAMAN KARTINI RAYA II RT003 RW010 (POKMAS HARAPAN 9) 560M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.769.000 |
SEMENISASI JALAN PERUM TAMAN KARTINI RAYA II RT004 RW010 (DAU) (POKMAS HARAPAN 10) 444M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 148.178.800 |
SEMENISASI JALAN LINGKUNGAN PERUM. BUKIT TIBAN SELARAS BLOK A, B, C RT 06 RW 07 | PERUM. BUKIT TIBAN SELARAS BLOK A, B, C RT 06 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 141.099.200 |
SEMENISASI JALAN PERUM PUTRI FORTUNA RT.003 RW.008 (POKMAS HARAPAN 11) VOL. 400 M2 | SUNGAI HARAPAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.298.900 |
SEMENISASI JALAN LINGKUNGAN PERUM. SIRIAON REGENCY BLOK G - L RT 02 RW 11 | PERUM. SIRIAON REGENCY BLOK G - L RT 02 RW 11 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.652.000 |
SEMENISASI JALAN LINGKUNGAN TAMAN DUTA INDAH JAYA RT 01 RW 07 | TAMAN DUTA INDAH JAYA RT 01 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 78.818.300 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK B2 RT 05 RW 05 | TIBAN INDAH PERMAI BLOK B2 RT 05 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.625.000 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK L1 NO. 1 - 6 RT 01 RW 05 | TIBAN INDAH PERMAI BLOK L1 NO. 1 - 6 RT 01 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 53.319.200 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN INDAH PERMAI BLOK Z-A RT 05 RW 05 | PERUM. TIBAN INDAH PERMAI BLOK Z-A RT 05 RW 05 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 172.269.900 |
SEMENISASI JALAN LINGKUNGAN PERUM PONDOK PELANGI RT 05 RW 09 | PERUM PONDOK PELANGI RT 05 RW 09 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.067.800 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BERLIAN RT 04 RW 13 | PERUM. TIBAN BERLIAN RT 04 RW 13 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 109.431.300 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK S NO. 39 DAN BLOK S NO. 43 RT 07 RW 03 | TIBAN INDAH PERMAI BLOK S NO. 39 DAN BLOK S NO. 43 RT 07 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 97.057.400 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI BLOK T NO. 28 - 39 RT 07 RW 03 | TIBAN INDAH PERMAI BLOK T NO. 28 - 39 RT 07 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 164.710.700 |
SEMENISASI JALAN LINGKUNGAN TIBAN INDAH PERMAI LORONG 1 & 2 RT 03 RW 03 | TIBAN INDAH PERMAI LORONG 1 & 2 RT 03 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 101.693.900 |
SEMENISASI JALAN LINGKUNGAN KAVLING BAKAU SERIP RT. 003 RW. 002 POKMAS GANG KETUPAT (450 M2) | RT. 003 RW. 002 KAVLING BAKAU SERIP | BATU AMPAR | - | PEMBANGUNAN | 2022 | 160.975.100 |
SEMENISASI JALAN LINGKUNGAN KAVLING BAKAU SERIP RT. 001 RW. 002 POKMAS POSKAL GROUP (450 M2) | RT. 001 RW. 002 KAVLING BAKAU SERIP | BATU AMPAR | - | PEMBANGUNAN | 2022 | 161.194.000 |
SEMENISASI JALAN LINGKUNGAN KAVLING NONGSA RT. 005 DAN RT. 006 RW. 003 POKMAS CIPTA KARYA (535 M2) | RT. 005 DAN RT. 006 RW. 003 KAVLING NONGSA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 191.390.100 |
DRAINASE U30 AIR RAJA RT.001/RW.002 (POKMAS AIR RAJA 22) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 164.403.000 |
DRAINASE U30 SIMPANG SRI BA'I AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 23) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 109.586.000 |
DRAINASE U30 TOK SENIN AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 24) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 109.586.000 |
BATU MIRING PENAHAN TEBING AIR RAJA RT.003/RW.002 (POKMAS AIR RAJA 21) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 369.004.000 |
PEMBANGUNAN PENATAAN KAWASAN MASJID AGUNG KABUPATEN KEPULAUAN ANAMBAS | KEC. SIANTAN KEPULAUAN ANAMBAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 5.591.100.000 |
PENATAAN LENGAN SIMP. BASECAMP (LANJUTAN) | BASECAMP SAGULUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 14.673.294.551 |
PENINGKATAN DRAINASE KAWASAN AVIARI KELURAHAN BULIANG (LANJUTAN) | KAWASAN AVIARI BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 5.225.335.727 |
PENGADAAN DAN PEMASANGAN KUBIKEL GD & SKTM 20 KV | MASJID BANDARA HANGNADIM - KK KAWASAN BANDARA HANGNADIM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 174.248.140 |
SEMENISASI JALAN PERMUKIMAN RT 02 RW 22 TELUK LENGUNG (POKMAS TELUK LENGUNG MAJU 330M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.155.400 |
SEMENISASI JALAN PERMUKIMANRT 04 RW 17 KAV BIDA KABIL (POKMAS ANTORIUM 2 & 3 330 M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.147.700 |
SEMENISASI JALAN PERMUKIMAN RT 01 RW 18 KAV BIDA KABIL (POKMAS TULIP 2 165 M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 59.012.800 |
SEMENISASI JALAN LINGKUNGAN RT 02 RW 08 PERUM PURNA YUDHA (POKMAS BERSAMA KITA BISA 330 M2) | KELURAHAN KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 118.206.000 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 001 RW 003 | KAMPUNG BARU RT 001 RW 003 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 36.152.700 |
REHABILITASI JALAN LINGKUNGAN KAMPUNG PONJEN RT 003 RW 005 | KAMPUNG PONJEN RT 003 RW 005 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 197.743.170 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 001 RW 004 | KAMPUNG BARU RT 001 RW 004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 69.336.150 |
SEMENISASI JALAN LINGKUNGAN KAMPUNG BARU RT 003 RW 004 | KAMPUNG BARU RT 003 RW 004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 104.641.920 |
REHABILITASI JALAN LINGKUNGAN KAMPUNG BUKIT RT 001 RW 006 | KAMPUNG BUKIT RT 001 RW 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.992.580 |
REHABILITASI JALAN LINGKUNGAN KAMPUNG BUKIT RT 003 RW 006 | KAMPUNG BUKIT RT 003 RW 006 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 203.606.190 |
PENARIKAN SKTM, PENGISIAN PERALATAN GARDU DISTRIBUSI | YAYASAN AL KAUTSAR TELAGA PUNGGUR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 75.047.529 |
PEKERJAAN PENGGANTIAN ATAP WTP, CONTROL ROOM WTP DAN CHLORINE PLANT PLTGU TANJUNG UNCANG | PLTGU TANJUNG UNCANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 378.254.019 |
PENINGKATAN/PENATAAN JALAN SIMP. BARELANG (LANJUTAN) | SIMP. LAMPUR MERAH BARELANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 18.223.928.403 |
PENATAAN JALAN (PELEBARAN JALAN) SIMP. KABIL - SIMP. MASJID RAYA BATAM CENTRE (LANJUTAN) | SIMP. KABIL - SIMP. MASJID RAYA BATAM CENTRE | BATU AMPAR | - | PEMBANGUNAN | 2022 | 16.244.904.604 |
PEMBANGUNAN JERAMBAH BETON SELAT NENEK RT 006 RW 003 (POKMAS TEMOYONG 34 - 150 M2) | RT 006 RW 003 SELAT NENEK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 307.011.000 |
PEMBANGUNAN JERAMBAH BETON PULAU AWENG RT 007 RW 003 (POKMAS TEMOYONG 35 - 150 M2) | RT 007 RW 003 PULAU AWENG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 296.307.000 |
PEMBANGUNAN JERAMBAH BETON TEMOYONG RT 001 RW 001 (POKMAS TEMOYONG 36 - 150 M2) | RT 001 RW 001 TEMOYONG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 306.950.000 |
PEMBANGUNAN JERAMBAH BETON RT 01 RW 02 SETOKOK (POKMAS SETOKOK 44 - 120 M2) | RT 01 RW 02 SETOKOK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 229.914.000 |
PEMBANGUNAN JERAMBAH BETON RT 02 RW 01 SETOKOK (POKMAS SETOKOK 46 - 120 M2) | RT 02 RW 01 SETOKOK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 240.367.000 |
PEMBANGUNAN JERAMBAH BETON RT 01 RW 01 SETOKOK (POKMAS SETOKOK 45 - 120 M2) | RT 01 RW 01 SETOKOK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 239.193.000 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=270M (PSPK) RT 04 RW 01 SEI PANCUR (POKMAS PTM 13) | RT 04 RW 01 SEI PANCUR TANJUNGPIAYU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 76.778.900 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 06 KEL. DURIANGKANG (POKMAS DURIANGKANG 9) | RT 03 RW 06 KEL DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 206.982.600 |
SEMENISASI JALAN LINGKUNGAN RT 05 RW 01 KEL DURIANGKANG (POKMAS DURIANGKANG 11) | RT 05 RW 01 KEL DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 208.766.800 |
SEMENISASI JALAN LINGKUNGAN RT 07 RW 02 KEL. DURIANGKANG (POKMAS DURIANGKANG 13) | RT 07 RW 02 KEL DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.877.500 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=210M (PSPK) RT 02 RW 13 TELAGA SAKINAH (POKMAS PTM 11) | RT 02 RW 13 TELAGA SAKINAH TANJUNGPIAYU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 54.817.400 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 P=100M (PSPK) RT 03 RW 01 SEI PANCUR (POKMAS PTM 9) | RT 03 RW 01 SEI PANCUR - TANJUNGPIAYU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 28.458.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=270M (PSPK) RT 01 RW 08 KAVLING BAGAN | RT 01 RW 08 KAVLING BAGAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 63.493.100 |
PEMBANGUNAN / REHABILITASI DRAINASE U-40 P=170M (PSPK) RT 02 RW 08 KAV. BAGAN | RT 02 RW 08 KEL. DURIANGKANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 48.595.800 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 P=200M (PSPK) RT 01 RW 05 PANCUR PELABUHAN | RT 01 RW 05 PENCUR PELABUHAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 46.931.500 |
PENINGKATAN DRAINASE PASAR PJB KELURAHAN SAGULUNG KOTA | PASAR PJB SAGULUNG KOTA - BATU AJI-BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.684.653.496 |
JL1 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 08 RW 02 MENUJU POSYANDU | KEL. TANJUNG BUNTUNG, KEC. BENGKONG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 149.834.939 |
SEMENISASI JALAN PEMUKIMAN KAMPUNG BARU RT.002/RW.006 (POKMAS GALANG BARU 34) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 134.262.700 |
SEMENISASI JALAN PEMUKIMAN TANJUNG MELAGAN RT.002/RW.003 (POKMAS GALANG BARU 35) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 122.057.000 |
JERAMBAH AIR LINGKA RT.001/RW.005 (POKMAS GALANG BARU 36) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 241.585.300 |
JERAMBAH AIR LINGKA RT.002/RW.005 (POKMAS GALANG BARU 37) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 241.585.300 |
JERAMBAH KAMPUNG BARU RT.001/RW.006 (POKMAS GALANG BARU 38) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.402.700 |
JERAMBAH PULAU NANGA RT.001/RW.002 (POKMAS GALANG BARU 39) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 219.637.000 |
JERAMBAH TANJUNG MELAGAN RT.002/RW.003 (POKMAS GALANG BARU 40) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 329.451.000 |
BATU MIRING AIR LINGKA RT.001/RW.005 (POKMAS GALANG BARU 41) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.722.700 |
BATU MIRING AIR LINGKA RT.003/RW.005 (POKMAS GALANG BARU 42) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.444.300 |
BATU MIRING PULAU KOREK RT.004/RW.001 (POKMAS GALANG BARU 43) | KELURAHAN GALANG BARU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 265.740.000 |
JERAMBAH DARI RUMAH, SABARIAH, KAMAT, AZMAN KAMPUNG BARU RT,004/RW,002 (POKMAS KAMPUNG BARU 3) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.374.000 |
JERAMBAH DARI RUMAH SAREP, MAIN, ROSLI PULAU JEMARA, RT,005/RW,002 (POKMAS PULAU JEMARA 4) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.374.000 |
JERAMBAH DARI RUMAH, SARIMAN, SARUDIN, ASBULLAH RT. 01 RW. 01 SUBANG MAS (POKMAS SUBANG MAS 3) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 434.884.000 |
PEMBANGUNAN JALAN LINGKUNGAN SUBANG MAS, RT.001/RW.001 (POKMAS SUBANG MAS 5) | KELURAHAN SUBANG MAS | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.539.000 |
PENINGKATAN JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI (TAHAP 2) | JALAN SIMP. GLOBAL - YOS SUDARSO - SIMP. SERUNI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 7.109.805.481 |
PEKERJAAN GROUTING, INJEKSI DAN PLESTER DINDING DI BCS MALL | BCS MALL, JALAN BUNGA RAYA SEI BALOI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 40.000.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. BAITUL HASANAH RT 02 RW 19 | PERUM. BAITUL HASANAH RT 02 RW 19 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT ASRI RT 01 RW 10 | PERUM. TIBAN BUKIT ASRI RT 01 RW 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT ASRI RT 03 RW 10 | PERUM. TIBAN BUKIT ASRI RT 03 RW 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN BUKIT PERMAI RT 01 RW 15 | PERUM. TIBAN BUKIT PERMAI RT 01 RW 15 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 110.168.610 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 02 RW 03 | PERUM. TAMAN SARI HIJAU RT 02 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI RT 04 RW 02 | PERUM. TAMAN SARI RT 04 RW 02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 06 RW 03 | PERUM. TAMAN SARI HIJAU RT 06 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN SARI HIJAU RT 01 RW 03 | PERUM. TAMAN SARI HIJAU RT 01 RW 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 111.333.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. TIBAN KOPERASI RT 01 RW 07 | PERUM. TIBAN KOPERASI RT 01 RW 07 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114.078.030 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW. 012 CIPTA ASRI (POKMAS TBS 8) | RT. 04 RW. 012 CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.707.890 |
SEMENISASI JALAN LINGKUNGAN RT.07 RW. 012 CIPTA ASRI (POKMAS TBS 12) | RT.07 RW. 012 CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.727.190 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | PT GAJAH IZUMI MAS PERKASA - KAWASAN HIJRAH INDUSTRIAL ESTATE BLOK AI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 97.894.968 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM PONDOK ASRI RT.001/RW.004 | PERUM PONDOK ASRI RT.001/RW.004 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 22.738.350 |
PEMBANGUNAN JERAMBAH BETON PULAU BULUH RT 01 RW 01 ( POKMAS PULAU BULUH 31 - 135 M2 ) | RT 01 RW 01 PULAU BULUH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 265.814.000 |
PEMBANGUNAN JERAMBAH BETON PULAU BULUH RT 02 RW 01 (POKKMAS PULAU BULUH 33 - 130,5 M2) | RT 02 RW 01 PULAU BULUH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 250.159.000 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) PERUM VILLA PESONA ASRI RT 03 | PERUM VILLA PESONA ASRI RT.05 RT.03 RW.10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 204.945.960 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK) | PERUM VALENCIA RT.02 RW.25 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 199.689.100 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM BUKIT RAYA RT.02 RW.38 | PERUM BUKIT RAYA RT.02 RW.38 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 186.408.960 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM BIDA ASRI 2 RT.04 RW.17 | PERUM BIDA ASRI 2 RT.04 RW.17 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 205.407.720 |
PEMBANGUNAN JALAN LINGKUNGAN SEMENISASI TEBAL 15CM (SWAKELOLA PSPK ) PERUM ALAM RAYA RT.01 RW.15 | PERUM ALAM RAYA RT.01 RW.15 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 209.261.640 |
SEMENISASI JALAN LINGKUNGAN PERUM. TAMAN EIRENE RT 02 RW 14 | PERUM. TAMAN EIRENE RT 02 RW 14 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 113.712.840 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. BUMI SAKINAH RW 11 MELEWATI JALAN PERUM. BUANA | PERUM. BUANA IMPIAN I RW 14, KEL. TEMBESI, KEC. SAGULUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 163.297.912 |
PEMELIHARAAN GARDU DISTRIBUSI | AREA TIBAN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 58.030.000 |
PEKERJAAN RENOVASI GARDU DISTRIBUSI DAN PEMASANGAN PERALATAN ISI GARDU SERTA PEMASANGAN KABEL SKTM | PT ADI BATAMUNI JAYA - KK MEGA CIPTA INDUSTRIAL PARK BATU AMPAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 33.467.346 |
PEKERJAAN SOIL INVESTIGATION | TANJUNG UNCANG KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 88.738.739 |
SEMENISASI JALAN LINGKUNGAN RT.01 DAN 06 RW.03 | RT.01 DAN 06 RW.03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 180.670.260 |
Pembangunan Semenisasi Jalan Lingkungan RT.01 RW.01 Kav Mandiri Kel. Sungai Pelunggut | RT.01 RW 01 Kelurahan Sungai Pelunggut | BATU AMPAR | - | PEMBANGUNAN | 2022 | 105.805.200 |
SEMENISASI JALAN LINGKUNGAN RT.02 DAN 03 RW.04 KELURAHAN SUNGAI LEKOP | RT.02 DAN 03 RW.04 KELURAHAN SUNGAI LEKOP | BATU AMPAR | - | PEMBANGUNAN | 2022 | 210.996.570 |
Pembangunan Semenisasi Jalan Lingkungan RT.02,03 RW.12 Kav Mandiri Blok.E | RT.02,03 RW 12 Kelurahan Sungai Pelunggut | BATU AMPAR | - | PEMBANGUNAN | 2022 | 173.400.870 |
Semenisasi Jalan Lingkungan RT.04 dan 05 RW.04 | RT.04 dan 05 RW.04 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 210.198.480 |
Pembangunan Drainase Lingkungan U-30 RT.02 RW.13 Kav Kamboja | RT.02 RW.13 Kav Kamboja | BATU AMPAR | - | PEMBANGUNAN | 2022 | 87.337.020 |
Pembangunan Drainase Lingkungan U-30 RT.02 RW.04 Kav Kamboja | RT.02 RW.04 Kav Kamboja | BATU AMPAR | - | PEMBANGUNAN | 2022 | 88.519.170 |
Pembangunan Semenisasi Jalan Lingkungan RT.01,02,03,04 RW 14 Kav Flamboyan | RT.01,02,03,04 RW 14 Kav Flamboyan | BATU AMPAR | - | PEMBANGUNAN | 2022 | 198.429.150 |
SEMENISASI JALAN LINGKUNGAN RT.06 DAN 07 RW.06 | RT.06 DAN 07 RW.06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 208.220.460 |
SEMENISASI JALAN LINGKUNGAN RT.02 DAN 04 RW.02 | RT.02 DAN 04 RW.02 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 142.793.730 |
SEMENISASI JALAN PERUM FORTUNA RAYA I RT.01 RW.13 | RT.01 RW.13 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 211.726.950 |
PEKERJAAN PEMASANGAN INFRASTRUKTUR GAS CUSTOMER ATTACHMENT TAHUN 2022 TAHAP II AREA BATAM | PT WARLBOR INTERNATIONAL INDONESIA DAN SWESS KOPITIAM NAGOYA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 4.749.133.000 |
PEKERJAAN SALURAN DI VILLA PANBIL BLOK DD MINI | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 56.233.076 |
PEKERJAAN ELEKTRIKAL VILLA PANBIL DI BLOK DD NO. 53-55 MINI | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 75.332.500 |
SEMENISASI JALAN LINGKUNGAN RW. 01 KAV. NATO BERSERI VOLUME 525 M2 POKMAS NATO BERSERI 01 | RW. 01 KAV. NATO BERSERI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 187.141.560 |
SEMENISASI JALAN PERUM FORTUNA RAYA I RT.02 RW.13 | FORTUNA RAYA I RT.02 RW.13 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.229.780 |
SEMENISASI JALAN KAV. LAMA RT.04 RW. 10 | KAV. LAMA RT.04 RW. 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 221.108.670 |
SEMENISASI JALAN KAV. LAMA RT.06 RW.10 | KAV. LAMA RT.06 RW.10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 213.744.930 |
SEMENISASI JALAN KAV. LAMA RT.07 RW. 10 | KAV. LAMA RT.07 RW. 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.326.790 |
SEMENISASI JALAN LINGKUNGAN RT.03 RW. 012 (POKMAS TBS 5) | RT.03 RW. 012 TAMAN CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 174.871.620 |
SEMENISASI JALAN LINGKUNGAN RT.06/08 RW. 12 CIPTA ASRI (POKMAS TBS 11) | RT. 06/08 RW.12 TAMAN CIPTA ASRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 152.192.100 |
Semenisasi Jalan Lingkungan RT.09 RW. 010 Villa Muka Kuning | RT. 09 RW. 0010 VILLA MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.273.200 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW. 01 GREEN LAGUNA (POKMAS TBS 10) | RT.05 RW.01 GREEN LAGUNA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 193.727.190 |
SEMENISASI JALAN LINGKUNGAN RT.01 / 02 RW. 020 SENTOSA PERDANA (POKMAS TBS 1) | RT. 01/02 RW. 020 SENTOSA PERDANA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 121.212.000 |
Semenisasi Jalan Lingkungan RT.03 dan 04 RW.03 Kelurahan Sungai Lekop | RT.03 dan 04 RW.03 Kelurahan Sungai Lekop | BATU AMPAR | - | PEMBANGUNAN | 2022 | 197.071.620 |
SEMENISASI JALAN LINGKUNGAN RW. 22 PERUM. BATUAJI RIAU BERTUAH VOLUME 525 M2 POKMAS RIAU BERTUAH 22 | RW. 22 PERUM. BATUAJI RIAU BERTUAH KEL. SUNGAI LANGKAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 185.060.310 |
SEMENISASI JALAN LINGKUNGAN RT. 01 RW. 18 PERUM. GRIYA VOLUMEN 455 M2 POKMAS GRIYA RT. 01 RW. 18 | RW. 18 PERUM. GRIYA BATUAJI ASRI KEL. SUNGAI LANGKAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 160.016.490 |
SEMENISASI JALAN LINGKUNGAN RW. 02 KAV. NATO PERMATA VOLUME 601 M2 POKMAS NATO PERMATA 02 | RW. 02 NATO PERMATA KEL. SUNGAI LANGKAI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.704.860 |
SEMENISASI JALAN LINGKUNGAN RW. 20 PERUM. GRIYA VOLUME 510 M2 POKMAS GRIYA 20 | RW. 20 PERUM. GRIYA BATUAJI ASRI TAHAP 6 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 178.880.940 |
SEMENISASI JALAN PERUM MUKA KUNING INDAH I RT02,RT04 RW 05 VOL-600M2 | KELURAHAN BULIANG (POKMAS FLAMBOYAN 05 MEMBANGUN) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 201.583.770 |
SEMENISASI JALAN PERUM MKI I RT 06 RW 07 VOL- 600M2 | KELURAHAN BULIANG (POKMAS BANGUN KARYA MANDIRI) | BATU AMPAR | - | PEMBANGUNAN | 2022 | 202.927.980 |
ELECTRICAL RETICULATION FLEXTRONICS | JL. RASAMAIA NO. 1, MUKA KUNING SE BEDUK | BATU AMPAR | - | PEMBANGUNAN | 2022 | 13.800.000.000 |
CONCRETE PAVEMENT WORK | JLN BRIGJEN KATAMSO KM 5 TANJUNG UNCANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 2.080.000.000 |
PEMBANGUNAN SALURAN DRAINASE PRA-CETAK TYPE U40 PERUMAHAN TAMAN RAYA TAHAP III RT.03 RW.24 | PERUMAHAN TAMAN RAYA TAHAP III RT.03 RW.24 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 24.454.410 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN II RT.01 RW.09 (100 M X 4 M) - POKMAS MUTIARA LAUT 1 | RT 01 RW 09 BENGKONG HARAPAN II BENGKONG LAUT | BATU AMPAR | - | PEMBANGUNAN | 2022 | 144.610.800 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN II RT.02 RW.09 (100 M X 4 M) - POKMAS MUTIARA LAUT 2 | RT 02 RW 09 BENGKONG HARAPAN II | BATU AMPAR | - | PEMBANGUNAN | 2022 | 144.610.800 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN I RT.03 RW.08 (100 M X 3 M) - POKMAS MUTIARA LAUT 3 | RT 03 RW 08 BENGKONG HARAPAN I | BATU AMPAR | - | PEMBANGUNAN | 2022 | 108.458.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG LAUT RT.04 RW.01 (150 M X 4 M) - POKMAS MUTIARA LAUT 5 | RT 04 RW 01 BENGKONG LAUT | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN BENGKONG RATU RT.03 RW.06 (150 M X 4 M) - POKMAS MUTIARA LAUT 7 | RT 03 RW 06 BENGKONG RATU | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN KOMP. GREEN TOWN RT.01 RW.10 (50 M X 4 M) - POKMAS MUTIARA LAUT 8 | RT 01 RW 10 KOMP. GREEN TOWN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 72.305.400 |
SEMENISASI JALAN LINGKUNGAN KOMP. GREEN TOWN RT.03 RW.10 (150 M X 4 M) - POKMAS MUTIARA LAUT 9 | RT 03 RW 10 KOMP. GREEN TOWN | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN KOMP. YKB RT.03 RW.11 (150 M X 4 M) - POKMAS MUTIARA LAUT 10 | RT 03 RW 11 KOMP. YKB | BATU AMPAR | - | PEMBANGUNAN | 2022 | 216.916.200 |
SEMENISASI JALAN LINGKUNGAN BALOI HARAPAN II SAMPING MASJID DARUL MUTALIM RT. 01 RW. 03 (100M X 3M) | BALOI HARAPAN II SAMPING MASJID DARUL MUTALIM RT. 01 RW. 03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 108.458.100 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN I RT. 02 RW. 06 (125 M X 3 M) POKMAS 47 | BENGKONG HARAPAN I RT. 02 RW. 06 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 135.572.625 |
SEMENISASI JALAN LINGKUNGAN BENGKONG INDAH RT. 01 RW. 01 (40 M X 4 M) POKMAS 48 | BENGKONG INDAH RT. 01 RW. 01 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 57.844.320 |
SEMENISASI JALAN LINGKUNGAN BALOI HARAPAN II RT.04 RW.03 (120M X 3M) POKMAS INDAH 44 | BALOI HARAPAN II RT.04 RW.03 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 130.149.720 |
RENOVASI STRUKTUR DAN FINISHING DI VILLA PANBIL BLOK R NO. 12, KAWASAN VILLA PANBIL | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 35.500.000 |
SEMENISASI JALAN LINGKUNGAN BENGKONG HARAPAN II RT. 06 RW. 10 (100M X 4M) | BENGKONG HARAPAN II RT. 06 RW. 10 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 115.949.200 |
RETAINING WALL BRONJONG SEKTOR VII DI KAV.9 INDUSTRI BARU, KAWASAN PANBIL INDUSTRIAL | KAWASAN PANBIL INDUSTRIAL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 71.324.000 |
DRIVEWAY AREA VILLA PANBIL DD NO. 53-58 MINI. KAWASAN VILLA PANBIL | KAWASAN VILLA PANBIL, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 33.867.720 |
STRUKTUR TANGKI AIR DAN RUANG POMPA TAMAN WISATA ALAM | TAMAN WISATA ALAM, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 23.087.000 |
STRUKTUR RESTAURAN DI TAMAN WISATA ALAM | TAMAN WISATA ALAM, MUKA KUNING | BATU AMPAR | - | PEMBANGUNAN | 2022 | 23.844.000 |
PEMBANGUNAN BATU MIRING PERMUKIMAN DAN PERUMAHAN DENGAN BATU (SWAKELOLA PSPK) CIPTA REGENCY RT.04 | CIPTA REGENCY RT.04 RW.21 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 211.365.090 |
PEMBANGUNAN SALURAN DRAINASE PRA-CETAK TYPE U40 (SWAKELOLA PSPK) | PERUM BOTANIA GARDEN RT.02 RW.43 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 86.604.420 |
PEMBANGUNAN BATU MIRING PERMUKIMAN DAN PERUMAHAN DENGAN BATU (SWAKELOLA PSPK) | PERUM GARDAN RAYA RT.01 RW.53 | BATU AMPAR | - | PEMBANGUNAN | 2022 | 212.667.120 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW. 24 MEDIO RAYA (POKMAS TBS 2) | RT. 01 RW. 24 MEDIO RAYA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.960.970 |
SEMENISASI JALAN LINGKUNGAN RT.03 RW.15 TAMAN ANUGRAH (POKMAS TBS 7) | RT. 03 RW. 15 TAMAN ANUGRAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 176.164.770 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW. 23 CITRA LAGUNA (POKMAS TBS 4) | RT. 02 RW. 23 CITRA LAGUNA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 192.939.090 |
PEMBANGUNAN DRAINASE RT 001 RW 006 ( 375 M ) POKMAS JAMBU | RT 001 RW 006 Kel Tanjung Sengkuang | BATU AMPAR | - | PEMBANGUNAN | 2022 | 108.330.450 |
PEMBANGUNAN JALAN LINGKUNGAN AIR RAJA RT.001/RW.001 (POKMAS AIR RAJA 15) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 268.550.000 |
PEMBANGUNAN JALAN LINGKUNGAN SIMPANG LIMA S/D SOYAH RT.002/RW.001 AIR RAJA (POKMAS AIR RAJA 16) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.543.000 |
PEMBANGUNAN JALAN LINGKUNGAN AIR RAJA RT.003/RW.001 (POKMAS AIR RAJA 17) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 187.916.000 |
PEMBANGUNAN JALAN LINGKUNGAN TOK SENIN S/D MENCARAS AIR RAJA RT.002/RW.002 (POKMAS AIR RAJA 18) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 179.018.000 |
SEMENISASI JALAN LINGKUNGAN JALAN SOYAH S/D MASJID NURUL RT.001/RW.001 AIR RAJA (POKMAS AIR RAJA 19) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 362.543.000 |
PEMBANGUNAN JALAN LINGKUNGAN AIR RAJA RT.002/RW.001 (POKMAS AIR RAJA 20) | KELURAHAN AIR RAJA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 223.791.000 |
PEMBANGUNAN GARDU BETON 3,5 M2 X 5,5 M2 | PT KALIBAN BANGUN PERKASA - KK RUKO WINNER KALIBAN SUPERBLOCK KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 146.055.910 |
PEMANGKASAN POHON DIBAWAH SUTM | AREA BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 129.762.500 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM/SKTM 20KV | PT TRIAS JAYA PROPERTINDO - KK PR PUTRA JAYA RESIDANCE CLUSTER B TJ UNCANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 58.593.897 |
SEMENISASI JALAN LINGKUNGAN DARI GAPURA KP.TUA KEARAH SMK PERTIWI RT.01 RW. 08 | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 190.105.000 |
PEMBUATAN RUANGAN BARU | JL. HANG KESTURI I NO. 2 KAWASAN TERPADU KABIL | BATU AMPAR | - | PEMBANGUNAN | 2022 | 107.740.000 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW.06 KELURAHAN BATU BESAR | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 165.260.000 |
SEMENISASI JALAN LINGKUNGAN RT.01 RW.12 PERUMAHAN NONGSA ASRI RW.12 | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 181.548.000 |
SEMENISASI JALAN LINGKUNGAN RT.04 RW.08 KP.MELAYU KELURAHAN BATU BESAR | BATU BESAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 172.263.000 |
PENINGKATAN DRAINASE HOTEL 01 MENUJU MAKAM PAHLAWAN KELURAHAN BUKIT TEMPAYAN (LANJUTAN) | KELURAHAN BUKIT TEMPAYAN BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 6.296.591.820 |
PEMBANGUNAN SPAM PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG KEC. BULANG (PENDUKUNG DAK REGULER) | PULAU SELAT NENEK DAN PULAU AWENG KEL. TEMOYONG | GALANG | - | PEMBANGUNAN | 2022 | 2.291.183.000 |
OPTIMALISASI SWRO BELAKANG PADANG | BELAKANG PADANG | GALANG | - | PEMBANGUNAN | 2022 | 2.831.274.000 |
OPTIMALISASI WTP PULAU ABANG | PULAU ABANG | GALANG | - | PEMBANGUNAN | 2022 | 3.144.928.000 |
PEMBANGUNAN SPAM PULAU LABU KEL. BATU LEGONG KEC. BULANG | PULAU LABU KEL. BATU LEGONG KEC. BULANG | GALANG | - | PEMBANGUNAN | 2022 | 9.391.583.000 |
PEMBANGUNAN / REHABILITASI DRAINASE U-30 P=475M (PSPK) RT 03 RW 05 PANCUR PELABUHAN (POKMAS PTM 23) | RT 003 RW 005 PANCUR PELABUHAN TANJUNGPIAYU | GALANG | - | PEMBANGUNAN | 2022 | 84.598.800 |
JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. ANGGREK MAS I | RT 01 RW 06, KEL. TAMAN BALOI, KEC. BATAM KOTA | GALANG | - | PEMBANGUNAN | 2022 | 160.935.355 |
PEKERJAAN RELOKASI GARDU PORTAL | SEI LEKOP 2 SAGULUNG | GALANG | - | PEMBANGUNAN | 2022 | 222.690.312 |
SEMENISASI JALAN LINGKUNGAN RT.02 RW. 01 TANJUNG GUNDAP (POKMAS TBS 3) | RT.02 RW.01 TANJUNG GUNDAP | GALANG | - | PEMBANGUNAN | 2022 | 189.989.820 |
SEMENISASI JALAN LINGKUNGAN RT.05 RW. 11 BUMI SAKINAH (POKMAS TBS 9) | RT. 05 RW. 11 BUMI SAKINAH | GALANG | - | PEMBANGUNAN | 2022 | 154.636.320 |
PEMBANGUNAN DRAINASE U 40 NGENANG RT 04 RW 01 KELURAHAN NGENANG - POKMAS SINAR REMBULAN | RT 04 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 30.298.000 |
PEMBANGUNAN DRAINASE U 40 PULAU KUBUNG RT 01 RW 03 KELURAHAN NGENANG - POKMAS KUBUNG MEMBANGUN | PULAU KUBUNG RT 01 RW 03 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 30.298.000 |
PEMBUATAN DRAINASE U40 NGENANG RT 03 RW 01 KELURAHAN NGENANG - POKMAS SEJAHTERA NGENANG | RT 03 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 90.931.000 |
SEMENISASI JALAN LINGKUNGAN NGENANG RT 01 RW 01 KELURAHAN NGENANG - POKMAS BETON JAYA | RT 01 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 122.018.000 |
SEMENISASI JALAN LINGKUNGAN NGENANG RT 02 RW 01 KELURAHAN NGENANG - POKMAS KUDA LAUT | RT 02 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 183.016.000 |
SEMENISASI JALAN LINGKUNGAN NGENANG RT 04 RW 01 KELURAHAN NGENANG - POKMAS MAKMUR | RT 04 RW 01 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 183.016.000 |
SEMENISASI JALAN LINGKUNGAN PULAU TODAK RT 02 RW 03 KELURAHAN NGENANG - POKMAS TODAK ANUGERAH | PULAU TODAK RT 02 RW 03 KELURAHAN NGENANG | GALANG | - | PEMBANGUNAN | 2022 | 81.368.000 |
PEMBANGUNAN / REHABILITASI DRAINASE U-40 RT 01 RW 03 (POKMAS GAHARU) | RT 01 RW 03 KELURAHAN MANGSANG | GALANG | - | PEMBANGUNAN | 2022 | 169.348.300 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | PT GRAHA ANUGERAH KEDIRI - KK SEI BURUS SEBELAH KANAN BUKIT GALANG BARU | GALANG | - | PEMBANGUNAN | 2022 | 67.575.226 |
PEMBANGUNAN/REHABILITASI DRAINASE U-40 RT 01, 02, 03 RW 23 (POKMAS DAMAR) | RT 01 RW 23 MANGSANG | GALANG | - | PEMBANGUNAN | 2022 | 77.463.100 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 RT 08 RW 02 (POKMAS MERANTI) | MANGSANG PERMAI RT 08 RW 02 | GALANG | - | PEMBANGUNAN | 2022 | 118.706.500 |
PEMBANGUNAN/REHABILITASI DRAINASE U-30 MANGSANG PERMAI BLOK C RT 01 RW 01 | RT 01 RW 01 MANGSANG PERMAI | GALANG | - | PEMBANGUNAN | 2022 | 165.731.500 |
PEMBANGUNAN GEDUNG NEGARA SEDERHANA 1 (SATU) LANTAI RT.001/RW.001 (POKMAS REMPANG 14) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 313.101.800 |
PEMBANGUNAN GEDUNG SERBAGUNA MONGGAK RT.001/RW.004 (POKMAS REMPANG 15) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 313.101.800 |
PEMBANGUNAN JALAN LINGKUNGAN RT.002/RW.001 REMPANG CATE (POKMAS REMPANG 16) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 236.316.300 |
PEMBANGUNAN JALAN LINGKUNGAN KP. TRALING RT.005/RW.001 (POKMAS REMPANG 17) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 335.610.000 |
PEMBANGUNAN JALAN LINGKUNGAN TANJUNG KELENGKING RT.003/RW.002 (POKMAS REMPANG 18) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 268.516.600 |
PEMBANGUNAN JALAN LINGKUNGAN PASIR PANJANG RT.001/RW.003 (POKMAS REMPANG 19) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 268.544.100 |
PEMBANGUNAN JALAN LINGKUNGAN MONGGAK RT.002/RW.004 (POKMAS REMPANG 20) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 358.013.700 |
PEMBANGUNAN SEMINISASI JALAN LINGKUNGAN TG. KERTANG RT.001/RW.002 (POKMAS REMPANG 21) | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 178.985.400 |
PEMBANGUNAN BATU MIRING BELONGKENG RT.003/RW.004 | KELURAHAN REMPANG CATE | GALANG | - | PEMBANGUNAN | 2022 | 372.049.700 |
BATU MIRING LANJUTAN RT 02 RW 04 SAKURA GARDEN ( 175 M² ) POKMAS DURIAN | RT 02 RW 04 SAKURA GARDEN | GALANG | - | PEMBANGUNAN | 2022 | 218.884.230 |
PEMBUATAN RETAINING WALL TOWER 30A SUTT 150 KV PHI CONNCETION SAGULUNG - HARAPAN | PT PLN BATAM | GALANG | - | PEMBANGUNAN | 2022 | 92.904.637 |
PENGADAAN DAN PEMASANGAN PERALATAN KUBIKEL DAN SKTM 20KV DARI RUSUN BP-GD BUMI ABADI | PT BUMIABADI TEGARSAKTI 2 - JL HANG KESTURI KABIL | GALANG | - | PEMBANGUNAN | 2022 | 352.588.294 |
PENGADAAN DAN PEMASANGAN JTM & PERALATAN GARDU | PORTABLE RIZA HAERUDIN - JL TPU SEI GOA REMPANG CATE DUSUN TEBING TINGGI | GALANG | - | PEMBANGUNAN | 2022 | 253.041.329 |
PRESERVASI JALAN DAN JEMBATAN NONGSA - BATU AMPAR - TEMBESI - GALANG (PULAU BATAM - GALANG) | PULAU BATAM - GALANG | GALANG | - | PEMBANGUNAN | 2022 | 23.518.769.000 |
BLASTING & PAINTING SHOP | PT FEEN MARINE, TG RIAU KEC SEKUPANG | GALANG | - | PEMBANGUNAN | 2022 | 3.723.576.751 |
PENGADAAN DAN PEMASANGAN PAGAR SPANDEK DI LAHAN TEMBESI | INDUSTRIAL ESTATE TEMBESI | GALANG | - | PEMBANGUNAN | 2022 | 68.000.000 |
PENGADAAN DAN PEMASANGAN SKTM 20 KV DARI STO TELKOM - RUSUN BP BATAM | PT BUMIABDI TEGARSAKTI 2 - JL HANG KESTURI KABIL | GALANG | - | PEMBANGUNAN | 2022 | 277.346.242 |
PENGADAAN DAN PEMASANGAN SKTM DARI AGUNG AUTOMALL KE GD MAIDERA (PECAH BEBAN FEEDER MAWAR) | JL JENDERAL SOEDIRMAN - JL AHMAD YANI - BATAM CENTER | GALANG | - | PEMBANGUNAN | 2022 | 287.699.500 |
PENGADAANN DAN PEMASANGAN SKTM DARI GI BALOI KE AGUNG AUTOMALL (PECAH BEBAN FEEDER MAWAR) | JL JENDRAL SUDIRMAN - JL AHMAD YANI -BATAM CENTER | GALANG | - | PEMBANGUNAN | 2022 | 273.539.621 |
proyek penaataan jalan (pelebaran jalan) simp.kabil-simp. masjid raya batam centre (lanjutan) | jalan ir.sutami sekupang - batam | BATAM KOTA | - | pembangunan jalan | 2022 | 1.463.504.919.200 |
proyek pelebaran jalan simp. basecamp - simp. man | simp. base camp - simp. man | SAGULUNG | - | pelebaran jalan menambah lajur | 2022 | 146.732.945.500 |
proyek pembangunan kantor dinas tenaga kerja kota batam | Jl. Kartini I No.29-30, Sungai Harapan, Kec. Sekupang, Kota Batam, Kepulauan Riau 29422 | SEKUPANG | - | pembangunan kantor | 2022 | 169.028.459.400 |
proyek penataan jalan simp. tiban princes - cipta land tiban indah (lanjutan ) | jalan simp. tiban princes - cipta land tiban indah | SEKUPANG | - | proyek penataan jalan simp. tiban princes - cipta land tiban indah (lanjutan ) | 2022 | 1.491.534.102.700 |
Permata Residences dan Baloi Apartment | 42H5+5M2, Baloi Indah, Kec. Lubuk Baja, Kota Batam, Kepulauan Riau 29444 | LUBUK BAJA | - | pembangunan apartement | 2022 | 1.000.000.000 |
Proyek Renovasi Kantor BPJS Ketenagakerjaan Sekupang di Ruko Cemara Asri Batu Aji | Ruko Cemara Asri Batu Aji | BATU AJI | - | pembangunan | 2022 | 31.000.000 |
proyek gedung serbaguna kelurahan tanjung pinggir | kantor kelurahan tanjung pinggir | SEKUPANG | - | pembangunan gedung serbaguna | 2022 | 19.746.710.900 |
proyek gedung serbaguna rw 002 rt 003 tanjung riau | tanjung riau | SEKUPANG | - | pembangunan gedung serba guna | 2022 | 18.679.142.500 |
proyejk tiban petra mandiri | tiban | SEKUPANG | - | pembangunan ruko | 2022 | 3.247.000.000 |
Proyek Pembangunan Gedung Serbaguna di Perum Rindang Garden. | 3X4H+49W, Buliang, Kec. Batu Aji, Kota Batam, Kepulauan Riau 29425 | BATU AJI | - | pembangunan gedung serbaguna | 2022 | 1.684.229.486.700 |
proyek ruko mitra mas business komplex batam centre | Batam Centre, Ferry Terminal Btm Cntr, Teluk Tering, Batam City, Riau Islands, 24961, Indonesia | BATAM KOTA | - | pembangunan ruko , sekolah dan kampus | 2022 | 2.464.000.000 |
proyek ruko 3 lantai grand juction (pt mitra muda bersama) | jl ali klana kelurahan belian kecamatan batam kota | BATAM KOTA | - | pembangunan ruko | 2022 | 3.000.000.000.000 |
proyek gedung kantor kesehatan pelabuhan kelas 1 batam | Jl. Lumba-Lumba No.5, Batu Merah, Kec. Batu Ampar, Kota Batam, Kepulauan Riau 29444 | BATU AMPAR | - | pembangunan gedung kantor | 2022 | 2.935.252.300 |
proyek ruko kota mas marina | Perumahan Kota Mas Marina, Tj. Riau, Kec. Sekupang, Kota Batam, Kepulauan Riau | SEKUPANG | - | pembangunan ruko | 2022 | 3.000.000.000.000 |
PEMBUATAN GROUNDING/LOT | JL. BRIDJEN KATAMSO, KAWASAN INDUSTRY II TANJUNG UNCANG | BENGKONG | - | PEMBANGUNAN | 2022 | 15 |
JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. TAMAN MARCHELIA RT 01 RW 09, KEL. TAMAN BALOI, | TAMAN BALOI | BENGKONG | - | PEMBANGUNAN | 2022 | 151 |
JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. CENDANA RT 04 RW 23, KEL. BELIAN, KEC. BATAM KO | BELIAN | BENGKONG | - | PEMBANGUNAN | 2022 | 150 |
JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. BATARA RAYA RW 3, KEL. BELIAN, KEC. BATAM KOTA | BELIAN | BENGKONG | - | PEMBANGUNAN | 2022 | 149 |
JL 5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. BAITUL HASANAH RT 04 /RW 19, KEL. TIBAN BARU K | SEKUPANG | BENGKONG | - | PEMBANGUNAN | 2022 | 162 |
D3 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN KEL DURIANGKANG, KEC SEI BEDUK (B | PIAYU | BENGKONG | - | PEMBANGUNAN | 2022 | 188 |
PENGECATAN GEDUNG BENGKONG SHOPPING CENTRE | BENGKONG | BENGKONG | - | PEMBANGUNAN | 2022 | 41 |
D5 PEMB/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN KEL BULIANG KEC BATU AJI | PERUM GENTA II RT 01 RT 02; RT 01-RT 08 RW 01 DIDEPAN UNRIKA; RW 01;RT 06;PENDAWA ASRI RT 05,04/ RW 002;RT 01,02,03 / RW 003 | BENGKONG | - | PEMBANGUNAN | 2022 | 174 |
D5 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN KEL BULIANG, KEC BATU AJI | PERUM. BUMI KENCANA RT 12 RW 28; PERUM MAITRI RT 1,2,3 DAN 04 RW 25; PERUM MAITRI RT 4,5 RW 25 | BENGKONG | - | PEMBANGUNAN | 2022 | 69 |
D1 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN TANJUNG BUNTUNG | RW02; RT 03 RW 08; RT 03 RW 13; RT 05 RW 04; RT 06 RW 04 | BENGKONG | - | PEMBANGUNAN | 2022 | 174 |
PENGECETAN-PERBAIKAN/PENGECETAN JALUR PIPA DAN RAK PIPA BERLOKASI DI PT MUSIM MAS BATAM,AREA SITE A | JL. RAYA PELABUHAN CPO KABIL | BENGKONG | - | PEMBANGUNAN | 2022 | 29 |
PENGADAAN DAN PEMASANGAN SKTM DARI GD MAIDERA KE AMTEK 1-GH BARELANG (PECAH BEBAN FEEDER MAWAR) | JL JEND SOEDIRMAN-JL AHMAD YANI-BATAM CENTRE | BENGKONG | - | PEMBANGUNAN | 2022 | 255 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20KV DARI GIS KABIL-GH KABIL-STO TELKOM | PT BUMIABADI TEGARSAKTI 2 - JL HANG KESTURI KABIL | BENGKONG | - | PEMBANGUNAN | 2022 | 274 |
PENINGKATAN STRUKTUR JL. DAPUR 12 - SEI PELUNGGUT (DAK REGULER) | BATU AJI | BENGKONG | - | PEMBANGUNAN | 2022 | 5 |
PENINGKATAN STRUKTUR JL. PELABUHAN RAKYAT TANJUNG UNCANG (DAK REGULER) | TANJUNG UNCANG | BENGKONG | - | PEMBANGUNAN | 2022 | 4 |
PEMBANGUNAN GEDUNG LAYANAN KANTOR KESEHATAN PELABUHAN KELAS I BATAM TAHUN 2022 | BATU AMPAR | BENGKONG | - | PEMBANGUNAN | 2022 | 24 |
PENINGKATAN KAPASITAS JALAN DUTAMAS - LEGENDA MALAKA (LANJUTAN) | BATAM | BATAM KOTA | - | PEMBANGUNAN | 2023 | 5.515.776.300 |
PERBAIKAN ATAP BOCOR HT | PT CITRA TUBINDO TBK, JL HANG KESTURI I NO 2 KAWASAN INDUSTRI TERPADU KABIL | BENGKONG | - | PEMBANGUNAN | 2022 | 10 |
PEMBERSIHAN TANGKI TIMBUN REFRIGERATED PROPANE T-510 DAN BUTANE T-610 DI INTEGRATED TERMINAL TANJUNG | TANJUNG UBAN | BENGKONG | - | PEMBANGUNAN | 2022 | 293 |
PEMBERSIHAN TANGKI TIMBUN REFRIGERATED PROPANE T-500 DAN BUTANE T-600 DI INTEGRATED TERMINAL TJ UBAN | TANJUNG UBAN | BENGKONG | - | PEMBANGUNAN | 2022 | 293 |
PENINGKATAN JALAN TANJUNG PANTUN - TERMINAL JODOH | BATAM | BENGKONG | - | PEMBANGUNAN | 2022 | 1 |
PEMBANGUNAN GARDU BETON 3.5 M2 X 5.5 M2 | PT SGD PROPERTINDO-KK RUKO DAN INDUSTRI ALIBABA BATU AJI | BENGKONG | - | PEMBANGUNAN | 2022 | 171 |
PEMBUATAN PAGAR PENGAMAN BRC GD PORTAL | GD SAKINAH,GD MITRA MAS ERA JAYA, PR ORCHID VILLE, TEMBESI BENGKEL, KAVLING BARU SAMBAU 2, KAVLING BARU SAMBAU 3 | BENGKONG | - | PEMBANGUNAN | 2022 | 96 |
PEMBANGUNAN GARDU BETON 3.5 M2 X 5.5 M2 | PT JOLIN PERMATA BUANA - KK PR JOLIN GREEN PALACE | BENGKONG | - | PEMBANGUNAN | 2022 | 171 |
PENINGKATAN JALAN SIMP. MAN -SIMP. POLSEK BATU AJI | BATU AJI | BENGKONG | - | PEMBANGUNAN | 2022 | 4 |
CANOPY ROOF U6 BUILDING,SHELTER,STORE ROOM&MAINTENANCE OFFICE,ADDITIONAL CONCRETE SLAB&REPAIRE ROOF | PT IEG OILFIELD INDONESIA, KABIL INTEGRATED INDUSTRIAL ESTATE | BENGKONG | - | PEMBANGUNAN | 2022 | 305 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | FREDDY HENDERSON-JL TRANS BARELANG SETELAH JEMBATAN VI BARELANG | BENGKONG | - | PEMBANGUNAN | 2022 | 79 |
JL1 PEMBANGUNAN/REHABILITASI JLN LINGKUNGAN KAVLING SEI TERING BLOK L-2 RT 03/RW07 KEL. TG SENGKUANG | KEC BATU AMPAR | BENGKONG | - | PEMBANGUNAN | 2022 | 179 |
PENGADAAN DAN PEMASANGAN JOINTING DAN TERMINASI 20 KV | BATAM | BENGKONG | - | PEMBANGUNAN | 2022 | 987 |
D4 PEMB/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN KAVLING SUNGAI LEKOP RT 003 RW 007 | KEL. SUNGAI LEKOP , KEC. SAGULUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 144 |
D1 PEMB/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN DEKAT MASJID SABILAL MUTTAQIM RT03 RW03 | KEL SADAI, KEC BENGKONG | BENGKONG | - | PEMBANGUNAN | 2022 | 194 |
PEMBANGUNAN DRAINASE PERUMAHAN PUTRI TUJUH TAHAP II KELURAHAN KIBING | BATU AJI | BENGKONG | - | PEMBANGUNAN | 2022 | 443 |
PEMBANGUNAN DRAINASE RW 17 KEL. SEI BINTI | BATU AJI | BENGKONG | - | PEMBANGUNAN | 2022 | 362 |
BM1 PEMB. TEMBOK PENAHAN TANAH/BATU MIRING (KAMPUNG HARAPAN SWADAYA (SAMPING LYTECH) RT04 RW05 | KEL SADAI, KEC BENGKONG | BENGKONG | - | PEMBANGUNAN | 2022 | 197 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUMAHAN CENDRAWASIH | RT 082 RW 08, KEL. PATAM LESTARI KEC. SEKUPANG | BENGKONG | - | PEMBANGUNAN | 2022 | 164 |
PEMELIHARAAN BERKALA JL. UTAMA VIHARA - PASAR HAPPY GARDEN (DAK PENUGASAN) | KEC LUBUK BAJA | BENGKONG | - | PEMBANGUNAN | 2022 | 1 |
JL2 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. BALOI MAS ASRI RT 07 RW 03 | KEL. BALOI INDAH, KEC. LUBUK BAJA | BENGKONG | - | PEMBANGUNAN | 2022 | 188 |
PEMBANGUNAN DRAINASE TAMAN LESTARI (BLOK B&E, RW 14) | BATU AJI | BENGKONG | - | PEMBANGUNAN | 2022 | 458 |
PEMBANGUNAN DAN PENGISIAN GARDU SISIPAN PORTAL | KAVLING SEI DAUN 3 TANJUNG PIAYU (LUM.DRG.067) | BENGKONG | - | PEMBANGUNAN | 2022 | 64 |
PEKERJAAN BAJA SITE FABRICATED | PT MUSIM MAS-JL RAYA PELABUHAN CPO KABIL | BENGKONG | - | PEMBANGUNAN | 2022 | 65 |
PEMBANGUNAN GARDU DISTRIBUSI 3.5M X 5.5 M | WARGA BENGKONG PALAPA MURNI-BENGKONG PALAPA MURNI | BENGKONG | - | PEMBANGUNAN | 2022 | 146 |
PEMANGKASAN POHON DI BAWAH SUTM | AREA BATAM CENTRE | BENGKONG | - | PEMBANGUNAN | 2022 | 165 |
PENGADAAN DAN PEMASANGAN KUBIKEL GD & SKTM 20 KV | PT INTERPAK INDUSTRIES BATAM-KAWASAN PURI INDUSTRIAL PARK 2000 BLOK D9 | BENGKONG | - | PEMBANGUNAN | 2022 | 49 |
PEMBANGUNAN KANTOR DISNAKER KOTA BATAM | JL RAJA HAJI NO. 1 | BENGKONG | - | PEMBANGUNAN | 2022 | 1 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 003 RW 011, KEL. SEI PELUNGGUT | KEC. SAGULUNG | BENGKONG | - | PEMBANGUNAN | 2022 | 186 |
PEKERJAAN PEREMAJAAN PERALATAN TRANSMISI 150KV | BATAM | BENGKONG | - | PEMBANGUNAN | 2022 | 476 |
D4 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN PERUM GRIYA BATU AJI RT 05/ RW 16 | KEL. SUNGAI LANGKAI, SAGULUNG | SAGULUNG | - | PEMBANGUNAN | 2022 | 89 |
JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KAVLING MANGSANG RT.01 RW.03 | KEL. MANGSANG, KEC SUNGAI BEDUK | SAGULUNG | - | PEMBANGUNAN | 2022 | 139 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. HUTATAP RT. 01 RW. 15, KEL. SAGULUNG KOTA | KEC. SAGULUNG | SAGULUNG | - | PEMBANGUNAN | 2022 | 128 |
JL4 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN VILLA NAMORA RT 02 RW 27, KEL. SAGULUNG KOTA | KEC. SAGULUNG | SAGULUNG | - | PEMBANGUNAN | 2022 | 116 |
D4 PEMB/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN PERUM TEMBESI LESTARI RT 03, RT 04/RW 13 | KEL. TEMBESI, KEC. SAGULUNG | SAGULUNG | - | PEMBANGUNAN | 2022 | 72 |
JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KAVLING MANGSANG INDAH RT.01 RW.24 | KEL. MANGSANG, KEC SUNGAI BEDUK | SAGULUNG | - | PEMBANGUNAN | 2022 | 139 |
SEMENISASI JALAN LINGKUNGAN RW. 13 LEGENDA BALI | BALOI PERMAI | SAGULUNG | - | PEMBANGUNAN | 2022 | 153 |
PENATAAN LINGKUNGAN SEMENISASI JALAN PERUM. MEDITERANIA RT. 08 RW.08 | BATAM KOTA BALOI PERMAI | SAGULUNG | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI JLN LINGKUNGAN DI RW 04 KEL. TG SENGKUANG | KEC. BATU AMPAR | SAGULUNG | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI JALAN LINGKUNGAN RW. 27 PERUM. BUNGA RAYA, BELIAN | BATAM KOTA | SAGULUNG | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI JALAN LINGKUNGAN PERUM. PURI LEGENDA RW. 07 BALOI PERMAI | BATAM KOTA | SAGULUNG | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI JALAN LINGKUNGAN RW. 03 LEGENDA MALAKA, BALOI PERMAI | BATAM KOTA | SAGULUNG | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI JALAN LINGKUNGAN RW. 12 KOMP. SEI NAYON | BENGKONG SADAI | SAGULUNG | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN GARDAN RAYA RW. 53, BELIAN | BATAM KOTA | SAGULUNG | - | PEMBANGUNAN | 2022 | 153 |
REVITALISASI DERMAGA SELATAN FASE 1 | JL. LUMBA-LUMBA NO. 5, KEL SEI JODOH, KEC BATU AMPAR | SAGULUNG | - | PEMBANGUNAN | 2022 | 65 |
PEKERJAAN SUTM MENJADI SKTM (FEEDER SULKTAN MAHMUD) | SUTM SIMPANG 3 BATU BESAR KE GD KAMPUNG JABI BATU BESAR | SAGULUNG | - | PEMBANGUNAN | 2022 | 294 |
LOT 326-NEW CONSTRUCTION TYPE B4 FOR INFINEON | WISMA BATAMINDO JL RASAMALA 1 MUKAKUNING | SAGULUNG | - | PEMBANGUNAN | 2022 | 15 |
UPGRADE TRAFO DAN RAK TR / SISIP TRAFO | AREA BATAM CENTRE DAN TIBAN TERSEBAR | SAGULUNG | - | PEMBANGUNAN | 2022 | 77 |
PEMBANGUNAN GARDU BETON DISTRIBUSI 3.5 X 5.5 M2 | PT HARAPAN MITRA JAYA-KK PR SP LAND MARINA TANJUNG UNCANG | SAGULUNG | - | PEMBANGUNAN | 2022 | 171 |
PERBAIKAN TOILET (ROUTINE YEARLY CLEANING ALL TOILET AND MAIN HOLE) | PURI INDUSTRIAL PARK 2000 KEL BALOI PERMAI | SAGULUNG | - | PEMBANGUNAN | 2022 | 130 |
REPAINTING CORROSION DUST COLLECTOR | PT CITRA TUBINDO, JL HANG KESTURI I NO. 2 KAWASAN INDUSTRI TERPADU KABIL | SAGULUNG | - | PEMBANGUNAN | 2022 | 23 |
PENINGKATAN JALAN ARTERI GAJAH MADA TAHAP 2 | JL. GAJAH MADA TIBAN | BATAM KOTA | - | PEMBANGUNAN | 2022 | 32 |
PERBAIKAN KEBOCORAN JENDELA QA | CITRA TUBINDO | BATAM KOTA | - | PEMBANGUNAN | 2022 | 5 |
JL2 PEMBANGUNAN/ REHABILITASI JALAN LINGKUNGAN PERUM. BIDA ASRI I | KEL. BALOI PERMAI, KEC. BATAM KOTA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 173 |
PENGADAAN DAN PEMASANGAN SKTM DARI GI TG SENGKUANG KE GD GARDEN MURRENT | JL TAMALATEA TANJUNG SENGKUANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 368 |
PEMBANGUNAN GARDU BETON 3.3 M2 X 5.5 M2 | PT MAHKOTA PROPERTI SUKSES-KK PR CENTRAL HILL BATAM CENTER | BATAM KOTA | - | PEMBANGUNAN | 2022 | 171 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN SKTM 20KV DARI GI BALOI KE BATU BATAM PERMAI | JL JEND SOEDRIMAN - JL GAJAH MADA - JL TAMAN KOTA - JL BUNGA RAYA BALOI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 341 |
PENATAAN JARINGAN UTILITAS BERKAITAN PEMBANGUNAN DI KOTA BATAM | AREA BATAM CENTRE DAN BATU AJI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 174 |
D4 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN RW 13 PERUM FORTUNA RAYA 1, | KEL. SAGULUNG KOTA, KEC. SAGULUNG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 81 |
PAKET PEKERJAAN KONSTRUKSI BELANJA MODAL BANGUNAN GEDUNG PERTOKOAN/KOPERASI/PASAR | SAGULUNG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 203 |
PAKET PEKERJAAN KONTRUKSI BELANJA MODAL BANGUNAN GEDUNG PERTOKOAN/KOPERASI/PASAR | PASAR HANGTUAH | BATAM KOTA | - | PEMBANGUNAN | 2022 | 234 |
UPGRADE JARINGAN DISTRIBUSI (REKONDUKTOR TEGANGAN DROP,PECAH BEBAN JURUSAN,UPGRADE JTR&SR BERDERET) | BATAM TERSEBAR | BATAM KOTA | - | PEMBANGUNAN | 2022 | 107 |
JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN | KAV. SUNGAI PANCUR BLOK A RT.01, RW. 01, BLOK M RT. 04 RW. 0, KEL TANJUNG PIAYU KEC SUNGAI BEDUK | BATAM KOTA | - | PEMBANGUNAN | 2022 | 158 |
ROUTINE YEARLY CLEANING STP I DAN STP 2 | PURI INDUSTRIAL PARK 2000 KEL. BALOI PERMAI BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 150 |
PEMBANGUNAN PENATAAN LINGKUNGAN PERUMAHAN TPI RW 09 | BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 153 |
BAJA SITE FABRICATED ITEM PADA PROYEK FRACTIONATION PLANT 1000 TPD | PT. MUSIM MAS SITE B | BATAM KOTA | - | PEMBANGUNAN | 2022 | 100 |
PENATAAN LINGKUNGAN PATAM LESTARI, KEC SEKUPANG SEMENISASI RT04/RW09 | PATAM LESTARI, KEC SEKUPANG RT04/RW09 | BATAM KOTA | - | PEMBANGUNAN | 2022 | 175 |
PEMBANGUNAN RUANG MAJELIS DI GEREJA GMIT DI KOMPLEK POLITEKNIK | KOMPLEK POLITEKNIK RT002 | BATAM KOTA | - | PEMBANGUNAN | 2022 | 175 |
JL1 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN | BENGKONG DALAM RW 09 JALAN UTAMA ARAH KE RW 10 RW 13, RW 15, KEL. TANJUNG BUNTUNG, KEC. BENGKONG KEL TANJUNG BUNTUNG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 150 |
PEMBANGUNAN GARDU BETON 3.5 X 5.5 M2 | PT MAHKOTA PROPERTI TANGGUH - KK PR THE ICON CENTRAL BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 171 |
BM2 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING KAMPUNG UTAMA | DEKAT PENGINAPAN RT.001 RW.001 KEL LUBUK BAJA KOTA, KEC LUBUK BAJA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 154 |
PENGADAAN DAN PENGECATAN DINDING DALAM DAN LUAR | VILLA PANBIL BLOK DD NO 53-55 DOWNSLOPE, KAWASAN PANBILL, MUKA KUNING BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 111 |
WAREHOUSE WALL DISPLACEMENT | PT CITRA TUBINDO TBK JL HANG KESTURI I NO 2 KAWASAN INDUSTRI TERPADU KABIL | BATAM KOTA | - | PEMBANGUNAN | 2022 | 9 |
JL1 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KAVLING JUJUR RT.05 RW.17, KEL. TANJUNG BUNTUNG | KEC. BENGKONG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 170 |
JL1 PEMB/REHABILITASI JALAN LINGKUNGAN PESONA MANTANG RT.01,02,03,04 RW.15, KEL.TANJUNG BUNTUNG | KEC. BENGKONG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 172 |
BM1 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING RT. 25 RW. 01, KEL. BATU MERAH | KEC. BATU AMPAR | BATAM KOTA | - | PEMBANGUNAN | 2022 | 90 |
PENINGKATAN JALAN SIMP. FRANKY - SIMP. BNI, KOTA BATAM (LANJUTAN) | SIMP. FRANKY - SIMP. BNI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 5 |
PENANGANAN PEMELIHARAAN JEMBATAN KHUSUS FISABILILLAH CS. (PULAU BATAM - GALANG) | PULAU BATAM - GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 32 |
PEMBANGUNAN LAPANGAN OLAHRAGA MULTI FUNGSI (LAPANGAN+PAGAR) | KAVLING SENJULUNG BARU 2 RT 04 RW10, KOTA BATAM, NONGSA, KABIL | BATAM KOTA | - | PEMBANGUNAN | 2022 | 187 |
BM3 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING | KAVLING SENJULUNG RT 02 RW 12, KEL. KABIL, KEC. NON | BATAM KOTA | - | PEMBANGUNAN | 2022 | 59 |
PEMBANGUNAN LAPANGAN OLAHRAGA MULTI FUNGSI (LAPANGAN+PAGAR) | BUKIT PELITA INDAH RT 05 RW 20, KOTA BATAM, NONGSA, KABIL | BATAM KOTA | - | PEMBANGUNAN | 2022 | 185 |
JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KAVLING BUKIT INDAH RT. 01 RW. 05, KEL. KABIL | KEC NONGSA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 115 |
RENOVASI GEDUNG KANTOR BPJS KETENAGAKERJAAN BATAM SEKUPANG | RUKO CEMARA ASRI TEMBESI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 8 |
D3 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN DANAU INDAH PUNGGUR RT 02 RW 13 | KEC. NONGSA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 145 |
PENATAAN LINGKUNGAN DI RW 41 KEL. BELIAN KECAMATAN BATAM KOTA, SEMENUSASI DI RT 03 | BELIAN | BATAM KOTA | - | PEMBANGUNAN | 2022 | 170 |
JLH PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KEL. TANJUNG SARI KEC. BELAKANG PADANG | KEL TANJUNG SARI KEC BELAKANG PADANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 1 |
PEMANGKASAN POHON DI BAWAH SUTM | NONGSA DAN SEKITARNYA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 70 |
PEKERJAAN PEMBANGUNAN GARDU BETON 3,5 X 5,5 M2 | PT PRIMA KARYA ASIH - KK PR ETERNAL MARINA CITY | BATAM KOTA | - | PEMBANGUNAN | 2022 | 170 |
PEMBANGUNAN GARDU BETON 3,5 M2 X 5,5 M2 | PT GRAHA CIPTA NIAGA - KK PR GRAHA MENTARAU PATAM SEKUPANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 170 |
PEKERJAAN PEMBANGUNAN GARDU DISTRIBUSI 3,5 M X 5,5 M2 | PT ADI BINTAN PERMATA -KK PR & RUKO YAFINDO RESIDENCE TAHAP II | BATAM KOTA | - | PEMBANGUNAN | 2022 | 170 |
proyek pembangunan pt ganda putra sentosa | Jl. Bunga Raya No.22, Baloi Indah, Kec. Lubuk Baja, Kota Batam, Kepulauan Riau 29444 | LUBUK BAJA | - | pembangunan gedung | 2022 | 37.000.000.000.000 |
proyek ruko mega legenda | Jalan Mega Legenda, Baloi Permai, Kec. Batam Kota, Kota Batam, Kepulauan Riau 29432 | BATAM KOTA | - | pembangunan ruko | 2022 | 3.000.000.000.000 |
proyek indogrosir batamindo | Mukakuning, Muka Kuning, Kec. Sei Beduk, Kota Batam, Kepulauan Riau 29433 | SEI BEDUK | - | pembangunan warehouse indogrosir | 2022 | 77.000.000.000.000 |
PEMBANGUNAN GARDU BETON 3,5 M2 X 5,5 M2 | PT PUTERA PESISIR BATAM - KK GOLDEN CITY RESIDENCE | BATU AJI | - | PEMBANGUNAN | 2022 | 170 |
PEMB. FASUM (TAMAN BERMAIN&FASILITAS OLAHRAGA DI LINGKUNGAN KAVLING SAGUBA RT 03 RW 04 KEL.SEI.BINTI | KEC. SAGULUNG | BATU AJI | - | PEMBANGUNAN | 2022 | 152 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20KV | GD YARD DERMAGA UTARA KE SIMPANG 4 MELCHEM | BATU AJI | - | PEMBANGUNAN | 2022 | 477 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU JTM/SKTM 20KV | PT JOLIN PERMATA BUANA - KK PR JOLIN GREEN PLACE | BATU AJI | - | PEMBANGUNAN | 2022 | 152 |
PEMANGKASAN POHON DI BAWAH SUTM | PUNGGUR DAN SEKITARNYA | BATU AJI | - | PEMBANGUNAN | 2022 | 64 |
CONCRETE INSIDE RACK | JALAN HANGKESTURI I NO.2 | BATU AJI | - | PEMBANGUNAN | 2022 | 177 |
REVITALISASI FASUM DI PERUMAHAN TAMAN LESTARI | BATU AJI | BATU AJI | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI JALAN DI PURI MAS 2 BATU AJI | BATAM | BATU AJI | - | PEMBANGUNAN | 2022 | 153 |
PEMBANGUNAN FASUM PERUMAHAN BUANA VIEW | BATAM | BATU AJI | - | PEMBANGUNAN | 2022 | 152 |
REVITALISASI SARANA DAN PRASARANA BLOK D RT. 04 RW. 03 LEGENDA MALAKA, BALOI PERMAI | BATAM KOTA | BATU AJI | - | PEMBANGUNAN | 2022 | 153 |
REVITALISASI SARANA DAN PRASARANA BLOK DD RW 05 RT 04 VILLA HANG LEKIR, BALOI PERMAI | BATAM KOTA | BATU AJI | - | PEMBANGUNAN | 2022 | 153 |
PEMBANGUNAN MASJID NURUSSYIFA RT 04 RW 01, TANJUNG SENGKUANG | BATU AMPAR | BATU AJI | - | PEMBANGUNAN | 2022 | 153 |
REVITALISASI FASUM RW. 09 PERUM. CENDANA, KOTA BATAM BATAM KOTA BELIAN | BATAM KOTA | BATU AJI | - | PEMBANGUNAN | 2022 | 153 |
PEMBANGUNAN MADRASAH MUBHAROKATUL IKLAS BENGKONG HARAPAN | BENGKONG | BATU AJI | - | PEMBANGUNAN | 2022 | 153 |
REVITALISASI FASUM PERUM. ODESSA RW. 040, KOTA BATAM BATAM KOTA BELIAN | BATAM KOTA | BATU AJI | - | PEMBANGUNAN | 2022 | 152 |
PEMBANGUNAN GAPURA PERUM. VALENCIA RW 25, KOTA BATAM BATAM KOTA BELIAN | BATAM KOTA | BATU AJI | - | PEMBANGUNAN | 2022 | 76 |
REVITALISASI FASUM RW. 04 LEGENDA MALAKA, KOTA BATAM BATAM KOTA BALOI PERMAI | BATAM KOTA | BATU AJI | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI JLN LINGKUNGAN DI RW 01 KEL. SENGKUANG, KEC. BATU AMPAR | BATU AMPAR | BATU AJI | - | PEMBANGUNAN | 2022 | 153 |
PEMBANGUNAN PENATAAN LINGKUNGAN PERUMAHAN BUKIT TIBAN PERMAI | SEKUPANG | BATU AJI | - | PEMBANGUNAN | 2022 | 114 |
PEMBANGUNAN PENATAAN LINGKUNGAN RW 08 KOMPLEK KAV CENDRAWASIH TIBAN 5 | SEKUPANG | BATU AJI | - | PEMBANGUNAN | 2022 | 137 |
PEMBANGUNAN PENATAAN LINGKUNGAN PERUMAHAN MUTIARA INDAH KEL. BULIANG | BATU AJI | BATU AJI | - | PEMBANGUNAN | 2022 | 114 |
PEMBANGUNAN PENATAAN LINGKUNGAN PERUMAHAN MELATI GARDEN KEL. SUNGAI HARAPAN | SEKUPANG | BATU AJI | - | PEMBANGUNAN | 2022 | 114 |
PEMBANGUNAN SARANA PENERANGAN FASILITAS UMUM KOTA BATAM | KOTA BATAM | BATU AJI | - | PEMBANGUNAN | 2022 | 1 |
EXTEND ROOF LINE 5 | PT CITRA TUBINDO TBK, JL HANG KESTURI I NO 2, KAWASAN INDUSTRI TERPADU KABIL - BATAM | BATU AJI | - | PEMBANGUNAN | 2022 | 1 |
PEMBANGUNAN PENATAAN LINGKUNGAN PERUMAHAN MASYEBA GADING MAS | TIBAN | BATU AJI | - | PEMBANGUNAN | 2022 | 137 |
PEMBUATAN FASUM RW 09 KELURAHAN SUNGAI LANGKAI | KEC SAGULUNG | BATU AJI | - | PEMBANGUNAN | 2022 | 152 |
RENOVASI FASUM RW. 21 PERUMAHAN TAMAN CIPTA TAHAP II, KEL. TEMBESI | KEC. SAGULUNG | BATU AJI | - | PEMBANGUNAN | 2022 | 145 |
PEMBANGUNAN GARDU BETON 3.5 M2 X 5.5 M2 | PT PINANG JAYA BERSAUDARA - KK PR RENGGALI NONGSA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 171 |
PEMBANGUNAN GEDUNG SERBAGUNA RW 25 KAVLING BUKIT BESTARI KAMPUNG NIAS KEL KABIL | KEC NONGSA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 199 |
PEMBANGUNAN TOILET (JAMBAN) SMP NEGERI 47 BATAM BESERTA SANITASINYA (DAK) | BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 195 |
JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN KAVLING BIDA KABIL RT 02 RW 21 KEL KABIL KEC NONGSA | KAVLING BIDA KABIL RT 02 RW 21 KEL KABIL KEC NONGSA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 75 |
JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN RT 05 RW 10 KAMPUNG TENGAH | RT 05 RW 10 KAMPUNG TENGAH | BATU AMPAR | - | PEMBANGUNAN | 2022 | 173 |
SEMENISASI JALAN DI TIBAN MENTARAU | SEKUPANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 152 |
SEMENISASI JALAN DI PERUMAHAN BRB II | BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 152 |
SEMENISASI JALAN DI PERUMAHAN PARISA INDAH SAGULUNG | KEC SAGULUNG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 152 |
SEMENISASI JALAN DI KAVLING NATO RW 02 | BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 152 |
REVITALISASI FASUM DI PERUMAHAN BRB II | BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 153 |
PEMBANGUNAN HKBP JUBILATE | BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 152 |
PEMBANGUNAN GEREJA HKI SEI PLUNGGUT | BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 152 |
PEMBANGUNAN PINTU GERBANG PERUMAHAN HARAPAN INDAH | KOTA BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114 |
PEMBANGUNAN TPQ AL IKHLAS KOMPLEK PERUMAHAN NIRWANA RESIDEN RW 07 BUNTUNG, PEMBANGUNAN SATU RUANGAN | KEC BENGKONG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 137 |
PENATAAN LINGKUNGAN RW 03 TIBAN INDAH PERUMAHAN TIBAN BTN | SEKUPANG | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114 |
PEMBANGUNAN PENATAAN LINGKUNGAN PERUMAHAN MARINA VIEW KEL TANJUNG UNCANG | BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 133 |
PEMBANGUNAN PENATAAN LINGKUNGAN RW 06 KEL BULIANG | BATU AJI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 114 |
SEMENISASI JALAN DI PERUMAHAN ARSE INDAH SAGULONG KOTA | PERUMAHAN ARSE INDAH SAGULUNG KOTA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI LAPANGAN FASUM DI PERUMAHAN HUTATAP | PERUMAHAN HUTATAP | BATU AMPAR | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI JALAN DI PERUMAHAN TEMBESI RAYA | TEMBESI RAYA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI LAPANGAN FASUM DI RW 07 KAVLING SEROJA KIRI | RW 07 KAVLING SEROJA KIRI | BATU AMPAR | - | PEMBANGUNAN | 2022 | 153 |
PEMBANGUNAN FASUM DI PERUMAHAN TEMBESI RAYA | PERUMAHAN TEMBESI RAYA | BATU AMPAR | - | PEMBANGUNAN | 2022 | 153 |
PEMBANGUNAN GEREJA ADVENT HARI KE-7 | BATAM | BATU AMPAR | - | PEMBANGUNAN | 2022 | 153 |
PEMBANGUNAN SEKOLAH HARAPAN BANGSA SAGULUNG | SAGULUNG | SEKUPANG | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI RT 01 RW 01 KAMPUNG CUNTING TANJUNG UNCANG BATU AJI | TANJUNG UNCANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 152 |
PENATAAN LINGKUNGAN PERUMAHAN MAITRI INDAH RW 25 KEL BULIANG | BATU AJI | SEKUPANG | - | PEMBANGUNAN | 2022 | 152 |
SEMENISASI LINGKUNGAN KOMPLEK PERUMAHAN PELUTO KEL TANJUNG UNCANG KEC BATU AJI | BATU AJI | SEKUPANG | - | PEMBANGUNAN | 2022 | 152 |
SEMENISASI LINGKUNGAN KOMPLEK PATAM LESTARI KEC SEKUPANG | KOMPLEK PATAM LESTARI | SEKUPANG | - | PEMBANGUNAN | 2022 | 153 |
SEMENISASI TIBAN KAMPUNG KEL TIBAN LAMA | KEC SEKUPANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 152 |
SEMENISASI DEPAN MASJID BAITUL JANNAH KEL BULIANG | KEC BATU AJI | SEKUPANG | - | PEMBANGUNAN | 2022 | 147 |
RENOVASI BALAI PERTEMUAN TELUK MATA IKAN, KEC NONGSA, KEL SAMBAU | NONGSA | SEKUPANG | - | PEMBANGUNAN | 2022 | 76 |
REVITALISASI TPA KALAMULLAH 2 LT KAV BARU SEI DAUN RT 02 RW 15 | KEC SEI BEDDUK KEL TJ PIAYU | SEKUPANG | - | PEMBANGUNAN | 2022 | 114 |
PEMBANGUNAN GAPURA PERUM BUKIT SENTOSA ESTATE | KEC SEI BEDUK KEL MANGSANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 75 |
RENOVASI BALAI PERTEMUAN RT 03/RW 013 KEC NONGSA KEL KABIL | KEL KABIL | SEKUPANG | - | PEMBANGUNAN | 2022 | 152 |
PEMBANGUNAN SEMENISASI JALAN PERUM LEGENDA BALI RW 13 | KEL BALOI PUTRA | SEKUPANG | - | PEMBANGUNAN | 2022 | 133 |
ERECTION WORKSHOP STEEL STRUCTURE WITH TARPAULIN ROOF | KAWASAN INDUSTRI SEKUPANG NO 61 | SEKUPANG | - | PEMBANGUNAN | 2022 | 97 |
SEMENISASI LAPANGAN SMA N 17 | SAGULUNG | SEKUPANG | - | PEMBANGUNAN | 2022 | 153 |
BM2 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING DEPAN KOMPLEK WINNER RT. 03 RW.05, KEL. BALOI INDAH | KEC. LUBUK BAJA | SEKUPANG | - | PEMBANGUNAN | 2022 | 169 |
PENATAAN JALAN KAWASAN TERMINAL BATU AMPAR | TERMINAL BATU AMPAR | SEKUPANG | - | PEMBANGUNAN | 2022 | 10 |
PEMBANGUNAN MUSHOLA DI SMP 50 BATAM | BATAM | SEKUPANG | - | PEMBANGUNAN | 2022 | 169 |
PEKERJAAN PEMBUATAN DRAINASE | GUDANG SBU BATU AMPAR | SEKUPANG | - | PEMBANGUNAN | 2022 | 85 |
PENGGANTIAN CURTAIN TERPAL DARK ROOM MPI | PT CITRA TUBINDO TBK, JL HANG KESTURI I NO 2, KAWASAN INDUSTRI TERPADU KABIL | SEKUPANG | - | PEMBANGUNAN | 2022 | 7 |
UPGRADE RELAY PROTEKSI PADA GARDU PELANGGAN TM | BATAM TERSEBAR | SEKUPANG | - | PEMBANGUNAN | 2022 | 12 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU PORTAL | JONI/TAMBAK UDANG - KP PASIR PANJANG KEL. REMPANG GATE | SEKUPANG | - | PEMBANGUNAN | 2022 | 85 |
PEMANGKASAN POHON DI BAWAH SUTM | BAKAU 2 DAN SEKITARNYA | SEKUPANG | - | PEMBANGUNAN | 2022 | 72 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM/SKTM 20 KV | BENDUNGAN SEI GONG | SEKUPANG | - | PEMBANGUNAN | 2022 | 208 |
JL3 PEMB/REHABILITASI JALAN LINGKUNGAN KAVLING SENJULUNG RT 01 RW 09 KEL KABIL KEC NONGSA | KEC NONGSA | SEKUPANG | - | PEMBANGUNAN | 2022 | 54 |
JL2 PEMB/REHABILITASI JALAN LINGKUNGAN PERUM BUKIT RAYA RT 01 RW 38 KEL. BELIAN, KEC. BATAM KOTA | KEC BATAM KOTA | SEKUPANG | - | PEMBANGUNAN | 2022 | 388 |
JL3 PEMB/REHABILITASI JALAN LINGKUNGAN RT 02 RW 01, RT 04 RW 01, KEL BATU BESAR KEC NONGSA | KEC NONGSA | SEKUPANG | - | PEMBANGUNAN | 2022 | 411 |
PEKERJAAN BAJA PENGECATAN TIANG TOWER NAVIGASI | PT INTI BENUA PERKASATAMA LUBUK GAUNG DUMAI | SEKUPANG | - | PEMBANGUNAN | 2022 | 19 |
JL1 PEMB/REHABILITASI JLN LINGKUNGAN KAVLING PENATAAN KAMPUNG TUA;KAMPUNG TUA RT01 RW01;KAVLING TUA | KAMPUNG TUA | SEKUPANG | - | PEMBANGUNAN | 2022 | 385 |
JL1 PEMB/REHABILITASI JALAN LINGKUNGAN BENGKONG BARU RT 02 RW 04 KEL. BENGKONG INDAH KEC. BENGKONG | KEC BENGKONG | SEKUPANG | - | PEMBANGUNAN | 2022 | 291 |
JL1 PEMB/REHABILITASI JALAN LINGKUNGAN JALAN UTAMA BENGKONG TANJUNG BUNTUNG ATAS RT. 001 RW. 001 | KEL. TANJUNG BUNTUNG, KEC. BENGKONG | SEKUPANG | - | PEMBANGUNAN | 2022 | 188 |
CONSTRUCTION OF METAL TRASH AREA (NEAR POS 5) | JALAN HANGKESTURI I NO. 2, KABIL BATAM | SEKUPANG | - | PEMBANGUNAN | 2022 | 75 |
PERBAIKAN ATAP BOCOR BERDASARKAN LIST TERLAMPIR | PT CITRA TUBINDO | SEKUPANG | - | PEMBANGUNAN | 2022 | 11 |
REPAIR ROOF LEAKAGE (4 AREA) AT SURFACE TREATMENT COUPLING SHOP AREA | PT CITRA TUBINDO TBK | SEKUPANG | - | PEMBANGUNAN | 2022 | 7 |
RENOVASI LOCKER ROOM UNTUK DIJADIKAN RUANG PERLENGKAPAN | PT CITRA TUBINDO TBK | SEKUPANG | - | PEMBANGUNAN | 2022 | 27 |
PEKERJAAN PEMELIHARAAN PREVENTIVE TM, TR DAN GARDU | BATAM TERSEBAR | SEKUPANG | - | PEMBANGUNAN | 2022 | 94 |
D3 PEMBANGUNAN/REHABILITASI DRAINASE/SALURAN LINGKUNGAN PERMUKIMAN KAVLING BUKIT INDAH | RT. 01 RW. 05, KEL. KABIL, KEC. NONGSA | SEKUPANG | - | PEMBANGUNAN | 2022 | 40 |
PEMBANGUNAN BATU MRING RT 002 RW 003, WAHDINA | KEL SEKANAK RAYA, KEC BELAKANG PADANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 137 |
PERBAIKAN DRAINASE PERUM GRAHA MAS RT 02 RW 13 | TANJUNG RIAU, KEC. SEKUPANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 106 |
PEMBANGUNAN RUMAH IMAM PERUM BAMBU KUNING | BUKIT TEMPAYAN BATU AJI | SEKUPANG | - | PEMBANGUNAN | 2022 | 129 |
SEMENISASI PERUM PURI MALAKA RT 04 | KEL. TIBAN BARU, KEC. SEKUPANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 114 |
PEMBANGUNAN LAPANGAN OLAHRAGA PERUM AVIARI GARDEN RT 03 RW 25 | KEL. SUNGAI LANGKAI, KEC. SAGULUNG | SEKUPANG | - | PEMBANGUNAN | 2022 | 122 |
PEMBANGUNAN DRAINASE KAVLING SAGUBA RW 06 | KEL. SUNGAI BINTI, KEC. SAGULUNG | SEKUPANG | - | PEMBANGUNAN | 2022 | 114 |
PEMBANGUNAN BATU MIRING PERUM TIBAN RIAU BERTUAH RT 06 RW 15 | KEL. PATAM LESTARI, KEC. SEKUPANG | SEKUPANG | - | PEMBANGUNAN | 2022 | 114 |
JL3 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM. PURI AGUNG I, RT 01/RW 05, KEL. MANGSANG | KEC SEI BEDUK | SEKUPANG | - | PEMBANGUNAN | 2022 | 112 |
PEKERJAAN UPGRADE ARESTER & FCO / ARESTER & PEMASANGAN GROUNDING | PT PLN BATAM | SEKUPANG | - | PEMBANGUNAN | 2022 | 132 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU DAN JTM/SKTM 20KV | PT CERAH CAHAYA CEMERLANG - KK PR PESONA SEI LEKOP TAHAP 3 | SEKUPANG | - | PEMBANGUNAN | 2022 | 74 |
PEMBANGUNAN SALURAN DI KAWASAN INDUSTRI BATU AMPAR (DEPAN MC DERMOTT) | BATU AMPAR | SEKUPANG | - | PEMBANGUNAN | 2022 | 2 |
SEPTIC TANK CONSTRUCTION | JALAN HANG KESTURI I NOMOR 14 KAWASAN INDUSTRI TERPADU KABIL | SEKUPANG | - | PEMBANGUNAN | 2022 | 21 |
PENATAAN LINGKUNGAN PERUMAHAN TIBAN 1 1 RW 04 | TIBAN | SEKUPANG | - | PEMBANGUNAN | 2022 | 137 |
PEMBANGUNAN PENATAAN LINGKUNGAN PERUMAHAN TIBAN HOUSING KOTA BATAM | PERUMAHAN TIBAN HOUSING KOTA BATAM | SEKUPANG | - | PEMBANGUNAN | 2022 | 137 |
PEMBUATAN FASUM RW 10 MARINA VIEW, KEL. TANJUNG UNCANG, KEC BATU AJI, KOTA BATAM | KEC BATU AJI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 152 |
REVITALISASI FASUM RW 02 BENGKONG INDAH KEC BENGKONG BATAM | RW 02 BENGKONG INDAH KEC BENGKONG BATAM | BATAM KOTA | - | PEMBANGUNAN | 2022 | 152 |
SEMENISASI LAPANGAN FASUM RW 03 BUKIT KAMBOJA | BUKIT KAMBOJA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 153 |
KONTRAK PAYUNG PERBAIKAN SIPIL & ARSITEKTUR PERIODE TAHUN 2022 DI RDP DAN KANTOR WILAYAH KOTA BATAM- | JL ANGGREK NO. 2 PULAU SAMBU | BATAM KOTA | - | PEMBANGUNAN | 2022 | 1 |
PEKERJAAN PEMBERSIHAN LAHAN DI PULAU NIPA | PULAU NIPA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 70 |
PERBAIKAN ATAP DAN PENGECATAN TOOL ROOM | PT CITRA TUBINDO, JL HANG KASTURI KABIL | BATAM KOTA | - | PEMBANGUNAN | 2022 | 40 |
BM1 PEMBANGUNAN TEMBOK PENAHAN TANAH/BATU MIRING BENGKONG PALAPA RT 4 RW 6 | TANJUNG BUNTUNG, BENGKONG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 154 |
PENGECATAN DAN PENGGANTIAN ATAP RUSAK DI TOOL ROOM 2 | PT CITRA TUBINDO TBK, JL HANG KESTURI I NO 2, KAWASAN INDUSTRI TERPADU KABIL | BATAM KOTA | - | PEMBANGUNAN | 2022 | 48 |
REPAIR AND REPLACEMENT OF WH SPANDEX ROOF | PT CITRA TUBINDO TBK | BATAM KOTA | - | PEMBANGUNAN | 2022 | 27 |
RELOKASI GARDU AKIBAT PEKERJAAN DINAS PEKERJAAN UMUM KOTA BATAM | UNRIKA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 196 |
PEMBANGUNAN GARDU BETON 3,5 M2 X 5,5 M2 | PT SUKSES BATAM SINDO - KK PR GLORY PARIS BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 171 |
PEKERJAAN PEMBANGUNAN GARDU BETON 3,5 X 5,5 M2 | PT BINTANG SAPTA SEJATI - KK PR CITRA RENGGALI CLUSTER ASOKA MARINA | BATAM KOTA | - | PEMBANGUNAN | 2022 | 171 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV | SIMPANG 3 BATU MERAH KE GI SENGKUANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 544 |
PENGADAAN DAN PEMASANGAN PERALATAN GARDU CANTOL | YAYASAN BUNDA BERBELAS KASIH KP SIJANTUNG-GALANG | BATAM KOTA | - | PEMBANGUNAN | 2022 | 27 |
Proyek Apartemen Opus Bay Batam | Jl.KH.Ahmad Dahlan Jl. Marina Waterfront City No.1, Tj. Riau, Kec. Sekupang, Kota Batam, Kepulauan Riau 29422 | SEKUPANG | - | pembangunan apartemen dan villa | 2022 | 380.000.000.000.000 |
Kantor BLK Kementerian Tenaga Kerja | kawasan Industri kabil | NONGSA | - | pembangunan kantor | 2022 | 3.000.000.000.000 |
Proyek Pembangunan Cafe de Sand | Tj. Buntung, Kec. Bengkong, Kota Batam, Kepulauan Riau | BENGKONG | - | pembangunan cafe | 2022 | 300.000.000.000 |
Proyek Pembangunan Ruang Kelas Baru Ibtidaiyah Negeri 2 Batam | sungai langkai,kec sagulung, kota batam | SAGULUNG | - | pembangunan ruang kelas baru | 2022 | 63.449.487.000 |
Pembangunan Perumahan Cluster Violet & Mawar Botania | Botania | BATAM KOTA | - | Proyek Perumahan | 2022 | 15.000.000.000 |
Masjid Agung Batam Centre | Batam Centre | BATAM KOTA | - | Revitalisasi Gedung | 2023 | 300.000.000 |
Pembangunan Gedung Serbaguna I Unit, Kantor Kelurahan Batu Selicin RT. 03 RW. 11 | Kantor Kelurahan Batu Selicin | LUBUK BAJA | - | Pengawasan Jasa Konstruksi | 2023 | 199.594.000 |
PROYEK RENOVASI SWISS-BELHOTEL | Jl. Duyung Sei Jodoh, Sungai Jodoh, Kec. Batu Ampar, Kota Batam, Kepulauan Riau 29432 | BATU AMPAR | - | Renovasi Hotel | 2023 | 1.000.000.000 |
PEMBANGUNAN RENOVASI KANTOR PLASA TELKOM PELITA | PELITA | LUBUK BAJA | - | PEMBANGUNAN | 2023 | 1.000.000.000 |
PROYEK PEMBANGUNAN RUANG LABORATORIUM KOMPUTER BESERTA PERABOTANNYA SMP ISLAM PLUS AN-NAHDHAH | Tiban Koperasi, Jl. Tiban Koperasi Blok K, Tiban Baru, Kec. Sekupang, Kota Batam, Kepulauan Riau 29425 | SEKUPANG | - | RENOVASI SEKOLAH | 2023 | 430.890.300 |
PEKERJAAN STRUKTUR, ARSITEKTUR DAN STP CONDOMINIUM 3 THE NOVE DI NUVASA BAY | JL. HANG LEKIU, SAMBAU, KEC. NONGSA, KOTA BATAM, KEPRI | NONGSA | - | PEMBANGUNAN | 2021 | 65.450.000.000 |
SEMENISASI JALAN LINGKUNGAN PERUM. MUKA KUNING PARADISE BLOK R, BLOK G DAN BLOK H RT 02 RW 05 | MUKA KUNING PARADISE BLOK R, BLOK G DAN BLOK H RT 02 RW 05 | SEI BEDUK | - | PEMBANGUNAN | 2023 | 170.259.000 |
PENATAAN JALAN KAWASAN TERMINAL BATU AMPAR | BATU AMPAR | BATU AMPAR | - | PEMBANGUNAN | 2022 | 10.571.668.180 |
LOT 326-NEW CONSTRUCTION TYPE B4 FOR INFINEON | Jl. Hang Jebat Komplek Ruko DePold Block A No. 8,9,10, Batu Besar, Nongsa, Batam City, Riau | NONGSA | - | PEMBANGUNAN | 2022 | 15.527.000.000 |
RUMAH RW 01 KELURAHAN SUKAJADI | RUMAH RW 01 KELURAHAN SUKAJADI | BATAM KOTA | - | PEMBANGUNAN | 2022 | 1.000.000.000 |
CONSTRUCTION OF TWO UNITS 700MT PKFAD TANKS AND TWO UNITS OF 7500MT STRORAGE TANKS | Jl. Hang Jebat Komplek Ruko DePold Block A No. 8,9,10, Batu Besar, Nongsa, Batam City, Riau | NONGSA | - | PEMBANGUNAN | 2022 | 23.500.000.000 |
INTERIOR DESIGN AND MILLWORKS CONTRACT PROPOSED INDIGO HOTEL & HOLIDAY INN RESORT DEVELOPMENT | WATERFRONT CITY, TANJUNG RIAU, SEKUPANG, BATAM | SEKUPANG | - | PEMBANGUNAN | 2021 | 68.131.818.182 |
SEMENISASI JALAN LINGKUNGAN PERUM SIERRA BLOK B NO. 1-20 RT 04 RW 10 KEL BUKIT TEMPAYAN | PERUM SIERRA BLOK B NO. 1-20 RT 04 RW 10 KEL BUKIT TEMPAYAN | BATU AJI | - | PEMBANGUNAN | 2023 | 170.259.000 |
SEMENISASI JALAN LINGKUNGAN BAMBU KUNING RT 04 DAN RT 05 RW 03 KELURAHAN BUKIT TEMPAYAN | JALAN LINGKUNGAN BAMBU KUNING RT 04 DAN RT 05 RW 03 KELURAHAN BUKIT TEMPAYAN | BATU AJI | - | PEMBANGUNAN | 2023 | 152.268.000 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUMAHAN GLORY CAHAYA PERMAI RT.002 RW.023 | JALAN LINGKUNGAN PERUMAHAN GLORY CAHAYA PERMAI RT.002 RW.023 | BATU AJI | - | PEMBANGUNAN | 2023 | 159.319.089 |
SEMENISASI JALAN LINGKUNGAN BAMBU KUNING RT 3 RW 12 KELURAHAN BUKIT TEMPAYAN | JALAN LINGKUNGAN BAMBU KUNING RT 3 RW 12 KELURAHAN BUKI | BATU AJI | - | PEMBANGUNAN | 2023 | 68.322.000 |
PENINGKATAN JALAN YOS SUDARSO TAHAP 4 | KEC. BATU AMPAR, KEL. SERAYA | BATU AMPAR | - | PEMBANGUNAN | 2023 | 28.654.249.492 |
REVITALISASI RUMAH IBADAH HKBP PERGAMOS DAPUR 12 (LANJUTAN) KAVLING KAMBOJA DAPUR 12 KEC.SAGULUNG | HKBP PERGAMOS DAPUR 12 (LANJUTAN) KAVLING KAMBOJA DAPUR 12 KEC.SAGULUNG | SAGULUNG | - | PEMBANGUNAN | 2023 | 180.010.811 |
JL2 PEMB/REHABILITASI JALAN LINGKUNGAN PERUM AKU TAHU 3 BLOK F RT.002 RW.013, KEL. SUNGAI PANAS | PERUM AKU TAHU 3 BLOK F RT.002 RW.013, KEL. SUNGAI PANAS | BATAM KOTA | - | PEMBANGUNAN | 2023 | 65.155.252 |
RETURNING FAIRWAY, PENDALAMAN KOLAM, PERBAIKAN BUGGY TRACK, RENOVASI TEE BOX DAN DRAINASE | KEC. SEI BEDUK, KEL. MUKA KUNING | SEI BEDUK | - | PEMBANGUNAN | 2023 | 817.000.000 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM PERMATA LAGUNA RT 06 RW 17 KEL TANJUNG UNCANG | PERUM PERMATA LAGUNA RT 06 RW 17 KEL TANJUNG UNCANG | SAGULUNG | - | PEMBANGUNAN | 2023 | 145.649.568 |
SEMENISASI JALAN LINGKUNGAN PERUM PERMATA HIJAU JLN DR BLKG RUKO SD SIMP POSYANDU RT02 RW06 | PERUM PERMATA HIJAU JLN DR BLKG RUKO SD SIMP POSYANDU RT02 RW06 | BATU AJI | - | PEMBANGUNAN | 2023 | 80.320.000 |
LANJUTAN PEMBANGUNAN GAPURA RT 04 RW 25 PERUMAHAN VALENCIA | PERUMAHAN VALENCIA | BATAM KOTA | - | PEMBANGUNAN | 2023 | 153.001.802 |
SEMENISASI BENGKONG SADAI RW 13 KOTA BATAM | BENGKONG SADAI RW 13 KOTA BATAM | BENGKONG | - | PEMBANGUNAN | 2023 | 161.873.874 |
SEMENISASI JALAN MASUK KE PERUMAHAN BUKIT CITRA LAGUNA KEL.TEMBESI KEC.SAGULUNG KOTA BATAM | BUKIT CITRA LAGUNA KEL.TEMBESI KEC.SAGULUNG KOTA BATAM | SAGULUNG | - | PEMBANGUNAN | 2023 | 116.884.685 |
REVITALISASI RUMAH IBADAH HKBP MARANATHA JALAN RAYA KAVLING BATU AJI LAMA RT 04 RW 09 | HKBP MARANATHA JALAN RAYA KAVLING BATU AJI LAMA RT 04 RW 09 | BATU AJI | - | PEMBANGUNAN | 2023 | 162.049.550 |
SEMENISASI JALAN LINGKUNGAN RW 27 PERUMAHAN BUNGA RAYA, KOTA BATAM KECAMATAN BATAM KOTA KEL BELIAN | PERUMAHAN BUNGA RAYA, KOTA BATAM KECAMATAN BATAM KOTA KEL BELIAN | BATAM KOTA | - | PEMBANGUNAN | 2023 | 153.090.991 |
SEMENISASI JALAN LINGKUNGAN RW 20 TANJUNG BUNTUNG, KOTA BATAM KECAMATAN BENGKONG KEL TANJUNG BUNTUNG | KECAMATAN BENGKONG KEL TANJUNG BUNTUNG | BENGKONG | - | PEMBANGUNAN | 2023 | 153.062.162 |
SEMENISASI JALAN LINGKUNGAN RW 023 PERUMAHAN CENDANA, KOTA BATAM KECAMATAN BATAM KOTA KEL BELIAN | KECAMATAN BATAM KOTA KEL BELIAN | BATAM KOTA | - | PEMBANGUNAN | 2023 | 153.101.802 |
PEMBANGUNAN GARDU BETON 3.5 M2 X 5.5 M2 | KECAMATAN BATAM KOTA KEL BELIAN | BATAM KOTA | - | PEMBANGUNAN | 2023 | 171.977.120 |
JALAN KORIDOR UTAMA PELABUHAN - BANDARA (RUAS SIMP. LALUAN MADANI - BUNDARAN PUNGGUR) | PELABUHAN - BANDARA (RUAS SIMP. LALUAN MADANI - BUNDARAN PUNGGUR) | NONGSA | - | PEMBANGUNAN | 2023 | 310.990.162.151 |
PENGADAAN DAN PEMASANGAN KUBIKEL DAN SKTM 20 KV tes | PT BATINDO MEBEL PERKASA-KK PANAU KABIL | NONGSA | - | - | 0 | 135.779.794 |
PEMBANGUNAN GARDU BETON DISTRIBUSI 3.5M X 5.5 M tes | PT INTAN KARYA LESTARI-KK PR RHABAYU ESTUARIO PATAM SEKUPANG | SEKUPANG | - | - | 0 | 146.055.910 |
PEMINDAHAN SLUDGE TOILET tes | PANASONIC INDUSTRIAL DEVICES BATAM | BATAM KOTA | - | - | 0 | 1.363.636 |
PEKERJAAN SISIP PERALATAN GARDU DISTRIBUSI DI GARDU EXISTING DAN KWH PANTAU tes | PT EKADI TRISAKTI MAS-KK PR PERMATA RIVERVIEW BUKIT PERMATA | LUBUK BAJA | - | - | 0 | 22.656.774 |
SUPPLY OR FABRICATION AND INSTALLATION TURBIN VENTILATOR tes | PT. CITRA TUBINDO TBK JL HANG KESTURI I NO 2 KAWASAN INDUSTRI TERPADU KABIL | NONGSA | - | - | 0 | 39.285.000 |
CRAFT LABOR HGPI UNTUK PEKERJAAN HGPI UNIT-1 DI ELB tes | PT.ENERGI LISTRIK BATAM | BATU AJI | CV TIARA SUKSES BERSAUDARA | - | 2031 | 129.500.000 |
PEMASANGAN DAN PENGADAAN SISIP PERALATAN GARDU BETON DAN KWH PANTAU GARDU tes | PT PANDUTAMA PERKASA-KK PR PONDOK BUKIT BARELANG TAHAP 2 TG PIAYU | SEI BEDUK | - | - | 0 | 23.477.386 |
PEMBANGUNAN DRAINASE PERUMAHAN LEGENDA BALI KELURAHAN BALOI PERMAI | PERUMAHAN LEGENDA BALI KELURAHAN BALOI PERMAI | BATAM KOTA | - | PEMBANGUNAN | 2023 | 1.424.301.079 |
PEMINDAHAN MATERIAL DARI GUDANG BATU AMPAR KE GI TANJUNG SENGKUANG | TANJUNG SENGKUANG | BATU AMPAR | - | PEMBANGUNAN | 2023 | 180.000.000 |
PENGADAAN DAN PEMASANGAN SKTM DARI BANK BNI KP UTAMA-GH THAMRIN CITY (PECAH BEBAN FEEDER PALM PUTRI) | KAMPUNG UTAMA | SEKUPANG | - | PEMBANGUNAN | 2023 | 186.088.153 |
JL5 PEMB./REHABILITASI JALAN LINGKUNGAN PERUMAHAN TANJUNG SAKINAH RT01-RT04 RW 14,KEL PATAM LESTARI | PERUMAHAN TANJUNG SAKINAH RT01-RT04 RW 14,KEL PATAM LESTARI | SEKUPANG | - | PEMBANGUNAN | 2023 | 149.515.474 |
JL5 PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM BAMBU KUNING RW 03 RT 02 KEL BUKIT TEMPAYAN | PERUM BAMBU KUNING RW 03 RT 02 KEL BUKIT TEMPAYAN | BATU AJI | - | PEMBANGUNAN | 2023 | 145.675.831 |
SEMENISASI JALAN LINGKUNGAN PERUM PERMATA HIJAU JALAN BLOK P1 S/D P7 RT 4 RW 6 KEL BUKIT TEMPAYAN | PERUM PERMATA HIJAU JALAN BLOK P1 S/D P7 RT 4 RW 6 KEL BUKIT TEMPAYAN | BATU AJI | - | PEMBANGUNAN | 2023 | 80.320.000 |
SEMENISASI JALAN LINGKUNGAN PERUM PERMATA HIJAU BLOK K PERBATASAN BLOK G DAN F RT 03 RW 06 | PERUM PERMATA HIJAU BLOK K PERBATASAN BLOK G DAN F RT 03 RW 06 | BATU AJI | - | PEMBANGUNAN | 2023 | 61.174.000 |
SEMENISASI PERUMAHAN ANGGREK MAS 1 KOTA BATAM | ANGGREK MAS 1 KOTA BATAM | BATAM KOTA | - | PEMBANGUNAN | 2023 | 161.853.153 |
PEMBANGUNAN SARANA DAN PRASARANA RW 10 , KOTA BATAM KECAMATAN BATAM KOTA KELURAHAN BELIAN | RW 10 , KOTA BATAM KECAMATAN BATAM KOTA KELURAHAN BELIAN | BATAM KOTA | - | PEMBANGUNAN | 2023 | 153.009.009 |
SEMENISASI JALAN CENTRA MELATI BATAM KOTA KOTA BATAM | CENTRA MELATI BATAM KOTA KOTA BATAM | BATAM KOTA | - | PEMBANGUNAN | 2023 | 161.873.874 |
REVITALISASI SARANA DAN PRASARANA ALAMAT RT 03 RW 12 PERUMAHAN OMA, KOTA BATAM KECAMATAN BATAM KOTA | RT 03 RW 12 PERUMAHAN OMA, KOTA BATAM KECAMATAN BATAM KOTA | BATAM KOTA | - | PEMBANGUNAN | 2023 | 153.044.144 |
SEMENISASI JLN LINGKUNGAN ALAMAT RW 46 PERUMAHAN BOTANIA GARDEN,KOTA BATAM KEC BATAM KOTA KEL BELIAN | RW 46 PERUMAHAN BOTANIA GARDEN,KOTA BATAM KEC BATAM KOTA KEL BELIAN | BATAM KOTA | - | PEMBANGUNAN | 2023 | 153.122.523 |
REVITALISASI RUMAH IBADAH HKBP MUNSON LYMAN DAPUR 12 KEL. SUNGAI PELUNGGUT | MUNSON LYMAN DAPUR 12 KEL. SUNGAI PELUNGGUT | SAGULUNG | - | PEMBANGUNAN | 2023 | 180.054.955 |
SEMENISASI JALAN LINGKUNGAN PERUM SIERRA BLOK A NO 45-56 RT 03 RW 10 KELURAHAN BUKIT TEMPAYAN | PERUM SIERRA BLOK A NO 45-56 RT 03 RW 10 KELURAHAN BUKIT TEMPAYAN | BATU AJI | - | PEMBANGUNAN | 2023 | 170.259.000 |
PEMBANGUNAN RUMAH MASSAL LAVISH HILLS 2.1 | KELURAHAN BELIAN BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 1.370.616.764 |
REVITALISASI MASJID AGUNG BATAM CENTRE (TAHUN JAMAK) | BATAM CENTRE | BATAM KOTA | - | PEMBANGUNAN | 2022 | 167.987.999.952 |
PAKET PEKERJAAN JASA PEMASANGAN UNIT AC & FAN PROYEK PEMBANGUNAN GEDUNG REKTORAT UIB | Jl. Gajah Mada, Tiban Indah, Kec. Sekupang | SEKUPANG | - | PEMBANGUNAN | 2022 | 2.230.216.216 |
REVITALISASI DERMAGA UTARA BATU AMPAR FASEI | DERMAGA UTARA BATU AMPAR | BATU AMPAR | - | PEMBANGUNAN | 2023 | 61.924.842.335 |
Replacement works for HIGH BAY LIGHT Workshop Line-1 at PT. Hunting Energy Asia | KABIL KECAMATAN NONGSA | NONGSA | - | PEMBANGUNAN | 2023 | 87.434.250 |
SEMENISASI JALAN BALOI KESUMA RT.OO1 RW.004 VOL. 600M2 POKMAS KUSUMA SEJAHTERA | BALOI KESUMA RT.OO1 RW.004 | LUBUK BAJA | - | PEMBANGUNAN | 2023 | 216.913.980 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN TIBAN 1 RT 2 RW 4, KEL PATAM LESTARI KEC. SEKUPANG | JALAN LINGKUNGAN TIBAN 1 RT 2 RW 4, KEL PATAM LESTARI KEC. SEKUPANG | SEKUPANG | - | PEMBANGUNAN | 2023 | 132.871.489 |
PEMBANGUNAN GEDUNG SERBA GUNA RT 02 RW 18 PERUM ARIRA GARDEN KEL. BATU BESAR KEC. NONGSA | PERUM ARIRA GARDEN KEL. BATU BESAR KEC. NONGSA RT 02 RW 18 | NONGSA | - | PEMBANGUNAN | 2023 | 154.010.723 |
SEMENISASI JALAN LINGKUNGAN RT 03 RW 023 PERUMAHAN CENDANA, KOTA BATAM KEC BATAM KOTA KEL BELIAN | PERUMAHAN CENDANA, KOTA BATAM KEC BATAM KOTA KEL BELIAN RT 03 RW 023 | BATAM KOTA | - | PEMBANGUNAN | 2023 | 153.114.414 |
SEMENISASI JALAN LINGKUNGAN PERUMAHAN MODENA, KOTA BATAM KECAMATAN BATAM KOTA KELURAHAN BELIAN | PERUMAHAN MODENA, KOTA BATAM KECAMATAN BATAM KOTA KELURAHAN BELIAN | BATAM KOTA | - | PEMBANGUNAN | 2023 | 153.086.486 |
SEMENISASI HALAMAN MASJID PERUMAHAN CIPTA LAND KEL. TIBAN INDAH KEC. SEKUPANG | PERUMAHAN CIPTA LAND KEL. TIBAN INDAH KEC. SEKUPANG | SEKUPANG | - | PEMBANGUNAN | 2023 | 162.072.072 |
PEMBANGUNAN/REHABILITASI JALAN PERUM.LEGENDA BALI BLOK RT 4 RW 13, KEL.BALOI PERMAI | JALAN PERUM.LEGENDA BALI BLOK RT 4 RW 13, KEL.BALOI PERMAI | BATAM KOTA | - | PEMBANGUNAN | 2023 | 170.259.000 |
REVITALISASI PEMBANGUNAN GPDI PEMULIHAN BIDA AYU | BIDA AYU | SEI BEDUK | - | PEMBANGUNAN | 2023 | 80.972.072 |
SEMENISASI SEI NAYON RT 05 RW 12 KOTA BATAM | SEI NAYON RT 05 RW 12 KOTA BATAM | BENGKONG | - | PEMBANGUNAN | 2023 | 161.918.018 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUM.OMA,KEL.BALOI PERMAI | PERUMAHAN OMA KEL.BALOI PERMAI | BATAM KOTA | - | PEMBANGUNAN | 2023 | 199.675.664 |
SEMENISASI GEREJA GKPI BENGKONG ABADI KOTA BATAM | BENGKONG ABADI KOTA BATAM | BENGKONG | - | PEMBANGUNAN | 2023 | 143.856.757 |
PEMBANGUNAN/REHABILITASI JALAN LINGKUNGAN PERUMAHAN JALAN MASUK PERUMAHAN AKU TAHU 2 DAN 3 | PERUMAHAN AKU TAHU 2 DAN 3 | BATAM KOTA | - | PEMBANGUNAN | 2023 | 198.820.540 |
PEMBANGUNAN PAVING BLOK RUMKITIBAN RW 05, KEL.BENGKONG LAUT, KEC.BENGKONG | RUMKITIBAN RW 05, KEL.BENGKONG LAUT, KEC.BENGKONG | BENGKONG | - | PEMBANGUNAN | 2023 | 179.227.027 |
PEMBANGUNAN GEDUNG SERBAGUNA SAKURA GARDEN RT 03 RW 04 | KELURAHAN KAMPUNG SERAYA, KECAMATAN BATU AMPAR | BATU AMPAR | - | PEMBANGUNAN | 2033 | 155.000.000 |
PEMBANGUNAN RUANG KELAS BARU SMPN 30 BATAM | Jl. BENGKONG SADAI, SADAI, KEC.BENGKONG | BENGKONG | - | PEMBANGUNAN | 2023 | 288.399.000 |
PEMBANGUNAN GEDUNG SERBAGUNA PERUMAHAN PURI GRASIA RT 06/ RW 07 | PERUMAHAN PURI GRASIA KEL.TG.RIAU | SEKUPANG | - | PEMBANGUNAN | 2023 | 15.442.171.740 |
PEMBANGUNAN GEDUNG SERBAGUNA PERUMAHAN CENDANA | JL.SUDIRMAN NO.2, BELIAN, KEC.BATAM KOTA | BATAM KOTA | - | PEMBANGUNAN | 2023 | 155.000.000 |
PEMBANGUNAN APARTEMEN GRAND BATAM MALL | JALAN PEMBANGUNAN, BATU SELICIN, KOTA BATAM | LUBUK BAJA | - | PEMBANGUNAN | 2023 | 0 |
PEMBANGUNAN RESTORAN DI KAWASAN SANCTURY GARDEN BATAM CENTRE | JL.AHMAD YANI, TLK.TERING. KCE.BATAM KOTA | BATAM KOTA | - | PEMBANGUNAN | 2023 | 0 |
PEMBANGUNAN RESTO DI KAWASAN SANCTUARY BATAM CENTRE (2 LANTAI) | JL.AHMAD YANI, TLK.TERING, KEC.BATAM KOTA | BATAM KOTA | - | PEMBANGUNAN | 2023 | 0 |
PEMBANGUNAN RUANG KELAS BARU SMP IT AL MUHAJIRIN,MEDITERANIA | PERUMAHAN TAMAN MEDITERANIA | BATAM KOTA | - | PEMBANGUNAN | 2023 | 556.592.279 |
PEMBANGUNAN GEDUNG SERBAGUNA PERUMAHAN MARINA PARK RT 03 RW 06 LUBUK BAJA | Perumahan Marina Park RT 03 RW 06 Lubuk Baja | LUBUK BAJA | - | PEMBANGUNAN | 2023 | 0 |
PEMBANGUNAN RUANG KELAS BARU SMP MUHAMMADIYAH KABIL | SMP MUHAMMADIYAH KABIL | NONGSA | - | PEMBANGUNAN | 2023 | 29.976.949.118 |
PEMBANGUNAN RUANG KELAS BARU (RKB) SMPN 62 | JL. GOLDEN PRAWN, Tanjung Buntung, Kec. Bengkong, Kota Batam | BENGKONG | - | PEMBANGUNAN | 2023 | 605.000.000 |
PSPK GEDUNG SERBAGUNA KELURAHAN BATU SELICIN | KANTOR LURAH BATU SELICIN KEC.LUBUK BAJA | LUBUK BAJA | - | PEMBANGUNAN PSPK | 2023 | 199.594.000 |
PEMBANGUNAN PROYEK GEDUNG WILAYAH TELKOM | l. Raden Patah No.12A, Lubuk Baja Kota, Kec. Lubuk Baja | LUBUK BAJA | - | PEMBANGUNAN | 2023 | 0 |
PEMBANGUNAN PERUMAHAN GOLDEN CITY RESIDENCE 2 (PT PUTRA PESISIR) | Jalan Tanjung Buntung Kecamatan Batam Kota | BENGKONG | - | PEMBANGUNAN | 2021 | 0 |
PEMBANGUNAN RUANG KELAS BARU (RKB) SMPN 60 | SMPN 60 KELURAHAN SEI LEKOP | SAGULUNG | - | PEMBANGUNAN | 2023 | 0 |
PEMBANGUNAN RUANG KELAS BARU (RKB) SMPN 16 | SMPN 16 KELURAHAN MANGSANG | SEI BEDUK | - | PEMBANGUNAN | 2023 | 61.788.860.000 |
PEMBANGUNAN RUANG KELAS BARU SMP MUHAMMADIYAH | SMP MUHAMMADIYAH KABIL KEC.NONGSA | NONGSA | - | PEMBANGUNAN | 2023 | 29.976.949.100 |
PEMBANGUNAN PERUMAHAN ORYZA HILL TIBAN | PERUMAHAN ORYZA HILL TIBAN, PATAM LESTARI | SEKUPANG | - | PEMBANGUNAN | 2023 | 0 |
PEMBANGUNAN RUANG LABORATORIUM KOMPUTER SMPN 43 | JALAN LEGENDA MALAKA , BALOI PERMAI, BATAM KOTA | BATAM KOTA | - | PEMBANGUNAN | 2023 | 480.000.000 |
PEMBANGUNAN DEEPSEA BEACH CLUB | Komplek Golden Coast Luxury Blok A No. 02 | BENGKONG | - | PEMBANGUNAN | 2023 | 0 |
PEMBANGUNAN ATLANTIS BEACH CLUB | GOLDEN CITY | BENGKONG | - | PEMBANGUNAN | 2023 | 0 |
PEMBANGUNAN PROYEK MEGAH BANGUN SEJAHTERA (RUKO SALMON) | Ruko golden city BLOK SALMON | BENGKONG | - | PEMBANGUNAN | 2023 | 0 |